tag:blogger.com,1999:blog-8693945536989916652024-03-17T22:04:09.784-05:00Go Ahead!TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comBlogger1290125tag:blogger.com,1999:blog-869394553698991665.post-62565797757713279922024-03-15T15:06:00.002-05:002024-03-15T15:06:42.397-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera
Parkway to IH-10 for eastbound direct connector bridge construction. Nightly
frontage road full closure. Only one full frontage lane closure to occur per
direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Kyle Seale Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Chase Hill Boulevard full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m. Loop
1604 and La Cantera Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Westbound mainlane full closure from the Kyle Seale Parkway exit ramp to the
Hausman Road temporary entrance ramp for overhead sign bridge installation.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Weeknights 9 p.m. until 5 a.m.
Eastbound mainlane full closure from Hausman Road exit ramp to the Kyle Seale
Parkway temporary entrance ramp for overhead sign bridge installation.
Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 18 until Monday, April 1. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, April 1. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span></li></ul><p></p>
<p class="MsoListParagraph" style="line-height: normal; margin-bottom: 6.0pt; margin-left: .25in; margin-right: 0in; margin-top: 0in; mso-add-space: auto;"><span style="mso-bookmark: _Hlk108794202;"><span style="color: #595959;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 17 until Friday, March 22. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 17 until Friday, March 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 17 until Friday, March 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 17 until Friday, March 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Thursday, March 21. Nightly 9 p.m. until 5 a.m. Westbound
mainlane full closure from the NW Military Highway exit ramp to the IH-10
interchange for rail demolition, deck breakback on the NW Military Highway
bridge, and setting overhangs and deck panels on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Thursday, March 21. Nightly 9 p.m. until 5 a.m.
NW Military Highway at Loop 1604 intersection full closure, including
turnarounds, for rail demolition and deck breakback on the NW Military Highway
bridge. Only single direction (northbound or southbound) will be closed at a time.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, March 21 until Saturday, March 23. Nightly 9 p.m. until 5 a.m.
Westbound mainlane full closure from Lockhill Selma Road to the IH-10
interchange for setting overhangs and deck panels on the direct connector.<b><span style="background: white; color: black; mso-color-alt: windowtext;"><span style="mso-tab-count: 1;"> </span></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, March 21 only. Daily. 9 a.m. until 3 p.m. Eastbound to
westbound turnaround at Stone Oak Parkway for guardrail repair. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 22, 2024 until Sunday, March 24. Nightly. 9 p.m. until 5
a.m. Eastbound mainlane full closure from the Vance Jackson exit ramp to the
Lockhill Selma Road entrance ramp for setting girders on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 22, 2024 until Sunday, March 24. Nightly. 9 p.m. until 5
a.m. IH-10 westbound exit ramp/direct connector to Loop 1604 eastbound full
closure for setting girders on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 22, 2024 until Sunday, March 24. Nightly. 9 p.m. until 5
a.m. IH-10 eastbound cloverleaf exit ramp (southwest cloverleaf) to Loop 1604
westbound full closure for setting girders on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">FULL WEEKEND CLOSURE. 9 p.m. Friday, March 22, 2024 until 5 a.m.,
Monday, March 25. Westbound mainlane full closure from the Blanco Road exit
ramp to the Bitters Road entrance ramp for re-pavement on existing lanes. The
closures will be in place for the entire duration. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 17 until Sunday, March 24.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;">Current
until Monday, March 18, 2024, long-term closure (24/7). Left lane closure on
eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway
for construction work.</span></span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 8 a.m. Full closure
on eastbound mainlanes of Loop 1604 from Union Pacific Railroad to Lookout Road
for drilled shaft work. Traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on eastbound frontage road of Loop 1604 and exit ramp closure from Lookout Road
to IKEA-RBFCU Parkway for column cap work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 connector ramps to I-35 and entrance ramp closure of
Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for bridge work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Left lane
closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
drilled shaft and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 8 a.m. Full closure
on eastbound mainlanes of Loop 1604 from Union Pacific Railroad to Lookout Road
for drilled shaft work. Traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on westbound mainlanes of Loop 1604 from I-35 to Lookout Road for equipment
movement. Traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway
Place, full closure on southbound I-35 to westbound Loop 1604 connector ramp,
and exit ramp closure to frontage road for column cap work. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Alternating
lane closures on westbound mainlanes of Loop 1604 from I-35 to Lookout Road for
drilled shaft and barrier work. </span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="mso-bookmark: _Hlk157162144;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for equipment
movement. Traffic must follow detour signs.</span></span></span></span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County</i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;"><span style="mso-bookmark: _Hlk160802590;">Sunday, March 17 until Friday, March 29. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage
road closure from Camp Bullis Road to De Zavala Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane
closure from De Zavala Road to Camp Bullis Road for portable concrete traffic
barrier installation. Nightly alternating mainlane closures. One lane to remain
open at all times. Excluding weekends.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="mso-bookmark: _Hlk160802590;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane
closure from Camp Bullis Road to De Zavala Road for portable concrete traffic
barrier installation. Nightly alternating mainlane closures. One lane to remain
open at all times. </span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Excluding weekends.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604
eastbound to IH-10 eastbound for portable concrete traffic barrier
installation. Nightly closures. Excluding weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10
westbound to Loop 1604 eastbound for portable concrete traffic barrier
installation. Nightly closures. Excluding weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from
IH-10 eastbound to Loop 1604 eastbound for bridge construction. Nightly
closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop
1604 eastbound to IH-10 westbound for bridge construction. Nightly closures.
Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, at the
Loop 1604 interchange full closure for drill shaft construction. Nightly
closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane
closure from the Loop 1604 interchange to the Camp Bullis Road exit ramp for
striping. Nightly alternating mainlane closures. One lane to remain open at all
times. Excluding weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday,
March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road
right turn lane full closure onto IH-10 eastbound frontage road for bridge
construction. Nightly closures. Excluding weekends. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage
road full closure at the IH-10 intersection for bridge construction. Excluding
weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road
full closure from the Loop 1604 interchange to UTSA Boulevard for bridge
construction. Nightly closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlanes full
closure from the La Cantera Parkway entrance ramp to the Loop 1604 Interchange
for bridge construction. Nightly closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlanes full
closure from the Loop 1604 Interchange to the La Cantera Parkway entrance ramp
for bridge construction. Nightly closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlanes
full closure at the IH-10 interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlanes
full closure at the IH-10 interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. IH-10 westbound cloverleaf
exit ramp to Loop 1604 westbound full closure for placement of steel girders. Nightly
closures.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound cloverleaf
exit ramp to IH-10 eastbound full closure for placement of steel girders.
Nightly closures. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound
collector-distributor for placement of steel girders. Nightly closures. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. IH-10 westbound exit ramp to
Loop 1604 westbound full closure for placement of steel girders. Nightly
closures. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound exit ramp
to IH-10 westbound full closure for placement of steel girders. Nightly
closures. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Monday, March 18 until Friday,
March 29. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage
road lane closure from De Zavala Road to Camp Bullis Road to set portable
concrete barrier. Daily alternating frontage road closures. One lane to remain
open at all times. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Monday, March 18 until Friday,
March 29. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage
road lane closure from Camp Bullis Road to De Zavala Road to set portable
concrete barrier. Daily alternating frontage road closures. One lane to remain
open at all times. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Monday, March 18 until Friday,
March 29. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full
closure at the IH-10 intersection for bridge construction. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;">Monday, March 18 until
Friday, March 29. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage
road full closure at the IH-10 intersection for bridge construction. Excluding
weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Monday, March 18 until
Friday, March 29. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage
road full closure from the IH-10 eastbound frontage road to the IH-10 westbound
frontage road for bridge construction. Daily closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Monday, March 18 until
Friday, March 29. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage
road full closure from the IH-10 eastbound frontage road to the IH-10 westbound
frontage road for bridge construction. Daily closures. Excluding weekends. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Monday, March 18 until
Friday, March 29. Weekdays 9 a.m. until 3 p.m. IH-10 eastbound frontage road
right turn lane full closure onto Loop 1604 westbound frontage road for
temporary pavement construction. Daily closures. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Daily/Nightly 24 hours a day. IH-10 westbound frontage road
right lane closure from the Loop 1604 interchange to the IH-10 westbound
mainlane entrance ramp for bridge construction. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk160802590;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until
Friday, March 29. Daily/Nightly 24 hours a day. Loop 1604 eastbound frontage
road left lane closure between the IH-10 eastbound frontage road and the IH-10
westbound frontage road for bridge construction.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Central San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Monday, March 18. Full
closure of the eastbound entrance ramp at Culebra Rd. for bridge joint
replacement. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 18 until Friday, March 22.
Full closure of the eastbound upper-level exit ramp to Culebra Rd. for bridge
joint replacement. Traffic will be detoured through the Colorado St. exit ramp.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar
County/Guadalupe County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through April. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use the
Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 25 until Tuesday, March 26. 9
p.m. to 5 a.m. Full closure of eastbound mainlanes from Loop 1604 to FM 1518
for paving operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, March 26 until Wednesday, March
27. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from FM 1518 to Santa
Clara Rd. for paving operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, March 27 until Thursday, March
28. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from FM 2538 to FM
1518 for paving operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, March 28 until Friday, March 29.
9 p.m. to 5 a.m. Full closure of westbound mainlanes from FM 2538 to Fm 1518 for
paving operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, March 16. The eastbound I-10 to
southbound I-410 exit ramp will be closed from 9 a.m. until 5 p.m. for overhead
sign work. Eastbound I-10 traffic to southbound I-410 will exit I-10 at W.W.
White and continue on the frontage road to access southbound I-410.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Northeast San Antonio/New
Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, April 14 until Sunday, April
28. 5 a.m. to 4 p.m. Rolling full closures of the mainlanes, in both
directions, from Rittiman Rd. to Binz Engleman Rd. for utility work. Traffic
will be stopped in 15-minute intervals throughout the day. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk113861123"><span style="mso-bookmark: _Hlk119044303;">Current until Sunday, March 31, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Sunday March 31,
2024, long-term closure (24/7). Left lane closure on northbound frontage road
of I-35 from Forum Parkway to Forum Access Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 31, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Bludau-Bishop Road to Judson Road for permanent widening and drainage work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, April
6, long-term closure (24/7). Left lane closure on northbound frontage road of
I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April
24, long term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Starlight Terrace to Weidner Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August
3, long-term closure (24/7). Left lane closure on northbound frontage road of
I-35 from Weidner Road to O'Connor Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September
8, long-term closure (24/7). Left lane closure on southbound frontage road of
I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp
closure of I-35 from Evans Road to Roy Richard Drive (FM 3009) for barrier
work. Traffic should use next available ramps.</span></a></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit
ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from
Forum Parkway to Evans Road for drainage work. Traffic should use next exit
ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for
barrier, earthworks, and bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, <a name="_Hlk161387333">March 17 until </a>Saturday, March 23, 9
p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama
Parkway to Olympia Parkway for bridge substructure work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for
bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell
Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum
Parkway for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 and entrance ramp closure from Olympia
Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for
striping, barrier, temporary pavement, and demolition works. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road, exit ramp closure of I-35 from Evans Road to
Arcadia Drive, full closure on northbound to southbound turnaround at Evans
Road and full closure on the westbound lanes on Evans Road at I-35 for
substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Corporate Drive to Evans Road and full
closure of eastbound and westbound lanes of Evans Road at I-35 for bridge
substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 to northbound I-35 connector ramp for construction work.
Traffic should follow detour signs. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on westbound I-35 collector ramp at the Loop 1604 interchange and full closure
on northbound I-35 to westbound Loop 1604 connector ramp for construction work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on northbound I-35 collector ramp at the Loop 1604 interchange for striping,
barrier, and construction entrance work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft,
columns, and caps. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 to southbound I-35 connector ramp for column cap work.
Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on
southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March. 17, until Saturday, March 23, 9 p.m. to 5 a.m. Full
closure on westbound I-35 collector ramp at the Loop 1604 interchange, full
closure on northbound I-35 to westbound Loop 1604 connector ramp, full closure
on southbound I-35 to westbound Loop 1604 connector ramp, and full closure of
northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road,
eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound
I-35 collector ramp closure at the Loop 1604 interchange for striping and
barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Alternating
ramp closures on southbound I-35 connector ramp to Pat Booker Road for
striping, barrier, and bridge substructure work. Traffic must exit Loop 1604
(exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane
closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge
substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama
Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound I-35 collector ramp at the Loop 1604 interchange for striping and
barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound
I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic
must exit at Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound I-35 connector ramps to Loop 1604 and full closure on southbound
frontage road of I-35 from Forum Parkway to Old Austin Road for striping,
barrier, temporary pavement, and demolition work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near
Shin Oak Drive to Forum Parkway for bridge work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
mainlane closures (3) on northbound I-35, multiple lanes (2) northbound
frontage road, entrance ramp closure, and alternating exit ramps closure from
Toepperwein Road to Pat Booker Road for structures work. Traffic should use
next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of I-35 Access Road bridge from I-35 northbound frontage road to I-35
southbound frontage road, near Shin Oak Drive for construction work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Alternating
lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat
Booker Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near
Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement
work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on
southbound I-35 frontage road, entrance ramp closure, and exit ramp closure
from Pat Booker Road to Toepperwein Road for structures work. Traffic should
use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell
Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of eastbound and westbound lanes of Pat Booker Road at I-35 for construction
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
mainlane closures (3) on northbound I-35, multiple lanes closure (2) northbound
frontage road, entrance ramp closure, and alternating exit ramps closure from
O’Connor Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes, multiple lane closures (2) on
northbound frontage road, and alternating exit ramps closure from Judson Road
to Toepperwein Road for structures work. Traffic should use next entrance and
exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on
southbound I-35 frontage road, entrance ramp closure, and exit ramp closure
from Toepperwein Road to Judson Road for structures work. Traffic should use
next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on
southbound I-35 frontage road, entrance ramp closure, and exit ramp closure
from Judson Road to O’Connor Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road and exit ramp of I-35 from Toepperwein Road to
Judson Road for cap form erection work. Accommodations will be made for local
traffic. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on northbound mainlanes, multiple lane closures (2) on
northbound frontage road, entrance ramp closure, and exit ramp closure of I-35
form Thousand Oaks Drive to Weidner Road for drainage and structures work.
Traffic should use the next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closure (3) on northbound mainlanes, multiple lane closures (2) on
northbound frontage road, entrance ramp closure, and exit ramp closure of I-35
from Weidner Road to O’Connor Road for drainage and structures work. Traffic
should use the next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road and entrance ramp closure of I-35 from O’Connor
Road to Tech Com Drive for cap form erection work. Accommodations will be made
for local traffic. Traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road and exit ramp closure of I-35 from Tech Com Drive
to Weidner Road for cap form erection work. Accommodations will be made for
local traffic. Traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, alternating lane closures on
southbound frontage road, entrance ramp closure, and exit ramp closure of I-35
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closure (3) on southbound mainlanes, multiple lane closures (2) on
southbound frontage road, entrance ramp closure, and exit ramp closure of I-35
from Weidner Road to Thousand Oaks Drive for drainage and structures work.
Traffic should use the next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road and northbound to southbound turnaround closure of
I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic
should follow detour signs. Accommodations will be made for local traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road, exit ramp closure, and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Randolph Boulevard for
bridge cap work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Multiple
lane closures (2) on southbound frontage road of I-35 from Whirlwind Drive to
Randolph Boulevard for construction work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic
should follow detour signs. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of northbound I-35 to westbound I-410 connector ramp and entrance ramp closure
from Randolph Boulevard for column work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of eastbound I-410 connector ramp to southbound I-35 for bridge work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Southbound
to northbound turnaround closure at Walzem Road, alternating lane closures on
northbound frontage road, and alternating entrance and exit ramp closures of
I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic
should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway,
alternating lane closures on southbound Interchange parkway from Austin Highway
(Loop 368) to Fratt Road, and full closure on Interchange Parkway from Fratt Road
and Walzem Road for utility, columns, and striping work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of Randolph Boulevard and southbound frontage road at I-35 for construction
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph
Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour
signs.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 31, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Saturday, March 23, 9 p.m. to 5 a.m. Full closure
of entrance ramp on westbound frontage road and exit ramp of I-410 to Austin
Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio/Bexar County <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Saturday, March 16. The southbound I-410 exit ramp to E. Houston St.
will be closed from 9 a.m. to 5 p.m for overhead sign work. Detour: Southbound
I-410 traffic to E. Houston may exit at Rigsby and turn around to access
northbound I-410 frontage road back to E. Houston.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Tuesday, March 19. 8 p.m. to 5 a.m. Alternating
lane closures, in both directions, from N.W. Military Highway to West Ave. for
milling and paving operations. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 31. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
construction work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 31. 8 p.m. to 5 a.m. Alternating mainlane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
paving operations.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 22. 7 a.m. to 6 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Huebner Rd. for curb and
sidewalk construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk139029066;"></span><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Thursday, March 28. 8:30 p.m. to 5 a.m. Alternating
mainlane closures, in both directions, from Loop 410 to W. Military Dr. for
asphalt operations. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, March 18 until Wednesday, March 20. 9 a.m. to 3 p.m. Single
eastbound mainlane closure from Callaghan Rd. to W. Military Dr. for bridge
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Thursday, March 21. 8:30 p.m. to 5 a.m.
Alternating mainlane closures, in both directions, from I-35 to Loop 410 for
guard rail repairs.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SL 368 – Broadway <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Monday, March 18. 9 p.m. to 5 a.m. Alternating
lane closures, in both directions, from Pershing Ave. to Cunningham Ave. for
barrier installation. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, March 18 until Sunday, March 24. Single lane closures, in both
directions, from Pershing Ave. to Cunningham Ave. for bus pad installations.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1516 – Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Monday, March 25. 9 a.m. to 5 p.m. Single northbound lane
closure from Key Windy Way to Hayes Parc Rd. for utility work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – South Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, March 18 until Friday, March 22. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Circle A Trail for curb and
sidewalk construction.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Guadalupe County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Friday, March 22. 9 p.m. to 5 a.m. Alternating
mainlane closures from SH 123 to FM 464 for asphalt operations.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1103 – Comal and Guadalupe Counties <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, March 18 until Friday, March 22. 8 a.m. to 4 p.m. Alternating
lane closures from Orth Ave. and Cibolo Heights for paving operations.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 2252 – Nacogdoches Rd. <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in; text-align: left;"><span style="font-family: arial; font-size: small;">Saturday, March 23. 7 a.m. to 7 p.m. Full closure at Marbach Lane for
drainage work.</span></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-36734887937900725142024-03-01T17:05:00.006-06:002024-03-01T17:05:39.914-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera
Parkway to IH-10 for eastbound direct connector bridge construction. Nightly
frontage road full closure. Only one full frontage lane closure to occur per
direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Kyle Seale Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Chase Hill Boulevard full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Weeknights 9 p.m. until 5 a.m. Loop
1604 and La Cantera Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 11. Weeknights 9 p.m. until 5 a.m.
Westbound mainlane full closure from the Kyle Seale Parkway exit ramp to the
Hausman Road temporary entrance ramp for overhead sign bridge installation.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 11. Weeknights 9 p.m. until 5 a.m.
Eastbound mainlane full closure from Hausman Road exit ramp to the Kyle Seale
Parkway temporary entrance ramp for overhead sign bridge installation.
Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Monday, March 18. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Monday, March 18. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, March 7 (24/7). Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for bridge
demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, March 7, (24/7). Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for bridge
demolition work. Traffic should use Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Tuesday, March 19, long-term (24/7). Left lane closure on
eastbound frontage road on Loop 1604 for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on eastbound mainlanes of Loop 1604 from Nacogdoches Road to Union Pacific
Railroad for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 to northbound I-35 connector ramp for construction work.
Traffic should follow detour signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 to southbound I-35 connector ramp for column cap work.
Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on
southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on eastbound frontage road of Loop 1604 and exit ramp closure from Lookout Road
to IKEA-RBFCU Parkway for column cap work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway
Place, full closure on southbound I-35 to westbound Loop 1604 connector ramp,
and exit ramp closure to frontage road for column cap work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on westbound I-35 collector ramp at the Loop 1604 interchange and full closure
on northbound I-35 to westbound Loop 1604 connector ramp for construction work.
Traffic should follow detour signs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 3 until Friday, March 8. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 3 until Friday, March 8. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 3 until Friday, March 8. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 3 until Friday, March 8. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Wednesday, March 6. Nightly. 10 p.m. until 5 a.m.
Blanco Road southbound lane full closure from the Loop 1604 eastbound frontage
road to Talavera Parkway for SAWS waterline work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m.
Westbound mainlane full closure from Lockhill Selma Road to the IH-10
interchange for setting overhangs and deck panels on the westbound
direct-connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 from 9 a.m. until 3 p.m. Alternating Sonterra Place
northbound lane closures at the Loop 1604 westbound frontage road for CPS gas
work. Only one single direction will be closed at a time. Off-duty officers
will direct traffic to/from Sonterra Place.<span style="mso-spacerun: yes;">
</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 from 9 a.m. until 3 p.m. Alternating Sonterra Place
southbound lane closures at the Loop 1604 westbound frontage road for CPS gas
work. Only one single direction will be closed at a time. Off-duty officers
will direct traffic to/from Sonterra Place.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, March 3 until Sunday, March 10.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 8 at 9 p.m. until Saturday at 5 a.m. Nightly. Westbound
mainlane full closure from Lockhill Selma Road to the IH-10 interchange for
deck pour on the westbound direct-connector.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, March 3 until Friday,
March 15. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for
drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to
the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound frontage road full closure at the IH-10 intersection for
bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road full closure from the Loop 1604 interchange to
UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound mainlanes full closure from the La Cantera Parkway entrance
ramp to the Loop 1604 Interchange for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to the La
Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m. IH-10
westbound cloverleaf exit ramp to Loop 1604 westbound full closure for
placement of steel girders. Nightly closures.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound cloverleaf exit ramp to IH-10 eastbound full closure for
placement of steel girders. Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound collector-distributor for placement of steel girders.
Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound exit ramp to Loop 1604 westbound full closure for placement of
steel girders. Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound exit ramp to IH-10 westbound full closure for placement of
steel girders. Nightly closures. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to
Camp Bullis Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure at the IH-10 intersection for
bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure at the IH-10 intersection for
bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m. Loop
1604 eastbound frontage road full closure from the IH-10 eastbound frontage
road to the IH-10 westbound frontage road for bridge construction. Daily
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Friday, March 15. Weekdays 9 a.m. until 3 p.m.
IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 15. Daily/Nightly 24 hours a day.
IH-10 westbound frontage road right lane closure from the Loop 1604 interchange
to the IH-10 westbound mainlane entrance ramp for bridge construction. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, March 1 at 9 p.m. until Monday, March 4 at 5 a.m. Weekend Full
Closure. Loop 1604 westbound mainlanes at the IH-10 interchange full closure
for placement of steel girders. Lane closures to remain in place for the entire
duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, March 1 at 9 p.m. until Monday, March 4 at 5 a.m. Weekend Full
Closure. Loop 1604 eastbound mainlanes at the IH-10 interchange full closure
for placement of steel girders. Lane closures to remain in place for the entire
duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, March 1 at 9 p.m. until Monday, March 4 at 5 a.m. Weekend Full
Closure. Loop 1604 westbound cloverleaf exit ramp to IH-10 eastbound full
closure for placement of steel girders. Lane closures to remain in place for
the entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, March 1 at 9 p.m. until Monday, March 4 at 5 a.m. Weekend Full
Closure. IH-10 eastbound collector-distributor full closure for placement of
steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, March 1 at 9 p.m. until Monday, March 4 at 5 a.m. Weekend Full
Closure. IH-10 eastbound cloverleaf exit ramp to Loop 1604 eastbound full
closure for placement of steel girders. Lane closures to remain in place for
the entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Central San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 10. Westbound
exit ramp to Culebra Ave. closed for repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, March 5 until Friday, March 8. 8
a.m. to 5 p.m. Eastbound entrance ramp at Fredericksburg Rd. closed for bridge joint
replacement. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Wednesday, March 6. 8
a.m. to 5 p.m. Eastbound exit ramp to Colorado St. closed for maintenance operations.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through April. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use the
Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 8, 7 p.m. until Monday, March
11, 5 a.m. Full closure of the Pfeil Rd. underpass at Loop 1604 for bridge
demolition. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 through Tuesday, March 5.
FULL CLOSURE. Eastbound I-10 mainlanes closed from 9:00 p.m. Monday, March 4,
until 5:00 a.m. Tuesday, March 5, for striping work. Detour: Eastbound I-10
mainlane traffic will exit at Loop 1604, continue on the eastbound frontage
road, and use the entrance ramp between Scenic Lake and Graytown Road to
re-enter the eastbound mainlanes.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Continuing through April. The westbound
I-10 entrance ramp from Ackerman closed. Detour: Westbound I-10 frontage road
traffic to westbound I-10 mainlanes may turn around at Ackerman, continue on
the eastbound frontage road, and use the Foster turnaround to access the
westbound I-10 entrance ramp at Foster. (Traffic wanting to access southbound
I-410 can continue on frontage road, turn around at FM 78, and enter southbound
I-410.) </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Continuing through Monday, March 4. NIGHTLY
CLOSURE. The ramp from eastbound I-10 to southbound I-410 and the southbound I-410
collector distributor will be closed for pavement work nightly from 9 p.m.
until 5 a.m., Monday, February 26, until Monday, March 4. Detour: Southbound
I-410 traffic will exit at W.W. White and continue on the frontage road until
the next southbound I-410 entrance ramp at E. Houston St.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 29 through Friday, March
8. The left eastbound frontage lane at Loop 1604 will be closed until
approximately 5 a.m. Monday, March 4, for culvert installation. The closure
will shift to the right eastbound frontage lane through 4 p.m. Friday, March 8.
The southbound Loop 1604 dedicated left turn lane onto the eastbound I-10
frontage road will also be closed through 4 p.m. Friday, March 8.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 28 through Thursday,
March 7. The dedicated right turn lane and the adjacent through lane on the
westbound exit ramp to LP 1604 will be closed for pavement work from 5 a.m.
Wednesday, February 28, until 4 p.m. Thursday, March 7.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, March 7 through Friday, March 8.
FULL CLOSURE. Eastbound I-10 mainlanes closed from 9:00 p.m. Thursday, March 7,
until 5:00 a.m. Friday, March 8, for striping work. Detour: Eastbound I-10
mainlane traffic will exit at Loop 1604, continue on the eastbound frontage
road, and use the entrance ramp between Scenic Lake and Graytown Road to
re-enter the eastbound mainlanes.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, March 12 through Wednesday, March
13. The left northbound lane of Loop 1604 will be closed between eastbound I-10
frontage road and westbound I-10 frontage road from 9 p.m. Tuesday, March 12,
until 5 a.m. Wednesday, March 13, for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 1 until Saturday, March 2. 9
p.m. to 5 a.m. Full closure of the westbound frontage road from Santa Clara to
FM 465 for concrete work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Northeast San Antonio/New
Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, March 23, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, April 6, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April 24, long term closure (24/7). Left lane
closure on southbound frontage road of I-35 from Forum Parkway to Old Austin
Road for bridge and roadway work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Tuesday, May 7, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson
Road for permanent widening and drainage work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20, long-term closure (24/7). Alternating
lane closures on southbound I-35 frontage road between Thousand Oaks Drive and
Whirlwind Drive for roadway reconstruction and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Starlight Terrace to Weidner
Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August 3, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road
for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp
closure of I-35 from Evans Road to Roy Richard Drive (FM 3009) for barrier
work. Traffic should use next available ramps.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk160182591">Sunday, March 3 until
Saturday, March 9. 9 p.m. to 5 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for
bridge structure work. Traffic should use next entrance and exit ramps.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum
Parkway to Evans Road for drainage work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for
barrier, earthworks, and bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for
bridge substructure work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for
bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Corporate Drive to Evans Road and full
closure of eastbound and westbound lanes of Evans Road for bridge substructure
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for
striping, barrier, temporary pavement, and demolition works. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell Road
for bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum
Parkway for bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road of I-35 and entrance ramp closure from Olympia
Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft,
columns, and caps. Traffic should follow detour signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on northbound I-35 collector ramp at the Loop 1604 interchange for striping,
barrier, and construction entrance work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound I-35 connector ramps to Loop 1604 and full closure on southbound
frontage road of I-35 from Forum Parkway to Old Austin Road for striping,
barrier, temporary pavement, and demolition works. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane
closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge
substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama
Parkway and follow the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound I-35 collector ramp at the Loop 1604 interchange for striping and
barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound
I-35 and follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic
must exit at Lookout Road and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on westbound I-35 collector ramp at the Loop 1604 interchange, full closure on
northbound I-35 to eastbound Loop 1604 connector ramp, full closure on
southbound I-35 to westbound Loop 1604 connector ramp, and full closure of
northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for
construction work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple mainlane
closures (3) on northbound I-35, entrance ramp closure, and alternating exit
ramps closure from Judson Road to Shin Oak Drive for structures work. Traffic
should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
of I-35 Access Road bridge from I-35 northbound frontage road to I-35
southbound frontage road, near Shin Oak Drive for construction work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin
Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road and exit ramp of I-35 from Toepperwein Road to
Judson Road for cap form erection work. Accommodations will be made for local
traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Alternating
ramp closures on southbound I-35 connector ramp to Pat Booker Road for
striping, barrier, and bridge substructure work. Traffic must exit Loop 1604
(exit 172) and follow the detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
of eastbound and westbound lanes of Pat Booker Road at I-35 for construction
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on northbound frontage road and exit ramp of I-35 from Judson Road to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Northbound frontage road of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp
closure from Pat Booker Road to Judson Road for structures work. Traffic should
use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp
closure, and multiple lane closures (2) on southbound frontage road of I-35
from Judson Road to O’Connor Road for striping, barrier, and paving work.
Traffic should use next entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (2) on northbound frontage road, alternating entrance ramp closures,
and alternating exit ramp closure of I-35 from Weidner Road to Judson Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on northbound mainlanes, multiple lane closures (2) on northbound
frontage road, entrance ramp closure, and exit ramp closure of I-35 form
Thousand Oaks Drive to Weidner Road for drainage and structures work. Traffic
should use the next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (2) on northbound frontage road, alternating entrance ramp closures,
and alternating exit ramp closure of I-35 from Weidner Road to Judson Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on northbound mainlanes, multiple lane closures (2) on northbound
frontage road, entrance ramp closure, and exit ramp closure of I-35 form
Thousand Oaks Drive to Weidner Road for drainage and structures work. Traffic
should use the next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road and entrance ramp closure of I-35 from O’Connor
Road to Tech Com Drive for column and column cap work. Accommodations will be
made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes, alternating lane closures on
southbound frontage road, entrance ramp closure, and exit ramp closure of I-35
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closure (3) on southbound mainlanes, multiple lane closures (2) on southbound
frontage road, entrance ramp closure, and exit ramp closure of I-35 from
Weidner Road to Thousand Oaks Drive for drainage and structures work. Traffic
should use the next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Multiple lane
closures (3) on southbound mainlanes, alternating entrance ramp closure, exit
ramp closure, southbound to northbound turnaround and alternating lane closures
on southbound frontage road of I-35 from O’Connor Road to Thousand Oaks Drive
for drainage and structures work. Traffic should use the next exit and entrance
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road, exit ramp closure, and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Randolph Boulevard for
bridge cap work.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk160183815">Sunday, March 3 until
Saturday, March 9. 9 p.m. to 7 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Full
closure of Randolph Boulevard and southbound frontage road at I-35 for
construction work. Traffic should follow detour signs.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Left lane
closure southbound frontage road of I-35 to Randolph Boulevard for construction
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph
Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
on southbound frontage road and northbound to southbound turnaround closure of I-35
from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should
follow detour signs. Accommodations will be made for local traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic
should follow detour signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
of northbound I-35 to westbound I-410 connector ramp and entrance ramp closure
from Randolph Boulevard for column work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
of eastbound I-410 connector ramp to southbound I-35 for bridge work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Southbound to
northbound turnaround closure at Walzem Road, alternating lane closures on
northbound frontage road, and alternating entrance and exit ramp closures of
I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic
should follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Saturday, March 9. 9 p.m. to 7 a.m. Full closure
on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway,
alternating lane closures on southbound Interchange parkway from Austin Highway
(Loop 368) to Fratt Road, and full closure on Interchange Parkway from Fratt
Road and Walzem Road for utility, columns, and striping work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, March 8 until Saturday, March 9. 9 p.m. to 5 a.m. Full closure
on southbound frontage road, exit ramp closure of I-35 from Evans Road to
Arcadia. Along with a full closure on northbound to southbound turnaround at
Evans Road and a full closure on the westbound lanes on Evans Road for
substructure work. Traffic should follow detour signs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March
9, long-term closure (24/7). Left lane closure on westbound frontage road of
I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until
Saturday, March 9. 9 p.m. to 7 a.m. Alternating lane closures on eastbound
frontage road of I-410, entrance ramp closure, and right mainlane closure from
Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until
Saturday, March 9. 9 p.m. to 7 a.m. Full closure of entrance ramp on westbound
frontage road and exit ramp of I-410 to Austin Highway (Loop 368) for barrier
work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current through Monday, March 4. The dedicated right turn lane from
Rigsby Ave. to I-410 NBFR will be closed from 8 p.m. Monday, February 26 until
5 a.m. Monday, March 4, for wall work. Traffic can turn right onto I-410 NBFR
at the intersection.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Friday, March 8. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Circle A Trail for curb and
sidewalk construction.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, March 17 until Tuesday, March 19. 8 p.m. to 5 a.m. Alternating
lane closures, in both directions, from N.W. Military Highway to West Ave. for
milling and paving operations. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, March 31. 9 a.m. to 3 p.m. Alternating lane closures,
in both directions, from N.W. Military Highway to Weidner Rd. for construction
work.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8. 7 a.m. to 6 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Huebner Rd. for sidewalk and
curb construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk139029066;"></span><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, March 15. 9 a.m. to 3 p.m. Single lane closure on
the eastbound frontage road from W. Military to Loop 410 for pole removals.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, March 4 until Wednesday, March 6. 9 a.m. to 3 p.m. Single
westbound mainlane closure from Callaghan Rd. to W. Military Dr. for bridge
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Thursday, March 7. 8:30 p.m. to 5 a.m. Single lane
closures, in both directions, from Loop 410 to I-35 for guard rail repairs. </span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Thursday, March 7. 9 p.m. to 5 a.m. Full closure
of the frontage road, in both directions, from W. Military Dr. to SH 16 for
mill and overlay operations. </span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Thursday, March 7. 9 p.m. to 5 a.m. Full closure
of the frontage road, in both directions, from Loop 410 to W. Military Dr. for
mill and overlay operations.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SL 368 – Broadway <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, March 3 until Friday, March 8. 9 p.m. to 5 a.m. Alternating lane
closures, in both directions, from Pershing Ave. to Cunningham Ave. for
concrete and barrier work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 2252 – Nacogdoches Road<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, March 5. 9 a.m. to 4 p.m. Single northbound lane closure at
Naco Pass for utility work. </span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-26413557910742365062024-02-16T15:18:00.002-06:002024-02-16T15:18:14.591-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Chase Hill Boulevard full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 18 until Friday, February 23. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 18 until Friday, February 23. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 18 until Friday, February 23. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 18 until Friday, February 23. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Saturday, February 24. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound entrance ramp closure from NW Military Highway (FM
1535) for bridge substructure work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22 at 9 p.m. until Friday, February 23 at 5 a.m.
Nightly. Westbound mainlane full closure from the Lockhill Selma Road exit ramp
to the IH-10 interchange to perform deck pour on the westbound direct
connector. <span style="mso-spacerun: yes;"> </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22 until Friday, February 23. Nightly 9 p.m. until 5
a.m. Vance Jackson Road northbound mainlane full closure on the bridge over
Loop 1604 to perform deck pour on the westbound direct connector.<span style="mso-spacerun: yes;"> </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22 until Friday, February 23. Nightly 9 p.m. until 5
a.m. Vance Jackson Road southbound mainlane full closure on the bridge over
Loop 1604 to perform deck pour on the westbound direct connector.<span style="mso-spacerun: yes;"> </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 18 until Sunday, February 25.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 23 at 9 p.m. until Saturday, February 24 at 12 p.m.
Weekend Only. Loop 1604 eastbound mainlane full closure from the Bitters Road
exit ramp to the Bitters Road entrance ramp for deck pour at Salado Creek.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk157162144"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 22, (24/7).
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union
Pacific Railroad for bridge demolition work. Traffic should use Lookout Road
intersection.</span></span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9
p.m. to 5 a.m. Full closure on eastbound frontage road of Loop 1604 and exit
ramp closure from Lookout Road to IKEA-RBFCU Parkway for column cap work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9
p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 from
Gateway Boulevard to Gateway Place, full closure on southbound I-35 to
westbound Loop 1604 connector ramp, and exit ramp closure to frontage road for
column cap work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="line-height: 107%;">Thursday February 22, until March 3, long-term
(24/7). Westbound to eastbound Loop 1604 turnaround closure from Lookout Road
to Union Pacific Railroad for bridge demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 281 – North San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, February 17.
Southbound HOV lane closure from Cibolo Creek to Evans Rd. for illumination
work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 18 until Friday,
March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange to
UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 westbound cloverleaf exit ramp to Loop 1604 westbound full closure
for placement of steel girders. Nightly closures.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound cloverleaf exit ramp to IH-10 eastbound full closure for
placement of steel girders. Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound collector-distributor for placement of steel girders.
Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. IH-10 westbound exit ramp to Loop 1604 westbound full closure for
placement of steel girders. Nightly closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound exit ramp to IH-10 westbound full closure for
placement of steel girders. Nightly closures. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to
Camp Bullis Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure at the IH-10 intersection for
bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure at the IH-10 intersection for
bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m.
IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. IH-10 westbound cloverleaf exit ramp to Loop 1604
westbound full closure for placement of steel girders. Lane closures to remain
in place for the entire duration. Off-duty officers will direct traffic thru
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound cloverleaf exit ramp to IH-10 eastbound full closure for placement of
steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound frontage road full closure at the IH-10 interchange for placement of
steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>IH-10 eastbound
frontage road full closure between the Loop 1604 eastbound and westbound for
placement of steel girders. Lane closures to remain in place for the entire
duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound collector-distributor for placement of steel girders. Lane closures
to remain in place for the entire duration. Off-duty officers will direct
traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>IH-10 westbound
exit ramp to Loop 1604 westbound full closure for placement of steel girders. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604 westbound
right lane closure for placement of steel girders. Lane closures to remain in
place for the entire duration. Off-duty officers will direct traffic thru
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure.<span style="mso-spacerun: yes;"> </span>Loop 1604
westbound exit ramp to IH-10 westbound full closure for placement of steel
girders. Lane closures to remain in place for the entire duration. Off-duty
officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 23 at 9 p.m. until Monday, February 26 at 5 a.m.
Weekend Full Closure. Loop 1604 westbound exit ramp to IH-10 westbound full
closure for placement of steel girders. Lane closures to remain in place for
the entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Central San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Friday, February
23. 8 a.m. to 5 p.m. Single lane closure on the eastbound frontage road from
Fredericksburg Rd. to Cincinnati Ave. for maintenance. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8. 9 p.m. to 5
a.m. Westbound exit ramp to Culebra Ave. closed for repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 23. 9 p.m.
to 5 a.m. Westbound turnaround closed at Fulton Ave. for maintenance.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through April. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use the
Foster turnaround to access the westbound I-10 entrance ramp at Foster.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Northeast San Antonio/New
Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk113861123"><span style="mso-bookmark: _Hlk119044303;">Current until Thursday, February 29, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Bludau-Bishop Road to Judson Road for permanent widening and drainage work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, March 25, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April 24, long
term closure (24/7). Left lane closure on southbound frontage road of I-35 from
Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20, long-term
closure (24/7). Alternating lane closures on southbound I-35 frontage road
between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and
structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Starlight Terrace to Weidner Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August 3,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Weidner Road to O'Connor Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></a></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Wednesday, February 21. 9 p.m. to 5 a.m. Full
closure on northbound mainlanes and entrance ramp closure of I-35 from Weidner
Road to O’Connor Road for overhead sign removal. Traffic should use next
entrance ramp.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk158979826">Sunday, February 18 until Saturday,
February 24. 9 p.m. to 5 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive (FM
3009) for barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for
bridge structure work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway
to Forum Parkway for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway
to Ferrell Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Forum Parkway to Gateway
Boulevard for striping, barrier, temporary pavement, and demolition work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on northbound frontage road of I-35 from Forum Parkway to Forum Access
Road for barrier, earthworks, and bridge work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 to northbound I-35 connector ramp for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on westbound I-35 collector ramp at the Loop 1604 interchange and full
closure on northbound I-35 to eastbound Loop 1604 connector ramp for striping
and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled
shaft, columns, and caps. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 to southbound I-35 connector ramp for column cap
work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 collector ramp at I-35 interchange and full
closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound I-35 connector ramps to Loop 1604 and full closure on
southbound frontage road of I-35 from Forum Parkway to Old Austin Road for
striping, barrier, temporary pavement, and demolition work. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Alternating lane closures on northbound frontage road of I-35 from Sandpiper
Drive to Pat Booker Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and entrance ramp of I-35 from Shin Oak
Drive to Toepperwein Road for cap form erection work. Accommodations will be
made for local traffic. Southbound frontage road of I-35 traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road,
eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound
I-35 collector ramp closure at the Loop 1604 interchange for striping and
barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple
lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit
ramp closure from Pat Booker Road to Judson Road for structures work. Traffic
should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on northbound frontage road and exit ramp of I-35 from Judson Road to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Northbound frontage road of I-35 traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of eastbound and westbound lanes of Toepperwein Road at I-35 for column
cap form work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple mainlane closures (3) on northbound I-35, entrance ramp closure, and
alternating exit ramps closure from Judson Road to Shin Oak Drive for
structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road
to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
exit ramp closure, and multiple lane closures (2) on southbound frontage road
of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving
work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk158980109">Sunday, February 18 until Saturday,
February 24. 9 p.m. to 5 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">. Multiple lane closures (2) on northbound frontage road, alternating
entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to
Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour
signs to the available ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for drainage and structures work.
Traffic should use the next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane
closures on southbound frontage road, entrance ramp closure, and exit ramp
closure of I-35 from O’Connor Road to Weidner Road for drainage and barrier
work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Left
lane closure southbound frontage road of I-35 to Randolph Boulevard for
drainage work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of Randolph Boulevard and southbound frontage road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and northbound to southbound turnaround
closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work.
Traffic should follow detour signs. Accommodations will be made for local
traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from
Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of northbound I-35 to westbound I-410 connector ramp for drilling work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure of northbound I-35 to westbound I-410 connector ramp and entrance ramp
closure from Randolph Boulevard for column work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work.
Traffic should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full
closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway and
full closure on Interchange Parkway from Fratt Road and Walzem Road for utility
work. Traffic should follow signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Monday, February 19. 12 p.m. to 12 a.m. Right lane closure on southbound
frontage road of I-35 from Evans Road to Retama Parkway for cap staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Monday, February 19. 9 p.m. to 5 a.m. Multiple lane closures (2) on
southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap
setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Monday, February 19. 9 p.m. to 5 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for cap setting. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk158980618">Tuesday, February 20. 8 p.m. to 6 a.m.</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"> Multiple lane closures (2) on southbound mainlanes of I-35 from Old
Austin Road to Forum Parkway for beam setting.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 20. 8 p.m. to 6 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for beam setting. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 20. 12 p.m. to 12 a.m. Right lane closure on
southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and
rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to
Pat Booker Road for beam staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 21. 12 p.m. to 12 a.m. Right lane closure on
southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and
rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to
Pat Booker Road for beam staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 21. 8 p.m. to 6 a.m. Multiple lane closures (2) on
southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for beam
setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 21. 8 p.m. to 6 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for beam setting. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22. 12 p.m. to 12 a.m. Right lane closure on
southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and
rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to
Pat Booker Road for beam staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22. 9 p.m. to 5 a.m. Multiple lane closures (2) on
southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for beam
setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Thursday, February 22. 9 p.m. to 5 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for beam setting. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Friday, February 23. 12 p.m. to 12 a.m. Right lane closure on southbound
frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures
on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for
beam staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Friday, February 23. 9 p.m. to 5 p.m. Right lane closure on southbound
mainlanes of I-35 from Loop 1604 to Pat Booker Road for beam setting.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">Friday, February 23, 9 p.m. to 5 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for barrier work. Traffic should follow
detour signs.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure
of entrance ramp on westbound frontage road and exit ramp of I-410 to Austin
Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Friday, February 23. 8 a.m. to 5 p.m.
Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail
for curb and sidewalk construction.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 29. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
roadway improvements. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Monday, February 19. Full closure of the entrance to
McAllister Park at Buckhorn Rd.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk139029066;"></span><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Saturday, February 17. 5 a.m. to 8 p.m. Full closure of the mainlanes,
in both directions, at Wiseman Blvd. for bridge work.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, February 18 until Thursday, February 22. 8:30 p.m. to 5 a.m.
Alternating mainlane closures, in both directions, from Loop 410 to I-35 for
guard rail repairs.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SL 368 – Broadway <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, February 18. 9 p.m. to 5 a.m. Right and center southbound lane
closures from Burr Rd. to Hildebrand Ave. for bus pad construction. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, February 19. 9 a.m. to 4 p.m. Right and center southbound lane
closures from Burr Rd. to Hildebrand Ave. for barrier installation. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, February 19 until Sunday, February 25. Single southbound lane
closure from Burr Rd. to Hildebrand Ave. For bus pad construction. </span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-7805962015600181932024-02-09T15:17:00.002-06:002024-02-09T15:17:27.103-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Monday, February 19. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 11 until Monday, February 19. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 11 until Friday, February 16. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 12 a.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 11 until Friday, February 16. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 11 until Friday, February 16. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 11 until Friday, February 16. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 at 9 p.m. until Tuesday, February 13 at 5 a.m.
Eastbound to Westbound turnaround at Blanco Road will be fully closed to pull
wire for illumination. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 at 9 p.m. until Tuesday, February 13 at 5 a.m.
Westbound mainlane full closure from the Lockhill Selma Road exit ramp to the
IH-10 interchange for setting girders on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 at 9 p.m. until Tuesday, February 13 at 5 a.m.
Eastbound mainlane full closure from the Blanco Road exit ramp to the Stone Oak
Parkway entrance ramp to pull wire for illumination. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 14 until Saturday, February 17. Nightly 9 p.m. until
5 a.m. Westbound mainlane full closure from the Lockhill Selma Road exit ramp
to the IH-10 interchange to set precast caps on the direct connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Thursday, February 15. Nightly 9 p.m. until 5
a.m. Eastbound mainlane full closure from the Vance Jackson Road exit ramp to
the Lockhill Selma Road entrance ramp for steel girders on eastbound direct
connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Thursday, February 15. Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlane exit ramp/direct connector full closure to Loop
1604 eastbound mainlane for steel girders on eastbound direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Thursday, February 15. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlane cloverleaf exit (southwest cloverleaf) full
closure to Loop 1604 eastbound for steel girders on eastbound direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 13 only. Daily 9 a.m. until 3 p.m. Blanco Road northbound
right lane closure at Talavera Parkway for CPS gas tie-in.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 11 until Sunday, February 18.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk157162144"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until
Saturday, February 17. 9 p.m. to 5 a.m. Full closure on eastbound frontage road
of Loop 1604 and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway for
column cap work. Traffic should follow detour signs.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until
Saturday, February 17. 9:00 p.m. to 5 a.m. Full closure on westbound frontage
road of Loop 1604 from Gateway Boulevard to Gateway Place, full closure on
southbound I-35 to westbound Loop 1604 connector ramp, and exit ramp closure to
frontage road for column cap work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until
Thursday, February 22 long-term (24/7). Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for bridge
demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;">Thursday, February 22 until
Sunday, March 3, long-term (24/7). Eastbound to westbound Loop 1604 turnaround
closure from Nacogdoches Road to Union Pacific Railroad for bridge demolition
work. Traffic should use Lookout Road intersection. </span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, February 10. 8 a.m. to 1 p.m.
Turnaround closures, in both directions, at FM 471 for bridge work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 281 – North San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Saturday, February
17. Southbound HOV lane closure from Cibolo Creek to Evans Rd. for illumination
work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 11 until Friday,
February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange to
UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. IH-10 eastbound cloverleaf exit ramp to Loop 1604
westbound full closure for placement of steel girders. Lane closures to remain
in place for the entire duration. Off-duty officers will direct traffic thru
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound cloverleaf exit ramp to IH-10 westbound full closure for placement of
steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound frontage road full closure at the IH-10 interchange for placement of
steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>IH-10 eastbound
frontage road full closure between the Loop 1604 eastbound and westbound for placement
of steel girders. Lane closures to remain in place for the entire duration.
Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604
westbound collector distributor for placement of steel girders. Lane closures
to remain in place for the entire duration. Off-duty officers will direct
traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Full Closure. <span style="mso-spacerun: yes;"> </span>IH-10 westbound
exit ramp to Loop 1604 westbound full closure for placement of steel girders. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m.
Weekend Closure. <span style="mso-spacerun: yes;"> </span>Loop 1604 westbound
right lane closure for placement of steel girders. Lane closures to remain in
place for the entire duration. Off-duty officers will direct traffic thru
intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through April. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use
the Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, February 15. 9
p.m. to 5 a.m. Single westbound mainlane closure from Loop 1604 to FM 1516 for
pavement operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Tuesday, February
13. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from Loop 1604 to
FM 2538 for pavement operations.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Current until Friday, February 16.
9 p.m. to 5 a.m. Alternating southbound mainlane closures from St. Mary’s St.
to San Pedro Ave. for maintenance operations.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Northeast San Antonio/New
Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk113861123"><span style="mso-bookmark: _Hlk119044303;">Current through Monday, February 12, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 29,
long-term closure (24/7). Left lane closure on southbound I-35 frontage road
between Toepperwein Road and Judson Road for retaining wall, drilled shaft,
column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Bludau-Bishop Road to Judson Road for permanent widening and drainage work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April 24, long
term closure (24/7). Left lane closure on southbound frontage road of I-35 from
Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20, long-term
closure (24/7). Alternating lane closures on southbound I-35 frontage road
between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and
structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4, long-term
closure (24/7). Left lane closure on northbound frontage road of I-35 from
Starlight Terrace to Weidner Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August 3,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Weidner Road to O'Connor Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></a></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk158375952">Sunday, February 11 until Saturday,
February 17. 9 p.m. to 5 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive (FM
3009) for barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for
bridge structure work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound I-35 connector ramps to Loop 1604 and full closure on
southbound frontage road of I-35 from Forum Parkway to Old Austin Road for
striping, barrier, temporary pavement, and demolition works. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Forum Parkway to Gateway
Boulevard for striping, barrier, temporary pavement, and demolition works.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway
to Forum Parkway for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway
to Ferrell Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled
shaft, columns, and caps. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 to northbound I-35 connector ramp for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on westbound I-35 collector ramp at the Loop 1604 interchange and full
closure on northbound I-35 to eastbound Loop 1604 connector ramp for striping
and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 to southbound I-35 connector ramp for column cap
work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on eastbound Loop 1604 collector ramp at I-35 interchange and full
closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway
for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple mainlane closures (3) on northbound I-35, entrance ramp closure, and
alternating exit ramps closure from Judson Road to Shin Oak Drive for
structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Alternating lane closures on northbound frontage road of I-35 from Sandpiper
Drive to Pat Booker Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35
southbound frontage road, near Shin Oak Drive for construction work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and entrance ramp of I-35 from Shin Oak
Drive to Toepperwein Road for cap form erection work. Accommodations will be
made for local traffic. Southbound frontage road of I-35 traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road,
eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound
I-35 collector ramp closure at the Loop 1604 interchange for striping and
barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on northbound frontage road and exit ramp of I-35 from Judson Road to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Northbound frontage road of I-35 traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of eastbound and westbound lanes of Toepperwein Road at I-35 for column
cap form work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road
to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
exit ramp closure, and multiple lane closures (2) on southbound frontage road
of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving
work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for drainage and structures work.
Traffic should use the next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane
closures on southbound frontage road, entrance ramp closure, and exit ramp
closure of I-35 from O’Connor Road to Weidner Road for drainage and barrier
work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road and northbound to southbound turnaround
closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work.
Traffic should follow detour signs. Accommodations will be made for local
traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of northbound I-35 to westbound I-410 connector ramp and on ramp
closure from Randolph Boulevard for column work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of northbound I-35 to westbound I-410 connector ramp for drilling work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of Randolph Boulevard and southbound frontage road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Left
lane closure southbound frontage road of I-35 to Randolph Boulevard for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from
Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17, 9 p.m. to 5 a.m. Full
closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway and
full closure on Interchange Parkway from Fratt Road and Walzem Road for barrier
work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Monday, February 12. 8 p.m. to 6 a.m. Multiple lane closures (2) on
southbound mainlanes of I-35 and exit ramp closure from Toepperwein Road to
Judson Road for beam setting. Traffic should use next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 13. 8 p.m. to 6 a.m. Multiple lane closures (3) on
southbound mainlanes, exit ramp closure, and left lane closure on southbound
frontage road of I-35 from Toepperwein Road to Judson Road for beam setting.
Traffic should use next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 13 until Saturday, February 17. 12 p.m. to 12 a.m.
Right lane closure on southbound frontage road of I-35 from Evans Road to
Retama Parkway for cap staging.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 13 until Saturday, February 17. 8 p.m. to 6 a.m.
Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road
to Forum Parkway for cap setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 13 until Saturday, February 17. 8 p.m. to 6 a.m. Full
closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for cap setting. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">Wednesday, February 14. 8 p.m. to 6 a.m. Multiple lane closures (2) on
southbound mainlanes and multiple lane closures (2) on southbound frontage road
of I-35 from Toepperwein Road to Judson Road for beam setting.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Saturday, February 17. 9 p.m. to 5 a.m. Full
closure of entrance ramp on westbound frontage road and exit ramp of I-410 to
Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 8 p.m. to Monday, February 12 5 a.m. Full closure of
the southbound mainlanes at I-10 for construction work.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 29. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
roadway improvements. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Monday, February 19. Full closure of the
entrance to McAllister Park at Buckhorn Rd.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk139029066;"></span><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, February 13 until Thursday, February 15. 9 a.m. to 3 p.m.
Single eastbound mainlane closure from Potranco Rd. to Loop 410.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal"></p><ul style="text-align: left;"><li><span style="line-height: 115%;"><span style="font-family: arial; font-size: x-small;">Sunday, February 11 until Thursday,
February 15. 8:30 p.m. to 5 a.m. Single mainlane closures, in both directions,
from Loop 410 to I-35 for guard rail repairs.</span></span></li></ul><o:p></o:p><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-48586172217427210972024-02-02T14:41:00.004-06:002024-02-02T14:41:30.792-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam
placement/bridge construction. Daily alternating frontage road closures. One
lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 4 until Friday, February 9. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 12 a.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 4 until Friday, February 9. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 4 until Friday, February 9. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 4 until Friday, February 9. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. Nightly 10 p.m. until 5
a.m. Vance Jackson northbound lane full closure on bridge over Loop 1604 for
direct connector deck preparation.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. Nightly 10 p.m. until 5
a.m. Vance Jackson southbound lane full closure on bridge over Loop 1604 for
direct connector deck preparation.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5
a.m. Eastbound mainlane full closure from the Vance Jackson Road exit ramp to the
Lockhill Selma Road entrance ramp for steel girders on eastbound direct
connector. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlane exit ramp/direct connector full closure to Loop
1604 eastbound mainlane for steel girders on eastbound direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlane cloverleaf exit (southwest cloverleaf) full
closure to Loop 1604 eastbound for steel girders on eastbound direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Wednesday, February 7. Nightly 9 p.m. until 5
a.m. Westbound frontage road right lane closure from the Stone Oak Parkway
entrance ramp to Panther Springs Creek for drilled shaft for bridge widening. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, February 4 until Sunday, February 11.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk157162144"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Tuesday, February 6, 9:00 p.m. to 5:00 a.m.
Full closure of Lookout Road intersection and turnarounds for striping. Traffic
must exit Loop 1604 exit ramp to Lookout Road and follow detour signs.</span></a></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><a name="_Hlk157763779">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;">. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp
for construction work. Traffic should follow detour signs. <o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for
column cap work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound frontage road of Loop 1604 and exit ramp closure from
Lookout Road to IKEA-RBFCU Parkway for column cap work. Traffic should follow
detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m.
Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place, full closure on southbound I-35 to westbound Loop 1604 connector
ramp, and exit ramp closure to frontage road for column cap work. Traffic
should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 through Thursday, February 15, long term (24/7).
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for bridge demolition work. Traffic should use Lookout
Road intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;"><span style="font-family: arial; font-size: x-small;">Saturday, February 10 until Tuesday, February 20, long term (24/7).
Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union
Pacific Railroad for bridge demolition work. Traffic must use Nacogdoches Road
turnaround.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk157162144;">Saturday, February 10 until Tuesday, February 20, long term (24/7).
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for bridge demolition work. Traffic should use Lookout
Road intersection.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February
9. 9 a.m. to 3 p.m. Closure of turn arounds, in both directions, at FM 471 for
bridge work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 4 until Friday,
February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3
p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through April. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use
the Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 6 until Thursday,
February 8. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from FM
1518 to FM 2538 for pavement repairs.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, February 4 until
Saturday, February 10. 9 p.m. to 5 a.m. Alternating southbound mainlane
closures from St. Mary’s St. to San Pedro Ave. for maintenance operations.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Northeast San Antonio/New
Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, February 12,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February
29, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April
24, long term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Starlight Terrace to Weidner Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August
3, long-term closure (24/7). Left lane closure on northbound frontage road of
I-35 from Weidner Road to O'Connor Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4, 9:00 p.m. to
5:00 a.m. Alternating multiple lane closure (2) on northbound mainlanes and
exit ramp closure of I-35 from Judson Road to Toepperwein Road for milling and
overlay operations.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk157763398">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, entrance ramp closure, and exit ramp closure of I-35 from
Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should
use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum
Parkway for striping, barrier, and temporary pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans
Road for drainage work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping,
barrier, temporary pavement, and demolition works. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on westbound I-35
collector ramp at the Loop 1604 interchange and full closure on northbound I-35
to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
to eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps.
Traffic should follow detour signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 collector ramp at I-35 interchange and full closure on southbound I-35 to
eastbound Loop 1604 connector ramp for barrier work. Traffic should follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
to westbound Loop 1604 connector ramp and alternating lane closures on
southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure
work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and
follow the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
collector ramp at the Loop 1604 interchange for striping and barrier work.
Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
connector ramps to Loop 1604 and full closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for striping, barrier, temporary
pavement, and demolition works. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple mainlane closures (3) on
northbound I-35, entrance ramp closure, and alternating exit ramps closure from
Judson Road to Shin Oak Drive for structures work. Traffic should use next
entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for
bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes of I-35 from Forum Parkway to Ferrell Road for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Pat Booker Road at I-35 for construction work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for
cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for
cap form erection work. Accommodations will be made for local traffic.
Northbound frontage road of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Toepperwein Road at I-35 for column cap form work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Judson Road to O’Connor Road for
earthwork, paving, striping, and barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from Weidner Road to Thousand
Oaks Drive for drainage and structures work. Traffic should use the next exit
and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35, entrance ramp closure, and exit ramp closure
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of Randolph
Boulevard and southbound frontage road at I-35 for drainage work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Left lane closure southbound
frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and northbound to southbound turnaround closure of I-35 from
Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow
detour signs. Accommodations will be made for local traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35
to westbound I-410 connector ramp for drilling work. Traffic should follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Southbound to northbound
turnaround closure at Walzem Road, alternating lane closures on northbound
frontage road, and alternating entrance and exit ramp closures of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until
Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5, 9:00 p.m. to
5:00 a.m. Multiple lane closures (2) on northbound I-35 mainlanes from Olympia
Parkway to Schertz Parkway for milling and overlay operations.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5, 9:00 p.m. to
5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Alamo
Parkway to N Evans Road for milling and overlay operations.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5, 9:00 p.m. to
5:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from
Toepperwein Road to Judson Road for beam setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5, 9:00 p.m. to
5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from
Toepperwein Road to Judson Road for beam setting. Accommodations will be made
for local traffic. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Tuesday,
February 6, 9:00 a.m. to 3:00 p.m. Left lane closure on northbound mainlanes of
I-35 from Judson Road to Pat Booker Road for illumination work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 6, 12:00 p.m.
to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans
Road to Retama Parkway for cap staging. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 6, <a name="_Hlk157765004">9:00 p.m. to 5:00 a.m</a>. Multiple lane closures (2) on
southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap
setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, February 6, 9:00 p.m. to
5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road
to Forum Parkway for cap setting. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 7, 12:00 p.m.
to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans
Road to Retama Parkway for cap staging. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 7, 9:00 p.m.
to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from
Old Austin Road to Forum Parkway for cap setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, February 7, 9:00 p.m.
to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin
Road to Forum Parkway for cap setting. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 8, 12:00 p.m.
to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans
Road to Retama Parkway for cap staging. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 8, 8:00 p.m.
to 6:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from
Old Austin Road to Forum Parkway for cap setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, February 8, 8:00 p.m.
to 6:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin
Road to Forum Parkway for cap setting. Traffic should follow detour signs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 9. 9 p.m. to 5 a.m. Full closure of the
southbound mainlanes at W.W. White Rd. for beam repairs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 5. NIGHT WORK. The southbound I-410 collector at the
I-10 interchange will be closed from 9 p.m. to 5 a.m. to clean inlets.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 9. 7 a.m. to 6 p.m.
Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd.
for curb and sidewalk construction. </span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 29. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
roadway improvements. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 12 until Monday, February 19. Full closure of the
entrance to McAllister Park at Buckhorn Rd.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 9. 8 p.m. to 5 a.m. Alternating
lane closures, in both directions, at the intersection of Cedar Trail for
pavement operations. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 9. 8 p.m. to 5 a.m. Alternating
lane closures, in both directions, at the FM 1560/Leslie Rd. intersection for
pavement operations. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Friday, February 9. 8 p.m. to 5 a.m. Alternating
lane closures, in both directions, from Loop 1604 to Circle A Trail for
pavement operations. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, February 5 until Friday, February 9. 9 a.m. to 3 p.m. Alternating
lane closures, in both directions, from Loop 1604 to Circle A Trail for curb
and sidewalk construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, February 4 until Thursday, February 8. 8:30 p.m. to 5 a.m.
Single lane closures, in both directions, from Loop 410 to I-35 for guard rail
repairs. </span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-24523818008304986612024-01-26T16:37:00.009-06:002024-01-26T16:37:49.277-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam
placement/bridge construction. Daily alternating frontage road closures. One
lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Monday, February 5. Weekdays
9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and
Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to
be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, January 26 until Saturday, January 27. Weeknights 9 p.m. until 7
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for bridge construction. Only one intersection to be
closed at a time.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Monday, February 5. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li></ul><p></p>
<p class="MsoListParagraph" style="line-height: normal; margin-bottom: 6.0pt; margin-left: .25in; margin-right: 0in; margin-top: 0in; mso-add-space: auto;"><span style="mso-bookmark: _Hlk108794202;"><span style="color: #595959;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;">Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 28 until Friday, February 2. Nightly 9 p.m. until
5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Eastbound mainlane full
closure from the Blanco Road exit ramp to the Stone Oak Parkway entrance ramp
for barrier setting and striping. Off-duty officers will direct traffic through
intersections.<o:p></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday January 29 until Friday, February 2. Nightly 9 p.m. until 5 a.m.
Westbound mainlane full closure from the Blanco Road exit ramp to the Blanco
entrance ramp for barrier setting and striping. <o:p></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, February 2 at 9 p.m. until Saturday, February 3 at 12 p.m.
</span></span><span style="mso-bookmark: _Hlk108794202;">Eastbound mainlane full closure from the Blanco
Road exit ramp to the Stone Oak Parkway entrance ramp for Panther Springs Creek
deck pour. </span><span style="mso-bookmark: _Hlk108794202;"><o:p></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Full Weekend Closure. Friday, February 2 at 9 p.m. until Monday,
February 5 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Eastbound mainlane full
closure from the Bitters Road exit ramp to the Stone Oak Parkway entrance ramp
for a traffic switch <i>(existing Blanco Road entrance ramp will be closed,
temporary entrance ramp opening east of that location).</i></span><span style="mso-bookmark: _Hlk108794202;"><o:p></o:p></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Full Weekend Closure. Friday, February 2 at 9 p.m. until Monday,
February 5 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound mainlane full
closure from the Stone Oak Parkway exit ramp to the Bitters Road entrance ramp
(just east of NW Military Highway) for a traffic switch.</span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current through
Thursday, February 8, long term (24/7). Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for bridge
demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current through
Saturday, February 10, long term (24/7). Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for bridge
demolition work. Traffic should use Lookout Road intersection.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk157162144"><span style="line-height: 107%;">Sunday, January 28 until Saturday, February 3. 9:00
p.m. to 5:00 a.m</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;">. Full closure on eastbound frontage road of Loop
1604 and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway for column
cap work. Traffic should follow detour signs.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
January 28 until Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on
westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place,
full closure on southbound I-35 to westbound Loop 1604 connector ramp, and exit
ramp closure to frontage road for column cap work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Wednesday,
January 31 until Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of
Lookout Road intersection and turnarounds for striping. Traffic must exit Loop
1604 exit ramp to Lookout Road and follow detour signs.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 31 until Thursday,
February 1. 9 p.m. to 5 a.m. Full closure of the northbound mainlanes from Culebra
Rd.to Shaenfield Rd. for restriping.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28. 7 a.m. to 4 p.m. Full rolling closure of the
mainlanes, in both directions, at Heuermann Rd. for utility work. Traffic will
be stopped in 15-minute intervals intermittently throughout the day. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 28 until Friday,
February 2. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, February 2 at 9 p.m. until Monday, February 5 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through March. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use
the Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 until Monday, January
29. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from FM 2538 to
Loop 1604 for traffic switch.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, January 27. 8 p.m.
to 5 a.m. Full closure of the westbound frontage road from Santa Clara to Zuehl
Rd. for drainage installation.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 to Thursday, February 1.
9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Santa Clara to
Zuehl Rd. for draining work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 9 p.m. until Monday,
January 29 5 a.m. Full closure of the westbound mainlanes from FM 2538 to Loop
1604 for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 30 until Wednesday,
January 31. 9 p.m. to 5 a.m. Single westbound mainlane closure at FM 1518 for
barrier reset. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Tuesday, January 30.
8 p.m. to 5 a.m. Full closure of the eastbound mainlanes from FM 2538 to FM 465
for pavement repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Thursday, February
1. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Santa Clara to
Zuehl Rd. for drainage work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk113861123"><span style="mso-bookmark: _Hlk119044303;">Current through Monday, February 12, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February
29, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April
24, long term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Thursday, July 4,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Starlight Terrace to Weidner Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, August
3, long-term closure (24/7). Left lane closure on northbound frontage road of
I-35 from Weidner Road to O'Connor Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></a></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk157155374"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;">Sunday, January 28 until Saturday, February 3. 9:00 p.m. to 5:00 a.m</span></span></span></a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;">. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.<o:p></o:p></span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Saturday,
February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound
mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for
drainage work. Traffic should use next exit ramp.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should
use next entrance and exit ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge
substructure work. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Corporate Drive to Evans Road and full closure of
eastbound and westbound lanes of Evans Road for bridge substructure work.
Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping,
barrier, temporary pavement, and demolition works. Traffic should follow detour
signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
connector ramps to Loop 1604 and full closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for striping, barrier, temporary
pavement, and demolition works. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><a name="_Hlk157161188">Sunday, January 28 until Saturday, February 3. 9:00 p.m. to 5:00 a.m</a></span></span></span></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;">. Multiple mainlane closures (3)
on southbound I-35 from Forum Parkway to Ferrell Road for bridge structure
work.<o:p></o:p></span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple mainlane closures (3) on
southbound I-35 from Schertz Parkway to Forum Parkway for bridge structure
work.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to northbound I-35 connector ramp for construction work. Traffic should
follow detour signs. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on westbound I-35
collector ramp at the Loop 1604 interchange and full closure on northbound I-35
to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 to
eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps.
Traffic should follow detour signs. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to southbound I-35 connector ramp for column cap work. Traffic must exit
at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 collector ramp at I-35 interchange and full closure on southbound I-35 to
eastbound Loop 1604 connector ramp for barrier work. Traffic should follow
detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to
westbound Loop 1604 connector ramp and alternating lane closures on southbound
mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work.
Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow
the detour signs to Loop 1604.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
collector ramp at the Loop 1604 interchange for striping and barrier work.
Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow
detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for
bridge structure work.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum
Parkway for striping, barrier, and temporary pavement work. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Pat Booker Road at I-35 for construction work. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for
cap form erection work. Accommodations will be made for local traffic. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Toepperwein Road at I-35 for structures work. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple mainlane closures (3) on
northbound I-35, entrance ramp closure, and alternating exit ramps closure from
Judson Road to Shin Oak Drive for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for
cap form erection work. Accommodations will be made for local traffic. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Judson Road to O’Connor Road for
earthwork, paving, striping, and barrier work. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from Weidner Road to Thousand
Oaks Drive for drainage and structures work. Traffic should use the next exit
and entrance ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35, entrance ramp closure, and exit ramp closure
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and northbound to southbound turnaround closure of I-35 from
Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow
detour signs. Accommodations will be made for local traffic.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Left lane closure southbound
frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should
follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard
and southbound frontage road at I-35 for drainage work. Traffic should follow
detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to
westbound I-410 connector ramp for drilling work. for drilling work. Traffic
should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Southbound to northbound
turnaround closure at Walzem Road, alternating lane closures on northbound
frontage road, and alternating entrance and exit ramp closures of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until
Saturday, February 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;"><span style="font-family: arial; font-size: x-small;">Monday, January 29, 9:00 a.m. to
3:00 p.m. Left lane closure on northbound mainlanes of I-35 from Walzem Road to
Starlight Terrace for illumination work.</span></span></span></span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk155329778;"><span style="mso-bookmark: _Hlk155936117;"><span style="mso-bookmark: _Hlk156555283;">Tuesday, January 30 until
Thursday, February 1. 9:00 a.m. to 3:00 p.m. Left lane closure on northbound
mainlanes of I-35 from Weidner Road to Judson Road for illumination work.</span></span></span></span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Saturday, February 3. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Saturday, February 3. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Wednesday, January 31. 9:00 p.m. to 5:00 a.m.
Full closure on northbound Austin Highway (Loop 368) connector ramp to
westbound I-410 for beam setting. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Saturday, February 3. 12:00 p.m. to 12:00 a.m.
Left lane closure on westbound frontage road of I-410 from Randolph Boulevard
to Perrin Beitel for beam staging.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 30 until Friday, February 2. 9:00 p.m. to 5:00 a.m.
Left lane closure on westbound frontage road of I-410 and exit ramp closure
from Perrin Creek to Perrin Beitel for beam setting. Traffic should use next
exit ramp.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – West San Antonio <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Saturday, January 27 until Sunday, January 28. 9 a.m. to 5 p.m. Alternating
southbound mainlane closures, from SH 151 to US 90 for restriping.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 9. 9 p.m. to 5 a.m. Full
closure of the southbound mainlanes at W.W. White Rd. for beam repairs.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Friday, February 2. 7 a.m. to 6 p.m. Alternating
lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and
sidewalk construction.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 8 p.m. to 5 a.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 2. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Circle A Trail for curb and
sidewalk construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Hunt Lane for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, Ingram Rd. for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Potranco Rd.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, January 29 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
westbound mainlane closures, including ramps, from 36<sup>th</sup> St. to W.
Military Dr. for mow strip placement. </span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 2. 8:30 p.m. to 5 a.m. Alternating
mainlane closures, in both directions, from Nogalitos St. to Loop 410 for guard
rail repairs.</span> </li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-55103430684219527002024-01-19T15:17:00.003-06:002024-01-19T15:17:20.313-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p></p><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County <o:p></o:p></i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam
placement/bridge construction. Daily alternating frontage road closures. One
lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Monday, February 5. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Monday, February 5. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 21 until Saturday, January 27. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 10 p.m. until 5 a.m. Vance Jackson Road northbound lane full
closure at the bridge over Loop 1604 for direct connector deck preparation.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 21 until Saturday, January 27. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 10 p.m. until 5 a.m. Vance Jackson Road southbound lane full
closure at the bridge over Loop 1604 for direct connector deck preparation.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, January 22 until Friday, January 26. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Westbound <span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;">mainlane
full closure from the Stone Oak Parkway exit ramp to the Blanco Road entrance
ramp for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 26 at 9 p.m. until Saturday, January 27 at 12 p.m.
Eastbound mainlane full closure from the Blanco Road exit ramp to the Stone Oak
Parkway entrance ramp for Panther Springs Creek deck pour.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Sunday, January
21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m. Alternating mainlane
closures on eastbound Loop 1604 from Lookout Road to I-35 for soil nail wall
work.</span></span></a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound frontage road of Loop 1604 and exit ramp closure from
Lookout road to IKEA-RBFCU Parkway for cap work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place, full closure on southbound I-35 to westbound Loop 1604 connector
ramp, and exit ramp closure to frontage road for cap work. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Monday, January 22 through Wednesday, January 31, long term
(24/7). Westbound to eastbound Loop 1604 turnaround closure from Lookout Road
to Union Pacific Railroad for bridge demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Wednesday, January 24 until Saturday, January 27. 9:00 p.m. to
5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road
for barrier work. Traffic should use next exit ramp.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Wednesday, January 24 through Friday, February 2, long term
(24/7). Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches
Road to Union Pacific Railroad for bridge demolition work. Traffic should use
Lookout Road intersection.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="background: white; color: black;">Wednesday, January 31 until Saturday, February 3. 9:00 p.m. to
5:00 a.m. Full closure of Lookout Road intersection and turnarounds for
striping. Traffic must exit Loop 1604 exit ramp to Lookout Road and follow
detour signs.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 21 until Friday,
February 2. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Friday, February 2. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Friday, February 2. Weekdays 9 a.m. until 3
p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604 interchange
for bridge construction. Lane closures to remain in place for the entire
duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 at 9 p.m. until Monday, January 29 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, January 26. 9 p.m. to
5 a.m. Alternating westbound mainlane closures at Loop 13/W.W. White Rd. for
steal beam repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, January 26. Full
closure of the westbound mainlanes at Loop 13/W.W.White Rd. for steal beam
repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19, 9 p.m. to Monday,
January 22, 5 a.m. Full closure of the westbound mainlanes from FM 2538 to Loop
1604 for traffic switch.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through March. The westbound I-10
entrance ramp from Ackerman will be closed from 9 a.m. January 18 through
March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes
may turn around at Ackerman, continue on the eastbound frontage road, and use
the Foster turnaround to access the westbound I-10 entrance ramp at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 26 until Monday, January
29. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from FM 2538 to
Loop 1604 for traffic switch.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 24 until Saturday, January
27. 8 p.m. to 5 a.m. Full closure of the westbound frontage road from Santa
Clara to Zuehl Rd. for drainage installation.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Northbound frontage road of I-35
from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February
29, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April
24, long term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk156555283"><span style="mso-bookmark: _Hlk155936117;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for
barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Corporate Drive to Evans
Road and full closure of eastbound and westbound lanes of Evans Road for bridge
substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway
Boulevard for striping, barrier, temporary pavement, and demolition works.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 to eastbound Loop 1604 connector ramp for
drilled shaft, columns, and caps. Traffic should follow detour signs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange and
full closure on northbound I-35 to eastbound Loop 1604 connector ramp for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full
closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for striping
and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Sandpiper
Drive to Pat Booker Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 connector ramps to Loop 1604 and full closure
on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for
striping, barrier, temporary pavement, and demolition works. Traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road and exit ramp of I-35 from Judson Road
to Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Northbound frontage road of I-35 traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein
Road to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for drainage and structures work.
Traffic should use the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Left lane closure southbound frontage road of I-35 to Randolph Boulevard for
drainage work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work. Traffic should follow detour signs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow
detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Wednesday, January 24. 9:00 a.m. to 3:00 p.m.
Left lane closure on northbound mainlanes of I-35 from Walzem Road to Starlight
Terrace for illumination repairs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 24 until Friday, January 26. 9:00 a.m. to 3:00 p.m.
Left lane closure on northbound mainlanes of I-35 from Weidner Road to Judson
Road for illumination repairs.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk155936117;">Thursday, January 25 until Friday, January 26. 12:00 p.m. to 11:00 p.m.
Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo
Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo
Valley Drive to Pat Booker Road for beam staging.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Wednesday, January 24. 12:00 p.m. to 9:00 p.m.
Left lane closure on westbound frontage road of I-410 from Randolph Boulevard
to Perrin Beitel for beam staging.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Thursday, January 25. 9:00 p.m. to 5:00 a.m.
Left lane closure on westbound frontage road of I-410 and exit ramp closure
from Randolph Boulevard to Perrin Beitel for beam setting. Traffic should use
next exit ramp.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 28 until Friday, February 9. 9 p.m. to 5 a.m. Full
closure of the southbound mainlanes at W.W. White Rd. for beam repairs.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Friday, January 26. 7 a.m. to 6 p.m.
Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd.
for curb and sidewalk construction.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 8 p.m. to 5 a.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. Alternating lane closures, in both
directions, from Loop 1604 to Circle A Trail for curb and sidewalk
construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 22 until Friday, January 26. 9 a.m. to 3 p.m. Alternating
lane closures, in both directions, from Lop 1604 to Circle A Trail for curb and
sidewalk construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Hunt Lane for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, Ingram Rd. for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Potranco Rd. </span></li><li><span style="font-family: arial; font-size: x-small;">Friday, January 19 until Saturday, January 20. 9 p.m. to 5 a.m. Single
lane closure on the westbound frontage road at Wiseman Rd. for barrier
installation.</span></li></ul><p></p><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-86545163869634112372024-01-12T13:57:00.002-06:002024-01-12T13:57:09.640-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam
placement/bridge construction. Daily alternating frontage road closures. One
lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge construction/retaining walls. Only one turnaround to be
closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 14 until Friday, January 19. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 14 until Friday, January 19. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 14 until Friday, January 19. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 14 until Friday, January 19. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Wednesday, January 17 through Friday, January 19. Nightly 9 p.m.
until 5 a.m. Blanco Road northbound right lane closure from Blanco Bluffs to
Talavera Parkway for CPS Energy gas line work under Talavera Parkway.</span></span><span style="mso-bookmark: _Hlk108794202;"> Off-duty officers will be used to control the flow of traffic through
the Talavera Parkway intersection.<span style="mso-spacerun: yes;"> </span><span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;"><span style="mso-spacerun: yes;"> </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Saturday, January 20 at 9 p.m. until Sunday, January 21 at 12 p.m.
</span></span><span style="mso-bookmark: _Hlk108794202;">Eastbound mainlane full closure from the Blanco
Road exit ramp to the Stone Oak Parkway entrance ramp for Panther Springs Creek
deck pour. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 19 until Monday, January 22. Nightly 9 p.m. until
at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Vance Jackson Road northbound
lane full closure at the bridge over Loop 1604 for setting overhangs on the
direct connector span over Vance Jackson Road.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 19 until Monday, January 22. Nightly 9 p.m. until
at 5 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> Vance Jackson Road southbound
lane full closure at the bridge over Loop 1604 for setting overhangs on the
direct connector span over Vance Jackson Road.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Current through Wednesday, January 24, long term (24/7). Westbound to
eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific
Railroad for bridge demolition work. Traffic must use Nacogdoches Road
turnaround.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Wednesday, January
17. 9:00 p.m. to 5:00 a.m. Full closure on eastbound mainlanes of Loop 1604
from Lookout Road to I-35 for barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Saturday, January
20. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604
from Gateway Boulevard to Gateway Place, full closure on southbound I-35 to westbound
Loop 1604 connector ramp, and exit ramp closure to frontage road for cap work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Wednesday, January 17 through Friday,
January 26, long term (24/7). Eastbound to westbound Loop 1604 turnaround
closure from Nacogdoches Road to Union Pacific Railroad for bridge demolition
work. Traffic should use Lookout Road intersection.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 14 until Friday,
January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3
p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604
westbound frontage road for temporary pavement construction. Daily closures. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604 interchange
for bridge construction. Lane closures to remain in place for the entire
duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 eastbound frontage road full closure between the
IH-10 eastbound and westbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. Loop 1604 westbound frontage road full closure between the
IH-10 westbound and eastbound frontage road for bridge construction. Lane
closures to remain in place for the entire duration. Off-duty officers will
direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction. Lane closures to remain in place for the
entire duration. Off-duty officers will direct traffic thru intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, January 26. 9 p.m. to
5 a.m. Alternating westbound mainlane closures at Loop 13/W.W. White Rd. for
steal beam repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January
26. Full closure of the westbound mainlanes at Loop 13/W.W.White Rd. for steal
beam repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, January 13. 9 p.m.
to 5 a.m. Full closure of the eastbound mainlanes at FM 1518 for bridge work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19, 9 p.m. to Monday,
January 22, 5 a.m. Full closure of the westbound mainlanes from FM 2538 to Loop
1604 for traffic switch.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, January 18 through March. The
westbound I-10 entrance ramp from Ackerman will be closed from 9 a.m. January
18 through March. Detour: Westbound I-10 frontage road traffic to westbound
I-10 mainlanes may turn around at Ackerman, continue on the eastbound frontage
road, and use the Foster turnaround to access the westbound I-10 entrance ramp
at Foster.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, February 12,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February
29, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Wednesday, April
24, long term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk155936117">Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should
use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans
Road for drainage work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping,
barrier, temporary pavement, and demolition works. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge
substructure work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 to
eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps.
Traffic should follow detour signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to northbound I-35 connector ramp for column and cap work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange and full closure on northbound I-35
to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
collector ramp at the Loop 1604 interchange for striping and barrier work.
Traffic must use West Loop 1604 (exit 172) to access southbound I-35 and follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to
westbound Loop 1604 connector ramp and alternating lane closures on southbound
mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work.
Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow
the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to southbound I-35 connector ramp closure for cap work. Traffic must exit
at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for
bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Saturday,
January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound
mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway
for striping, barrier, and temporary pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for
cap form erection work. Accommodations will be made for local traffic. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage
road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form
erection work. Accommodations will be made for local traffic. Southbound
frontage road of I-35 traffic must follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Judson Road to O’Connor Road for
earthwork, paving, striping, and barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, entrance ramp closures, and exit ramp closure of I-35
from Weidner Road to O’Connor Road for structures work. Traffic should follow
the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from Weidner Road to Thousand
Oaks Drive for drainage and structures work. Traffic should use the next exit
and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard
and southbound frontage road at I-35 for drainage work. Traffic should follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Left lane closure southbound
frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Saturday,
January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and
northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to
Whirlwind Drive for drilling work. Traffic should follow detour signs.
Accommodations will be made for local traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to
westbound I-410 connector ramp for drilling work. Traffic should follow detour
signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Southbound to northbound
turnaround closure at Walzem Road, alternating lane closures on northbound
frontage road, and alternating entrance and exit ramp closures of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until
Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk155936767">Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until
Wednesday, January 17. 9:00 a.m. to 3:00 p.m. Left lane closure on northbound mainlanes
of I-35 from Corporate Drive to Roy Richard Drive for existing highway
illumination repairs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until
Thursday, January 18. 12:00 p.m. to 5:00 a.m. Right lane closure on southbound
frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures
on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for
beam staging. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, January 18 until
Friday, January 19. 9:00 a.m. to 3:00 p.m. Left lane closure on northbound
mainlanes of I-35 from Walzem Road to Starlight Terrace for existing highway
illumination repairs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until
Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until Saturday,
January 27. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road and
exit ramp of I-35 from Judson Road to Toepperwein Road for cap form erection
work. Accommodations will be made for local traffic. Northbound frontage road
of I-35 traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until
Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for
cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 21 until
Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Corporate Drive to Evans Road and full closure of
eastbound and westbound lanes of Evans Road for bridge substructure work.
Traffic should follow detour signs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk155936915"><span style="font-family: arial; font-size: x-small;">Monday, January 15, until
Wednesday, January 17, 12:00 p.m. to 9:00 p.m. Left lane closure on westbound
frontage road of I-410 from Randolph Boulevard to Perrin Beitel for beam
staging.</span></a></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Monday, January 15 until Thursday, January 18. 9:00 p.m. to 5:00 a.m.
Left lane closure </span></span>on westbound frontage road of I-410 and exit ramp closure from Randolph Boulevard
to Perrin Beitel for beam setting. Traffic should use next exit ramp.</span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Thursday, January 18. 9:00 p.m. to 5:00 a.m.
Full closure on northbound Austin Highway (Loop 368) connector ramp to
westbound I-410 for beam setting. Traffic should follow detour signs.</span></span></span></li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk155936915;"></span>
</span>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway</i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Friday, January 19. 7 a.m. to 6 p.m. Alternating
lane closures, in both directions, from Loop 1604 to Huebner Rd. for sidewalk
and curb construction.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 8 p.m. to 5 a.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Alternating lane
closures, in both directions, from N.W. Military Highway to Weidner Rd. for
barrier work.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. Alternating lane closures, in both
directions, from Loop 1604 to Circle A Trail for curb and sidewalk
construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Friday, January 19. 9 a.m. to 3 p.m. Alternating
lane closures, in both directions, from Loop 1604 to Circle A Trail for
sidewalk and curb construction.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until Friday, January 12. 9 a.m.to 3 p.m. Single
eastbound mainlane closure from New Life Circle to Callaghan Rd. for sign work.</span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January 19. 8:30 p.m. to 5 a.m.
Multiple alternating westbound mainlane closures from 36<sup>th</sup> St. to
Loop 410 for guard rail upgrades. Alternating ramps will also be closed.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Wednesday, January 17. 9 a.m. to 3 p.m.
Alternating westbound mainlane closures from 36<sup>th</sup> St. to W. Military
Dr. for mow strip installation. Alternating ramps will also be closed.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure
on the eastbound frontage road from Wiseman Rd. to Westover Hills.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure
on the eastbound frontage road from SH 151 to Wiseman. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Hunt Lane for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, Ingram Rd. for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Potranco Rd. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January 10. 9 p.m. to 5 a.m. Single
mainlane closures, in both directions, from Loop 1604 to Westover Hills for
bridge work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, January 15 until Wednesday, January 17. 9 a.m. to 3 p.m.
Westbound exit ramp to Westover Hills closed for drill shaft work.</span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-30535582179627131232024-01-05T14:47:00.008-06:002024-01-05T14:47:55.940-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction. </span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Friday, January 12. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Friday, January 12. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Friday, January 12. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Friday, January 12. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Saturday, January 13. Nightly 9 p.m. until
at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Blanco Road northbound
right lane closure from Blanco Bluffs to 200 ft. beyond the Talavera Parkway intersection
for installation of a gas line across Talavera Parkway. Off-duty officers will
be used to control the flow of traffic through the Talavera Parkway
intersection.<span style="mso-spacerun: yes;"> </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, January 8 until Sunday, January 14. Nightly 9 p.m. until
at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Vance Jackson northbound
lane full closure at the Loop 1604 bridge for setting overhangs on the direct
connector span over Vance Jackson bridge. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, January 8 until Sunday, January 14. Nightly 9 p.m. until
at 5 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> Vance Jackson southbound
lane full closure at the Loop 1604 bridge for setting overhangs on the direct
connector span over Vance Jackson bridge. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 9 until Saturday, January 13. Nightly 9 p.m.
until 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound mainlane full
closure from Lockhill Selma Road exit ramp to the IH-10 interchange exit ramps
for setting steel girders on the westbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 9 until Saturday, January 13. Nightly 9 p.m. until
5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound exit ramp full
closure for the frontage road/IH-10 intersection for setting steel girders on
the westbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 9 until Saturday, January 13. Nightly 9 p.m.
until 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound mainlane entrance
ramp full closure from Lockhill Selma Road/Auxiliary lane full closure<span style="mso-spacerun: yes;"> </span>for setting steel girders on the westbound
direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, January 7 until Sunday, January 14.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Saturday, January 13 at 9 p.m. until Sunday, January 14 at 12 p.m.
</span></span><span style="mso-bookmark: _Hlk108794202;">Eastbound mainlane full closure from the Blanco
Road exit ramp to the Stone Oak Parkway entrance ramp for Panther Springs Creek
deck pour. </span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place for setting caps. Traffic should follow detour signs.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January
13. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604
from Gateway Boulevard to Gateway Place, full closure on southbound I-35 to
westbound Loop 1604 connector ramp, and exit ramp closure to frontage road for
cap work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
frontage road of Loop 1604 from Lookout Road to I-35 for striping work.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Wednesday, January 10 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection
and turnarounds for striping. Traffic must exit Loop 1604 exit ramp to Lookout
Road and follow detour signs.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 7 until Friday,
January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway
entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Friday, January 19. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Friday, January 19. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to
Camp Bullis Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Friday, January 19. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Friday, January 19. Weekdays 10 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, January 8 until Friday, January 19. Weekdays 10 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Weekdays 9 a.m. until 3 p.m.
Loop 1604 westbound frontage road full closure from the IH-10 eastbound
frontage road to the IH-10 westbound frontage road for bridge construction.
Daily closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m. Alternating
IH-10 eastbound mainlane closure from La Cantera Parkway to the Loop 1604 interchange
for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m.
Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to
La Cantera Parkway for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10
interchange for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. Loop 1604 westbound mainlane full closure at the IH-10
interchange for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604
interchange for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full
weekend closure. IH-10 westbound mainlane full closure at the Loop 1604
interchange for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Monday, January 22. Daily/Nightly 24 hours a
day. Loop 1604 westbound to IH-10 westbound frontage road right lane closure
for bridge construction. </span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, January 26. 9 p.m. to
5 a.m. Alternating westbound mainlane closures at Loop 13/W.W. White Rd. for
steal beam repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, January 14 until Friday, January
26. Full closure of the westbound mainlanes at Loop 13/W.W.White Rd. for steal beam
repairs. Traffic under the bridge will be closed as well.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January
10. 9 p.m. to 5 a.m. <span style="mso-spacerun: yes;"> </span>Full closure of the
westbound mainlanes at FM 1518 for bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until Saturday,
January 13. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at FM 1518
for bridge work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 19, 9 p.m. to Monday,
January 22, 5 a.m. Full closure of the westbound mainlanes from FM 2538 to Loop
1604 for traffic switch.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January
10. 8 p.m. to 5 a.m. Single westbound mainlane closure from FM 465 to Zuehl Rd.
for bridge work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, January 11 through March. The
westbound I-10 entrance ramp from Ackerman will be closed from 9 a.m. January
11 until mid-March. Detour: Westbound I-10 frontage road traffic to westbound
I-10 mainlanes may turn around at Ackerman, continue on the eastbound frontage
road, and use the Foster turnaround to access the westbound I-10 entrance ramp
at Foster. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, January 6 until Sunday, January
7. 3 p.m. to 5 a.m. Single westbound mainlane closure from FM 465 to Zuehl Rd.
for bridge work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk113861123"><span style="mso-bookmark: _Hlk119044303;">Current through Monday, February 12, long-term closure (24/7). Left lane
closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February
29, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 8,
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="font-family: arial; font-size: x-small;">Current through Monday, May 20,
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></a></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk155329778">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for
barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road from Forum Parkway to Gateway
Boulevard for traffic shift, striping, and barrier work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway
Boulevard for striping, barrier, temporary pavement, and demolition works.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for
column and cap work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13, 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for
striping and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 to southbound I-35 connector ramp for
columns and cap work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for cap
work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk151097051"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></a></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and
exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic must follow detour.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound
frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving,
striping, and barrier work. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound
I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker
Road to Judson Road for structures work. Traffic should use next entrance and
exit ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left
lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and
northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to
Whirlwind Drive for drilling work. Traffic should follow detour signs.
Accommodations will be made for local traffic.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and
southbound frontage road at I-35 for drainage work. Traffic should follow
detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Left lane closure southbound frontage road
of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour
signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and
northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to
Whirlwind Drive for drilling work. Traffic should follow detour signs.
Accommodations will be made for local traffic.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and
southbound frontage road at I-35 for drainage work. Traffic should follow
detour signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Left lane closure southbound frontage road
of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour
signs.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure
at Walzem Road, alternating lane closures on northbound frontage road, and
alternating entrance and exit ramp closures of I-35 from Walzem Road to
Crestway Drive for striping and barrier work. Traffic should follow detour
signs for available ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday,
January 13. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and
southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road
and multiple lane closures (2) on eastbound and westbound of Fratt Road from
I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until
Wednesday, January 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, entrance ramp closures, and exit ramp closure of I-35
from Weidner Road to O’Connor Road for striping and barrier work. Traffic
should follow the detour signs to the available ramps.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Monday, January 15, through
Wednesday, January 24, long term (24/7). Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for bridge
demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Monday, January 15, through
Wednesday, April 24, long term closure (24/7). Left lane closure on southbound
frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and
roadway work.</span></span></span></span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk113861123;"><span style="mso-bookmark: _Hlk119044303;"><span style="mso-bookmark: _Hlk141422353;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;">Wednesday, January 17, through
Friday, January 26, long term (24/7). Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for bridge
demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Current until Friday, March 1, long-term closure (24/7). Left lane
closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway
(Loop 368) for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, January 7 until Saturday, January 13. 9:00 p.m. to 5:00 a.m. Full
closure of entrance ramp on westbound frontage road and exit ramp of I-410 to
Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Friday, January 12. 7 a.m. to 6 p.m. Alternating
lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and
sidewalk construction.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January 31. 8 p.m. to 5 a.m.
Alternating lane closures, in both directions, from N.W. Military Highway to
Weidner Rd. for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January 31. 9 a.m. to 3 p.m.
Alternating lane closures, in both directions, from N.W. Military Highway to
Weidner Rd. for barrier work.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January 31. Alternating lane
closures, in both directions, from Loop 1604 to Circle A Trail for curb and sidewalk
construction.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until Friday, January 12. 9 a.m.to 3 p.m. Single
eastbound mainlane closure from New Life Circle to Callaghan Rd. for sign work.</span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure
on the eastbound frontage road from Wiseman Rd. to Westover Hills.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure on
the eastbound frontage road from SH 151 to Wiseman. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Hunt Lane for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, Ingram Rd. for bore work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, at Potranco Rd. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, January 8 until Wednesday, January 10. 9 p.m. to 5 a.m. Single
mainlane closures, in both directions, from Loop 1604 to Westover Hills for
bridge work.</span> </li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-42351923044203137142023-12-21T13:16:00.006-06:002023-12-21T13:16:49.410-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><i><span style="font-family: arial; font-size: x-small;">Loop 1604 – North West San Antonio/Bexar
County</span></i></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Monday, January 8. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road
for bridge construction/retaining walls. Only one turnaround to be closed at a
time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 2 until Friday, January 5. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 2 until Friday, January 5. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 2 until Friday, January 5. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure
from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 2 until Friday, January 5. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure
from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday, January 2 until Sunday, January 7.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Full weekend closure. Vance Jackson northbound lane closure at the Loop
1604 bridge for setting steel girders. Lane closure will remain in place for the
entire duration. Off-duty officers to direct traffic through intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Full weekend closure. Vance Jackson southbound lane closure at the Loop
1604 bridge for setting steel girders. Lane closure will remain in place for the
entire duration. Off-duty officers to direct traffic through intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 5 at 8 p.m. until Monday, January 8 at 5 a.m. Full
weekend closure. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound right/auxiliary
mainlane closure from the Lockhill Selma Road exit ramp to the frontage
road/IH-10 intersection for setting steel girders. Lane closures to remain in
place for the entire duration. Off-duty officers to direct traffic through
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, January 5 at 8 p.m. until Monday, January 8 at 5 a.m. Full
weekend closure. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound entrance ramp
full closure from Lockhill Selma Road for setting steel girders. The westbound
exit ramp to the frontage road/IH-10 intersection will remain OPEN. Lane
closures to remain in place for the entire duration. Off-duty officers to
direct traffic through intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until
Saturday, January 6. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage
road of Loop 1604 from Gateway Boulevard to Gateway Place, full closure on
southbound I-35 to westbound Loop 1604 connector ramp, and exit ramp closure to
frontage road for cap work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until
Saturday, January 6. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage
road of Loop 1604 from Gateway Boulevard to Gateway Place for setting caps.
Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until
Saturday, January 13. 9:00 p.m. to 5:00 AM. Full closure of Lookout Road
intersection and turnarounds for striping. Traffic must exit Loop 1604 exit
ramp to Lookout Road and follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 10 until
Saturday, January 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping
work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Tuesday, January 2 until Friday,
January 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange
and UTSA Boulevard for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway entrance
ramp to the Loop 1604 Interchange for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to
the La Cantera Parkway entrance ramp for bridge construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Friday, January 5. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Friday, January 5. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to
Camp Bullis Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Friday, January 5. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Friday, January 5. Weekdays 10 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, January 2 until Friday, January 5. Weekdays 10 a.m. until 3
p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m. Alternating
IH-10 eastbound mainlanes from La Cantera Parkway to the Loop 1604 interchange for
bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, January 5 at 9 p.m. until Monday, January 8 at 5 a.m.
Alternating IH-10 westbound mainlanes from the Loop 1604 interchange to La
Cantera Parkway for bridge construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Monday, January 8. Daily/Nightly 24 hours a
day. Loop 1604 westbound to IH-10 westbound frontage road right lane closure
for bridge construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 29
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Saturday,
February 3, 2024 long-term closure (24/7). Left lane closure on northbound
frontage road of I-35 from Judson Road to Toepperwein Road for drainage,
column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Thursday, February 29,
2024, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday March 2,
2024 long-term closure (24/7). Left lane closure on northbound frontage road of
I-35 from Bludau-Bishop Road to Judson Road for permanent widening and drainage
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
2024, long-term closure (24/7). Left lane closure on southbound frontage road
of I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk151097051"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;">Wednesday,
January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum
Parkway to Evans Road for drainage work. Traffic should use next exit ramp.</span></span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><a name="_Hlk153970897">Wednesday, January 3 until
Saturday, January 6. 9:00 p.m. to 5:00 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;">. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp
for column and cap work. Traffic should follow detour signs.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for
striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow
the detour signs to southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 to southbound I-35 connector ramp for
striping and barrier work. Westbound Loop 1604 traffic to southbound I-35 must
exit at Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must exit west Loop 1604 (exit 172) to
access southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 to southbound I-35 connector ramp for
columns and cap work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Road to Pat Booker Road for drilled shafts. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound of Pat Booker Road and exit ramp
closure to Pat Booker Road at I-35 for beam setting. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for barrier
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures on northbound frontage road, entrance ramp closure, and
alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for
barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein
Road to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 to Randolph Boulevard for
drainage work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Wednesday, January 3 until Saturday, January 6. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Friday, January 12. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from Wiseman Rd. to Westover Hills.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Friday, January 12. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from SH 151 to Wiseman. </span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Hunt Lane for bore
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, Ingram Rd. for bore
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Potranco Rd. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-36119580854085710982023-12-15T14:46:00.001-06:002023-12-15T14:46:46.772-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Friday, December 22. Nightly 12 a.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Friday, December 22. Nightly 12 a.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Friday, December 22. Nightly 12 a.m. until 5
a.m. Alternating westbound mainlane closure from Kyle Seale Parkway to the
Braun Road entrance ramp for barrier relocation. Alternating lane closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Friday, December 22. Nightly 12 a.m. until 5
a.m. Alternating westbound frontage road closure from Kyle Seale Parkway to the
Braun Road entrance ramp for barrier relocation. Alternating lane closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Wednesday, January 3. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Friday, December 22. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend
closure. Westbound right lane closure from Kyle Seale Parkway to the Braun Road
entrance ramp for an entrance ramp reversal. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound entrance ramp full closure after Hausman Road
for an entrance ramp reversal. </span><span style="mso-bookmark: _Hlk108794202;">The existing entrance ramp
from Hausman Road will close permanently while a new permanent entrance ramp
from Hausman Road will open simultaneously at the conclusion of the weekend
lane closures.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound exit ramp full closure to Bandera Road for an
entrance ramp reversal.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound exit ramp full closure to Braun Road for an
entrance ramp reversal.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 17 until Friday, December 22. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 12 a.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 17 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 17 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-spacerun: yes;"> </span>Nightly 12 a.m. until 5 a.m.
Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway
exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 17 until Friday, December 22. <span style="mso-spacerun: yes;"> </span></span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5
a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit
ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22.<span style="mso-spacerun: yes;"> </span></span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5
a.m. Westbound mainlane full closure from the Lockhill Selma Road exit ramp to
IH-10 to mobilize equipment and materials from the westbound workzone to the
eastbound workzone.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Vance Jackson northbound lane closure at
the Loop 1604 bridge for setting overhangs on the westbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Vance Jackson southbound lane closure at
the Loop 1604 bridge for setting overhangs on the westbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. Loop 1604 eastbound mainlanes from the
Vance Jackson Road exit ramp to the Lockhill Selma entrance ramp will be fully
closed to mobilize equipment and materials from the westbound workzone to the
eastbound workzone. Off-duty officers will direct traffic through
intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. IH-10 westbound exit ramp / direct
connector to the Loop 1604 eastbound mainlanes will be closed to mobilize
equipment and materials from the westbound workzone to the eastbound workzone.
Off-duty officers will direct traffic through intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 18 until Friday, December 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 12 a.m. until 5 a.m. IH-10 eastbound mainlane cloverleaf exit
ramp (southwest cloverleaf) to the Loop 1604 eastbound mainlanes will be closed
to mobilize equipment and materials from the westbound workzone to the
eastbound workzone. Off-duty officers will direct traffic through
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 17 until Sunday, December 24.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway
Boulevard to Gateway Place for setting caps. Traffic should follow detour
signs.</span></span></a></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 18 until Friday, December 22. Nightly 12 a.m. until 5
a.m. Alternating IH-10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 18until Friday, December 22. Nightly 12 a.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">Loop 1604 westbound
exit ramp to IH-10 westbound mainlane full closure for bridge construction
(drill shafts). Nightly full closure. Excluding weekends.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk153530193"><span style="font-family: arial; font-size: x-small;">Sunday, December 17. One
Night Only. 12 a.m. until 9 a.m. Alternating IH-10 westbound mainlane closure
from the Loop 1604 interchange to Camp Bullis Road for bridge construction.
Weekend closure. One lane to remain open at all times. </span></a></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk153530193;">Sunday, December 17. One
Night Only. 12 a.m. until 9 a.m. Alternating IH-10 eastbound mainlane closure
from Camp Bullis Road to the Loop 1604 interchange for bridge construction.
Weekend closure. One lane to remain open at all times.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="paragraph" style="margin: 0in; vertical-align: baseline;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148687365"><span style="font-family: arial; font-size: x-small;">Friday, December 15
through Monday, December 18. CONTINUOUS northbound and southbound Loop 1604
closed continuously at I-10 from 8 p.m. 12/15 until 5 a.m. 12/18 for bridge
demo. Detour:</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148687365;"><span style="font-family: arial; font-size: x-small;">Southbound Loop 1604
traffic may take I-10 westbound frontage road, turn around at FM 1516, and use
I-10 eastbound frontage road back to Loop 1604.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148687365;">Northbound Loop 1604
traffic may take I-10 eastbound frontage road, turn around at Pfeil Road, and
use I-10 westbound frontage road back to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, December 19 until Friday, December 22. 9 p.m. to 5
a.m. Single westbound mainlane closure from FM 465 to Zuehl Rd. for bridge
work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
until Saturday, December 29, long-term closure (24/7). Left lane closure on
southbound frontage road of I-35 at Fratt Road for construction work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
until Saturday, December 29 long-term closure (24/7). Alternating lane closures
on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind
Drive for roadway reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
through Saturday, February 3, 2024 long-term closure (24/7). Left lane closure
on northbound frontage road of I-35 from Judson Road to Toepperwein Road for
drainage, column, and cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
until Thursday, February 29, 2024, long-term closure (24/7). Left lane closure
on southbound I-35 frontage road between Toepperwein Road and Judson Road for
retaining wall, drilled shaft, column, and cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
until Sunday, September 8, 2024, long-term closure (24/7). Left lane closure on
southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for
construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk151097051"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;">Sunday, December 17 until Friday, December 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier
work. Traffic should use next available ramps.</span></span></span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz
Parkway for bridge structure work. Traffic should use next entrance and exit
ramps.</span></span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><a name="_Hlk153530753"><span style="line-height: 107%;">Sunday, December 17 until Friday,
December 22. 9:00 p.m. to 5:00 a.m</span></a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;">. Multiple lane closures (3) on northbound
mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage
work. Traffic should use next exit ramp.<o:p></o:p></span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance
ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic
should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from
Schertz Parkway to Forum Parkway for bridge structure work.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604
connector ramp and alternating lane closures on southbound mainlanes of I-35 at
the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop
1604 traffic should exit at Retama Parkway and follow the detour signs to Loop
1604.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old
Austin Road to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama
Parkway to Olympia Parkway for bridge substructure work. Traffic should follow
detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to northbound I-35
connector ramp for striping and barrier work. Traffic should follow detour
signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop
1604 interchange for striping, barrier, and construction entrance work. Traffic
should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound I-35 collector ramp at the Loop
1604 interchange for striping and barrier work. Traffic must use west Loop 1604
(exit 172) to access southbound I-35 and follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on westbound Loop 1604 to southbound I-35
connector ramp for earthwork. Traffic must exit at Lookout Road and follow the
detour signs to southbound I-35.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to southbound I-35
connector ramp for striping and barrier work. Traffic must exit at IKEA-RBFCU
Parkway and follow the detour signs to southbound I-35.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35 northbound
frontage road to I-35 southbound frontage road, near Shin Oak Drive for
construction work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35
from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping,
barrier, and temporary pavement work. </span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of
I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson
Road for structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from
Forum Parkway to Ferrell Road for bridge structure work.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat Booker
Road at I-35 for construction work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU
Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector
ramp closure, and southbound I-35 collector ramp closure at the Loop 1604
interchange for striping and barrier work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp
to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic
must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on northbound frontage road and exit ramp of
I-35 from Judson Road to Toepperwein Road for drilled shaft, column, and cap
work.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right
lane closure on northbound mainlanes, and exit ramp closure of I-35 from
Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and
westbound at the intersection of Judson Road and Randolph Boulevard and left
lane closure on Randolph Boulevard at Judson Road for temporary pavement and
signal works. Traffic should use the next exit ramp.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of
I-35 from Toepperwein Road to Judson Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic must follow detour.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35
mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2)
on southbound frontage road of I-35 from Judson Road to O’Connor Road for
striping, barrier, and paving work. Traffic should use next entrance and exit
ramps. </span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35
from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier
work. </span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp
closure of I-35 from O’Connor Road to Tech Com Drive for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic must follow detour.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of
I-35 from Tech Com Drive to Weidner Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic must follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to
southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind
Drive for drilling work. Traffic should follow detour signs. Accommodations
will be made for local traffic.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound frontage
road at I-35 for drainage work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 at Randolph
Boulevard for drainage work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410 connector
ramp for drilling work. Traffic should follow detour signs. </span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road,
alternating lane closures on northbound frontage road, and alternating entrance
and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping
and barrier work. Traffic should follow detour signs for available ramps.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and
entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft
work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of
Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple
lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound
frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and
entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft
work. Traffic should follow detour signs.</span></span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="mso-bookmark: _Hlk152934569;"><span style="line-height: 107%;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of
Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple
lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound
frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term
closure (24/7). Left lane closure on westbound frontage road of I-410 from
Perrin Creek to Austin Highway (Loop 368) for construction.</span></span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of
I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to
Austin Highway (Loop 368) for striping and barrier work. Traffic should follow
detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="line-height: 107%;">Sunday, December 17 until Friday, December 22. 9:00
p.m. to 5:00 a.m. Full closure of entrance ramp on westbound frontage road and
exit ramp of I-410 to Austin Highway (Loop 368) for barrier work. Traffic
should follow detour signs.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, December
20. Daily 9 a.m. to 4 p.m. . Single southbound mainlane closure at Sinclair Rd.
for bridge repairs. Full closure of Sinclair Rd. under the overpass.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, December 16 until Sunday,
December 17. 7 a.m. to 3 p.m. Multiple eastbound lane closures from N.W.
Military Highway to Blanco Rd. for overhead sign installation.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, December 19 until
Friday, December 22. 8 p.m. to 5 a.m. Alternating lane closures, in both
directions from Loop 1604 to Cedar Trail for barrier work and restriping.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, December
22. 9 a.m. to 3 p.m. Turn arounds closures in both directions under Leon Creek
Bridge for overhead work.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Friday, January 12. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from Wiseman Rd. to Westover Hills.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, January 3 until Friday, January 12. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from SH 151 to Wiseman. </span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Hunt Lane for bore
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, Ingram Rd. for bore
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, January 2 until Wednesday, January 31. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Potranco Rd. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-80722560920800716822023-12-08T17:34:00.003-06:002023-12-08T17:34:15.013-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. Alternating eastbound frontage road lane closure from La Cantera Parkway
to IH-10 eastbound frontage road for illumination post removal. Alternating
lane closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. Alternating westbound frontage road lane closure from IH-10 eastbound
frontage road to La Cantera Parkway for illumination post removal. Alternating
lane closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from Kyle Seale Parkway to the
Braun Road entrance ramp for barrier relocation. Alternating lane closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from La Cantera Parkway to
IH-10 eastbound frontage road for concrete beam placement. Daily alternating
closures.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to Babcock
Road for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from Babcock Road to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11 until Monday, December 18. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11 until Monday, December 18. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend
closure. Westbound right lane closure from Kyle Seale Parkway to the Braun Road
entrance ramp for an entrance ramp reversal. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound entrance ramp full closure after Hausman Road
for an entrance ramp reversal. </span><span style="mso-bookmark: _Hlk108794202;">The existing entrance ramp
from Hausman Road will close permanently while a new permanent entrance ramp
from Hausman Road will open simultaneously at the conclusion of the weekend
lane closures.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound exit ramp full closure to Bandera Road for an
entrance ramp reversal.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m.
Weekend full closure. Westbound exit ramp full closure to Braun Road for an
entrance ramp reversal.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 10 until Friday, December 15. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 10 until Friday, December 15. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 10 until Friday, December 15. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m.
Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway
exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 10 until Friday, December 15. <span style="mso-spacerun: yes;"> </span></span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m.
Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to
IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, December 11 until Wednesday, December 13.<span style="mso-spacerun: yes;"> </span></span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m.
Westbound mainlane full closure from the Lockhill Selma Road exit ramp to IH-10
for setting girders on the direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 10 until Sunday, December 17.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Full weekend closure. Vance Jackson Road northbound mainlane full
closure at the Loop 1604 bridge<span style="mso-spacerun: yes;"> </span>for
setting steel girders. Lane closures to remain in place for the entire
duration. Off-duty officers to direct traffic through intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Full weekend closure. Vance Jackson Road southbound mainlane full
closure at the Loop 1604 bridge<span style="mso-spacerun: yes;"> </span>for
setting steel girders. Lane closures to remain in place for the entire
duration. Off-duty officers to direct traffic through intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, December 15 at 8 p.m. until Monday, December 18 at 5 a.m.
Full weekend closure. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound right/auxiliary
mainlane closure from the Lockhill Selma Road exit ramp to the frontage
road/IH-10 intersection for setting steel girders. Lane closures to remain in
place for the entire duration. Off-duty officers to direct traffic through
intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, December 15 at 8 p.m. until Monday, December 18 at 5 a.m.
Full weekend closure. </span></span><span style="mso-bookmark: _Hlk108794202;">Westbound entrance ramp
full closure from Lockhill Selma Road for setting steel girders. The westbound
exit ramp to the frontage road/IH-10 intersection will remain OPEN. Lane
closures to remain in place for the entire duration. Off-duty officers to
direct traffic through intersections.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="paragraph" style="margin: 0in; vertical-align: baseline;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, December 10
until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating mainlane
closures on eastbound Loop 1604 and alternating exit ramp closures from
Nacogdoches Road to I-35 for barrier work. Traffic should use next exit ramp.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Saturday, December 16. 9:00 p.m.
to 5:00 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway
Boulevard to Gateway Place for setting caps. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Saturday, December 16. 9:00 p.m.
to 5:00 a.m. Full closure on westbound Loop 1604 collector ramp at I-35
interchange for geotechnical work. Traffic should follow the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Saturday, December 16. 9:00 p.m.
to 5:00 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker
Road to Lookout Road for overhead sign removal. Traffic should follow signs and
use next entrance ramp.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Sunday, December 10 until Saturday, December 16. 9:00 p.m.
to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance
ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for barrier
work. Traffic should use prior exit and next entrance ramps.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 18 until Wednesday,
December 20. 9 a.m. to 4 p.m. Alternating lane closures at Culebra Rd. for road
repairs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. IH-10 eastbound exit ramp to the Loop 1604 westbound collector-distributor
full closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. IH-10 eastbound frontage road entrance ramp from Loop 1604 eastbound full
closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to Camp Bullis Road for bridge construction. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to
the Loop 1604 interchange for bridge construction. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. </span></span><span style="font-family: arial; font-size: small;">Loop 1604
eastbound collector distributor exit ramp to IH-10 eastbound mainlane
(cloverleaf) full closure for bridge construction (drill shafts). Nightly full
closure. Excluding weekends.</span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. </span></span><span style="font-family: arial; font-size: small;">Loop 1604
westbound collector distributor exit ramp to IH-10 eastbound mainlane
(cloverleaf) full closure for bridge construction (drill shafts). Nightly full
closure. Excluding weekends.</span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until
5 a.m. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;"><span style="font-family: arial; font-size: x-small;">Alternating
IH-10 westbound frontage road closure from La Cantera Parkway to Camp Bullis
Road full closure for illumination post installation. Nightly alternating
closures. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">IH-10
eastbound frontage road full closure from the Loop 1604 westbound frontage road
to the Loop 1604 eastbound frontage road for bridge construction. Nightly
closures. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">Loop 1604
westbound collector distributor exit ramp to IH-10 westbound mainlane full
closure for bridge construction. Nightly full closure. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m.
Alternating IH‑10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="paragraph" style="margin: 0in; vertical-align: baseline;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11. NIGHTTIME westbound I-10 full mainlane
closure from Pfeil Road to FM 1515 from 8 p.m. to 5 a.m. for striping. Detour:
I-10 westbound traffic will take the Pfeil Rd. exit and travel on frontage road
to next entrance ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, December 12. NIGHTTIME eastbound I-10 rolling full
mainlane closures from Loop 1604 to Graytown Road from 9 p.m. to 5 a.m. for
striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, December 12. NIGHTTIME I-10 eastbound frontage
road alternating single lane closures at Loop 1604 from 9 p.m. to 5 a.m.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148687365"><span style="font-family: arial; font-size: x-small;">Friday, December 15
through Sunday, December 17. CONTINUOUS northbound and southbound Loop 1604
closed continuously at I-10 from 8 p.m. 12/15 until 5 a.m. 12/18 for bridge
demo. Detour:</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148687365;"><span style="font-family: arial; font-size: x-small;">Southbound Loop 1604
traffic may take I-10 westbound frontage road, turn around at FM 1516, and use
I-10 eastbound frontage road back to Loop 1604.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148687365;">Northbound Loop 1604
traffic may take I-10 eastbound frontage road, turn around at Pfeil Road, and
use I-10 westbound frontage road back to Loop 1604.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
at Fratt Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, February
3, 2024, long-term closure (24/7). Left lane closure on southbound I-35
frontage road between Toepperwein Road and Judson Road for retaining wall,
drilled shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February
3, 2024 long-term closure (24/7). Left lane closure on northbound frontage road
of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
2024, long-term closure (24/7). Left lane closure on southbound frontage road
of I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk152934569"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;">Sunday,
December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m</span></span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;">. Northbound to southbound I-35
turnaround closure at Evans Road and full closure of westbound Evans Road at
I-35 for striping, barrier, drainage, and temporary pavement work. Traffic
should use Corporate Drive intersection.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35
turnaround closure at Evans Road and full closure of westbound Evans Road at
I-35 for striping, barrier, drainage, and temporary pavement work. Traffic
should use Corporate Drive intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Right shoulder closure on
northbound I-35 entrance ramp from I-35 connector ramp from westbound Loop 1604
for utilities work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans
Road for drainage work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping,
barrier, temporary pavement, and demolition works. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp
closure from Old Austin Road to Forum Parkway for construction work. Traffic
must use the Forum Parkway turnaround and follow detour signs to access
southbound I-35. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge
substructure work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge
structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to northbound I-35 connector ramp for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to southbound I-35 connector ramp for striping and barrier work. Traffic
must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
to westbound Loop 1604 connector ramp and alternating lane closures on
southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure
work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and
follow the detour signs to Loop 1604.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
collector ramp at the Loop 1604 interchange for striping and barrier work.
Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow
detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp
closure from Toepperwein Road to Loop 1604 for barrier setting and structures
work. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum
Parkway for striping, barrier, and temporary pavement work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat
Booker Road for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of northbound
frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat
Booker Road to Loop 1604 interchange for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2)
on northbound mainlanes of I-35, entrance ramp closure, and alternating exit
ramp closures from O’Connor Road to Toepperwein Road for barrier setting and
structures work. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for
cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound
frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and
barrier work. Traffic should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp closure of I-35 from O’Connor Road to Tech Com
Drive for cap form erection work. Accommodations will be made for local
traffic. Southbound frontage road of I-35 traffic must follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Tech Com Drive to Weidner Road for cap
form erection work. Accommodations will be made for local traffic. Southbound
frontage road of I-35 traffic must follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner
Road for striping work. Traffic should use the next exit and entrance ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for
striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for striping
and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, entrance ramp closure, and exit ramp closures of I-35
from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and northbound to southbound turnaround closure of I-35 from
Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow
detour signs. Accommodations will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35
to westbound I-410 connector ramp for drilling work. Traffic should follow
detour signs. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound I-410 exit ramp to southbound I-35 frontage road and alternating lane
closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem
Road for geotechnical, drilled shaft, and column work. Traffic to use next exit
ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound I-410 exit ramp to southbound I-35 frontage road and alternating lane
closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem
Road for geotechnical, drilled shaft, and column work. Traffic to use next exit
ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of Randolph
Boulevard and southbound frontage road at I-35 for drainage work. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk151097051;"><span style="mso-bookmark: _Hlk152314319;">Monday, December 11 until Friday,
December 15. 9:00 a.m. to 3:00 p.m. Left lane closure on I-35 northbound and
southbound mainlanes from Corporate Drive to Roy Richard Drive for utility
work.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16,
2024, long-term closure (24/7). Left lane closure on westbound frontage road of
I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work.
Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for
barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph
Boulevard for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlanes of I-410 from Starcrest Drive to Randolph Boulevard for
barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and right mainlane
closure from Perrin Beitel to Austin Highway (Loop 368) for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of entrance ramp on
westbound frontage road and exit ramp of I-410 to Austin Highway (Loop 368) for
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and
barrier work.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 10 until
Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel
for striping and barrier work. Traffic should use next exit ramp.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, December
20. Daily 9 a.m. to 4 p.m. . Single southbound mainlane closure at Sinclair Rd.
for bridge repairs. Full closure of Sinclair Rd. under the overpass.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11 until Friday,
December 15. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, December
22. 9 a.m. to 3 p.m. Turn arounds closures in both directions under Leon Creek
Bridge for overhead work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 11 until
Wednesday, December 13. 9 a.m. to 3 p.m. Alternating mainlane closures, in both
directions, from Cupples Rd. to W. Military Dr. for road repairs.</span></span> </li></ul>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Potranco Rd. for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Potranco Rd. to Loop 1604 for utility work.
</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Ingram Rd. for utility work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Kendall County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10. 9 a.m. to 3 p.m. Alternating rolling
mainlane closures, in both directions, from Scenic Loop Rd. to Fredericks Creek
for vegetation work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10. 9 a.m. to 3 p.m. Alternating lane
closures on the frontage roads, in both directions, from Scenic Loop Rd. to
Fredericks Creek for vegetation work.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, December 13. 9 a.m. to 3 p.m. Single eastbound mainlane
closure from US 87 to Scenic Loop Rd. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-62915571596738816582023-12-01T14:45:00.001-06:002023-12-01T14:45:08.897-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from La Cantera Parkway
to IH-10 eastbound frontage road for illumination post removal. Alternating
lane closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 eastbound
frontage road to La Cantera Parkway for illumination post removal. Alternating
lane closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, December 1 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from La Cantera Parkway to
IH-10 eastbound frontage road for concrete beam placement. Daily alternating
closures.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to Babcock
Road for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from Babcock Road to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Friday, December 8. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Friday, December 8. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 3 until Friday, December 8. N</span></span><span style="mso-bookmark: _Hlk108794202;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from
Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 3 until Friday, December 8. </span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from
Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 3 until Friday, December 8. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m.
Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway
exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 3 until Friday, December 8. <span style="mso-spacerun: yes;"> </span></span></span><span style="mso-bookmark: _Hlk108794202;">Nightly 9 p.m. until 5 a.m.
Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to
IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Monday,
December 4 until Friday, December 8. Nightly 9 p.m. to 5 a.m. </span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;">Westbound mainlane full
closure from the Lockhill Selma Road exit ramp to IH-10 to mobilize equipment
and materials from the westbound work zone to the eastbound work zone.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="background: white; color: black;">Monday,
December 4 until Friday, December 8. Nightly 9 p.m. to 5 a.m. </span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;">Loop 1604 eastbound
mainlanes from the Vance Jackson Road exit ramp to the Lockhill Selma entrance
ramp will be fully closed to mobilize equipment and materials from the
westbound work zone to the eastbound work zone.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="background: white; color: black;">Monday, December
4 until Friday, December 8. Nightly 9 p.m. to 5 a.m. </span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;">IH-10 westbound exit ramp /
direct connector to the Loop 1604 eastbound mainlanes will be closed to
mobilize equipment and materials from the westbound work zone to the eastbound
work zone.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="background: white; color: black;">Monday, December
4 until Friday, December 8. Nightly 9 p.m. to 5 a.m. </span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;">IH-10 eastbound mainlane
cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound
mainlanes will be closed to mobilize equipment and materials from the westbound
work zone to the eastbound work zone.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, December 3 until Sunday, December 10.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;">Sunday, December 3 until Saturday, December 9. 9:00
p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to
IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.</span></span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Westbound to
eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific
Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road
turnaround.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
Lookout Road intersection and turnarounds at Loop 1604 for striping work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on the eastbound Loop 1604 collector ramp at the I-35 interchange for
striping work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of Loop 1604, right lane entrance ramp
closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad
for striping work. Traffic should use Lookout Road intersection. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for
striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating
mainlane closures on eastbound Loop 1604 and alternating exit ramp closures
from Nacogdoches Road to I-35 for barrier work. Traffic should use next exit
ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Eastbound to
westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific
Railroad for retaining wall demolition work. Traffic should use Lookout Road
intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign
removal. Traffic should follow signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
westbound Loop 1604 collector ramp at I-35 interchange for geotechnical work.
Traffic should follow the detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on westbound
mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for overhead sign
removal. Traffic should follow signs and use next entrance ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Westbound to
eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
Traffic should use Lookout Road intersection. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating
mainlane closures, exit ramp closure, and entrance ramp closure on westbound
Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should use
prior exit and next entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on westbound frontage road, exit ramp closure, and entrance ramp
closure of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for
barrier work. Traffic should use next available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on westbound frontage road and westbound bypass ramp of Loop 1604 from
I-35 to Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Exit ramp closure
on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping
work. Traffic should use next exit ramp. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Exit ramp closure
to Lookout Road from southbound I-35 to westbound Loop 1604 connector ramp for
cap work. Traffic should use next exit ramp.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="line-height: 107%;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place
for setting caps. Traffic should follow detour signs.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. IH-10 eastbound exit ramp to the Loop 1604 westbound collector-distributor
full closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. IH-10 eastbound frontage road entrance ramp from Loop 1604 eastbound full
closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to Camp Bullis Road for bridge construction. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to the
Loop 1604 interchange for bridge construction. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 3 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">Loop 1604
eastbound collector distributor exit ramp to IH-10 eastbound mainlane
(cloverleaf) full closure for bridge construction (drill shafts). Nightly full
closure. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">Loop 1604
westbound collector distributor exit ramp to IH-10 eastbound mainlane
(cloverleaf) full closure for bridge construction (drill shafts). Nightly full
closure. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, December 3 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">Alternating
IH-10 westbound frontage road closure from La Cantera Parkway to Camp Bullis
Road full closure for illumination post installation. Nightly alternating
closures. Excluding weekends.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, December 4 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating IH‑10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December
2. 8 p.m. to 6 a.m. Single westbound mainlane closure from Woman Hollering
Creek to FM 1518 for construction access.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term
closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt
Road for construction work.</span></span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term
closure (24/7). Alternating lane closures on southbound I-35 frontage road
between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and
structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, February 3, 2024, long-term
closure (24/7). Left lane closure on southbound I-35 frontage road between
Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and
cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term
closure (24/7). Left lane closure on southbound frontage road of I-35 from
McMorris Boulevard to Pat Booker Road for construction.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk152314319"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;">Sunday, December 3 until
Saturday, December 9. 9:00 p.m. to 5:00 a.m</span></span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;">.
Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier
work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Evans Road to Schertz Parkway for barrier work. Traffic
should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Schertz Parkway to Roy Richard Drive for barrier work.
Traffic should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Southbound to
northbound I-35 turnaround closure at Corporate Drive for striping, barrier,
and temporary pavement work. Traffic should use Corporate Drive intersection. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Southbound to
northbound I-35 turnaround closure at Corporate Drive and full closure of
eastbound Corporate Drive at I-35 for striping, barrier, and temporary pavement
work. Traffic should use Evans Road intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp
closure from Roy Richard Drive to Schertz Parkway for bridge structure work.
Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Roy Richard Drive to Schertz Parkway for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and
temporary pavement work. Traffic should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum
Parkway to Evans Road for drainage work. Traffic should use next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Forum Parkway to Evans Road for drainage and barrier work.
Traffic should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures of northbound frontage road of I-35 from Loop 1604 to Forum Parkway
for striping, barrier, and temporary pavement work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Northbound to
southbound I-35 turnaround closure at Evans Road and full closure of westbound
Evans Road at I-35 for striping, barrier, drainage, and temporary pavement work.
Traffic should use Corporate Drive intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for
striping, barrier, temporary pavement, and demolition works. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway
to Forum Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes from Schertz Parkway to Forum Parkway
for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road
for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Southbound I-35
entrance ramp closure from Old Austin Road to Forum Parkway for construction
work. Traffic must use the Forum Parkway turnaround and follow detour signs to
access southbound I-35. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 from Old Austin Road to Forum Parkway for
bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for
bridge substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road and entrance ramp and exit ramp closures
of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping,
barrier work, and temporary pavement work. Traffic should use prior exit ramp
and next entrance ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from Olympia Parkway to Gateway
Boulevard for bridge foundation, temporary pavement, striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
northbound I-35 collector ramp at the Loop 1604 interchange for striping,
barrier, and construction entrance work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating ramp
closures on southbound I-35 connector ramp to Pat Booker Road for striping,
barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172)
and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, entrance ramp closure, and alternating
exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work.
Traffic should follow the detour sign to the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound mainlanes of I-35, alternating exit ramp closures,
and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier
setting and structures work. Traffic should follow the detour signs to the
available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin
Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
northbound frontage road of I-35 and entrance ramp closure from Shin Oak Road
to Pat Booker Road for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Pat Booker Road to Loop 1604 interchange for striping, barrier, and
temporary pavement work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound
frontage road, near Shin Oak Drive for construction work. Traffic should follow
detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
eastbound and westbound lanes of Pat Booker Road at I-35 for construction work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on westbound Pat Booker Road at I-35 for striping work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound Pat Booker Road at I-35 for striping work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound
Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35
collector ramp closure at the Loop 1604 interchange for striping and barrier
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating ramp
closures on southbound I-35 connector ramp to Pat Booker Road for striping,
barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172)
and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, right lane closure on northbound
mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road,
right lane closure on the eastbound and westbound at the intersection of Judson
Road and Randolph Boulevard and left lane closure on Randolph Boulevard at
Judson Road for temporary pavement and signal works. Traffic should use the
next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple right
lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and
alternating exit ramp closures from O’Connor Road to Toepperwein Road for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Right lane
closure on eastbound Judson Road from Independence Avenue to southbound I-35
frontage road, and right turn lane closure on eastbound Judson Road to
southbound I-35 frontage road for utilities work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson
Road for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from Judson Road to O’Connor Road
for earthwork, paving, striping, and barrier work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Right lane
closure on southbound mainlanes of I-35, exit ramp closure, entrance ramp
closure, and left lane closure on southbound frontage road of I-35 at O’Connor
Road for barrier work. Traffic should use available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp
closure from Pat Booker Road to Judson Road for structures work. Traffic should
use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple right
lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit
ramp closure, and left lane closures (2) on southbound frontage road of I-35
from Judson Road to O’Connor Road for striping, barrier, and paving work.
Traffic should use next entrance and exit ramps. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for
striping work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound mainlanes of I-35, exit ramp closure, and
alternating lane closures on southbound frontage road of I-35 from Toepperwein
Road to Judson Road for earthwork and barrier work. Traffic should use next
exit ramp. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive to
Weidner Road for striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound frontage road, entrance ramp closure, and exit ramp
closures of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and
striping. Traffic should use next available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound frontage road, alternating entrance ramp closures,
and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop
Road for striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and entrance ramp closure of I-35 from O’Connor Road
to Tech Com Drive for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and exit ramp of I-35 from Tech Com Drive to Weidner
Road for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35, entrance ramp closure, and exit
ramp closure from O’Connor Road to Weidner Road for drainage and barrier work.
Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 and entrance ramp closure from
Weidner Road to Thousand Oaks Drive for earthwork, drainage and barrier work.
Traffic should use prior entrance ramp. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on southbound mainlanes, entrance and exit ramp closures, and
alternating lane closures on southbound frontage road of I-35 from O’Connor
Road to Weidner Road for striping work. Traffic should use the next exit and
entrance ramps. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on southbound mainlanes, entrance ramp closure, exit ramp closure,
and alternating lane closures on southbound frontage road of I-35 from Weidner
Road to Thousand Oaks Drive for striping work. Traffic should use the next exit
and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound mainlanes of I-35 from Randolph Boulevard to
Thousand Oaks for barrier setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road of I-35 from Crestway Drive to Starlight
Terrace for barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 and exit ramp closure from
Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic
should use prior exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and northbound to southbound turnaround closure of
I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic
should follow detour signs. Accommodations will be made for local traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound mainlanes of I-35 and alternating lane closures on
exit ramp from Walzem Road to Randolph Boulevard for barrier setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Southbound to
northbound turnaround closure at Walzem Road, alternating lane closures on
northbound frontage road, and alternating entrance and exit ramp closures of
I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic
should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
Randolph Boulevard and southbound frontage road at I-35 for drainage work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 to Randolph Boulevard for drainage work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on northbound and southbound of Interchange Parkway from Austin
Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound
and westbound of Fratt Road from I-35 southbound frontage road to Austin
Highway (Loop 368) for barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for
drilled shaft and column work. Traffic to use next entrance ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Right lane
closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road
for cap work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph
Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday,
December 4 until Friday, December 8. 9:00 p.m. to 5:00 a.m. Right lane closure
on westbound Starlight Terrance at I-35 from northbound frontage road to
southbound frontage road for pothole work. </span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk151097051;"><span style="line-height: 107%;">Thursday,
December 7. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound
lanes of Toepperwein Road at I-35 for beam setting. Traffic should follow
detour signs.</span></span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current
until Friday, February 16, 2024, long-term closure (24/7). Left lane closure on
westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368)
for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier
work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound Austin Highway (Loop 368) from Walzem Road to Interchange
Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound Austin Highway (Loop 368) connector ramp to westbound
I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of I-410, entrance ramp closure, and
eastbound to westbound turnaround closure between Starcrest Drive and Perrin
Beitel for striping and barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of I-410, entrance ramp closure, and right
mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping
and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound I-410 exit ramp to southbound I-35 frontage road and
alternating lane closures on southbound frontage road of I-35 from Randolph
Boulevard to Walzem Road for geotechnical, drilled shaft, and column work.
Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to
Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Randolph
Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on westbound frontage road and exit ramp closure of I-410 from
Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next
exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop
368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to
Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Full closure of
entrance ramp on westbound frontage road and exit ramp of I-410 to Austin
Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Multiple left
lane closures (2) and entrance ramp closure on eastbound frontage road of I-410
from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
December 3 until Saturday, December 9. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of I-410, entrance ramp closure, and exit
ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and
barrier work. Traffic should use prior entrance and exit ramps.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, December
20. Daily 9 a.m. to 4 p.m. . Single southbound mainlane closure at Sinclair Rd.
for bridge repairs. Full closure of Sinclair Rd. under the overpass.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 9 a.m. to 3 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Circle A for curb and sidewalk construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, December 2. 6 a.m. to 5
p.m. Center lane closures from Loop 1604 to Cedar Trail, in both directions,
for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Friday, December
8. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop
1604 to Circle A for curb and sidewalk construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, December 8 until
Friday, December 8. 8 p.m. to 5 a.m. Alternating lane closures, in both
directions, from Loop 1604 to Cedar Trail for barrier and striping work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, December 22.
9 a.m. to 3 p.m. Turn arounds closures in both directions under Leon Creek
Bridge for overhead work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, December 4 until
Wednesday, December 6. 9 a.m. to 3 p.m. Alternating westbound mainlane closures
from Cupples Rd. to Callaghan Rd. for mow strip replacement.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Potranco Rd. for utility
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, November 27until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closure on the westbound frontage road from Potranco Rd. to Loop 1604 for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Ingram Rd. for utility
work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Kendall County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Sunday, December 10. 9 a.m. to 3 p.m.
Alternating rolling mainlane closures, in both directions, from Scenic Loop Rd.
to Fredericks Creek for vegetation work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Sunday, December 10. 9 a.m. to 3 p.m.
Alternating lane closures on the frontage roads, in both directions, from Scenic
Loop Rd. to Fredericks Creek for vegetation work.</span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-88738043908465039392023-11-27T12:31:00.003-06:002023-11-27T12:31:13.871-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to Babcock
Road for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from Babcock Road to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Monday, December 11. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Monday, December 11. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday,
November 27 until Friday, December 1. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating
eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp
for barrier setting and striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday,
November 27 until Friday, December 1.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road
for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday,
November 27 until Friday, December 1.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday,
November 27 until Friday, December 1. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating
westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Monday, November 27 until Saturday, December 2. Nightly 9 p.m. to
5 a.m.</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;"> Right lane closure on Lockhill
Selma Road northbound at Loop 1604 intersection for installing illumination. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November 26 until Sunday, December 3.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of Lookout Road intersection and turnarounds at Loop 1604 for
striping work. Traffic should follow detour signs.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on eastbound
mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on westbound
frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting
caps. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on westbound
mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for overhead sign
removal. Traffic should follow signs and use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on eastbound
mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 collector ramp at I-35 interchange for geotechnical work. Traffic should
follow the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road
intersection and turnarounds at Loop 1604 for striping work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage
road of Loop 1604 from Gateway Boulevard to Gateway Place for setting caps.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. IH-10 eastbound exit ramp to the Loop 1604 westbound collector-distributor
full closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. IH-10 eastbound frontage road entrance ramp from Loop 1604 eastbound full
closure for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to Camp Bullis Road for bridge construction. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Nightly 10:30 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to the
Loop 1604 interchange for bridge construction. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 27 until Friday, December 8. Nightly 10 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 8. Daily 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from the Loop 1604
interchange to UTSA Boulevard for bridge construction. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 8 p.m. to 6 a.m. Single westbound mainlane closure from
Woman Hollering Creek to FM 1518 for construction access.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, November 29, long-term closure (24/7). Left
lane closure on southbound I-35 frontage road between Toepperwein Road and
Judson Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024 long-term closure (24/7).
Left lane closure on northbound frontage road of I-35 from Judson Road to
Toepperwein Road for drainage, column, and cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151097051">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for
barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work. Traffic should
use prior exit ramp and next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to northbound I-35 for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of westbound Loop 1604 connector ramp to southbound I-35 for
earthwork. Traffic must exit at Lookout Road and follow the detour signs to
southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to southbound I-35 for
striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow
the detour signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 collector ramp at I-35 interchange for
geotechnical work. Traffic should follow the detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Drive to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement
work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour signs
to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should use next available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp closure of I-35 from
O’Connor Road to Tech Com Drive for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Tech Com
Drive to Weidner Road for cap form erection work. Accommodations will be made
for local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, entrance
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should use available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work. Traffic should follow detour signs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closures on exit ramp from Walzem Road to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151097671">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Entrance ramp closure on southbound frontage road of I-35 from Fratt
Drive to Walzem Road for drilled shaft and column work. Traffic to use next
entrance ramp.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151098359">Sunday, November 26 until
Saturday, December 2. 10:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for
barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work. Traffic should
use prior exit ramp and next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to northbound I-35 for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to southbound I-35 for
striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow
the detour signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of westbound Loop 1604 connector ramp to southbound I-35 for
earthwork. Traffic must exit at Lookout Road and follow the detour signs to
southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Drive to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein
Road to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp closure of I-35 from
O’Connor Road to Tech Com Drive for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Tech Com
Drive to Weidner Road for cap form erection work. Accommodations will be made
for local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26, until Saturday, December 2, 10:00 PM to 5:00 AM.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work. Traffic should follow detour signs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closures on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph
Boulevard at Judson Road for temporary pavement and signal works. Traffic
should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, entrance
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should use available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should use next available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00 p.m. to 5:00 a.m.
Full closure of westbound I-410 connector ramp to southbound I-35 for beam
setting. Traffic should follow detour signs.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m. Multiple
lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from
I-35 to Perrin Beitel for striping and barrier work. Traffic should use next
exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Monday, November 27 until Saturday, December 2. 12:00 p.m. to 12:00 a.m.
Left lane closure on eastbound frontage road of I-410 from Harry Wurzbach Road
to Starcrest Drive and rolling closures on eastbound mainlanes of I-410 from
Harry Wurzbach Road to I-35 southbound mainlanes for beam staging.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 15. Nightly 9 p.m. to 5 a.m. Single southbound mainlane closure at
Sinclair Rd. for bridge repairs. Full closure of Sinclair Rd. under the
overpass.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 9 a.m. to 3 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Circle A for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 9 a.m. to 3 p.m. Single westbound mainlane closure from Nogalitos
St. to General Hudnell Dr. for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 22. 9 a.m. to 3 p.m. Turn arounds closures in both directions under
Leon Creek Bridge for overhead work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday,
December 1. 8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from 36<sup>th</sup>
St. to Loop 410 for guard fence repairs.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Potranco Rd. for utility
work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, November 27until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closure on the westbound frontage road from Potranco Rd. to Loop 1604 for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Friday, December 15. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Ingram Rd. for utility
work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Kendall County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Sunday, December 10. 9 a.m. to 3 p.m.
Alternating rolling mainlane closures, in both directions, from Scenic Loop Rd.
to Fredericks Creek for vegetation work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, December 4 until Sunday, December 10. 9 a.m. to 3 p.m.
Alternating lane closures on the frontage roads, in both directions, from Scenic
Loop Rd. to Fredericks Creek for vegetation work.</span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-17552162202013664862023-11-17T14:42:00.001-06:002023-11-17T14:42:02.807-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURE<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Westbound mainlane full closure from the Bandera Road exit ramp to the
Braun Road entrance ramp for hanging overhead sign trusses. Nightly full
closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 20 until Monday, November 27. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 20 until Monday, November 27. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November
19 until Wednesday, November 22. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 19 until Wednesday, November 22.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road
for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 19 until Wednesday, November 22.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 19 until Wednesday, November 22. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating
westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m.
to 5 a.m.</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;"> Right lane closure on Lockhill
Selma Road northbound at Loop 1604 intersection for installing illumination. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November 19 until Sunday, November 26.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of Lookout Road intersection and turnarounds at Loop 1604 for
striping work. Traffic should follow detour signs.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on eastbound
mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on westbound
frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting
caps. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Full closure on westbound
mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for overhead sign
removal. Traffic should follow signs and use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on eastbound
mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 collector ramp at I-35 interchange for geotechnical work. Traffic should
follow the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road
intersection and turnarounds at Loop 1604 for striping work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage
road of Loop 1604 from Gateway Boulevard to Gateway Place for setting caps.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Monday, November 27 until
Saturday, December 2. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 19 until Wednesday,
November 22. Nightly 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road full closure at the IH-10 interchange
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 20 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound exit ramp to IH-10 westbound frontage road full
closure for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. IH-10 eastbound frontage road from the Loop 1604 interchange to USTA
Boulevard full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlanes from the Loop 1604 interchange to the La Cantera
Parkway exit full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlanes from La Cantera Parkway to the Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road from Vance Jackson Road to the Loop 1604
interchange full closure for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Monday, November 20. Nightly 7:30 p.m. until 5
a.m. IH-10 eastbound exit ramp to the Loop 1604 westbound frontage road full
closure for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Monday, November 20. Nightly 7:30 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for roadway construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 20 until Tuesday, November 21. Daily 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Sunday, November 26. Daily/Nightly 24 hours a
day. IH-10 eastbound frontage road to Loop 1604 westbound frontage road right turn
lane closure for bridge construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November
21. 8 p.m. to 6 a.m. Full westbound mainlane closure from Zuehl Rd. to FM 465
for bridge work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Tuesday, November 21. 8 p.m. to 6 a.m. Single eastbound mainlane closure from
Graytown to Pfeil for construction access.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, November 29, long-term
closure (24/7). Left lane closure on southbound I-35 frontage road between
Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and
cap work.</span></span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term
closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt
Road for construction work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term
closure (24/7). Alternating lane closures on southbound I-35 frontage road
between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and
structural work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024
long-term closure (24/7). Left lane closure on northbound frontage road of I-35
from Judson Road to Toepperwein Road for drainage, column, and cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term
closure (24/7). Left lane closure on southbound frontage road of I-35 from
McMorris Boulevard to Pat Booker Road for construction.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151097051"><span style="line-height: 107%;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m</span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;">. Multiple lane closures (3) on northbound
mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road
to Roy Richard Drive for barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Roy Richard Drive for barrier work. Traffic should use next exit and entrance
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz
Parkway for barrier work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to
Schertz Parkway for striping, barrier, and temporary pavement work. Traffic
should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz
Parkway for bridge structure work. Traffic should use next entrance and exit
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at
Corporate Drive for striping, barrier, and temporary pavement work. Traffic
should use Corporate Drive intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures of northbound frontage road of
I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and
exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use Evans Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to
Evans Road for drainage and barrier work. Traffic should use next exit and
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Schertz Parkway to Forum Parkway for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and
entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary
pavement, striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road
and entrance ramp and exit ramp closures of I-35 from Evans Road to Olympia
Parkway for bridge foundation, striping, barrier work, and temporary pavement
work. Traffic should use prior exit ramp and next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Forum Parkway to Ferrell Road for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin
Road to Forum Parkway for construction work. Traffic must use the Forum Parkway
turnaround and follow detour signs to access southbound I-35. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and
entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of eastbound Loop 1604 connector ramp to
northbound I-35 for striping and barrier work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the
Loop 1604 interchange for striping, barrier, and construction entrance work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of southbound I-35 collector ramp at the
Loop 1604 interchange for striping and barrier work. Traffic must use west Loop
1604 (exit 172) to access southbound I-35 and follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604
connector ramp and alternating lane closures on southbound mainlanes of I-35 at
the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop
1604 traffic should exit at Retama Parkway and follow the detour signs to Loop
1604.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of westbound Loop 1604 connector ramp to
southbound I-35 for earthwork. Traffic must exit at Lookout Road and follow the
detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of eastbound Loop 1604 connector ramp to
southbound I-35 for striping and barrier work. Traffic must exit at IKEA-RBFCU
Parkway and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on westbound Loop 1604 collector ramp at
I-35 interchange for geotechnical work. Traffic should follow the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
entrance ramp closure, and alternating exit ramp closures of I-35 from Judson
Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign
to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35, alternating exit ramp closures, and entrance ramp closure from
Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic
should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35
northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive
for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp
closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604
interchange for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and
entrance ramp closure from Shin Oak Drive to Pat Booker Road for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping,
barrier, and temporary pavement work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance
ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Pat Booker Road
at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Pat Booker Road
at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector
ramp to Pat Booker Road for striping, barrier, and bridge substructure work.
Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat
Booker Road.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU
Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector
ramp closure, and southbound I-35 collector ramp closure at the Loop 1604
interchange for striping and barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat
Booker Road at I-35 for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
right lane closure on northbound mainlanes, and exit ramp closure of I-35 from
Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound
at the intersection of Judson Road and Randolph Boulevard and left lane closure
on Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes
of I-35, entrance ramp closure, and alternating exit ramp closures from
O’Connor Road to Toepperwein Road for barrier setting and structures work.
Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound
frontage road at I-35 for drainage work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and
barrier work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson
Road for structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35
mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2)
on southbound frontage road of I-35 from Judson Road to O’Connor Road for
striping, barrier, and paving work. Traffic should use next entrance and exit
ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Judson Road to O’Connor Road for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of
I-35, exit ramp closure, and left lane closure on southbound frontage road of
I-35 from Toepperwein Road to Judson Road for earthwork and barrier work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive
to Weidner Road for earthwork and striping. Traffic should use next available
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner
Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow
the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance
ramp closure of I-35 from O’Connor Road to Tech Com Drive for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp
of I-35 from Tech Com Drive to Weidner Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit
ramp closure, entrance ramp closure, and left lane closure on southbound
frontage road of I-35 at O’Connor Road for barrier work. Traffic should use
available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to
Weidner Road for drainage and barrier work. Traffic should use next entrance
and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for
earthwork, drainage and barrier work. Traffic should use prior entrance ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes,
alternating entrance and exit ramp closures, and alternating lane closures on
southbound frontage road of I-35 from O’Connor Road to Weidner Road for
striping work. Traffic should use the next exit and entrance ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes,
entrance ramp closure, exit ramp closure, and alternating lane closures on
southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for
striping work. Traffic should use the next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of
I-35 from Crestway Drive to Starlight Terrace for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound
to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind
Drive for drilling work. Traffic should follow detour signs. Accommodations
will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for
permanent widening work. Traffic should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound
to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind
Drive for drilling work. Traffic should follow detour signs. Accommodations
will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410
connector ramp for drilling work. Traffic should follow detour signs. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem
Road, alternating lane closures on northbound frontage road, and alternating
entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for
striping and barrier work. Traffic should follow detour signs for available
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound
of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and
multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35
southbound frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 and alternating lane closures on exit ramp from Walzem Road to Randolph
Boulevard for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound I-410 exit ramp
to southbound I-35 frontage road and alternating lane closures on southbound
frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical,
drilled shaft, and column work. Traffic to use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from
Randolph Boulevard to Walzem Road for cap work.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151097671"><span style="line-height: 107%;">Sunday, November 19 until
Wednesday, November 22. 9:00 p.m. to 5:00 a.m</span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;">. Entrance ramp closure on southbound frontage road
of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work.
Traffic to use next entrance ramp.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and
entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft
work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk151098359"><span style="line-height: 107%;">Sunday, November 26 until
Saturday, December 2. 10:00 p.m. to 5:00 a.m</span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;">. Multiple lane closures (3) on northbound
mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road
to Roy Richard Drive for barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz
Parkway for barrier work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Roy Richard Drive for barrier work. Traffic should use next exit and entrance
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to
Schertz Parkway for striping, barrier, and temporary pavement work. Traffic
should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at
Corporate Drive for striping, barrier, and temporary pavement work. Traffic
should use Corporate Drive intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35
mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive
to Schertz Parkway for bridge structure work. Traffic should use next entrance
and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to
Evans Road for drainage and barrier work. Traffic should use next exit and
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures of northbound frontage road
of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use Evans Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and
exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road
and entrance ramp and exit ramp closures of I-35 from Evans Road to Olympia
Parkway for bridge foundation, striping, barrier work, and temporary pavement
work. Traffic should use prior exit ramp and next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road
of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation,
temporary pavement, striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and
entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin
Road to Forum Parkway for construction work. Traffic must use the Forum Parkway
turnaround and follow detour signs to access southbound I-35. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and
entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Schertz Parkway to Forum Parkway for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the
Loop 1604 interchange for striping, barrier, and construction entrance work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00
p.m. to 5:00 a.m. Full closure of eastbound Loop 1604 connector ramp to
northbound I-35 for striping and barrier work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of eastbound Loop 1604 connector ramp to
southbound I-35 for striping and barrier work. Traffic must exit at IKEA-RBFCU
Parkway and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of westbound Loop 1604 connector ramp to
southbound I-35 for earthwork. Traffic must exit at Lookout Road and follow the
detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604
connector ramp and alternating lane closures on southbound mainlanes of I-35 at
the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop
1604 traffic should exit at Retama Parkway and follow the detour signs to Loop
1604.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of southbound I-35 collector ramp at the
Loop 1604 interchange for striping and barrier work. Traffic must use west Loop
1604 (exit 172) to access southbound I-35 and follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and
entrance ramp closure from Shin Oak Drive to Pat Booker Road for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp
closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 interchange
for striping, barrier, and temporary pavement work. Traffic should follow
detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35
northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive
for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping,
barrier, and temporary pavement work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance
ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Pat Booker Road
at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Pat Booker Road
at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat
Booker Road at I-35 for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from
IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35
connector ramp closure, and southbound I-35 collector ramp closure at the Loop
1604 interchange for striping and barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector
ramp to Pat Booker Road for striping, barrier, and bridge substructure work.
Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat
Booker Road.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Forum Parkway to Ferrell Road for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road
of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and
barrier work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp
of I-35 from Toepperwein Road to Judson Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance
ramp closure of I-35 from O’Connor Road to Tech Com Drive for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp
of I-35 from Tech Com Drive to Weidner Road for cap form erection work.
Accommodations will be made for local traffic. Southbound frontage road of I-35
traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road
of I-35 from Crestway Drive to Starlight Terrace for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road
of I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard
for permanent widening work. Traffic should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound
to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind
Drive for drilling work. Traffic should follow detour signs. Accommodations
will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound
frontage road at I-35 for drainage work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26, until Saturday, December 2,
10:00 PM to 5:00 AM. Full closure of northbound I-35 to westbound I-410
connector ramp for drilling work. Traffic should follow detour signs. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem
Road, alternating lane closures on northbound frontage road, and alternating
entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for
striping and barrier work. Traffic should follow detour signs for available
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 and alternating lane closures on exit ramp from Walzem Road to Randolph
Boulevard for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from
Randolph Boulevard to Walzem Road for cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound
of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and
multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35
southbound frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of
I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic
to use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2.
10:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp,
and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled
shaft work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35, alternating exit ramp closures, and entrance ramp closure from
Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic
should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2. 9:00
p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
entrance ramp closure, and alternating exit ramp closures of I-35 from Judson
Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign
to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes
of I-35, entrance ramp closure, and alternating exit ramp closures from
O’Connor Road to Toepperwein Road for barrier setting and structures work.
Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of
I-35, exit ramp closure, and left lane closure on southbound frontage road of
I-35 from Toepperwein Road to Judson Road for earthwork and barrier work.
Traffic should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
right lane closure on northbound mainlanes, and exit ramp closure of I-35 from
Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and
westbound at the intersection of Judson Road and Randolph Boulevard and left
lane closure on Randolph Boulevard at Judson Road for temporary pavement and
signal works. Traffic should use the next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson
Road for structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35
mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2)
on southbound frontage road of I-35 from Judson Road to O’Connor Road for
striping, barrier, and paving work. Traffic should use next entrance and exit
ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Judson Road to O’Connor Road for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit
ramp closure, entrance ramp closure, and left lane closure on southbound
frontage road of I-35 at O’Connor Road for barrier work. Traffic should use
available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive
to Weidner Road for earthwork and striping. Traffic should use next available
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner
Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow
the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes,
alternating entrance and exit ramp closures, and alternating lane closures on
southbound frontage road of I-35 from O’Connor Road to Weidner Road for
striping work. Traffic should use the next exit and entrance ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes,
entrance ramp closure, exit ramp closure, and alternating lane closures on
southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for
striping work. Traffic should use the next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for
earthwork, drainage and barrier work. Traffic should use prior entrance ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to
Weidner Road for drainage and barrier work. Traffic should use next entrance
and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Monday, November 27 until Saturday, December 2.
9:00 p.m. to 5:00 a.m. Full closure of westbound I-410 connector ramp to
southbound I-35 for beam setting. Traffic should follow detour signs.</span></span></span></span></li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk148081574;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Full closure of entrance ramp on westbound frontage road and exit ramp of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until Wednesday, November 22. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m. Multiple
lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from
I-35 to Perrin Beitel for striping and barrier work. Traffic should use next
exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 26 until Saturday, December 2. 10:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Monday, November 27 until Saturday, December 2. 12:00 p.m. to 12:00 a.m.
Left lane closure on eastbound frontage road of I-410 from Harry Wurzbach Road
to Starcrest Drive and rolling closures on eastbound mainlanes of I-410 from
Harry Wurzbach Road to I-35 southbound mainlanes for beam staging.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – West San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Tuesday, November 21. Alternating southbound mainlane closures from US 90 to Medina
Base Rd. for mill and overlay operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, November 21 until
Thursday, November 23. Single mainlane closure, in both directions at Medina
Base Rd. for bridge work. Bridge will also be closed to traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 19 until
Tuesday, November 21. Bridge closure at Valley Hi Rd. for bridge work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military Highway
<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 20 until Wednesday,
November 22. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from
Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 20 until
Tuesday, November 21. 9 a.m. to 3 p.m. Single westbound mainlane closure from
Nogalitos to General Hudnell for mow strip replacement.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Ingram Rd. to SH 151
for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Potranco Rd. to SH 151
for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures, on the frontage roads, in both directions, at Hunt Lane for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 410 to Potranco
Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 1604 to Wiseman
Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Saturday, November 18. 5 a.m. to 5 p.m. Full closure of the mainlanes, in
both directions, from Westover Hills Blvd. to Loop 1604 for beam setting. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-58658665012823001502023-11-10T16:25:00.005-06:002023-11-10T16:25:25.706-06:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Monday, November 20. Nightly 9 p.m. until 5
a.m. Westbound mainlane full closure from the Bandera Road exit ramp to the
Braun Road entrance ramp for hanging overhead sign trusses. Nightly full
closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Monday, November 20. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Monday, November 20. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Monday, November 20. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November
12 until Friday, November 17. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 12 until Friday, November 17. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"><span style="mso-spacerun: yes;"> </span>Nightly
9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak
Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 12 until Friday, November 17.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 12 until Friday, November 17. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating
westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, November 13 until Saturday, November 18 Nightly 9 p.m. to
5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Loop 1604 eastbound
mainlanes from the Bitters Road exit ramp to the Blanco Road entrance ramp will
be fully closed to install underpass illumination.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Monday, November 13 until Saturday, November 18 Nightly 9 p.m. to
5 a.m.</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;"> Westbound mainlane full closure
from the Lockhill Selma Road exit ramp to IH-10 to set overhangs for the westbound
direct connector. Only the westbound mainlanes or westbound frontage road will
be closed at a time. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="background: white; color: black;">Monday, November 13 until Saturday, November 18 Nightly 9 p.m. to
5 a.m.</span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;"> Westbound frontage road full
closure from the Lockhill Selma Road exit ramp to IH-10 to set overhangs for
the westbound direct connector. Only the westbound mainlanes or westbound
frontage road will be closed at a time.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November 12 until Sunday, November 19.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, November 10 at 9 p.m. until Sunday, November 12 at 5 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> FULL WEEKEND CLOSURE. Loop 1604 westbound mainlane full closure from
the NW Military Highway exit ramp to the Lockhill Selma Road entrance ramp to
perform a traffic switch. This closure will remain in place for the entire
duration. Off duty officers will direct traffic through intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, November 10 at 9 p.m. until Sunday, November 12 at 5 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> FULL WEEKEND CLOSURE. Loop 1604 eastbound mainlane full closure from
the Vance Jackson Road exit ramp to the Bitters Road entrance ramp to perform a
traffic switch. This closure will remain in place for the entire duration. Off
duty officers will direct traffic through intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, November 10 at 9 p.m. until Sunday, November 12 at 5 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> FULL WEEKEND CLOSURE<span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;">. </span>IH-10 westbound
exit ramp / direct connector to the Loop 1604 eastbound mainlanes will be fully
closed to perform a traffic switch. This closure will remain in place for the
entire duration. Off duty officers will direct traffic through intersections.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, November 10 at 9 p.m. until Sunday, November 12 at 5 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> FULL WEEKEND CLOSURE<span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;">. </span>IH-10 eastbound
mainlane cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound
mainlanes will be fully closed to perform a traffic switch. This closure will
remain in place for the entire duration. Off duty officers will direct traffic
through intersections.</span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to southbound I-35 for
striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow
the detour signs to southbound I-35.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound Pat Booker Road at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Full closure on eastbound
mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road
intersection and turnarounds at Loop 1604 for striping work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Full closure of westbound Loop
1604 connector ramp to southbound I-35 for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound Pat Booker Road at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Full closure on westbound
mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for overhead sign
removal. Traffic should follow signs and use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Full closure on westbound
frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting
caps. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San
Antonio/Bexar County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Friday,
November 17. 9 a.m. to 3 p.m. Southbound to northbound turnaround closure at
Culebra Rd. for bridge work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 12 until Friday,
November 17. Nightly 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 10. Nightly 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road full closure at the IH-10 interchange
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound exit ramp to IH-10 westbound frontage road full
closure for roadway construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. IH-10 eastbound frontage road from the Loop 1604 interchange to USTA
Boulevard full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlanes from the Loop 1604 interchange to the La Cantera
Parkway exit full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlanes from La Cantera Parkway to the Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Friday, November 17. Nightly 9 p.m. until 5
a.m. Loop 1604 westbound frontage road from Vance Jackson Road to the Loop 1604
interchange full closure for roadway construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Friday, November 17. Daily 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to
Camp Bullis Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 13 until Friday, November 17. Daily 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Sunday, November 19. Daily/Nightly 24 hours a
day. IH-10 eastbound frontage road to Loop 1604 westbound frontage road right turn
lane closure for bridge construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Sunday, November 19. Daily/Nightly 24 hours a
day. Loop 1604 westbound to eastbound frontage turnaround at the IH-10
interchange closure for drainage construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Eastbound I-10 exit to Graytown
Road closed. Detour: Eastbound I-10 traffic to Graytown Road should exit
earlier at FM 1516 and continue on the eastbound I-10 frontage road to
Graytown.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Saturday,
November 18. 8 p.m. to 6 a.m. Single eastbound mainlane closure from Graytown
Rd. to Pfeil Rd. for paving operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until
Tuesday, November 14. 9 p.m. to 5 a.m. Single westbound mainlane closure from
Zuehl Rd. to Cibolo creek for bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, November 15 until Tuesday,
November 21. 8 p.m. to 6 a.m. Full westbound mainlane closure from Zuehl Rd. to
FM 465 for bridge work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="font-family: arial; font-size: x-small;">Current until Saturday, November 25, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024 long-term closure (24/7).
Left lane closure on northbound frontage road of I-35 from Judson Road to
Toepperwein Road for drainage, column, and cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk149233638"><span style="mso-bookmark: _Hlk149891577;">Sunday, November 12 until Friday, November 17. 9:00
p.m. to 6:00 a.m. Southbound to northbound I-35 turnaround closure at Weidner
Road for pothole work. Traffic should use Weidner Road intersection.</span></a></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><a name="_Hlk150504237">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;">. Alternating lane closures on northbound frontage road, exit ramp
closure, and entrance ramp closure of I-35 from Evans Road to Schertz Parkway
for barrier work. Traffic should use next exit and entrance ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier
work. Traffic should use next available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road and full closure
of westbound Evans Road at I-35 for striping, barrier, drainage, and temporary
pavement work. Traffic should use Corporate Drive intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work. Traffic should
use prior exit ramp and next entrance ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound Loop 1604 connector ramp to northbound I-35 for
striping and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of westbound Loop 1604 connector ramp to northbound I-35 for
striping, barrier work, and concrete pours. Traffic should follow detour signs.
</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound I-35 to westbound Loop 1604 connector ramp and
alternating lane closures on southbound mainlanes of I-35 at the exit to Loop
1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should
exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of southbound I-35 collector ramp at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on westbound Loop 1604 collector ramp at I-35 interchange for
geotechnical work. Traffic should follow the detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound frontage road of I-35 from Ferrell Road to
Toepperwein Road for utilities work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein
Road to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, entrance
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should use available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should use next available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><a name="_Hlk150504768">Sunday, November 12 until
Saturday, November 18. 9:00 p.m. to 5:00 a.m</a></span></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;">. Multiple lane closures (2) on southbound mainlanes, entrance ramp
closure, exit ramp closure, and alternating lane closures on southbound
frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping
work. Traffic should use the next exit and entrance ramps.<o:p></o:p></span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, exit ramp closure, and southbound to northbound turnaround closure
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp closure of I-35 from
O’Connor Road to Tech Com Drive for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Tech Com
Drive to Weidner Road for cap form erection work. Accommodations will be made
for local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work. Traffic should follow detour signs. </span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closures on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="mso-bookmark: _Hlk149891577;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work.</span></span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">S Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Sunday, November 12 until Saturday, November 18. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 13 until
Wednesday, November 15. 8:30 p.m. to 5 a.m. Full closure of the westbound
mainlanes from Acme Rd. to Military Dr. for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12 until
Wednesday, November 15. 8:30 p.m. to 5 a.m. Multiple mainlane closures from
I-35 to Loop 410 for mill and overlay operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 12. 9 a.m. to 4
p.m. Full closure of the mainlanes, in both directions, from SH 151 to Callaghan
Rd. for utility crossing.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Ingram Rd. to SH 151
for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Potranco Rd. to SH 151
for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures, on the frontage roads, in both directions, at Hunt Lane for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 410 to Potranco
Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 1604 to Wiseman
Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Sunday, November 12. 9 p.m. to 4 a.m. Full westbound
mainlane closure from Potranco Rd. to Westover Hills for striping operations. </span></li><li><span style="font-family: arial; font-size: x-small;">Saturday, November 18. 5 a.m. to 5 p.m. Full closure of the mainlanes, in
both directions, from Westover Hills Blvd. to Loop 1604 for beam setting. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, November 13 until Wednesday, November 15. 9 p.m. to 5 a.m.
Single eastbound mainlane closure from Loop 1604 to Westover Hills for concrete
work.</span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-1248162081996636802023-11-03T15:36:00.001-05:002023-11-03T15:36:15.407-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Monday, November 20. Weeknights 9 p.m. until 5
a.m. Westbound mainlane full closure from the Bandera Road exit ramp to the
Braun Road entrance ramp for hanging overhead sign trusses. Nightly full
closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Monday, November 20. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Monday, November 20. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Monday, November 20. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, November
5 until Friday, November 10. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 5 until Friday, November 10. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"><span style="mso-spacerun: yes;"> </span>Nightly
9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak
Parkway exit ramp to Tradesman Road for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 5 until Friday, November 10.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating
eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday,
November 5 until Friday, November 10. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating
westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for
barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, November 6 at 9 p.m. until Tuesday, November 7 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to
the Lockhill Selma entrance ramp will be fully closed to set girders on the
eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, November 6 at 9 p.m. until Tuesday, November 7 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">IH-10 westbound exit ramp / direct connector to the Loop 1604 eastbound
mainlanes will be closed to set girders on the eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, November 6 at 9 p.m. until Tuesday, November 7 at 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">IH-10 eastbound mainlane cloverleaf exit ramp (southwest cloverleaf) to
the Loop 1604 eastbound mainlanes will be closed to set girders on the
eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Tuesday, November 7 until Thursday, November 9. </span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;">Nightly. 9 p.m. until 5 a.m. Westbound mainlane full closure from
the Lockhill Selma Road exit ramp to IH-10 to set girders for the direct
connector.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299193"><span style="background: white; color: black;">Wednesday, November 8 at 9 p.m. until Thursday, November 9 at 5
a.m</span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;"><span style="color: black;">. Loop 1604 westbound mainlane
right lane from Huebner Road to Bitters Road exit ramp will be closed for
striping and barrier setting for new temporary ramp. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Sunday, November 5 until Sunday, November 12. Daily/Nightly 24
hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604
and Lockhill Selma Road for wall construction under bridge. This closure will
remain in place for approximately 4 weeks.</span></span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
overhead sign removal. Traffic should follow signs.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604, right lane entrance ramp closure, and
turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping
work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on
eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to
I-35 for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound
mainlanes of Loop 1604 to IKEA-RBFRCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the
eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and eastbound to
westbound turnaround closure between Starcrest Drive and Perrin Beitel for
striping and barrier work. Traffic should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and right mainlane
closure from Perrin Beitel to Austin Highway (Loop 368) for striping and
barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound I-410 exit ramp to southbound I-35 frontage road and alternating lane
closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem
Road for geotechnical, drilled shaft, and column work. Traffic to use next exit
ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector
ramp closure at I-35 interchange for geotechnical work. Traffic should follow
the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on westbound
mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for overhead sign
removal. Traffic should follow signs and use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures,
exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35
to Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road, exit ramp closure, and entrance ramp closure of Loop
1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to
Nacogdoches Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound
mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on westbound
frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting
caps. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road
from southbound I-35 to westbound Loop 1604 connector ramp for cap work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard
to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 10. 9 p.m. to 5 a.m. Full
closure of the eastbound mainlanes at Johns Rd. for bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 5 until Friday,
November 17. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for
drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound to westbound turnaround at IH-10 full closure for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 17. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Friday, November 10. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Friday, November 10. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Friday, November 10. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Friday, November 17. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Friday, November 17. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, November 6 until Friday, November 17. Weekdays 10 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound mainlanes right lane at the IH-10 interchange for hanging girder
lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound collector-distributor at the IH-10 interchange for hanging
girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound frontage road through the IH-10 interchange for hanging girder
lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. IH-10
eastbound frontage road under Loop 1604 for hanging girder lines for the Loop
1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m.
Ramp/cloverleaf from IH-10 eastbound to Loop 1604 eastbound closure for hanging
girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Sunday, November 19. Daily/Nightly 24 hours a
day. IH-10 eastbound to Loop 1604 westbound frontage road right lane closure
for drill shaft construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 through
Monday, November 6. Full eastbound I-10 closure between Loop 1604 and Pfeil
Road from 9 p.m. Friday (11/3) until 5 a.m. Monday (11/6) for a traffic shift.
Detour to the frontage road and reenter at the next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Eastbound I-10 exit to Graytown
Road closed. Detour: Eastbound I-10 traffic to Graytown Road should exit
earlier at FM 1516 and continue on the eastbound I-10 frontage road to
Graytown.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="font-family: arial; font-size: x-small;">Current until Saturday, November 25, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024 long-term closure (24/7).
Left lane closure on northbound frontage road of I-35 from Judson Road to
Toepperwein Road for drainage, column, and cap work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk149891577"><span style="mso-bookmark: _Hlk149233638;">Sunday, November 5 until Saturday, November 11.
9:00 p.m. to 5:00 a.m</span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;">. Multiple lane closures (3) on northbound
mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road
to Roy Richard Drive for barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday,
November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound
frontage road, exit ramp closure, and entrance ramp closure of I-35 from Evans
Road to Schertz Parkway for barrier work. Traffic should use next exit and
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Schertz Parkway to Roy Richard Drive for barrier work. Traffic should use
next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Southbound to northbound I-35
turnaround closure at Corporate Drive for striping, barrier, and temporary
pavement work. Traffic should use Corporate Drive intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary
pavement work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Schertz Parkway to Evans Road for striping, barrier, and temporary
pavement work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday,
November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound
mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for
drainage work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures of
northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Forum Parkway to Evans Road for drainage and barrier work. Traffic should
use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge
structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge
structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road and entrance ramp and exit ramp closures of I-35 from
Evans Road to Olympia Parkway for bridge foundation, striping, barrier work,
and temporary pavement work. Traffic should use prior exit ramp and next
entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for
bridge foundation, temporary pavement, striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage
road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure
work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp
closure from Old Austin Road to Forum Parkway for construction work. Traffic
must use the Forum Parkway turnaround and follow detour signs to access
southbound I-35. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35
turnaround closure at Evans Road for striping, barrier, and temporary pavement
work. Traffic should use Evans Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35
turnaround closure at Evans Road and full closure of westbound Evans Road at
I-35 for striping, barrier, drainage, and temporary pavement work. Traffic
should use Corporate Drive intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to northbound I-35 connector ramp for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closures on westbound Loop
1604 connector ramp to northbound I-35 for striping, barrier work, and concrete
pours. Traffic should follow detour signs. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat
Booker Road for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop
1604 to southbound I-35 connector ramp for striping and barrier work. Traffic
must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop
1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
to westbound Loop 1604 connector ramp and alternating lane closures on
southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure
work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and
follow the detour signs to Loop 1604.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35
collector ramp at the Loop 1604 interchange for striping and barrier work.
Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow
detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Pat Booker Road at I-35 for construction work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp
closure from Toepperwein Road to Loop 1604 for barrier setting and structures
work. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum
Parkway for striping, barrier, and temporary pavement work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of northbound
frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat
Booker Road to Loop 1604 interchange for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat
Booker Road for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound Pat Booker Road at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound Pat Booker Road at I-35 for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday,
November 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage
road of I-35 from Ferrell Road to Toepperwein Road for utilities work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, entrance ramp closure, and alternating exit ramp
closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic
should follow the detour sign to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2)
on northbound mainlanes of I-35, entrance ramp closure, and alternating exit
ramp closures from O’Connor Road to Toepperwein Road for barrier setting and
structures work. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, right lane closure on northbound mainlanes, and exit
ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure
on the eastbound and westbound at the intersection of Judson Road and Randolph
Boulevard and left lane closure on Randolph Boulevard at Judson Road for
temporary pavement and signal works. Traffic should use the next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for
cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Judson Road to O’Connor Road for
earthwork, paving, striping, and barrier work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound
mainlanes of I-35, exit ramp closure, entrance ramp closure, and left lane
closure on southbound frontage road of I-35 at O’Connor Road for barrier work.
Traffic should use available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes of I-35, exit ramp closure, and left lane closure on
southbound frontage road of I-35 from Toepperwein Road to Judson Road for
earthwork and barrier work. Traffic should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for
striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, entrance ramp closure, and exit ramp closures of I-35
from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic
should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for
striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from O’Connor Road to Weidner Road for
cap form erection work. Accommodations will be made for local traffic.
Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35, entrance ramp closure, and exit ramp closure
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 and entrance ramp closure from Weidner Road to
Thousand Oaks Drive for earthwork, drainage and barrier work. Traffic should
use prior entrance ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, alternating entrance and exit ramp closures, and
alternating lane closures on southbound frontage road of I-35 from O’Connor
Road to Weidner Road for striping work. Traffic should use the next exit and
entrance ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from Weidner Road to Thousand
Oaks Drive for striping work. Traffic should use the next exit and entrance
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp closure of I-35 from O’Connor Road to Tech Com
Drive for cap form erection work. Accommodations will be made for local
traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage
road and exit ramp of I-35 from Tech Com Drive to Weidner Road for cap form
erection work. Accommodations will be made for local traffic. Southbound
frontage road of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for
barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and northbound to southbound turnaround closure of I-35 from
Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow
detour signs. Accommodations will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive
to Randolph Boulevard for permanent widening work. Traffic should use prior
exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35
to westbound I-410 connector ramp for drilling work. Traffic should follow
detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Southbound to northbound
turnaround closure at Walzem Road, alternating lane closures on northbound
frontage road, and alternating entrance and exit ramp closures of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35 and alternating lane closures on exit ramp from
Walzem Road to Randolph Boulevard for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound
mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled
shaft and column work. Traffic to use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of Randolph
Boulevard and southbound frontage road at I-35 for drainage work. Traffic
should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound
frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures
on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for
beam staging. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="mso-bookmark: _Hlk149233638;">Wednesday, November 8 until
Saturday, November 11. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Toepperwein Road at I-35 for beam setting. Traffic should
follow detour signs.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Friday,
November 10. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, November 6 until Friday,
November 10. 9 a.m. to 3 p.m. Alternating ramp closures from 36<sup>th</sup> St.
to Cupples Rd. for mow strip replacement. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday,
November 10. 8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from
36<sup>th</sup> St. to Loop 410 for mill and overlay operations.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Ingram Rd. to SH 151
for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Potranco Rd. to SH 151
for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures, on the frontage roads, in both directions, at Hunt Lane for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 410 to Potranco
Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, November 21. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from Loop 1604 to Wiseman Rd.
for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, November 7 until Sunday, November 12. 9 p.m. to 4 a.m. Full westbound
mainlane closure from Potranco Rd. to Westover Hills for striping operations.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-37 – San Antonio/Bexar County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Friday, November 10. 9 p.m. to 5 a.m.
Alternating mainlane closures, in both directions, from I-10 to US 181 for road
repairs. </span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-84306198153611279082023-10-27T16:15:00.005-05:002023-10-27T16:15:34.775-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10
for portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16)
for portable concrete barrier installation. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane to
remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for portable concrete traffic barrier installation. Nightly
alternating frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 8 p.m. until 5
a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La
Cantera Parkway to IH-10 for eastbound direct connector bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 8 p.m. until 5
a.m. Westbound frontage road lane full closure from IH-10 to John Peace
Boulevard/La Cantera Parkway for westbound collector-distributor bridge
construction. Nightly frontage road full closure. Only one full frontage lane
closure to occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, November 6. Weeknights 9 p.m. until 5
a.m. Loop 1604 and La Cantera Parkway full intersection closure (both
directions, including turnarounds) for demolition work/bridge construction.
Only one intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16)
to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera
Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Weekdays 9 a.m. until 3
p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 30 until Monday, November 6. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 30 until Monday, November 6. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Daily/Nightly 24 hours a
day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Monday, November 6. Daily/Nightly 24 hours a
day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale
Parkway for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be
closed at a time.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
29 until Friday, November 3. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
29 until Friday, November 3. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"><span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
29 until Friday, November 3.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road
closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
29 until Friday, November 3. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road
closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 30 at 11 p.m. until Tuesday, October 31 at 1 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to
the Lockhill Selma entrance ramp will be fully closed to mobilize crane from
the westbound to eastbound side of Loop 1604. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 30 at 11 p.m. until Tuesday, October 31 at 1 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">IH-10 westbound exit ramp / direct connector to the Loop 1604 eastbound
mainlanes will be closed to mobilize crane from the westbound to eastbound side
of Loop 1604.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 30 at 11 p.m. until Tuesday, October 31 at 1 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">IH-10 eastbound mainlane cloverleaf exit ramp (southwest cloverleaf) to
the Loop 1604 eastbound mainlanes will be closed to mobilize crane from the
westbound to eastbound side of Loop 1604.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299179"><span style="background: white; color: black;">Monday, October 30 until Sunday, November 5. </span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;">Including weeknight and weekend nights 9 p.m. until 5 a.m.
Westbound mainlane full closure from the Lockhill Selma Road exit ramp to IH-10
to mobilize crane from the westbound to eastbound side of Loop 1604, set
girders on the westbound direct-connector at UPRR, and place overhangs and deck
panels on the westbound direct-connector.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="background: white; color: black;">Wednesday, November 1 at 9 p.m. until Thursday, November 2 at</span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299179;"><span style="color: black;"> 5 a.m. Eastbound frontage road full closure from Vance Jackson
Road exit ramp to Tradesman Road to set girders on the eastbound direct
connector at UPRR.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk149299193"><span style="background: white; color: black;">Thursday,
November 2 at 9 p.m. until Friday, November 3 at 5 a.m. </span></a></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;">Loop 1604 eastbound
mainlanes from the Vance Jackson Road exit ramp to the Lockhill Selma entrance
ramp will be fully closed to set girders on the eastbound direct connector.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;"><span style="background: white; color: black;">Thursday,
November 2 at 9 p.m. until Friday, November 3 at 5 a.m. </span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;">IH-10 westbound exit ramp /
direct connector to the Loop 1604 eastbound mainlanes will be closed to set
girders on the eastbound direct connector.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;"><span style="background: white; color: black;">Thursday, November
2 at 9 p.m. until Friday, November 3 at 5 a.m</span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk149299193;">. IH-10 eastbound <span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;">mainlane cloverleaf exit ramp (southwest cloverleaf) to the Loop
1604 eastbound mainlanes will be closed to set girders on the eastbound direct
connector.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, November 3 at 9 p.m. until Saturday, November 4 at 12 a.m.
Short-term weekend closure. Westbound frontage full closure from the Lockhill
Selma Road exit ramp to IH-10 to set beams at the railroad crossing. Following
the completion of this work, the frontage road lanes will open, and the
westbound mainlanes will close.<span style="mso-spacerun: yes;"> </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 30 until Sunday, November 5. Including weeknight
and weekend nights 9 p.m. until 5 a.m. Westbound mainlane full closure from the
Lockhill Selma Road exit ramp to IH-10 to mobilize crane from the westbound to
eastbound side of Loop 1604, set girders on the westbound direct-connector at
UPRR, and place overhangs and deck panels on the westbound direct-connector.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Sunday, November 5.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for retaining wall demolition work. Traffic should use
Lookout Road intersection.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604, right lane
entrance ramp closure, and turnaround closure from Nacogdoches Road to Union
Pacific Railroad for striping work. Traffic should use Lookout Road
intersection. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout
Road to I-35 for striping and barrier work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 and alternating exit ramp
closures from Nacogdoches Road to I-35 for barrier work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on eastbound mainlanes of Loop 1604 to IKEA-RBFRCU Parkway
for striping work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout
Road for striping. Traffic should follow signs and use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for
demolition work. Traffic should use Lookout Road intersection. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures, exit ramp closure, and entrance ramp closure on
westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should
use prior exit and next entrance ramps.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union
Pacific Railroad for retaining wall demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road, exit ramp closure, and
entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches
Road for barrier work. Traffic should use next available ramps.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and westbound bypass ramp
of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and
temporary pavement work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for
pavement and striping work. Traffic should use next exit ramp. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place for setting caps. Traffic should follow detour signs.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Exit ramp closure to Lookout Road from southbound I-35 to westbound Loop 1604
connector ramp for cap work. Traffic should use next exit ramp.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, October 29 until Friday,
November 3. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to
De Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound
for bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure
for drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound to westbound turnaround at IH-10 full closure for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604
interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. IH-10 westbound mainlane full closure from La Cantera Parkway entrance
ramp to the Camp Bullis Road exit ramp for overhead sign bridge removal.
Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. IH-10 westbound collector-distributor full closure at the IH-10
intersection for bridge cap construction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for
bent cap construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Friday, November 3. Weeknights 9 p.m. until 5
a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for
bent cap construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Friday, November 3. Weekdays 10 a.m. until 3
p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection
for bridge construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Friday, November 3. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road
to Camp Bullis Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until Friday, November 3. Weekdays 9 a.m. until 3
p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis
Road to De Zavala Road to set portable concrete barrier. Daily alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. Loop
1604 eastbound mainlane full closure from Vance Jackson Road exit ramp to the
entrance ramp east of IH-10 for hanging girder lines for the Loop 1604 eastbound
direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. Loop
1604 eastbound collector-distributor full closure at the IH-10 interchange for
hanging girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. Loop
1604 eastbound frontage road full closure through the IH-10 interchange for
hanging girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. Loop
1604 westbound mainlanes left lane closure through the IH-10 interchange for
hanging girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. IH-10
eastbound frontage road full closure under Loop 1604 for hanging girder lines
for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 at 9 p.m. until Monday, October 30 at 5 a.m. Ramp/cloverleaf
from IH-10 eastbound to Loop 1604 eastbound closure for hanging girder lines
for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound mainlanes from Vance Jackson Road exit ramp to the entrance ramp
east of IH-10 for hanging girder lines for the Loop 1604 eastbound direct
connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound collector-distributor at the IH-10 interchange for hanging
girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 eastbound frontage road through the IH-10 interchange for hanging girder
lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Loop
1604 westbound mainlanes left lane closure through the IH-10 interchange for
hanging girder lines for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. IH-10
eastbound frontage road under Loop 1604 for hanging girder lines for the Loop
1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 at 9 p.m. until Monday, November 6 at 5 a.m. Ramp/cloverleaf
from IH-10 eastbound to Loop 1604 eastbound closure for hanging girder lines
for the Loop 1604 eastbound direct connector to IH-10.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Sunday, November 5. Daily/Nightly 24 hours a
day. IH-10 eastbound to Loop 1604 westbound frontage road right lane closure for
drill shaft construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 30 until Friday, November 3.
8 p.m. to 6 a.m. Single eastbound mainlane closure from Graytown Rd. to Pfeil Rd.
for paving operations.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="font-family: arial; font-size: x-small;">Current until Saturday, November 25, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024 long-term closure (24/7).
Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk149233638">Sunday, October 29 until
Saturday, November 4. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Southbound to northbound I-35 turnaround closure at Corporate Drive
for striping, barrier, and temporary pavement work. Traffic should use
Corporate Drive intersection. <o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier
work. Traffic should use next available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and entrance
ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier,
and temporary pavement work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road and full closure
of westbound Evans Road at I-35 for striping, barrier, drainage, and temporary
pavement work. Traffic should use Corporate Drive intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work. Traffic should
use prior exit ramp and next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35
interchange for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should use next available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, entrance
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should use available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Full closure of Randolph Boulevard and southbound frontage road at I-35 for
drainage work</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closure on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk149234167">Sunday, October 29 until
Saturday, November 4. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Full closure on southbound frontage road, exit ramp, and entrance ramp
of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Monday, October 30 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to northbound I-35 connector ramp closure Striping, barrier
work, and concrete pours. Traffic should follow detour signs. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein
Road to Judson Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from
O’Connor Road to Weidner Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Saturday, November 11. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, November 5 until Sunday, November 12. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Monday, October 30. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound Austin Highway (Loop 368) at I-410 for utility
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Sunday, October 29 until Saturday, November 4. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until </span><span style="mso-bookmark: _Hlk108794202;">Friday</span><span style="mso-bookmark: _Hlk108794202;">, November 3. 7 a.m. to 6 p.m. Alternating lane
closures, in both directions, from Loop 1604 to Huebner Rd. for curb and sidewalk
construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until </span><span style="mso-bookmark: _Hlk108794202;">Friday</span><span style="mso-bookmark: _Hlk108794202;">, November 3. 8:30 p.m. to 5 a.m. Alternating
westbound mainlane closures from 36<sup>th</sup> St. to Loop 410 for mill and
overlay operations. <o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until </span><span style="mso-bookmark: _Hlk108794202;">Friday</span><span style="mso-bookmark: _Hlk108794202;">, November 3. 8:30 p.m. to 5 a.m. Single westbound
mainlane closure from Callaghan Rd. to Loop 410 for metal beam guard fence
repairs. <o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, October 30 until </span><span style="mso-bookmark: _Hlk108794202;">Friday</span><span style="mso-bookmark: _Hlk108794202;">, November 3. 9 a.m. to 3 p.m. Single eastbound
mainlane closure from W. Military Dr. to General McMullen for concrete work.<o:p></o:p></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 29 until </span><span style="mso-bookmark: _Hlk108794202;">Friday</span><span style="mso-bookmark: _Hlk108794202;">, November 3. 8:30 p.m. to 5 a.m. Alternating lane
closures on the frontage roads, in both directions, from Loop 410 to W.
Military Dr. for mill and overlay operations. <span style="mso-spacerun: yes;"> </span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 30 until Friday, November 3.
9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604
to Circle A for curb and sidewalk construction.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closure
on the frontage roads, in both directions, at Potranco Rd. for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Ingram Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closure
on the eastbound frontage road from Wiseman to Loop 1604.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Hunt Lane for utility work.</span> </li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-46535287129130304982023-10-20T15:40:00.001-05:002023-10-20T15:40:16.900-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Nov. 6. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Oct. 30. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Oct. 30. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Kyle Seale Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Oct. 30. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Oct. 30. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Chase Hill Boulevard full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Monday, Oct. 30. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and La Cantera Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Monday, Nov. 6. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Monday, Nov. 6. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Monday, Nov. 6. Daily/Nightly 24 hours a day. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
22 until Friday, October 27. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
22 until Friday, October 27. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"><span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
22 until Friday, October 27.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road
closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
22 until Friday, October 27. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road
closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 23 until Thursday, October 26. Nightly 9 p.m.
until 5 a.m. </span></span><span style="mso-bookmark: _Hlk108794202;">Loop 1604 eastbound
mainlanes from the Vance Jackson Road exit ramp to the Lockhill Selma entrance
ramp will be fully closed to set girders for the eastbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 23 until Thursday, October 26. Nightly 9 p.m.
until 5 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> IH-10 westbound exit ramp
/ direct connector to the Loop 1604 eastbound mainlanes will be closed to set
girders for the eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October 23 until Thursday, October 26. Nightly 9 p.m.
until 5 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> IH-10 eastbound mainlane
cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound
mainlanes will be closed to set girders for the eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Tuesday,
October 24 until Saturday, October 28. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Westbound
mainlane full closure from the Lockhill Selma Road exit ramp to IH-10 to set
girders and deck pour on the westbound direct-connector. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Wednesday,
October 25 until Saturday, October 28. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Westbound
mainlane full closure from the Blanco Road exit ramp to the NW Military Highway
entrance ramp to install underpass illumination. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Wednesday,
October 25 until Saturday, October 28. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Eastbound
mainlane full closure from the Bitters Road exit ramp to the Blanco Road
entrance ramp to install underpass illumination. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Saturday, October 28 at 9 a.m. until 3 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> Weekend closure. NW Military Highway northbound lanes at Loop 1604 / NW
Military Highway intersection will be closed to install underpass illumination.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Saturday,
October 28 at 9 a.m. until 3 p.m.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Weekend closure. NW Military Highway southbound lanes at Loop 1604
/ NW Military Highway intersection will be closed to <span style="background: white; mso-shading-themecolor: background1;">install underpass illumination.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
22 until Sunday, October 29. Daily/Nightly 24 hours a day. Westbound to
Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for
wall construction under bridge. This closure will remain in place for
approximately 4 weeks.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, Oct. 23
until Sunday, October 29. Daily/Nightly 24 hours a day. Westbound to Eastbound
turnaround long term closure at Loop 1604 and Huebner Road for TMS
installation. This closure will remain in place for approximately 2 weeks.</span></span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop
1604 to Lookout Road for striping work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road
of Loop 1604, right lane entrance ramp closure, and turnaround closure from
Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should
use Lookout Road intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road
of Loop 1604 from Lookout Road to I-35 for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604
and alternating exit ramp closures from Nacogdoches Road to I-35 for barrier
work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure
from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition
work. Traffic should use Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure,
and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road
for barrier work. Traffic should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage
road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union
Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next
available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road
and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches Road for
construction entrance and temporary pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop
1604 to Lookout Road for pavement and striping work. Traffic should use next
exit ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure
from Lookout Road to Union Pacific Railroad for retaining wall demolition work.
Traffic must use Nacogdoches Road turnaround.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure
at Lookout Road for demolition work. Traffic should use Lookout Road
intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October
28. 9:00 p.m. to 5:00 a.m. Exit ramp closure to Lookout Road from southbound
I-35 to westbound Loop 1604 connector ramp for cap work. Traffic should use
next exit ramp.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Thursday, October 26. 9 p.m. to 5 a.m. Multiple
westbound mainlane closures at Fredericksburg Rd. for bridge repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 22 until Friday,
Nov. 3. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for
drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound to westbound turnaround at IH-10 full closure for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to
the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 22 until Friday, Nov. 3. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound mainlane full closure from La Cantera Parkway entrance ramp to
the Camp Bullis Road exit ramp for overhead sign bridge removal. Nightly
closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Friday, Oct. 27. Weeknights 9 p.m. until 5 a.m. Loop
1604 eastbound mainlanes full closure at the IH-10 interchange for bent cap
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Friday, Oct. 27. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound mainlanes full closure at the IH-10 interchange for bent cap
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Friday, Oct. 27. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound frontage road full closure at the IH-10 intersection for bridge
construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Friday, Oct. 27. Weekdays 10 a.m. until 3 p.m. Loop
1604 eastbound frontage road full closure at the IH-10 intersection for bridge
construction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Friday, Nov. 3. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 23 until Friday, Nov. 3. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604
eastbound frontage road at the IH-10 interchange closure for steel erection for
direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. IH-10
eastbound frontage road closure between Loop 1604 eastbound frontage road and
Loop 1604 westbound frontage road closure for steel erection for direct
connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604
eastbound collector-distributor at the IH-10 interchange closure for steel
erection for direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m.
Ramp/cloverleaf from IH-10 eastbound to Loop 1604 eastbound closure for steel
erection for direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604
eastbound mainlanes right lane closure at the IH-10 interchange for steel
erection for direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 27 at 9 p.m. until Monday, Oct. 30 at 5 a.m. Loop 1604
eastbound frontage road at the IH-10 interchange closure for steel erection for
direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 27 at 9 p.m. until Monday, Oct. 30 at 5 a.m. IH-10
eastbound frontage road closure between Loop 1604 eastbound frontage road and
Loop 1604 westbound frontage road closure for steel erection for direct
connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 27 at 9 p.m. until Monday, Oct. 30 at 5 a.m. Loop 1604
eastbound collector-distributor at the IH-10 interchange closure for steel
erection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 27 at 9 p.m. until Monday, Oct. 30 at 5 a.m.
Ramp/cloverleaf from IH-10 eastbound to Loop 1604 eastbound closure for steel
erection for direct connector construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 27 at 9 p.m. until Monday, Oct. 30 at 5 a.m. Loop 1604
eastbound mainlanes right lane closure at the IH-10 interchange for steel
erection for direct connector construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 23 until Monday, Nov. 6. Daily/Nightly 24 hours a day. IH-10
eastbound to Loop 1604 westbound frontage road right lane closure for drill
shaft construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 20 until Saturday, October
21. 9 p.m. to 5 a.m. Full closure of the mainlanes and intersection, in both
directions, at FM 1518 for bridge construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, October 25 until Thursday, October
26. 8 p.m. to 5 a.m. Full closure of the westbound mainlanes from Pfeil Rd. to
Loop 1604 for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 9 p.m. until Monday,
October 30 5 a.m. Full closure of the eastbound mainlanes from Loop 1604 to
Pfeil Rd. for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, November 3 9 p.m. to Monday, October
7 5 a.m. Full closure of the intersection at Loop 1604 for bridge demolition. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday, October 27.
8 p.m. to 6 a.m. Single eastbound mainlane closure from Graytown Rd. to Pfeil Rd.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Monday, October
23. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Santa Clara
to FM 465 for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, October 25 until Thursday, October
26. 8 p.m. to 6 a.m. Full closure of the westbound mainlanes from Santa Clara
to FM 465 for beam setting. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, October 26 until Friday, October
27. 8 p.m. to 6 a.m. Full closure of the westbound mainlanes from Santa Clara
to FM 465 for beam setting. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 27 until Saturday, October
28. 8 p.m. to 6 a.m. Full closure of the westbound mainlanes from Santa Clara
to FM 465 for beam setting.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Tuesday,
October 24. 9 p.m. to 5 a.m. Full closure of the northbound mainlanes at
AT&T Center Parkway for bridge repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, November
25, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
at Fratt Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
2024, long-term closure (24/7). Left lane closure on southbound frontage road
of I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574"><span style="font-family: arial; font-size: x-small;">Current through Saturday, February 3, 2024 long-term closure (24/7).
Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein
Road for drainage, column, and cap work.</span></a></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><a name="_Hlk148680022">Sunday, October 22 until
Saturday, October 28. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;">. Multiple lane closures (3) on northbound mainlanes, exit ramp closure,
and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for
barrier work. Traffic should use next available ramps.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work. Traffic should
use prior exit ramp and next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35
interchange for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m. Eastbound
Loop 1604 to southbound I-35 connector ramp closure for striping and barrier
work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to
southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, entrance
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should use next available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closure on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk148081574;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound Austin Highway (Loop 368) at I-410 for utility
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound I-410 exit ramp to southbound I-35
frontage road and alternating lane closures on southbound frontage road of I-35
from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and
column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
to Austin Highway (Loop 368) for barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Sunday, October 22 until Saturday, October 28. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday,
October 27. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for sidewalk and curb construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday,
October 27. 9 a.m. to 3 p.m. Single eastbound mainlane closure from W. Military
Dr. to General McMullen for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Wednesday,
October 25. 9 a.m. to 3 p.m. Single westbound mainlane closure from Callaghan
Rd. to W. Military Dr. for rail operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 22 until Friday,
October 27. 8:30 p.m. to 5 a.m. Multiple westbound mainlane closures from General
McMullen to Callaghan Rd. for mill and overlay operations. The ramps at Acme
St., and 36<sup>th</sup> St. will also be closed.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until
Thursday, October 26. 8:30 p.m. to 5 a.m. Full closure of the westbound frontage
road from W. Military Dr. to Horal St. for road repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until
Thursday, October 26. 8:30 p.m. to 5 a.m. Full closure of the eastbound ramp to
I-35 for road repairs.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Current until Tuesday, October
31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W.
Military Highway to Weidner Rd. for roadway construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday, October
27. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop
1604 to Circle A for curb and sidewalk construction.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Hunt Lane to W. Military Dr. for utility
work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Potranco Rd. to Hunt Lane for utility work.
</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from W. Military Dr. to Westover Hills for
utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closure
on the frontage roads, in both directions, at Potranco Rd. for utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Ingram Rd. for utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closure
on the eastbound frontage road from Wiseman to Loop 1604.</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, November 3. 9 a.m. to 3 p.m. Single lane closures
on the frontage roads, in both directions, at Hunt Lane for utility work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Kendall County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, October 24. 9 a.m. to 3 p.m. Single westbound mainlane closure
from Scenic Loop Rd. to SH 46 for repairs. SH 46 turnaround will also be
closed.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday, October 27. Alternating mainlane
closures, in both directions, from Scenic Loop Rd. to Fredericks Creek for
vegetation work. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, October 23 until Friday, October 27. 9 a.m. to 3 p.m. Alternating
lane closures on the frontage roads, in both directions, from Scenic Loop Rd.
to SH 46 for painting operations. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-82257372702123638022023-10-13T14:44:00.004-05:002023-10-13T14:44:30.910-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for
westbound collector-distributor bridge construction on the bridge at Leon
Creek. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound frontage road entrance ramp from IH-10 closure for
westbound direct connector bridge construction. Nightly closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Kyle Seale Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Babcock Road full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Chase Hill Boulevard full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Monday, Oct. 23. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and La Cantera Parkway full intersection closure (both directions,
including turnarounds) for demolition work/bridge construction. Only one
intersection to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m. Westbound
to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan
Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 16 until Monday, Oct. 23. Daily/Nightly 24 hours a day.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 16 until Monday, Oct. 23. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one
turnaround to be closed at a time on each direction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Monday, Oct. 23. Daily/Nightly 24 hours a day. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="background: white; line-height: normal; margin-bottom: 6.0pt; mso-background-themecolor: background1;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
15 until Friday, October 20. N</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">ightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure
from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and
striping. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
15 until Friday, October 20.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure
from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
15 until Friday, October 20.</span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;"> Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road
closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October
15 until Friday, October 20. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road
closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and
striping.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Monday, October
16 until Saturday, October 21. </span></span><span style="mso-bookmark: _Hlk108794202;"><span style="color: black;">Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from
the Blanco Road exit ramp to the Blanco Road entrance ramp for substructure at
Blanco Road. </span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, October 20 at 9 p.m. until Saturday, Oct. 21 at 8 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> Weekend closure. Loop 1604 eastbound mainlanes from the Vance Jackson
Road exit ramp to the Lockhill Selma entrance ramp will be fully closed to set
girders for the eastbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, October 20 at 9 p.m. until Saturday, Oct. 21 at 8 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> <span style="background: white; color: black; mso-color-alt: windowtext; mso-shading-themecolor: background1;"><span style="mso-spacerun: yes;"> </span></span>Weekend
closure. IH-10 westbound exit ramp / direct connector to the Loop 1604
eastbound mainlanes will be closed to set girders for the eastbound direct
connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, October 20 at 9 p.m. until Saturday, Oct. 21 at 8 a.m.</span></span><span style="mso-bookmark: _Hlk108794202;"> <span style="mso-spacerun: yes;"> </span>Weekend closure. IH-10 eastbound
mainlane cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound
mainlanes will be closed to set girders for the eastbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Friday, October 20 at 9 p.m. until Saturday, October 21 </span></span><span style="mso-bookmark: _Hlk108794202;">at 12 p.m. Weekend closure. Loop 1604 eastbound left and middle
mainlanes from the Blanco Road entrance ramp to Stone Oak Parkway will be
closed for Slip SSTR rail work.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 15 until Sunday, October 22. </span></span><span style="mso-bookmark: _Hlk108794202;">Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and NW Military Highway for bridge substructure. This
closure will remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="background: white; color: black;">Sunday, October 15 until Sunday, October 22.</span></span><span style="mso-bookmark: _Hlk108794202;"> Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long
term closure at Loop 1604 and Lockhill Selma Road for wall construction under
bridge. This closure will remain in place for approximately 4 weeks.</span></span><b style="background-color: transparent;"><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop
1604 to Lookout Road for striping work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Full closure on eastbound mainlanes of Loop 1604
from Lookout Road to I-35 for striping. Traffic should follow signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure
from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition
work. Traffic should use Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road
of Loop 1604, right lane entrance ramp closure, and turnaround closure from
Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should
use Lookout Road intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road
of Loop 1604 from Lookout Road to I-35 for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure
at Lookout Road for construction work. Traffic should use Lookout Road
intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604
and alternating exit ramp closures from Nacogdoches Road to I-35 for barrier
work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop
1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from
Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and
next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop
1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic should
use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604
collector ramp at the I-35 interchange for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop
1604 to IKEA-RBFCU Parkway for striping work. Traffic should prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop
1604 to Lookout Road for pavement and striping work. Traffic should use next
exit ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector ramp closure at I-35 interchange
for geotechnical work. Traffic should follow the detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of Loop 1604
from Pat Booker Road to Lookout Road for striping. Traffic should follow signs
and use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure
at Lookout Road for demolition work. Traffic should use Lookout Road
intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure,
and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road
for barrier work. Traffic should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage
road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union
Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next
available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road
and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches Road for
construction entrance and temporary pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure
from Lookout Road to Union Pacific Railroad for retaining wall demolition work.
Traffic must use Nacogdoches Road turnaround.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and
turnarounds at Loop 1604 for striping work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October
21. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604
from Gateway Boulevard to Gateway Place for setting caps. Traffic should follow
detour signs.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 15 until Friday,
Oct. 20. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for
bridge construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for
drill shaft construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound to westbound turnaround at IH-10 full closure for bridge
construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to
the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 15 until Friday, Oct. 20. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound mainlane full closure from La Cantera Parkway entrance ramp to
the Camp Bullis Road exit ramp for overhead sign bridge removal. Nightly
closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 16 until Friday, Oct. 20. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 16 until Friday, Oct. 20. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 13 at 9 p.m. until Monday, Oct. 16 at 5 a.m. Loop 1604
westbound mainlanes inside lane closure at the IH-10 interchange for bridge
construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 13 at 9 p.m. until Monday, Oct. 16 at 5 a.m. Loop 1604
eastbound mainlanes inside lane closure at the IH-10 interchange for bridge
construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 13 at 9 p.m. until Monday, Oct. 16 at 5 a.m. IH-10 eastbound
frontage road closure between Loop 1604 eastbound frontage road and Loop 1604
westbound frontage road closure for bridge construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 13 at 9 p.m. until Monday, Oct. 16 at 5 a.m.
Ramp/cloverleaf from Loop 1604 eastbound to IH-10 eastbound closure for bridge
construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 13 at 9 p.m. until Monday, Oct. 16 at 5 a.m.
Ramp/cloverleaf from Loop 1604 westbound to IH-10 eastbound closure for bridge
construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604 eastbound
frontage road at the IH-10 interchange closure for steel erection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. IH-10
eastbound frontage road closure between Loop 1604 eastbound frontage road and
Loop 1604 westbound frontage road closure for steel erection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604 eastbound
collector-distributor at the IH-10 interchange closure for steel erection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Ramp/cloverleaf
from IH-10 eastbound to Loop 1604 eastbound closure for steel erection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 20 at 9 p.m. until Monday, Oct. 23 at 5 a.m. Loop 1604 eastbound
mainlanes right lane closure at the IH-10 interchange for steel erection.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 20 until Saturday, October
21. 9 p.m. to 5 a.m. Full closure of the mainlanes and intersection, in both
directions, at FM 1518 for bridge construction. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, October 17. 2 a.m. to 5 a.m. Single
westbound mainlane closure from Santa Clara to FM 465 for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15. Possible I-10
alternating westbound I-10 mainline closure to load cranes.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 through Friday, October
20. NIGHTLY northbound and southbound Loop 1604 closures at I-10 intersection
from 8 p.m. to 5 a.m. each night. Detour:</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Southbound Loop 1604 traffic may take I-10
westbound frontage road, turn around at FM 1516, and use I-10 eastbound
frontage road back to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Northbound Loop 1604 traffic may take I-10
eastbound frontage road, turn around at Pfeil Road, and use I-10 westbound
frontage road back to Loop 1604.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Thursday,
October 19.9 p.m. to 5 a.m. Full closure of the northbound mainlanes at
AT&T Center Parkway for bridge repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, November
25, long-term closure (24/7). Left lane closure on southbound I-35 frontage
road between Toepperwein Road and Judson Road for retaining wall, drilled
shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
at Fratt Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December
30, long-term closure (24/7). Left lane closure on southbound frontage road of
I-35 from Retama Parkway to Old Austin Road for temporary pavement, striping,
barrier, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8,
2024, long-term closure (24/7). Left lane closure on southbound frontage road
of I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148081574">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Alternating lane closures on
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Schertz Parkway to Roy Richard Drive for barrier work. Traffic should use
next exit and entrance ramps.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from
Evans Road to Roy Richard Drive for barrier work. Traffic should use next
available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Evans Road to Schertz Parkway for barrier work. Traffic should use next
exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should
use next entrance and exit ramps.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk148082142">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Alternating lane closures on
southbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary
pavement work. Traffic should use next exit and entrance ramps.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Southbound to northbound I-35
turnaround closure at Corporate Drive for striping, barrier, and temporary
pavement work. Traffic should use Corporate Drive intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound
Gateway Boulevard at Loop 1604 for column and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35
turnaround closure at Evans Road for striping, barrier, and temporary pavement
work. Traffic should use Evans Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures of
northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping,
barrier, and temporary pavement work. Traffic should follow signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans
Road for drainage work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Forum Parkway to Evans Road for drainage and barrier work. Traffic should
use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge
substructure work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp
closure from Old Austin Road to Forum Parkway for construction work. Traffic
must use the Forum Parkway turnaround and follow detour signs to access
southbound I-35. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge
structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for
bridge foundation, temporary pavement, striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Schertz Parkway to Evans Road for striping, barrier, and temporary
pavement work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road and entrance ramp and exit ramp closures of I-35 from
Evans Road to Olympia Parkway for bridge foundation, striping, barrier work,
and temporary pavement work. Traffic should use prior exit ramp and next
entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound
I-35 connector ramp closure for striping and barrier work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35
collector ramp at the Loop 1604 interchange for striping, barrier, and
construction entrance work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound
I-35 connector ramp closure for striping and barrier work. Traffic must exit at
IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop
1604 connector ramp closure and alternating lane closures on southbound
mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work.
Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow
the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound
I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road
and follow the detour signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp
closure from Toepperwein Road to Loop 1604 for barrier setting and structures
work. Traffic should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum
Parkway for striping, barrier, and temporary pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat
Booker Road for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure of northbound
frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat
Booker Road to Loop 1604 interchange for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road
bridge from I-35 northbound frontage road to I-35 southbound frontage road,
near Shin Oak Drive for construction work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound Pat Booker Road at I-35 for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and
westbound lanes of Pat Booker Road at I-35 for construction work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure of southbound
frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604
to southbound I-35 connector ramp closure, and southbound I-35 collector ramp
closure at the Loop 1604 interchange for striping and barrier work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on
southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and
bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the
detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound Pat Booker Road at I-35 for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road
for bridge work. Accommodations will be made for local traffic. Southbound
frontage road of I-35 traffic must follow detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2)
on northbound mainlanes of I-35, entrance ramp closure, and alternating exit
ramp closures from O’Connor Road to Toepperwein Road for barrier setting and
structures work. Traffic should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, right lane closure on northbound mainlanes, and exit
ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure
on the eastbound and westbound at the intersection of Judson Road and Randolph
Boulevard and left lane closure on Randolph Boulevard at Judson Road for
temporary pavement and signal works. Traffic should use the next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road, entrance ramp closure, and alternating exit ramp
closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic
should follow the detour sign to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes of I-35, exit ramp closure, and left lane closure on
southbound frontage road of I-35 from Toepperwein Road to Judson Road for
earthwork and barrier work. Traffic should use next exit ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from
Pat Booker Road to Judson Road for structures work. Traffic should use next
entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3)
on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and
left lane closures (2) on southbound frontage road of I-35 from Judson Road to
O’Connor Road for striping, barrier, and paving work. Traffic should use next
entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 from Judson Road to O’Connor Road for
earthwork, paving, striping, and barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound
mainlanes of I-35, exit ramp closure, and left lane closure on southbound
frontage road of I-35 at O’Connor Road for barrier work. Traffic should use next
exit.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, entrance ramp closure, and exit ramp closures of I-35
from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic
should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound frontage road, alternating entrance ramp closures, and exit ramp
closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for
striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for
striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
southbound mainlanes, alternating entrance and exit ramp closures, and
alternating lane closures on southbound frontage road of I-35 from O’Connor
Road to Weidner Road for striping work. Traffic should use the next exit and
entrance ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating
lane closures on southbound frontage road of I-35 from Weidner Road to Thousand
Oaks Drive for striping work. Traffic should use the next exit and entrance
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 and entrance ramp closure from Weidner Road to
Thousand Oaks Drive for earthwork, drainage and barrier work. Traffic should
use prior entrance ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35, entrance ramp closure, and exit ramp closure
from O’Connor Road to Weidner Road for drainage and barrier work. Traffic
should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for
barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road and northbound to southbound turnaround closure of I-35 from
Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow
detour signs. Accommodations will be made for local traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on exit
ramp from I-410 eastbound to I-35 southbound mainlanes and alternating lane
closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem
Road for geotechnical, drilled shaft, and column work. Traffic to use next exit
ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive
to Randolph Boulevard for permanent widening work. Traffic should use prior
exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for
barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
northbound and southbound of Interchange Parkway from Austin Highway (Loop 368)
to Walzem Road and multiple lane closures (2) on eastbound and westbound of
Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Southbound to northbound
turnaround closure at Walzem Road, alternating lane closures on northbound
frontage road, and alternating entrance and exit ramp closures of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound
mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled
shaft and column work. Traffic to use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until
Saturday, October 21. 9:00 p.m. to 5:00 a.m. Full closure on southbound
frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to
Fratt Road for drilled shaft work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Saturday,
October 21. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on
southbound I-35 mainlanes and left lane closure (1) on southbound frontage road
of I-35 from Pat Booker Road to Toepperwein Road for beam setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Saturday,
October 21. 12:00 p.m. to 12:00 a.m. Right lane closure on southbound frontage
road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on
southbound mainlanes of I-35 from Cibolo Valley Drive to Toepperwein Road for
beam staging.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, October 17 until
Saturday, February 3, 2024, long-term closure (24/7). Left lane closure on
northbound I-35 frontage road between Toepperwein Road and Judson Road for
retaining wall, drilled shaft, column, and cap work. </span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – South San Antonio/Bexar County</i><o:p></o:p></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until
October 20. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from
Kinney Rd. to Loop 410 for road repairs.</span></span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio</i><o:p></o:p></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk139029066"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term closure (24/7). Left
lane closure on westbound frontage road of I-410 from Perrin Creek to Austin
Highway (Loop 368) for construction.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound
I-410 for barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem
Road to Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound Austin Highway (Loop 368) connector
ramp to westbound I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and eastbound to westbound turnaround closure between Starcrest Drive
and Perrin Beitel for striping and barrier work. Traffic should use next
entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop
368) for striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive
to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway
(Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and exit ramp closure of
I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic
to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin
Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on westbound mainlanes and exit ramp closure of
I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should
use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on westbound frontage road and exit ramp closure of I-410
westbound to Austin Highway (Loop 368) for barrier work. Traffic should follow
detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Multiple left lane closures (2) and entrance ramp closure on eastbound frontage
road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and
barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk139029066;">Sunday, October 15 until Saturday, October 21. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of I-410, entrance ramp
closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for
striping and barrier work. Traffic should use prior entrance and exit ramps. </span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – South San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, October 13 until Sunday,
October 15. 7 p.m. to 7 p.m. Full closure of the intersection at FM 2790 for reconstruction.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – Northwest Military
Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Friday,
October 20. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Friday,
October 20. 8:30 p.m. to 5 a.m. Single westbound mainlane closure from 36<sup>th</sup>
St. to W. Military Dr. for metal beam guard replacement. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, October 18. 9 a.m. to
3 p.m. Single westbound mainlane closure from Callaghan Rd. to W. Military Dr.
for rail operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Friday,
October 20. 9 a.m. to 3 p.m. Single eastbound mainlane closure from W. Military
Dr. to General McMullen for mow strip operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 15 until Friday,
October 20. 8:30 p.m. to 5 a.m. Multiple eastbound mainlane closures from Loop
410 to General McMullen for mill and inlay operations.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Friday,
October 20. 9 a.m. to 3 p.m. Turnarounds closed, in both directions, at Leon
Creek bridge for bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 16 until Friday,
October 20. 8:30 p.m. to 5 a.m. Multiple westbound mainlane closures from
General McMullen to Callaghan Rd. for mill and overlay operations.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Current until Tuesday, October
31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W.
Military Highway to Weidner Rd. for roadway construction.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Hunt Lane to W. Military Dr. for utility work.
</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Potranco Rd. to Hunt Lane for utility work.
</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Tuesday, October 31. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from W. Military Dr. to Westover Hills for
utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, October 18 until Friday, November 3. 9 a.m. to 3 p.m. Single
lane closure on the frontage roads, in both directions, at Potranco Rd. for
utility work.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, October 18 until Friday, November 3. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Ingram Rd. for
utility work. </span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, October 18 until Friday, November 3. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from Wiseman to Loop 1604.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, October 18 until Friday, November 3. 9 a.m. to 3 p.m. Single
lane closures on the frontage roads, in both directions, at Hunt Lane for utility
work.</span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-61984280595242985942023-09-29T15:51:00.009-05:002023-09-29T15:51:37.483-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector-distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound exit ramp to La Cantera Parkway closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound entrance ramp from IH-10 closure for westbound direct connector
bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound
to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge
widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be
closed at a time on each direction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day. Westbound
to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway
exit ramp for barrier setting and striping. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m.
Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway
exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m.
Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to
IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5
a.m. Eastbound mainlane right lane closure from the IH-10 interchange to
Tradesman Road will be closed for setting eastbound direct connector girders.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector girders.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5
a.m. IH-10 eastbound mainlanes cloverleaf exit ramp (southwest cloverleaf) to
Loop 1604 eastbound mainlanes will be closed for setting eastbound direct
connector girders.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5
a.m. Eastbound collector-distributor through / left lane to Loop 1604 eastbound
mainlanes will be closed for setting eastbound direct connector girders.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend
closure. Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to
the Lockhill Selma entrance ramp will be fully closed for mill and fill / level
up hot mix asphalt concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend
closure. IH-10 westbound exit ramp / direct connector to the Loop 1604
eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt
concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend
closure. IH-10 eastbound mainlane cloverleaf exit ramp (southwest cloverleaf)
to the Loop 1604 eastbound mainlanes will be closed for mill and fill / level
up hot mix asphalt concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Saturday, October 7 at 12 p.m. Weekend
closure. Loop 1604 eastbound left and middle mainlanes from the Blanco Road
entrance ramp to Stone Oak Parkway will be closed for Slip SSTR rail work.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Monday, October 9 at 5 a.m. Full
Weekend closure. Lockhill Selma Road intersection underneath Loop 1604 will be
fully closed for storm sewer crossing work. Traffic control devices to remain
in place for entire duration until crossing is complete. Off-duty officers will
direct traffic thru intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, October 6 at 9 p.m. until Monday, October 9 at 5 a.m. Full
Weekend closure. Loop 1604 westbound frontage road left lane at Lockhill Selma
Road will be closed for storm sewer crossing work. Traffic control devices to
remain in place for entire duration until crossing is complete. Off-duty
officers will direct traffic thru intersections. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day.
Westbound to Eastbound turnaround long term closure at Loop 1604 and NW
Military Highway for bridge substructure. This closure will remain in place for
approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day.
Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill
Selma Road for wall construction under bridge. This closure will remain in
place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day.
Eastbound to Westbound turnaround long term closure at Loop 1604 and Huebner
Road for asphalt removal and installation of bore 9-ABCD-3. This closure will
remain in place for approximately 2 weeks.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, October 3 until Wednesday, October 4. 9 p.m. to 5 a.m. Full
closure of the eastbound mainlanes at Bulverde Rd. for bridge repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for retaining wall demolition work. Traffic should use
Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604, right lane
entrance ramp closure, and turnaround closure from Nacogdoches Road to Union
Pacific Railroad for striping work. Traffic should use Lookout Road
intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout
Road to I-35 for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for
construction work. Traffic should use Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 and alternating exit ramp
closures from Nacogdoches Road to I-35 for barrier work. Traffic should use
next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit
ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping
work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound bypass ramp and entrance ramp closure of
Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic
should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure,
and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for
striping work. Traffic should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure of Lookout Road intersection and turnarounds at Loop 1604 for striping
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit
ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to
IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35
interchange for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 and eastbound bypass
closure from Nacogdoches Road to Lookout Road for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
striping. Traffic should follow signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound Pat Booker Road at I-35 for striping
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place for setting caps. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union
Pacific Railroad for retaining wall demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road, exit ramp closure, and
entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches
Road for barrier work. Traffic should use next available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and westbound bypass ramp
of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and
temporary pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit
ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement
and striping work. Traffic should use next exit ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout
Road for striping. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures, exit ramp closure, and entrance ramp closure on
westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic
should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for
demolition work. Traffic should use Lookout Road intersection.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 1 until Friday,
Oct. 6. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit
ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure
for portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera
Parkway (braided ramp) full closure for portable concrete traffic barrier
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete
traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit
ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10
westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector-distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop
1604 eastbound collector-distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure for
concrete barrier relocation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for
pedestrian bridge installation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound frontage road from the La Cantera Parkway intersection to the
entrance ramp just after La Cantera Parkway full closure for pedestrian bridge
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10
eastbound frontage road, directly under the Loop 1604 interchange full closure
for bridge foundation construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop
1604 eastbound exit ramp onto IH-10 eastbound full closure for removing column
concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop
1604 eastbound frontage road at IH-10 interchange full closure for removing
column concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Oct. 1 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m. Loop
1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound
frontage road for bridge foundation construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Loop
1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound
frontage road for bridge foundation construction. Daily closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Thursday, Sept. 28 until Friday, Oct. 6. Daily/Nightly 24 hours a day. Loop
1604 westbound frontage road right turn lane IH-10 westbound frontage road will
be closed for utility construction. Closure will remain for the full duration. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. IH-10
eastbound to Loop 1604 eastbound cloverleaf exit ramp closure for construction
on the direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. Loop 1604
eastbound to IH-10 westbound cloverleaf exit ramp closure for construction on
the direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. IH-10
eastbound collector-distributor right lane only at the Loop 1604 interchange
will be closed for construction on the direct connector.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 6 at 9 p.m. until Monday, Oct. 9 at 5 a.m. IH-10 eastbound
frontage road, directly under the Loop 1604 interchange full closure for bridge
foundation construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Oct. 6 at 9 p.m. until Monday, Oct. 9 at 5 a.m. Loop 1604
eastbound exit ramp onto IH-10 eastbound full closure for removing column
concrete forms.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Tuesday, October 3. 9 p.m. to 5 a.m. Full
closure of the southbound mainlanes at S. New Braunfels Ave. for bridge
repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, October 4 until Thursday, October 5. 9 p.m. to 5 a.m. Full
closure of the northbound mainlanes at AT&T Center Parkway for bridge
repairs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, October 7, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, December 15, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 30, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from Retama Parkway to Old Austin
Road for temporary pavement, striping, barrier, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard for
construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk146824637">Sunday, October 1 until
Saturday, October 7. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (3) on northbound mainlanes and entrance ramp
closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic
should use next entrance ramp.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage
work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of
I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use
next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for striping
and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on northbound frontage road of I-35 and entrance ramp closure from Shin
Oak Road to Pat Booker Road for striping, barrier, and temporary pavement work.
Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35
southbound frontage road, near Shin Oak Drive for construction work. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road,
eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound
I-35 collector ramp closure at the Loop 1604 interchange for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road and entrance ramp of I-35 from Shin Oak
Drive to Toepperwein Road for cap form erection work. Accommodations will be
made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left
lane closure on southbound frontage road of I-35 at O’Connor Road for barrier
work. Traffic should use next exit.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign
removal. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road and northbound to southbound turnaround
closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work.
Traffic should follow detour signs. Accommodations will be made for local
traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closure on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full
closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from
Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow
detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on exit ramp from I-410 to southbound mainlanes and
alternating lane closures on southbound frontage road of I-35 from Randolph
Boulevard to Walzem Road for geotechnical, drilled shaft, and column work.
Traffic to use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 8 until Saturday, October 14. 9:00 p.m. to 5:00 a.m.
Full closure of northbound I-35 to westbound I-410 connector ramp for drilling
work.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – South San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until
October 20. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from
Kinney Rd. to Loop 410 for road repairs.</span></span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16, 2024, long-term
closure (24/7). Left lane closure on westbound frontage road of I-410 from
Perrin Creek to Austin Highway (Loop 368) for construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410,
entrance ramp closure, and eastbound to westbound turnaround closure between
Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should
use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410,
entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin
Highway (Loop 368) for striping and barrier work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from
Starcrest Drive to Randolph Boulevard for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from
Austin Highway (Loop 368) to Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp
closure of I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft
work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35
to Austin Highway (Loop 368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp
closure of I-410 from I-35 to Perrin Beitel for striping and barrier work.
Traffic should use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Entrance ramp closure on westbound frontage road and exit ramp
closure of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on
eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road
for striping and barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bidi-font-family: Arial; mso-fareast-font-family: "Times New Roman";"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Saturday, October 7. 9:00 p.m.
to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410,
entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to
Starcrest Drive for striping and barrier work. Traffic should use prior
entrance and exit ramps.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, September 29 through Monday,
October 1. FULL WEEKEND CLOSURE. All eastbound and westbound I-10 lanes and all
northbound I-410 lanes at the I-10 interchange closed from 8 p.m. Friday (9/29)
thru 5 a.m. Monday (10/1). Detour: </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Eastbound I-10 traffic detour to
southbound I-410. Exit at Rigsby, turn around, re-enter northbound I-410, and
take eastbound I-10 exit.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Westbound I-10 traffic detoured
to northbound I-410. Exit at Rittiman, turn around, and take southbound I-410
back to westbound I-410. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Northbound I-410 traffic detoured
to eastbound I-10. Exit at Foster and turn around back to I-410 north.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Southbound I‑410 lanes will
remain open.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, October 6.
8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from 36<sup>th</sup>
St. to Loop 410 for mill and overlay operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, October 2 until
Wednesday, October 4. 9 a.m. to 3 p.m. Single eastbound mainlane closure form
W. Military Dr. to Leon Creek for mowstrip operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Friday,
October 6. Alternating westbound mainlane closures from Cupples Rd. to
Callaghan Rd. for metal beam guard fence repairs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, October 1 until Friday,
October 6. Alternating westbound mainlane closures from Callaghan Rd. to Loop
410 for mill and overlay operations.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Tuesday,
October 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions,
from N.W. Military Highway to Weidner Rd. for roadway construction.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, October 6. 9 a.m. to 3 p.m. Single lane closure on
the westbound frontage road from Ingram Rd. to Potranco Rd. for ITS work.</span></li><li><span style="font-family: arial; font-size: x-small;">Thursday, October 5 until Friday, October 6. 9 p.m. to 5 a.m. Full
closure of the eastbound mainlanes from Ingram Rd. to Potranco Rd. of pole
installation.</span></li><li><span style="font-family: arial; font-size: x-small;">Thursday, October 5 until Friday, October 6. 9 p.m. to 5 a.m. Single lane
closure on the eastbound frontage road from W. Military Dr. to Hunt Lane for
pole installation.</span></li><li><span style="font-family: arial; font-size: x-small;">Thursday, October 5 until Friday, October 13. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from W. Military Dr. to Hunt Lane for
pole installation. </span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-11877276702421080782023-09-22T15:00:00.003-05:002023-09-22T15:00:17.205-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES <p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County <o:p></o:p></i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector-distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound
to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan
Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be
closed at a time on each direction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak
Parkway exit ramp for barrier setting and striping. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5
a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak
Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit
ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until
5 a.m. Eastbound mainlane right lane closure from the IH-10 interchange to
Tradesman Road will be closed for setting eastbound direct connector bent caps.
</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until
5 a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until
5 a.m. IH-10 eastbound cloverleaf exit ramp (southwest cloverleaf) to Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until
5 a.m. Eastbound collector distributor through / left lane to Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, September 25 until Friday, September 29. Nightly 9 p.m. until 5
a.m. Westbound mainlane from Lockhill Selma Road exit ramp to the IH-10
interchange will be fully closed to set deck panels on the westbound direct
connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m. Weekend
closure. Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to
the Lockhill Selma entrance ramp will be fully closed for mill and fill / level
up hot mix asphalt concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m.
Weekend closure. IH-10 westbound exit ramp / direct connector to the Loop 1604
eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt
concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m.
Weekend closure. IH-10 eastbound mainlane cloverleaf exit ramp (southwest
cloverleaf) to the Loop 1604 eastbound mainlanes will be closed for mill and
fill / level up hot mix asphalt concrete.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 29 at 9 p.m. until Saturday, September 30 at 12 p.m.
Weekend closure. Loop 1604 eastbound left and middle mainlanes from the Blanco
Road entrance ramp to Stone Oak Parkway will be closed for Slip SSTR rail work.
</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 24 until Sunday, October 1. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and NW Military.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
striping.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for retaining wall demolition work. Traffic should use
Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604, right lane
entrance ramp closure, and turnaround closure from Nacogdoches Road to Union
Pacific Railroad for striping work. Traffic should use Lookout Road
intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout
Road to I-35 for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for
construction work. Traffic should use Lookout Road intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 and alternating exit ramp
closures from Nacogdoches Road to I-35 for barrier work. Traffic should use
next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for
striping work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound bypass ramp and entrance ramp closure of
Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic
should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure,
and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for
striping work. Traffic should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to
IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35
interchange for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to
Lookout Road for striping. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for
demolition work. Traffic should use Lookout Road intersection. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures, exit ramp closure, and entrance ramp closure on
westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic
should use prior exit and next entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road, exit ramp closure, and
entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches
Road for barrier work. Traffic should use next available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and westbound bypass ramp
of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and
temporary pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for
pavement and striping work. Traffic should use next exit ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to
Lookout Road for striping work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union
Pacific Railroad for retaining wall demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure of Lookout Road intersection and turnarounds at Loop 1604 for
striping work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 27 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 and eastbound bypass closure
from Nacogdoches Road to Lookout Road for striping work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, Sept. 24 until Friday,
Oct. 6. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure
for portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera
Parkway (braided ramp) full closure for portable concrete traffic barrier installation.
Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete
traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10
eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure
for concrete barrier relocation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for
pedestrian bridge installation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound frontage road from the La Cantera Parkway intersection to the
entrance ramp just after La Cantera Parkway full closure for pedestrian bridge
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road, directly under the Loop 1604 interchange full
closure for bridge foundation construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9 Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound exit ramp onto IH-10 eastbound lane full closure for
removing column concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Monday, Oct. 9 Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road at IH-10 interchange full closure for
removing column concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge foundation construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, Sept. 27 at 9 p.m. until Friday, Oct. 6 at 5 a.m. Loop 1604
westbound frontage road right turn lane IH-10 westbound frontage road will be
closed for SAWS water line work. Excluding weekends. Closure will remain for
the full duration<s>. <o:p></o:p></s></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 25 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 24 until Friday, Oct. 6. Weeknights 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge foundation construction. Daily closures.
Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. IH-10
eastbound to Loop 1604 eastbound cloverleaf exit ramp closure for bridge
construction.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. Loop 1604
eastbound to </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 115%;">IH-10
westbound cloverleaf exit ramp closure for bridge construction.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. IH-10
eastbound collector-distributor at the Loop interchange will be closed for
bridge construction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, September 23. 4 a.m. to 9 a.m. Full
closure of the westbound mainlanes from Pfeil Rd. to Scenic Loop Rd. for maintenance
operations.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24. 6 a.m. to 4 p.m. Full
closure of the mainlanes, in both directions, at FM 1516 for utility work.
Traffic will be stopped in 15-minute intervals throughout the day. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 25 until Thursday, September
28. Alternating full mainlane closures, in both directions, at FM 1518 for
bridge work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 25 until Thursday, November
30. Full closure of the westbound frontage road for roadway construction. </span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Tuesday,
September 26. Full closure of the southbound mainlanes at S. New Braunfels Ave.
for bridge repair.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 26 until Thursday, September
28. Nightly 9 p.m. to 5 a.m. Full closure of the northbound mainlanes at
AT&T Center Parkway for bridge repairs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, October 7,
long-term closure (24/7). Left lane closure on southbound I-35 frontage road
between Toepperwein Road and Judson Road for retaining wall, drilled shaft,
column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, December 15,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
at Fratt Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 30, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from Retama Parkway to Old Austin
Road for temporary pavement, striping, barrier, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, September 8, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard for
construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Tuesday, September 26. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes and closure on northbound
I-35 collector ramp from Pat Booker Road to Loop 1604 for utilities work.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk146211493">Sunday, September 24 until Saturday,
September 30. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;">. Multiple lane closures (3) on northbound mainlanes and entrance ramp
closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic
should use next entrance ramp.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Southbound to northbound I-35 turnaround closure at Corporate Drive for
striping, barrier, and temporary pavement work. Traffic should use Corporate
Drive intersection. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to
Forum Parkway for striping, barrier, and temporary pavement work. Traffic
should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road and entrance ramp and
exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge
foundation, striping, barrier work, and temporary pavement work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of
I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use
next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 and entrance ramp closure from
Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to
Gateway Place for setting caps. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form work. Accommodations will be made
for local traffic. Southbound frontage road of I-35 traffic must follow detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound Pat Booker Road at I-35 for striping
work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign
removal. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left
lane closure on southbound frontage road of I-35 at O’Connor Road for barrier
work. Traffic should use next exit.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for
barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks
Drive to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Weidner
Road to Loop 1604 for utility work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Walzem
Road to Weidner Road for utility work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closure on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on southbound mainlanes and alternating lane closures on
southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for
geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;">Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – South San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until
October 20. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from
Kinney Rd. to Loop 410 for road repairs.</span></span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, February 16,
2024, long-term closure (24/7). Left lane closure on westbound frontage road of
I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work.
Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound Austin Highway (Loop 368) from Walzem Road to Interchange Parkway
for barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for
barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and eastbound to
westbound turnaround closure between Starcrest Drive and Perrin Beitel for
striping and barrier work. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and right mainlane
closure from Perrin Beitel to Austin Highway (Loop 368) for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph
Boulevard for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlanes of I-410 from Starcrest Drive to Randolph Boulevard for
barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard
to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on
westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel
for striping and barrier work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop
368) for barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2)
and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches
Road to Harry Wurzbach Road for striping and barrier work. Traffic should use
next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure
from Harry Wurzbach Road to Starcrest Drive for striping and barrier work.
Traffic should use prior entrance and exit ramps.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Friday, October 6.
8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from 36<sup>th</sup>
St. to Loop 410 for mill and overlay operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24. 9 p.m. to 5
a.m. Full closure of the westbound mainlane from Enrique Barrera Parkway to
Callaghan Rd. for barrier relocation.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24 until
Monday, September 25. 9 p.m. to 5 a.m. Double westbound mainlane closure from
36<sup>th</sup> St. to Military Dr. for mill and overlay operations</span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – N.W. Military Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 25 until Friday,
September 29. 7 a.m. to 6 p.m. Alternating lane closures, in both directions,
from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, October 1 until Tuesday,
October 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions,
from N.W. Military Highway to Weidner Rd. for roadway construction.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, October 6. 9 a.m. to 3 p.m. Single lane closure on
the westbound frontage road from Ingram Rd. to Potranco Rd. for ITS work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Road <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, September 25 until Friday, September 29. 9 a.m. to 3 p.m.
Alternating lane closures, in both directions, from Loop 1604 to Circle A for
sidewalk and curb construction.</span></li></ul><p></p><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-25761482026721774532023-09-15T16:49:00.009-05:002023-09-15T16:49:48.873-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County <o:p></o:p></i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan
Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan
Avenue for bridge widening. Only one turnaround to be closed at a time.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 18 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m. Eastbound
to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Monday, Sept. 25. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 18 until Monday, Sept. 25. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Friday, September 22. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak
Parkway exit ramp for barrier setting and striping. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Friday, September 22. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Friday, September 22. Nightly 9 p.m. until 5
a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak
Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Friday, September 22. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit
ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Saturday, September 23. Nightly 9 p.m. until
5 a.m. Eastbound mainlane right lane closure from the IH-10 interchange to
Tradesman Road will be closed for setting eastbound direct connector bent caps.
</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Saturday, September 23. Nightly 9 p.m. until
5 a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Saturday, September 23. Nightly 9 p.m. until
5 a.m. IH-10 eastbound cloverleaf exit ramp (southwest cloverleaf) to Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Saturday, September 23. Nightly 9 p.m. until
5 a.m. Eastbound collector distributor through / left lane to Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, September 18 until Saturday, September 23. Nightly 9 p.m. until
5 a.m. Westbound mainlane from Lockhill Selma Road exit ramp to the IH-10
interchange will be fully closed to set deck panels on the westbound direct
connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Sunday, September 24. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and NW Military Highway for bridge substructure. This closure will remain in
place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17 until Sunday, September 24. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and Lockhill Selma Road for wall construction under bridge. This closure will
remain in place for approximately 4 weeks.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
striping.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
frontage road of Loop 1604, right lane entrance ramp closure, and turnaround
closure from Nacogdoches Road to Union Pacific Railroad for striping work.
Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier
work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure at Lookout Road for construction work. Traffic should use
Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound
Loop 1604 and alternating exit ramp closures from Nacogdoches Road to I-35 for
barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes
of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit
ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to
Lookout Road for striping work. Traffic should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound
Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604
from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit
and next entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection
and turnarounds at Loop 1604 for striping work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes
of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic
should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound
Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of
Loop 1604 from Pat Booker Road to Lookout Road for striping. Traffic should use
next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp
closure, and entrance ramp closure on westbound Loop 1604 from I-35 to
Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound
frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from
Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should
use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound
frontage road and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches
Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes
of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use
next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604
connector ramp from southbound I-35 to Lookout Road for striping work. Traffic
should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of
Loop 1604 from Gateway Boulevard to Gateway Place for setting caps. Traffic
should follow detour signs.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 18. 9 a.m. to 3 p.m.
Single southbound mainlane closure at SH 151 for concrete work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, Sept. 17 until Friday,
Sept. 22. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full
closure for portable concrete traffic barrier installation. Nightly closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La
Cantera Parkway (braided ramp) full closure for portable concrete traffic
barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure
for concrete barrier relocation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for
pedestrian bridge installation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound frontage road from the La Cantera Parkway intersection to the
entrance ramp just after La Cantera Parkway full closure for pedestrian bridge
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH-10 eastbound frontage road, directly under the Loop 1604 interchange full
closure for bridge foundation construction. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 18 Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound exit ramp onto IH-10 eastbound lane full closure for
removing column concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 17 until Monday, Sept. 18 Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road at IH-10 interchange full closure for
removing column concrete forms. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 18 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge foundation construction. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, Sept. 20 at 9 p.m. until Friday, Sept. 22 at 5 a.m. Loop 1604
westbound frontage road right turn lane IH-10 westbound frontage road will be
closed for SAWS water line work. Excluding weekends. Closure will remain for
the full duration. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Friday, Sept. 22. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 18 until Friday, Sept. 22. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 18 until Friday, Sept. 22. Weeknights 9 a.m. until 3 p.m.
Loop 1604 eastbound frontage road right turn lane full closure onto IH-10
eastbound frontage road for bridge foundation construction. Daily closures.
Excluding weekends.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County/Guadalupe
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 24. 6 a.m. to 4 p.m. Full
closure of the mainlanes, in both directions, at FM 1516 for utility work.
Traffic will be stopped in 15-minute intervals throughout the day. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, September 15 9 p.m. until Saturday,
September 16 9 a.m. Full closure of eastbound mainlane at FM 1518 for beam
setting. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Saturday, September 16 9 p.m. until Sunday
September 17 9 a.m. Full closure of westbound mainlanes at FM 1518 for beam
setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 18 until Friday,
September 22. Nightly 9 p.m. to 5 a.m. Alternating full closures on the mainlanes,
in both directions, at FM 1518 for bridge work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday,
October 4, long-term closure (24/7). Left lane closure on southbound I-35
frontage road between Toepperwein Road and Judson Road for retaining wall,
drilled shaft, column, and cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until
Sunday, December 10, long-term closure (24/7). Left lane closure on southbound
frontage road of I-35 at Fratt Road for construction work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday,
December 23 long-term closure (24/7). Alternating lane closures on southbound
I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway
reconstruction and structural work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk141422353"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 30, long-term
closure (24/7). Left lane closure on southbound frontage road of I-35 from
Retama Parkway to Old Austin Road for temporary pavement, striping, barrier,
column, and cap work.</span></span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, September 7, 2024,
long-term closure (24/7). Left lane closure on southbound frontage road of I-35
from McMorris Boulevard for construction.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk145665723"><span style="line-height: 107%;">Sunday, September 17 until Saturday,
September 23. 9:00 p.m. to 5:00 a.m</span></a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;">. Multiple lane closures (3) on northbound
mainlanes and entrance ramp closure of I-35 from Evans Road to Roy Richard
Drive for barrier work. Traffic should use next entrance ramp.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and
entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Schertz Parkway to Forum Parkway for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and
exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work.
Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to
Evans Road for drainage work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour
signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary
pavement, striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 from Evans Road to Olympia Parkway for bridge foundation, striping,
barrier work, and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Forum Parkway to Ferrell Road for bridge structure work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from
Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road
to Forum Parkway for construction work. Traffic must use the Forum Parkway
turnaround and follow detour signs to access southbound I-35. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and
entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping
work. Traffic should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at
Corporate Drive for striping, barrier, and temporary pavement work. Traffic
should use Corporate Drive intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to
Roy Richard Drive for barrier work. Traffic should use next exit and entrance
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz
Parkway for barrier work. Traffic should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz
Parkway for bridge structure work. Traffic should use next entrance and exit
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to
Schertz Parkway for striping, barrier, and temporary pavement work. Traffic
should use next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to
Evans Road for drainage and barrier work. Traffic should use next exit and
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use Evans Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road of I-35 from
Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures of northbound frontage road of
I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary
pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp
closure for striping and barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector ramp closure at I-35
interchange for geotechnical work. Traffic must should follow the detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the
Loop 1604 interchange for striping, barrier, and construction entrance work.
Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp
closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway
and follow the detour signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp
closure for earthwork. Traffic must exit at Lookout Road and follow the detour
signs to southbound I-35.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp closure at the Loop 1604
interchange for striping and barrier work. Traffic must use west Loop 1604
(exit 172) to access southbound I-35 and follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp
closure and alternating lane closures on southbound mainlanes of I-35 at the
exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604
traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35, alternating exit ramp closures, and entrance ramp closure from
Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic
should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping,
barrier, and temporary pavement work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp
closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604
interchange for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance
ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection
work. Accommodations will be made for local traffic. Southbound frontage road
of I-35 traffic must follow detour.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU
Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector
ramp closure, and southbound I-35 collector ramp closure at the Loop 1604
interchange for striping and barrier work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat
Booker Road at I-35 for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and
entrance ramp closure from Shin Oak Road to Pat Booker Road for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector
ramp to Pat Booker Road for striping, barrier, and bridge substructure work.
Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat
Booker Road.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35
northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive
for construction work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
entrance ramp closure, and alternating exit ramp closures of I-35 from Judson
Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign
to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road,
right lane closure on northbound mainlanes, and exit ramp closure of I-35 from
Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and
westbound at the intersection of Judson Road and Randolph Boulevard and left
lane closure on Randolph Boulevard at Judson Road for temporary pavement and
signal works. Traffic should use the next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes
of I-35, entrance ramp closure, and alternating exit ramp closures from
O’Connor Road to Toepperwein Road for barrier setting and structures work.
Traffic should follow the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound mainlanes of I-35 at O’Connor
Road for overhead sign removal. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and
barrier work. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit
ramp closure, and left lane closure on southbound frontage road of I-35 at
O’Connor Road for barrier work. Traffic should use next exit.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes,
entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson
Road for structures work. Traffic should use next entrance and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35
mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2)
on southbound frontage road of I-35 from Judson Road to O’Connor Road for
striping, barrier, and paving work. Traffic should use next entrance and exit
ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes
from Judson Road to O’Connor Road for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of
Toepperwein Road at I-35 for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35,
exit ramp closure, and left lane closure on southbound frontage road of I-35
from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic
should use next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of
I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive
to Weidner Road for earthwork and striping. Traffic should follow the detour
signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road,
alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner
Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow
the detour signs to the available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Left lane closure on northbound and southbound mainlanes
of I-35 from Weidner Road to Loop 1604 for utility work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to
Weidner Road for drainage and barrier work. Traffic should use next entrance
and exit ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for
earthwork, drainage and barrier work. Traffic should use prior entrance ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes,
alternating entrance and exit ramp closures, and alternating lane closures on
southbound frontage road of I-35 from O’Connor Road to Weidner Road for
striping work. Traffic should use the next exit and entrance ramps. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes,
entrance ramp closure, exit ramp closure, and alternating lane closures on
southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for
striping work. Traffic should use the next exit and entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of
I-35 from Crestway Drive to Starlight Terrace for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound
to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind
Drive for drilling work. Traffic should follow detour signs. Accommodations
will be made for local traffic.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of
I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for
permanent widening work. Traffic should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem
Road, alternating lane closures on northbound frontage road, and alternating
entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for
striping and barrier work. Traffic should follow detour signs for available
ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound
of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and
multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35
southbound frontage road to Austin Highway (Loop 368) for barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of
I-35 and alternating lane closure on exit ramp from Walzem Road to Randolph
Boulevard for barrier setting.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Left lane closure on northbound and southbound mainlanes
of I-35 from Walzem Road to Weidner Road for utility work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and
alternating lane closures on southbound frontage road of I-35 from Randolph
Boulevard to Walzem Road for geotechnical, drilled shaft, and column work.
Traffic to use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from
Randolph Boulevard to Walzem Road for cap work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of
I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic
to use next entrance ramp.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="line-height: 107%;">Sunday, September 17 until Saturday, September 23.
9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and
entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft
work. Traffic should follow detour signs.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: 107%; margin-bottom: 8.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Current until Friday,
February 16, 2024, long-term closure (24/7). Left lane closure on westbound
frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for
construction.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Thursday, September 21. 9:00 p.m. to 5:00 a.m. Alternating
lane closure on westbound frontage road of I-410 at Harry Wurzbach Road for
traffic signal equipment installation.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier
work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on northbound Austin Highway (Loop 368) from Walzem Road to
Interchange Parkway for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September
17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound Austin Highway (Loop 368) connector ramp to westbound
I-410 for barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
eastbound to westbound turnaround closure between Starcrest Drive and Perrin
Beitel for striping and barrier work. Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday, September
17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound frontage road of I-410, entrance ramp closure, and right
mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping
and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to
Randolph Boulevard for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Austin
Highway (Loop 368) for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on westbound frontage road and exit ramp closure of I-410 from
Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next
exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop
368) for cap and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to
Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on westbound frontage road and exit ramp closure of I-410 to Austin
Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Multiple left
lane closures (2) and entrance ramp closure on eastbound frontage road of I-410
from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
Traffic should use next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="line-height: 107%;"><span style="font-family: arial; font-size: x-small;">Sunday,
September 17 until Saturday, September 23. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and
barrier work. Traffic should use prior entrance and exit ramps.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk145667056"><span style="line-height: 107%;">Sunday, September 17 until Thursday, September 21.
9:00 p.m. to 5:00 a.m. Alternating lane closure on westbound frontage road of
I-410 at Harry Wurzbach Road for traffic signal equipment installation.</span></a></span></span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – West San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 18 until
Tuesday, September 19. 9 p.m. to 5 a.m. Single northbound mainlane closure from
Old Pearsall Rd. to Ray Ellison Blvd. for milling operations.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 20 until
Friday, September 22. 9 p.m. to 5 a.m. Single southbound mainlane closure from
Medina Base Rd. to Ray Ellison Blvd. for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 18. 9 p.m. to 5
a.m. Single lane closure on the southbound frontage road from Medina Base Rd.
to Old Pearsall Rd. for road work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 19. 9 p.m. to
5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Medina Base
Rd. for road work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 20. 9 p.m.
to 5 a.m. Single lane closure on the northbound frontage road from Old Pearsall
Rd. to Hwy 90 for road work.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – N.W. Military Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 18 until
Friday, September 22. 7 a.m. o 6 p.m. Alternating lane closures, in both
directions, from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Current until Friday, September
22. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from N.W.
Military Highway to Wetmore Rd. for milling and paving operations. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 17. 7 a.m. to 3
p.m. Full closure of lanes, in both directions, from West Ave. to Blanco Rd.
for utility work. Traffic will be stopped in 15-minute intervals throughout the
day.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, September 22. 9 a.m. to 3 p.m. Alternating lane
closures on the westbound frontage road from Ingram Rd. to Loop 410 for
excavation. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, September 22. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Ingram Rd. to Potranco Rd. for conduit
installation. </span></li><li><span style="font-family: arial; font-size: x-small;">Current until Friday, September 22. 9 a.m. to 3 p.m. Single lane closure
on the westbound frontage road from Loop 410 to Ingram Rd. for conduit work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, September 18. 9 a.m. to 3 p.m. Single lane closure on the
eastbound frontage road at Wiseman for moving equipment.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – Kendall County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, September 18. 9 a.m. to 3 p.m. Single westbound mainlane closure
from SH 46 to Fredericks Creek for mow strip work.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, September 18. 9 a.m. to 3 p.m. Single lane closures on the
frontage roads, in both directions, from SH 46 to Scenic Loop Rd. for painting
operations.</span></li><li><span style="font-family: arial; font-size: x-small;">Monday, September 18 until Friday, September 22. 9 a.m. to 3 p.m. Rolling
mainlane closures, in both directions, from Scenic Loop to Fredericks Creek.</span></li></ul><p></p><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-12205226192652928132023-09-08T09:42:00.005-05:002023-09-08T09:42:36.385-05:00UPCOMING SCHEUDLED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Monday, Sept. 25. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan
Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m.
Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 11 until Monday, Sept. 25. Weekdays 9 a.m. until 3 p.m. Eastbound
to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Monday, Sept. 25. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 11 until Monday, Sept. 25. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Friday, September 15. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak
Parkway exit ramp for barrier setting and striping. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10 until Friday, September 15. Nightly 9 p.m. until 5
a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to
Tradesman Road for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10 until Friday, September 15. Nightly 9 p.m. until 5
a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak
Parkway exit ramp for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10 until Friday, September 15. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit
ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Thursday, September 14 until Saturday, September 16. Nightly 9 p.m.
until 5 a.m. Westbound mainlane right lane from Lockhill Selma Road entrance
ramp to the IH-10 interchange exit ramps will be closed to set deck panels on
the westbound direct connector. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Thursday, September 14 until Saturday, September 16. Nightly 9 p.m.
until 5 a.m. Loop 1604 westbound exit ramp to frontage road/ IH-10 intersection
will be closed set deck panels on the westbound direct connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Thursday, September 14 until Saturday, September 16. Nightly 9 p.m.
until 5 a.m. Loop 1604 westbound entrance ramp from Lockhill Selma Road. The
auxiliary lane will also be closed to set deck panels on the westbound direct
connector.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10 until Sunday, September 17. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and NW Military Highway for bridge substructure. This closure will remain in
place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10 until Sunday, September 17. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and Lockhill Selma Road for wall construction under bridge. This closure will
remain in place for approximately 4 weeks.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
striping work.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure from Nacogdoches Road to Union Pacific Railroad for
retaining wall demolition work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
frontage road of Loop 1604, right lane entrance ramp closure, and turnaround
closure from Nacogdoches Road to Union Pacific Railroad for striping work.
Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier
work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604
turnaround closure at Lookout Road for construction work. Traffic should use
Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound
Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road
for barrier work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes
of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit
ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound
bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to
Lookout Road for striping work. Traffic should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound
Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604
from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit
and next entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes
of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic
should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound
Loop 1604 collector ramp at the I-35 interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of
Loop 1604 from Pat Booker Road to Lookout Road for striping work. Traffic
should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure at Lookout Road for demolition work. Traffic should use
Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp
closure, and entrance ramp closure on westbound Loop 1604 from I-35 to
Nacogdoches Road for barrier work. Traffic should use prior exit and next
entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound
frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from
Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should
use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound
frontage road and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches
Road for construction entrance and temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes
of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use
next exit ramp. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604
connector ramp from southbound I-35 to Lookout Road for striping work. Traffic
should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604
turnaround closure from Lookout Road to Union Pacific Railroad for retaining
wall demolition work. Traffic must use Nacogdoches Road turnaround.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection
and turnarounds for striping work. Traffic should follow detour signs.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of
Loop 1604 from Gateway Boulevard to Gateway Place for setting caps. Traffic
should follow detour signs.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>US 281 – North San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 until Saturday,
September 16. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads,
in both directions, from Marshall Rd. to Borgfeld Rd. for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 until Saturday,
September 16. 8 p.m. to 5 a.m. Alternating lane closures on the frontage roads,
in both directions, from Marshall Rd. to Borgfeld Rd. for concrete work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 until Saturday, September
16. 9 a.m. to 4 p.m. Northbound exit ramp to Bulverde Rd. closed for concrete work.
</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 util Saturday,
September 16. 9 a.m. to 3 p.m. Alternating mainlane closures, in both
directions, from Marshall Rd. to Borgfeld Rd. for painting operations. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 util Saturday,
September 16. 8 p.m. to 5 a.m. Alternating mainlane closures, in both
directions, from Marshall Rd. to Borgfeld Rd. for painting operations.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Sunday, September 10. 7
a.m. to 4 p.m. Full closure of mainlanes, in both directions, at Loop 1604 for utility
work. Traffic will be stopped intermittently throughout the day in 15-minute
intervals.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp
Bullis Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full
closure for portable concrete traffic barrier installation. Nightly closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La
Cantera Parkway (braided ramp) full closure for portable concrete traffic
barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure
for concrete barrier relocation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for
pedestrian bridge installation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound frontage road from the La Cantera Parkway intersection to the
entrance ramp just after La Cantera Parkway full closure for pedestrian bridge
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, Sept. 10 until Friday, Sept. 22. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound frontage road, directly under the Loop 1604 interchange full closure
for bridge foundation construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Friday, Sept. 22. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 11 until Friday, Sept. 22. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
exit ramp to La Cantera Parkway full closure for braided ramp demolition.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
mainlane right travel lane between the Loop 1604 interchange and the exit ramp
to Camp Bullis Road full closure for braided ramp demolition.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
frontage road left lane between the Loop 1604 interchange and La Cantera
Parkway full closure for braided ramp demolition.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – East San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, September 8 until Saturday,
September 9. 8 p.m. to 5 a.m. Single eastbound mainlane closure from FM 2538 to
Zuehl Rd. for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, September 8 until Monday, September
11. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from FM 465 to FM
1518 for traffic switch.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday September
9, long-term closure (24/7). Left lane closure on southbound frontage road of
I-35 from McMorris Boulevard to Pat Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, October 4,
long-term closure (24/7). Left lane closure on southbound I-35 frontage road
between Toepperwein Road and Judson Road for retaining wall, drilled shaft,
column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December
10, long-term closure (24/7). Left lane closure on southbound frontage road of
I-35 at Fratt Road for construction work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23
long-term closure (24/7). Alternating lane closures on southbound I-35 frontage
road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction
and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk141422353"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 30, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from Retama Parkway to Old Austin
Road for temporary pavement, striping, barrier, column, and cap work.</span></a></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Current until Monday, September 9, 2024, long-term closure (24/7). Left
lane closure on southbound frontage road of I-35 from McMorris Boulevard for
construction.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><a name="_Hlk145001339">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m</a></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;">. Rolling closure project-wide for sweeping operation.<o:p></o:p></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and entrance ramp closure of
I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use
next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge
structure work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage
work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Evans Road
to Olympia Parkway for bridge foundation, striping, barrier work, and temporary
pavement work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for bridge structure work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for bridge substructure work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for
construction work. Traffic must use the Forum Parkway turnaround and follow
detour signs to access southbound I-35. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of
I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use
next entrance ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
construction work. Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for construction work.
Traffic should follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign
removal. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left
lane closure on southbound frontage road of I-35 at O’Connor Road for barrier
work. Traffic should use next exit.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for
barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive
to Weidner Road for striping and barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
exit ramp closures, and northbound to southbound turnaround at I-35 from
Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic should
follow the detour signs to the available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Weidner
Road to Loop 1604 for utility work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Walzem
Road to Weidner Road for utility work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane
closure on exit ramp from Walzem Road to Randolph Boulevard for barrier
setting.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday, September 16. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on southbound mainlanes and alternating lane closures on
southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for
geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.</span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk141422353;">Monday, September 11 until Friday, September 15. 12:00 p.m. to 5:00 a.m.
Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo
Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo
Valley Drive to Pat Booker Road for beam staging.</span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday September 23,
long-term closure (24/7). Left lane closure on westbound frontage road of I-410
from Perrin Creek to Austin Highway (Loop 368) for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work.
Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound
Austin Highway (Loop 368) from Walzem Road to Interchange Parkway for barrier
work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for
barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and eastbound to
westbound turnaround closure between Starcrest Drive and Perrin Beitel for
striping and barrier work. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and right mainlane
closure from Perrin Beitel to Austin Highway (Loop 368) for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph
Boulevard for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
eastbound mainlanes of I-410 from Starcrest Drive to Austin Highway (Loop 368)
for barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard
to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on
westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Saturday,
September 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound
mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for
striping and barrier work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on
westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop
368) for barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2)
and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches
Road to Harry Wurzbach Road for striping and barrier work. Traffic should use
next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until
Saturday, September 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on
eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure
from Harry Wurzbach Road to Starcrest Drive for striping and barrier work.
Traffic should use prior entrance and exit ramps.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – N.W. Military Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, September 11 until
Friday, September 15. 7 a.m. to 6 p.m. Alternating lane closures, in both
directions, from Loop 1604 to Huebner Rd. for curb and sidewalk installation.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Current until Friday, September
22. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from N.W.
Military Highway to Wetmore Rd. for milling and paving operations. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10. 6 a.m. to 5
p.m. Full closure of the intersection at Nacogdoches Rd. for utility work.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Monday, September 11 until Friday, September 22. 9 a.m. to 3 p.m. Alternating
lane closures on the westbound frontage road from Ingram Rd. to Loop 410 for excavation.
</span></li><li><span style="font-family: arial; font-size: x-small;">Current until Wednesday, September 13. 9 a.m. to 3 p.m. Alternating lane
closures on the westbound frontage road from Potranco Rd. to Ingram Rd. for
excavation. </span></li><li><span style="font-family: arial; font-size: x-small;">Sunday, September 10 until Tuesday, September 12. 9 p.m. to 5 a.m.
Westbound turnaround to Ingram Rd. closed for bore installation.</span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, September 12 until Friday, September 15. 9 a.m. to 3 p.m. Turnarounds
closed in both directions at Hunt Ln. for drilling operations.</span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, September 13 until Friday, September 22. 9 a.m. to 3 p.m. Single
lane closure on the westbound frontage road from Ingram Rd. to Potranco Rd. for
conduit installation. </span></li><li><span style="font-family: arial; font-size: x-small;">Monday, September 11 until Friday, September 22. 9 a.m. to 3 p.m. Single
lane closure on the westbound frontage road from Loop 410 to Ingram Rd. for
conduit work.</span></li></ul><p></p>
TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.comtag:blogger.com,1999:blog-869394553698991665.post-78936343266046003352023-09-01T14:42:00.004-05:002023-09-01T14:42:21.185-05:00UPCOMING SCHEDULED CONSTRUCTION CLOSURES<p><a name="_Hlk108794202"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North West San Antonio/Bexar
County</i></span></b></a></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. <a name="_Hlk111814029">Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. <a name="_Hlk111814055">Nightly alternating frontage road closures. </a>One lane
to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Monday, Sept. 11. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. <a name="_Hlk111814252">Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.</a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, Sept. 5 until Monday, Sept. 11. Weekdays 9 a.m. until 3 p.m.
Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 4 until Monday, Sept. 11. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Monday, Sept. 4 until Monday, Sept. 11. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge
widening/retaining walls.</span><span style="mso-bookmark: _Hlk108794202;"><span class="MsoCommentReference"> </span></span><span style="mso-bookmark: _Hlk108794202;">Only one turnaround to be closed at a time.<b><span style="background: white;"><o:p></o:p></span></b></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 4 until Monday, Sept. 11. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Monday, Sept. 4 until Monday, Sept. 11. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace
Boulevard for bridge construction. Only one turnaround to be closed at a time
on each direction.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North Central San Antonio/Bexar
County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Friday, September 8. Nightly 9 p.m. until 5
a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak
Parkway exit ramp for barrier setting and striping. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8. <span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m. Alternating
westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road
for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8. <span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m. Alternating
eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for
barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8. Nightly 9 p.m. until 5
a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit
ramp to IH-10 for barrier setting and striping.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8. Nightly 9 p.m. until 5
a.m. NW Military Highway at Loop 1604 intersection, including turnarounds, will
be fully closed westbound for prepping bridge deck at NW Military Highway.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8.<span style="mso-spacerun: yes;"> </span>Nightly 9 p.m. until 5 a.m. Eastbound
mainlane right lane closure from the IH-10 interchange to Tradesman Road will
be closed for setting eastbound direct connector bent caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8 Nightly 9 p.m. until 5
a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604
eastbound mainlanes will be closed for setting eastbound direct connector bent
caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8 Nightly 9 p.m. until 5
a.m. IH-10 eastbound cloverleaf exit ramp to Loop 1604 eastbound mainlanes will
be closed for setting eastbound direct connector bent caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday, September 8 Nightly 9 p.m. until 5
a.m. Eastbound collector distributor through / left lane to Loop 1604 eastbound
mainlanes will be closed for setting eastbound direct connector bent caps. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 3 until Sunday, September 10. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and NW Military Highway for bridge substructure. This closure will remain in
place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 3 until Sunday, September 10. Daily/Nightly 12 a.m.
until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604
and Lockhill Selma Road for wall construction under bridge. This closure will
remain in place for approximately 4 weeks.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 8 at 9 p.m. until Saturday, September 9 at 5 a.m.
Eastbound mainlane closure from NW Military exit ramp to NW Military entrance
ramp will be fully closed for pouring bridge deck at NW Military Highway.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 8 at 9 p.m. until Saturday, September 9 at 5 a.m. Westbound
mainlane closure from NW Military exit ramp to NW Military entrance ramp will
be fully closed for pouring bridge deck at NW Military Highway.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Friday, September 8 at 9 p.m. until Saturday, September 9 at 5 a.m. NW Military
Highway at Loop 1604 intersection, including turnarounds, will be fully closed
for pouring bridge deck at NW Military Highway.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>Loop 1604 – North East San Antonio/Bexar
County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk138422613"><span style="mso-bookmark: _Hlk139027610;">Tuesday, September 5 until
Saturday, September 9. 9:00 p.m. to 5:00 a.m. Full closure on westbound
frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting
caps. Traffic should follow detour signs.</span></a></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><a name="_Hlk144453952">Wednesday, September 6
until Saturday, September 9. 9:00 p.m. to 5:00 a.m</a></span></span></span><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">. Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout
Road to IKEA-RBFCU Parkway for striping work. Traffic should use prior exit
ramp.<o:p></o:p></span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35
interchange for striping work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for
striping work. Traffic should use prior exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound bypass ramp and entrance ramp closure of
Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic
should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure,
and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for
striping work. Traffic should use prior exit and next entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to
Lookout Road for striping work. Traffic should use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for
overhead sign removal. Traffic should follow signs.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604, right lane
entrance ramp closure, and turnaround closure from Nacogdoches Road to Union
Pacific Railroad for striping work. Traffic should use Lookout Road
intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout
Road to I-35 for striping and barrier work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to
I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should
use next exit ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to
Union Pacific Railroad for retaining wall demolition work. Traffic should use
Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating mainlane closures, exit ramp closure, and entrance ramp closure on
westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic
should use prior exit and next entrance ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on westbound mainlanes of Loop 1604 from I-35 to Lookout Road for
overhead sign removal. Traffic should use next entrance ramp.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for
demolition work. Traffic should use Lookout Road intersection. </span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for
construction work. Traffic should use Lookout Road intersection.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road, exit ramp closure, and
entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches
Road for barrier work. Traffic should use next available ramps.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on westbound frontage road and westbound bypass ramp
of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and
temporary pavement work.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;"><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for
pavement and striping work. Traffic should use next exit ramp. </span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk138422613;"><span style="mso-bookmark: _Hlk139027610;">Wednesday, September 6 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union
Pacific Railroad for retaining wall demolition work. Traffic must use
Nacogdoches Road turnaround.</span></span></span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-10 – North West San Antonio/Bexar County<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;"><a name="_Hlk92913900"><span style="mso-bookmark: _Hlk105054794;">Tuesday, Sept. 5 until Friday,
Sept. 8. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.</span></a></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.</span></span></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><span style="mso-bookmark: _Hlk92913900;"><span style="mso-bookmark: _Hlk105054794;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. </span></span></span><span style="mso-bookmark: _Hlk108794202;">Excluding weekends.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full
closure for portable concrete traffic barrier installation. Nightly closures.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La
Cantera Parkway (braided ramp) full closure for portable concrete traffic
barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604
interchange full closure for bridge construction. Nightly closures. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding
weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure
for concrete barrier relocation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for
pedestrian bridge installation. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 11 p.m. until 5 a.m.
IH-10 eastbound frontage road from the La Cantera Parkway intersection to the
entrance ramp just after La Cantera Parkway full closure for pedestrian bridge
installation. Nightly closures. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound frontage road, directly under the Loop 1604 interchange full closure
for bridge foundation construction. Nightly closures. Excluding weekends. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, Sept. 5 until Friday, Sept. 8. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
exit ramp to La Cantera Parkway full closure for braided ramp demolition.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
mainlane right travel lane between the Loop 1604 interchange and the exit ramp
to Camp Bullis Road full closure for braided ramp demolition.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Friday, Sept. 8 at 9 p.m. until Monday, Sept. 11 at 5 a.m. IH-10 westbound
frontage road left lane between the Loop 1604 interchange and La Cantera
Parkway full closure for braided ramp demolition.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 6.0pt;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday September 9, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from McMorris Boulevard to Pat
Booker Road for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Wednesday, October 4, long-term closure (24/7). Left lane
closure on southbound I-35 frontage road between Toepperwein Road and Judson
Road for retaining wall, drilled shaft, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Sunday, December 10, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 at Fratt Road for construction
work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 23 long-term closure (24/7).
Alternating lane closures on southbound I-35 frontage road between Thousand
Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current until Saturday, December 30, long-term closure (24/7). Left lane
closure on southbound frontage road of I-35 from Retama Parkway to Old Austin
Road for temporary pavement, striping, barrier, column, and cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 12:00 p.m. to 5:00 a.m.
Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo
Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo
Valley Drive to Pat Booker Road for beam staging. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk144452753">Tuesday, September 5 until
Saturday, September 9. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (3) on northbound mainlanes and entrance ramp
closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic
should use next entrance ramp.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for
barrier work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier
work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes and entrance and exit
ramp closures from Roy Richard Drive to Schertz Parkway for structure work.
Traffic should use next exit and entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for
striping, barrier, and temporary pavement work. Traffic should use next exit
and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes and exit ramp closure of
I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use
next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage
work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, exit ramp closure, and
entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and
barrier work. Traffic should use next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Northbound to southbound I-35 turnaround closure at Evans Road for striping,
barrier, and temporary pavement work. Traffic should use Evans Road
intersection.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to
Forum Parkway for structure work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Old Austin Road to Forum
Parkway for bridge work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Olympia
Parkway to Gateway Boulevard for bridge foundation, temporary pavement,
striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Evans Road
to Olympia Parkway for bridge foundation, striping, barrier work, and temporary
pavement work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to
Ferrell Road for structure work.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk144452850">Tuesday, September 5 until
Saturday, September 9. 9:00 p.m. to 5:00 a.m.</a></span><span style="mso-bookmark: _Hlk108794202;"> Southbound I-35 entrance ramp closure from Old Austin Road to Forum
Parkway for striping and barrier work. Traffic must use the Forum Parkway
turnaround and follow detour signs to access southbound I-35. <o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia
Parkway for structure work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for
striping, barrier, and construction entrance work. Traffic should follow detour
signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and
barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical
work. Traffic should follow the detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road
for striping, barrier, and bridge substructure work. Traffic must exit Loop
1604 (exit 172) and follow the detour signs to Pat Booker Road.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and
barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour
signs to southbound I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork.
Traffic must exit at Lookout Road and follow the detour signs to southbound
I-35.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access
southbound I-35 and follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating
lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for
bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at
Retama Parkway and follow the detour signs to Loop 1604.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for beam setting. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit
ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access
Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary
pavement work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on northbound frontage road of I-35 and entrance ramp closure from
Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement
work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure of I-35 Access Road bridge from I-35 northbound frontage road to
I-35 southbound frontage road, near Shin Oak Drive for beam setting. Traffic
should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure of northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping,
barrier, and temporary pavement work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and entrance ramp of I-35 from Shin
Oak Drive to Toepperwein Road for cap form erection work. Accommodations will
be made for local traffic. Southbound frontage road of I-35 traffic must follow
detour.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker
Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and
southbound I-35 collector ramp closure at the Loop 1604 interchange for
striping and barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for
beam setting. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU
Parkway to Pat Booker Road for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, entrance ramp closure,
and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive
for barrier work. Traffic should follow the detour sign to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road, right lane closure on
northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to
Gunn Road, right lane closure on the eastbound and westbound at the
intersection of Judson Road and Randolph Boulevard and left lane closure on
Randolph Boulevard at Judson Road for temporary pavement and signal works.
Traffic should use the next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to
Bludau-Bishop Road for striping and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, alternating entrance
ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop
Road for earthwork and striping. Traffic should follow the detour signs to the
available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign
removal. Traffic should follow signs. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 from Judson Road
to O’Connor Road for earthwork, paving, striping, and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left
lane closure on southbound frontage road of I-35 at O’Connor Road for barrier
work. Traffic should use next exit.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure,
and exit ramp closure from Pat Booker Road to Judson Road for structures work.
Traffic should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp
closure, exit ramp closure, and left lane closures (2) on southbound frontage
road of I-35 from Judson Road to O’Connor Road for striping, barrier, and
paving work. Traffic should use next entrance and exit ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to
O’Connor Road for striping work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for
barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure,
and left lane closure on southbound frontage road of I-35 from Toepperwein Road
to Judson Road for earthwork and barrier work. Traffic should use next exit
ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Weidner
Road to Loop 1604 for utility work.</span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"><a name="_Hlk144453440">Tuesday, September 5 until
Saturday, September 9. 9:00 p.m. to 5:00 a.m</a></span><span style="mso-bookmark: _Hlk108794202;">. Multiple lane closures (3) on northbound mainlanes of I-35 from
Thousand Oaks Drive to Weidner Road for striping and barrier work.<o:p></o:p></span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound frontage road, entrance ramp closure,
and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for
earthwork and striping. Traffic should follow the detour signs to the available
ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35, entrance ramp
closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage
and barrier work. Traffic should use next entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and entrance ramp
closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and
barrier work. Traffic should use prior entrance ramp. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (3) on southbound mainlanes, alternating entrance and
exit ramp closures, and alternating lane closures on southbound frontage road
of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should
use the next exit and entrance ramps. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit
ramp closure, and alternating lane closures on southbound frontage road of I-35
from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use
the next exit and entrance ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph
Boulevard to Thousand Oaks for barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on northbound frontage road of I-35 from Crestway
Drive to Starlight Terrace for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Alternating lane closures on southbound frontage road of I-35 and exit ramp
closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening
work. Traffic should use prior exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road and northbound to southbound
turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for
drilling work. Traffic should follow detour signs. Accommodations will be made
for local traffic.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Left lane closure on northbound and southbound mainlanes of I-35 from Fratt
Road to Weidner Road for utility work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Southbound to northbound turnaround closure at Walzem Road, alternating lane
closures on northbound frontage road, and alternating entrance and exit ramp
closures of I-35 from Walzem Road to Crestway Drive for striping and barrier
work. Traffic should follow detour signs for available ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Exit ramp closure on southbound mainlanes and alternating lane closures on
southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for
geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to
Walzem Road for cap work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to
Walzem Road for drilled shaft and column work. Traffic to use next entrance
ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Multiple lane closures (2) on northbound and southbound of Interchange Parkway
from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on
eastbound and westbound of Fratt Road from I-35 southbound frontage road to
Austin Highway (Loop 368) for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m.
Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35
from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should
follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9:00 p.m. to 6:00 a.m.
Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of
I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use
next entrance ramp.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410 – North East San Antonio<o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in; vertical-align: baseline;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Current
until Saturday September 16, long-term closure (24/7). Left lane closure on
westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368)
for construction.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier
work. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on northbound Austin Highway (Loop 368) from Walzem Road to
Interchange Parkway for barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on northbound Austin Highway (Loop 368) connector ramp to
westbound I-410 for barrier work. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Austin
Highway (Loop 368) for barrier setting.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to
Randolph Boulevard for barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for
striping and barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
eastbound to westbound turnaround closure between Starcrest Drive and Perrin
Beitel for striping and barrier work. Traffic should use next entrance ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on westbound frontage road and exit ramp closure of I-410 from
Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic should use
next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Entrance ramp
closure on westbound frontage road and exit ramp closure of I-410 to Austin
Highway (Loop 368) for barrier work. Traffic should follow detour signs.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to
Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Multiple lane
closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop
368) for cap and barrier work.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on westbound frontage road and exit ramp closure of I-410 from
Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next
exit ramp.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Alternating
lane closures on eastbound frontage road of I-410, entrance ramp closure, and
exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and
barrier work. Traffic should use prior entrance and exit ramps.</span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Saturday, September 9. 9:00 p.m. to 5:00 a.m. Multiple left
lane closures (2) and entrance ramp closure on eastbound frontage road of I-410
from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
Traffic should use next entrance ramp.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in; vertical-align: baseline;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>I-410
– West San Antonio <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in; vertical-align: baseline;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday,
September 5 until Wednesday, September 6. 9 p.m. to 5 a.m. Single lane closures
on the frontage roads, in both directions, from Medina Base Rd. to Old Pearsall
Rd. for traffic switch. </span></span></li><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Wednesday,
September 6 until Thursday, September 7. 9 p.m. to 5 a.m. Single southbound mainlane
closure from Medina Base Rd. to Ray Ellison Blvd. for barrier removal.</span></span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>FM 1535 – N.W. Military Highway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="mso-bookmark: _Hlk108794202;"><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until
Friday, September 8. 7 a.m. to 6 p.m. Alternating lane closures, in both
directions, from Loop 1604 to Huebner Rd. for curb and sidewalk construction.</span></span><b><o:p><span style="font-family: arial; font-size: x-small;"> </span></o:p></b></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><span style="mso-bookmark: _Hlk108794202;"><b><span style="font-family: arial; font-size: x-small;"><i>PA 1502 – Wurzbach Parkway <o:p></o:p></i></span></b></span></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Tuesday, September 5 until Friday,
September 22. 8 p.m. to 5 a.m. Alternating lane closures, in both directions,
from N.W. Military Highway to Wetmore Rd. for milling and paving operations. </span></span></li><li><span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;">Sunday, September 10. 6 a.m. to 5
p.m. Full closure of the intersection at Nacogdoches Rd. for utility work.</span></span> </li></ul><p></p>
<span style="font-family: arial; font-size: x-small;"><span style="mso-bookmark: _Hlk108794202;"></span>
</span><p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 151 – West San Antonio/Bexar County<o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Wednesday, September 6. 9 a.m. to 3 p.m.
Eastbound to westbound turnaround closure at Ingram Rd. for conduit work. </span></li><li><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Friday, September 8. 7 a.m. to 3 p.m. Westbound
to eastbound turnaround closed at Ingram Rd. for conduit work. </span></li><li><span style="font-family: arial; font-size: x-small;">Wednesday, September 6 until Thursday, September 7. 9 p.m. to 5 a.m. Single
lane closure on the eastbound frontage road from W. Military Dr. to Hunt Lane
for road work.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>US 90 – West San Antonio/Bexar County <o:p></o:p></i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Current until Friday, September 8. 8:30 p.m. to 5 a.m. Alternating
eastbound mainlane closures from Springvale Dr. to Leon Creek bridge for paving
operations.</span> </li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SH 16 – Bandera Rd.</i><o:p></o:p></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Friday, September 8. 9 a.m. to 3 p.m.
Alternating lane closures, in both directions, from Loop 1604 to Circle A for
curb and sidewalk construction.</span></li></ul><p></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"><b><span style="font-family: arial; font-size: x-small;"><i>SL 368 – Broadway</i></span></b></p>
<p class="MsoNormal" style="line-height: normal; margin-bottom: 0in;"></p><ul style="text-align: left;"><li><span style="font-family: arial; font-size: x-small;">Tuesday, September 5 until Saturday, September 9. 9 p.m. to 5 a.m.
Alternating lane closures, in both directions, from Roy Smith to Casa Blanca for
pavement operations. </span></li></ul><p></p>TxDOTSanAntoniohttp://www.blogger.com/profile/13225422220441024257noreply@blogger.com