Pages

Tuesday, December 18

ADDITIONAL CLOSURES FOR WEEK OF DEC. 17-21

Loop 1604 -- West San Antonio
  • Wednesday, December 19. 9 a.m. until 3 p.m. Westbound left mainlane between Milan Road and Huebner Road for electrical work.
I-35 -- Northeast San Antonio
  • Wednesday, December 19. 9 a.m. until 4 p.m. Northbound left frontage road at North New Braunfels Avenue for crash cushion repair work.
  • Wednesday, December 19. 9 a.m. until 4 p.m. Southbound right mainlane at Nogalitos Street for crash cushion repair work.
I-10 -- Northwest San Antonio
  • Wednesday, December 19 until Thursday, December 20. Daily 8:30 a.m. until 5 p.m. Alternating westbound mainlanes from Fair Oaks Parkway to Ralph Fair Road for emergency asphalt repair work.
US 90 -- West San Antonio
  • Wednesday, December 19. 9 a.m. until 4 p.m. Eastbound right mainlane at Zarzamora Avenue for crash cushion repair work.
I-410 -- Southeast San Antonio
  • Tuesday, December 18 until Thursday, December 20. Nightly 10 p.m. until 5 a.m. Southbound left mainlane from Military Drive to SH 151 for road repair work.
Dominion Drive -- Northwest San Antonio
  • Current until Thursday, December 20. Daily 7 a.m. until 5 p.m. Alternatiing lanes in both directions at I-10 for bridge work.
Wiseman Boulevard -- West San Antonio
  • Wednesday, December 19 until Thursday, December 20. Nightly 9 p.m. until 5 a.m. Full closure in both directions at Loop 1604 for beam installation work.



Friday, December 14

UPCOMING CONSTRUCTION-RELATED CLOSURES

** WEATHER PERMITTING** 

I-10 – East San Antonio
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
  • Current until Saturday, December 15. 9 p.m. until 9 p.m. Full westbound mainlane closure at FM 1516 for road repair work. DETOUR: Westbound traffic will take the FM 1516 exit, remain on the frontage road through the intersection and reenter the mainlanes west of FM 1516. 
  • Saturday, December 15. 7 a.m. until 5 p.m. Alternating mainlanes in both directions for barrier work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane between I-410 and Rosillo Creek (just west of Foster Road) for construction vehicle work zone access. 
  • Sunday, December 16 until Friday, December 21. Nightly 7 p.m. until 5 a.m. Left westbound mainlane between Rosillo Creek (just west of Foster Road) and I-410 for construction vehicle work zone access. 
I-10 – West San Antonio
  • Saturday, December 15. 7 a.m. until 5 p.m. Westbound right mainlane from Camp Bullis Road to La Cantera Parkway for laying asphalt work. 
  • Sunday, December 16 until Wednesday, December 19. Nightly 9 p.m. until 5 a.m. Right mainlane in both directions from Fair Oaks Parkway to Ralph Fair Road for barrier shifting and removal work. 
  • Sunday, December 16 until Tuesday, December 18. Nightly 9 p.m. until 5 a.m. Eastbound left and center frontage road lanes from USAA to Wurzbach Road for laying asphalt work. 
  • Monday, December 17 until Wednesday, December 19. Nightly 9 p.m. until 5 a.m. Eastbound center and right frontage road lanes from USAA to Wurzbach Road for laying asphalt work. 
  • Monday, December 17 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
I-410 – West San Antonio
  • Sunday, December 16. 10 p.m. until 1 a.m. Full mainlane closure from Marbach to US 90 for Overhead Sign Barrier (OSB) work. 
  • Monday, December 17 until Tuesday, December 18. 9 a.m. until 3 p.m. Northbound right-turn lane at Marbach for electrical work. 
I-37 – Southern Region
  • Monday, December 17 until Thursday, December 20. 7 a.m. until 8 p.m. Southbound left mainlane from Atascosa/Live Oak county line to one mile north of US 281A for median crossover work. 
Loop 1604 – West San Antonio
  • Current until Saturday, December 15. Daily 9 a.m. until 3 p.m. Alternating northbound mainlanes from US 90 to Dove Canyon for guard rail installation work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Westbound frontage road from I-10 to Roger’s Ranch Road for milling and paving work. 
  • Monday, December 17 until Friday, December 21. Daily 9 a.m. until 3 p.m. Westbound frontage road from Lockhill Selma Road to SH 16 (Bandera Road) for guardrail and mow strip work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Eastbound frontage road from I-10 to Roger’s Ranch Road for milling and paving work. 
  • Tuesday, December 18 until Wednesday, December 19. 9 p.m. until 5 a.m. Alternating northbound mainlanes from Reed Road to Kilmarnoch Lane for paving, striping and barrier work. NOTE: Traffic will be diverted from mainlanes to new frontage road segment. 
Loop 1604 – North San Antonio
  • Saturday, December 15 until Sunday, December 16. Nightly 10 p.m. until 6 a.m. Full closure of westbound frontage road from US 281 northbound frontage road to US 281 southbound frontage road for direct connector work. 
  • Wednesday, December 19 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Full closure of eastbound frontage road from US 281 northbound frontage road to US 281 southbound frontage road for direct connector work. 
  • Thursday, December 20 until Thursday, December 20. Nightly 8 p.m. until 5 a.m. Full closure of eastbound mainlanes from US 281 northbound exit ramp to Gold Canyon Drive entrance ramp for direct connector work. 
US 281 – North San Antonio
  • Saturday, December 15 until Sunday, December 16. 10 p.m. until 6 a.m. Full closure of northbound frontage road from Loop 1604 to Sonterra Boulevard exit ramp for direct connector work. 
  • Saturday, December 15 until Sunday, December 16. 10 p.m. until 6 a.m. Full closure of northbound mainlanes from Frontage Road exit ramp to Sonterra Boulevard exit ramp for direct connector work. 
  • Wednesday, December 19 until Thursday, December 20. 9 p.m. until 5 a.m. Full closure of northbound frontage road from Loop 1604 to Sonterra Boulevard exit ramp for direct connector work. 
  • Wednesday, December 19 until Thursday, December 20. 9 p.m. until 6 a.m. Full closure of northbound mainlanes from Frontage Road exit ramp to Sonterra Boulevard exit ramp for direct connector work. 
US 90 – West San Antonio
  • Current until Monday, December 16. Nightly 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for direct connector work. DETOUR: Traffic diverted onto frontage road to then access the mainlanes. 
SH 151 – Far West San Antonio
  • Current until Friday, December 21. Daily 9 a.m. until 4 p.m. Right frontage road lane in both directions between Castroville Road and Callaghan Road for curb ramp work. 
SH 16 – Bandera Road
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Two northbound lanes from 7-11 to Legend Trail for barrier removal work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Right northbound lane from HEB to 7-11 for right-turn island reconstruction. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Southbound right lane and right-turn lane from Cooter Brown to Chili’s for right-turn island reconstruction. 
SH 46 – River Road (Boerne/Kendall County)
  • Sunday, December 16 until Monday, December 17. 9 p.m. until 5 a.m. Eastbound right lane from Sharon Drive to Champion Boulevard for resetting barrier work. 
Loop 1346 – E. Houston St. 
  • Monday, December 17 until Thursday, December 20. Daily 9 a.m. until 4 p.m. Westbound right lane from Flora to WW White for sidewalk and driveway work. 
US 87 – Rigsby Road
  • Monday, December 17 until Thursday, December 20. Daily 9 a.m. until 4 p.m. Eastbound right lane from Spokane Road to Bermuda Road for sidewalk and driveway work. 
  • Monday, December 17 until Thursday, December 20. Daily 9 a.m. until 4 p.m. Westbound right lane from Bermuda Road to Semlinger Road for sidewalk and driveway work. 
Other roads – Bexar County
  • Current until Friday, December 21. Nightly 9 p.m. until 5 a.m. Both directions of Kilmarnoch Lane from Bonny Brae Lane to Loop 1604 for construction work. 
  • Current until Saturday, December 15. Daily 9 a.m. until 5 p.m. Both directions of Reed Road between Copperfield Road to Loop 1604 northbound for road work. 
  • Saturday, December 15. 5 a.m. until 9 p.m. Right lane of Ackerman Road in both directions at I-10 East for overpass construction. 
  • Saturday, December 15 & Thursday, December 19 until Friday, December 20. 9 p.m. until 5 a.m. Wiseman Boulevard in both directions at Loop 1604 for beam installation work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Alternating eastbound lanes of Stone Oak Parkway at US 281 intersection for road work. 
  • Sunday, December 16 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Alternating westbound lanes of Stone Oak Parkway at US 281 intersection for road work.

Friday, December 7

UPCOMING CONSTRUCTION-RELATED CLOSURES

**ALL CLOSURES WEATHER PERMITTING**

I-10 – East San Antonio
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
  • Saturday, December 8, 5 a.m. until 9 p.m. Left eastbound mainlane between I-410 and Foster Road for barrier installation work. 
  • Saturday, December 8, 5 a.m. until 9 p.m. Left westbound mainlane between FM 1516 and Martinez Creek and between Foster Road and I-410 for barrier installation work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane between I-410 and Rosillo Creek (just west of Foster Road) for construction vehicle access to/from work site. 
  • Sunday, December 9 until Friday, December 14. Nightly 7 p.m. until 5 a.m. Left westbound mainlane closure between Rosillo Creek (just west of Foster Road) and I-410 for construction vehicle access to/from work site. 
  • Friday, December 14 until Saturday, December 15. 9 p.m. until 9 p.m. Full westbound mainlane closure at FM 1516 for road repair work. DETOUR: Westbound traffic will take the FM 1516 exit, remain on the frontage road through the intersection and reenter the mainlanes west of FM 1516. 
I-10 – West San Antonio
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Westbound right mainlane from Camp Bullis Road to La Cantera Parkway for barrier removal work. 
  • Friday, December 7 until Monday, December 10. Nightly 9 p.m. until 5 a.m. Right westbound mainlane from Parkway Drive to US 87 for shoulder work. 
  • Monday, December 10 until Tuesday, December 11. 9 p.m. until 5 a.m. Right mainlane in both directions from Fair Oaks Parkway to Ralph Fair Road for barrier shifting and removal work. 
  • Tuesday, December 11 until Wednesday, December 12. Daily 9 a.m. until 4 p.m. Westbound right mainlane from US 87 to SH 46 for beam installation at Menger Creek. 
  • Tuesday, December 11 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Right mainlane in both directions from Fair Oaks Parkway to Ralph Fair Road for barrier shifting and removal work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
  • Monday, December 17 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
I-35 – Northeast San Antonio
  • Tuesday, December 11. 9 a.m. until 4 p.m. Southbound right mainlane from Eisenhauer Road to Rittiman Road for crash cushion repair work. 
  • Tuesday, December 11. 9 a.m. until 4 p.m. Northbound right mainlane from Rittiman Road to Eisenhauer Road for crash cushion repair work. 
I-410 – West San Antonio 
  • Current until Thursday, December 13. Daily 9 a.m. until 3 p.m. Left southbound frontage road lane from Waters Edge Road to Marbach Road for retaining wall work. 
  • Sunday, December 9 until Friday, December 14. Nightly 8 p.m. until 5 a.m. and daily 9 a.m. to 3 p.m. Northbound frontage road at Marbach Road for trench work. 
  • Tuesday, December 11. 9 a.m. until 4 p.m. Right westbound mainlane at Harry Wurzbach for road repair work. 
  • Current until Friday, December 14. Daily 8 p.m. until 5 a.m. Full northbound mainlane and frontage road closure from US 90 to Marbach to install light poles. 
  • Current until Friday, December 14. Daily 8 p.m. until 5 a.m. Full southbound mainlane and frontage road closure from US 90 to Valley Hi for overhang removal and direct connector work. 
Loop 1604 – West San Antonio
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 3 p.m. Northbound right mainlaine from Reed Road to Military Drive for curb and sidewalk work. 
  • Monday, December 10 until Friday, December 14. 9 a.m. until 3 p.m. Southbound right mainlane from Potranco Road to Walmart for damaged guard rail fence repair work. 
  • Monday, December 10 until Saturday, December 15. Daily 9 a.m. until 3 p.m. Alternating northbound mainlanes from US 90 to Dove Canyon for guard rail installation work. 
Loop 1604 – North San Antonio
  • Saturday, December 8 until Monday, December 10. Nightly 2 a.m. until 5 a.m. Full closure of westbound frontage road from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Westbound left mainlane from US 281 northbound exit to Stone Oak Parkway exit for guard fence installation work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Eastbound left mainlane from Stone Oak Parkway to Gold Canyon Road exit for guard fence installation work. 
  • Monday, December 10 until Monday, December 14. Nightly 9 p.m. until 5 a.m. Full closure of eastbound mainlanes from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
  • Monday, December 10 until Monday, December 14. Nightly 9 p.m. until 5 a.m. Full closure of westbound frontage road from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
Loop 1604 – Northeast San Antonio
  • Tuesday, December 11 until Thursday, December 13. Nightly 9 p.m. until 5 a.m. Southbound exit ramp to FM 1976 between Kitty Hawk Road and FM 78 for barrier placement work. DETOUR: Traffic will make a U-Turn at Kneupper Road, then follow Loop 1604 northbound to exit at FM 1976. 
US 281 – North San Antonio 
  • Current until Monday, December 10. Nightly 3 a.m. until 5 a.m. Southbound Sonterra Boulevard entrance ramp for retaining wall demolition work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Frontage Road to Sonterra Boulevard for direct connector work. 
  • Monday, December 10 until Tuesday, December 11. 9 p.m. until 5 a.m. Right northbound mainlane from Redland Road to Encino Rio for culvert wall work. 
  • Saturday, December 8 until Monday, December 10. Nightly 3 a.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from Frontage Road to Sonterra Boulevard for direct connector work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlanes from Stone Oak/TPC Parkway to Marshall Road for restriping work. 
  • Tuesday, December 11 until Thursday, December 13. Alternating southbound frontage road lanes from Sonterra Boulevard to Loop 1604 westbound frontage road for restriping work. 
US 90 – West San Antonio
  • Current until Friday, December 14. Nightly 8 p.m. until 5 a.m. Full closure of eastbound mainlanes from Ray Ellison Drive to I-410 for direct connector work. DETOUR: Traffic diverted onto frontage road to then access the mainlanes. 
  • Current until Monday, December 15. Nightly 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for direct connector work. DETOUR: Traffic diverted onto frontage road to then access the mainlanes. 
  • Current until Thursday, December 13. Daily 9 a.m. to 3 p.m. Left westbound frontage road lane from Horal Street to Hunt Lane for retaining wall work. 
  • Sunday, December 9 until Monday, December 10. 9 p.m. until 5 a.m. Right eastbound mainlane from Loop 1604 to Medio Creek for barrier installation work. 
  • Monday, December 10. 9 a.m. until 3 p.m. Right westbound mainlane from I-410 to Military Drive for barrier work. NOTE: Work will be underneath pedestrian bridge and westbound Military entrance ramp and westbound I-410 exit ramp will remain open. 
SH 16 – Bandera Road
  • Sunday, December 8 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Southbound right lane and right turn lane from Cooter Brown to Chili’s for reconstruction of right-turn island. 
  • Sunday, December 8 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Northbound right lane and right turn lane from Academy to 7-11 for reconstruction of right-turn island. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Two southbound lanes from Legend Trail to Chili’s for Overhead Sign Bridge work. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound closure from Quincy Lee to HEB for Overhead Sign Bridge work. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Two southbound lanes from HEB to Quincy Lee for Overhead Sign Bridge work. 
Loop 1346 – E. Houston St.
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Westbound right lane from Flora to WW White for sidewalk and driveway work. 
US 87 – Rigsby Road
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Eastbound right lane from Tucker Road to Bermuda for sidewalk and driveway work. 
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Eastbound right lane from Bonair Road to Loop 13 (Military Drive) for sidewalk and driveway work. 
FM 1937
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. to 5 p.m. Full northbound closure from Loop 1604 to FM 3499 for drainage work. 
FM 3499
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. to 5 p.m. Full northbound closure from Loop 1604 to FM 1937 for drainage work. 
Other roads – Bexar County
  • Current until Friday, December 21. Nightly 9 p.m. until 5 a.m. Both directions of Kilmarnoch Lane from Bonny Brae Lane to Loop 1604 for construction work. 
  • Current until Saturday, December 15. Daily 9 a.m. until 5 p.m. Both directions of Reed Road between Copperfield Road to Loop 1604 northbound for road work. 
  • Saturday, December 8 until Monday, December 10. Nightly 3 a.m. until 5 a.m. Westbound and eastbound Encino Commons at US 281 for drainage work. 
  • Thursday, December 13 until Friday, December 14. 9 p.m. until 5 a.m. Wiseman Boulevard in both directions at Loop 1604 for beam installation work. 
SH 46 – Kendall County
  • Sunday, December 9 until Thursday, December 13. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions from Herff Road to Ammenn Road for barrier placement work.

Monday, December 3

Beam Us Up: I-10 Project Advances With Boerne Stage Road Bridge Widening


The clocks rolled may have recently rolled back for daylight savings time, but the work continues with the completion of the I-10 bridge widening over Boerne Stage Road. Contractors installed a total of 72 bridge beams on the east and westbound lanes. 

In our previous post, we noted that 42 beams were installed as of early November, with each beam weighing a whopping 90,000-lbs (18 tons!). All the beams together add up to around 1,296 tons or about the weight of a giant Sierra Redwood tree! These strongly reinforced beams will ensure the new bridges will be able to withstand the new traffic volumes. 
Check out the progress in the pictures below:






















Looking forward, once the bridge widening is completed, traffic will be moved to the newly widened eastbound and westbound lanes. This will allow the center lanes to be reconstructed. Completion of the widening process is necessary before demolition of the old bridge, because it ensures traffic flow continues with little interruption. 

We sincerely appreciate your patience as construction activities continue -- safety is our number one priority, so keep your eyes out for any dangerous conditions with changing weather patterns.