Pages

Friday, April 26

UPCOMING CONSTRUCTION-RELATED CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, April 28 until Monday, April 29. 9 p.m. until 5 a.m. Eastbound left frontage road lane between Redland Road and Bulverde Road (including entrance ramp in that section) for restriping work.
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road entrance ramp and Bulverde exit ramp for barrier wall work.
  • Monday, April 29 until Friday, May 3. Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane between Redland Road and Bulverde Road (including entrance ramp in that section) for barrier work.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Full eastbound closure of the frontage road from the Stone Oak Parkway entrance ramp and the US 281 southbound frontage road to install steel girders. DETOUR: take the Stone Oak Parkway entrance ramp, take the Gold Canyon Road exit ramp, use the eastbound to westbound turnaround at Gold Canyon Road and continue on the westbound Loop 1604 frontage road.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Right lane closure of the eastbound frontage road from the US 281 northbound exit ramp to the northbound to eastbound direct connector entrance ramp to install steel girders.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Alternating lane closure of the westbound frontage road from the US 281 northbound exit ramp to the US 281 northbound frontage road, including the US 281 northbound exit ramp, to install bridge overhangs.
  • Saturday, May 4 until Monday, May 6. All weekend from 3 a.m. until 5 a.m. Full closure of the eastbound frontage road from the Stone Oak Parkway entrance ramp to the US 281 southbound frontage road to place steel girders. DETOUR: use the Stone Oak Parkway entrance ramp, take the Gold Canyon Road exit ramp, use the eastbound to westbound turnaround at Gold Canyon Road and go west of the Loop 1604 westbound frontage road.
Loop 1604 – Northeast San Antonio
  • Monday, April 29 until Tuesday, April 30. 9 p.m. until 5 a.m. Alternating northbound mainlanes between Kitty Hawk and SH 218 (Pat Booker Road) for Overhead Sign Bridge (OSB) work.
Loop 1604 – Northwest San Antonio
  • Monday, April 22 until Monday, April 29. Nightly 9 p m. until 5 a.m. Alternating frontage road lanes in both directions for pavement marking and striping work.
  • Friday, April 26 until Saturday, April 27. Midnight to 12 p.m. Full frontage road closure in both directions at SH 16 (Bandera Road) for traffic signal work.
  • Saturday, April 27 until Monday, April 29. Midnight to 5 a.m. Alternating frontage road lanes in both directions for traffic signal work.
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Alternating frontage road lanes in both directions between 7-11 and Chili’s for final pavement marking work.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Eastbound frontage road from I-10 to Roger’s Ranch Road for milling and paving work.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Eastbound frontage road from NW Military Highway to Roger’s Ranch Road for mow strip work.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Eastbound frontage road from Bandera Road to Roger’s Ranch Road for bridge joint work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3 p.m. Westbound frontage road from Vance Jackson Road to I-10 for mow strip work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3 p.m. Westbound frontage road from Bandera Road to Roger’s Ranch Road for bridge joint work.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Cloverleaf ramps at I-10 in both directions for mow strip and riprap work.
  • Tuesday, April 30 until Wednesday, May 1. 9 p.m. until 5 a.m. Full eastbound mainlane closure from NW Military Highway to Blanco Road for deck placement on the new Huebner Road turnaround bridge. DETOUR: Traffic diverted to eastbound frontage road at Bitters Road, go through intersections at Bitters, Huebner and Blanco and then reenter the highway after Blanco.
  • Tuesday, April 30 until Wednesday, May 1. 9 p.m. until 5 a.m. Full westbound mainlane closure from Blanco Road to Bitters Road for deck placement on the new Huebner Road turnaround bridge. DETOUR: Traffic diverted to westbound frontage road, go through Blanco, Huebner and Bitters intersections and then reenter the highway.
Loop 1604 – West San Antonio
  • Current until 6 a.m. Saturday, April 27. Alternating southbound frontage lanes between SH 151 and FM 1957 (Potranco Road) for paving and final surface work.
  • Current until 5 a.m. Saturday, April 27. Alternating northbound frontage lanes between FM 1597 (Potranco Road) and SH 151 for traffic switch over to new lane configuration and setting concrete traffic barriers.
  • Current until 6 a.m. Saturday, April 27. The right lane on northbound Loop 1604 at Marbach Road for overhead structure work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. Alternating northbound frontage road lanes between FM 1957 (Potranco Road) to SH 151 will be closed for sidewalk work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 7 p.m. Alternating southbound frontage lanes between SH 151 and FM 1957 (Potranco Road) will be closed for paving and final surface work.
  • Monday, April 29 until Saturday, May 4. Nightly 7 p.m. to 6 a.m. Alternating southbound frontage lanes between SH 151 and FM 1957 (Potranco Road) will be closed for paving and final surface work.
  • Monday, April 29 until Saturday, May 4. Nightly 9 p.m. to 5 a.m. All lanes at Wiseman Boulevard (right lanes will be open) will be closed for painting beams under the bridge deck and installing clearance signs. DETOUR: Traffic will be detoured to Military Drive and FM 471 (Culebra Road).
US 281 – North Central San Antonio
  • Monday, April 29 until Tuesday, April 30. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp to install pavement markings. DETOUR: take the Frontage Road exit ramp, take a right on the Loop 1604 westbound frontage road. If going north; use the turnaround at Gold Canyon Road and take a right on the northbound frontage road. If heading west; drive along the eastbound Loop 1604 frontage road through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Left lane closure of the northbound frontage from the Loop 1604 westbound frontage road and the Sonterra Boulevard entrance ramp to install bridge bents.
  • Monday, April 29 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp and the Donella Drive entrance ramp to install pavement markings. DETOUR: take the Sonterra Boulevard exit ramp, drive along the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, April 29 until Wednesday, May 1. Nightly 9 p.m. until 5 a.m. Alternating southbound lanes of the frontage road from the Sonterra Boulevard exit ramp to the Loop 1604 westbound frontage road to install bridge overhangs.
  • Wednesday, May 1 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Full closure of the northbound to westbound direct connector ramp to install steel girders. DETOUR: take the Frontage Road exit ramp, take a left on the Loop 1604 westbound frontage road and use the US 281 entrance ramp.
  • Wednesday, May 1 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Sonterra Boulevard exit ramp to the Frontage Road entrance ramp, including the Sonterra Boulevard entrance ramp to install steel girders. DETOUR: Sonterra Boulevard traffic will head north on US 281, take the turnaround south of Encino Rio and stay on the southbound US 281 mainlanes. All southbound US 281 traffic will take the Donella Drive exit ramp, use the turnaround at Donella Drive and stay on the northbound frontage road.
  • Saturday, May 4 until Monday, May 6. All weekend from 2 a.m. until 5 a.m. Alternating northbound lanes from Redland Road to Evans Road to reset barriers and restripe.
  • Saturday, May 4 until Monday, May 6. All weekend from 2 a.m. until 5 a.m. Full closure of the northbound to southbound turnaround south of Encino Rio for a traffic switch. DETOUR: Use the turnaround north of Evans Road.
  • Saturday, May 4 until Monday, May 6. All weekend from 2 a.m. until 5 a.m. Alternating southbound lanes from Evans Road to Redland Road to reset barriers and restripe.
  • Saturday, May 4 until Monday, May 6. All weekend from 2 a.m. until 5 a.m. Full closure of the southbound to northbound turnaround south of Encino Rio for a traffic switch. DETOUR: Use the turnaround at Loop 1604.
  • Saturday, May 4 until Monday, May 6. All weekend from 3 a.m. until 5 a.m. Full closure of the northbound to westbound direct connector ramp. DETOUR: take the Frontage Road exit ramp, take a left on the Loop 1604 westbound frontage road and use the US 281 entrance ramp.
  • Saturday, May 4 until Monday, May 6. All weekend from 3 a.m. until 5 a.m. Full southbound frontage road closure from the Sonterra Boulevard exit ramp to the Frontage Road entrance ramp, including the Sonterra Boulevard entrance ramp. DETOUR: Sonterra Boulevard traffic will head north on US 281, take the turnaround south of Encino Rio and stay on the southbound US 281 mainlanes. All southbound US 281 traffic will take the Donella Drive exit ramp, use the turnaround at Donella Drive and stay on the northbound frontage road.
I-10 – Northwest San Antonio/Bexar County/Kendall County
  • Saturday, April 27 until Monday, April 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlanes between Fredericks Creek to US 87 for barrier and striping work in preparation for traffic switch.
  • Saturday, April 27 until Monday, April 29. Nightly 9 p.m. until 5 a.m. Westbound left mainlane from US 87 to Fredericks Creek for barrier work.
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Left mainlane in both directions between SH 46 and US 87 for paving work in the median.
  • Sunday, April 28 until Tuesday, May 14. Full-time closure of westbound Exit 550/Ralph Fair Road exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
  • Monday, April 29 until Monday, May 13. Full-time closure of eastbound Exit 552/Dominion Drive exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
I-10 – Far East San Antonio/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Sunday, April 28 until Wednesday, May 1. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane between Foster Road and Woodlake Parkway for pavement striping.
  • Sunday, April 28 until Friday, May 3. Nightly 7 p.m. until 5 a.m. Left westbound mainlane from FM 1516 to Martinez Creek and from Woodlake Parkway to Rosillo Creek for construction truck access.
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from Rosillo Creek to Woodlake Parkway and from Martinez Creek to FM 1516 for construction truck access.
  • Monday, April 29 until Tuesday, April 30. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround and southbound lane on Foster Rd at IH – 10.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3:30 p.m. Left frontage road lane in both directions from Dietrich Road to Ackerman Road for storm drain installation.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3:30 p.m. Left westbound mainlane from FM 1516 to Martinez Creek for construction truck access.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3:30 p.m. Eastbound-to-westbound turnaround at FM 1516 for overpass construction. Police officers will direct traffic through the intersection when the turnaround is closed.
  • Monday, April 29 until Thursday, May 2. Daily 7:30 a.m. until 7 p.m. Alternating eastbound mainlanes between SH 130 and US 183 for guard rail work.
  • Wednesday, May 1 until Thursday, May 2. 7 p.m. until 5 a.m. All westbound mainlanes between FM 1516 and Foster Road for installation of bridge beams at Martinez Creek. DETOUR: All westbound mainlane traffic will exit at FM 1516, travel on the frontage road through the FM 1516 and Foster Road intersections, and re-enter the mainlanes after Foster Road. Police officers will be utilized at the FM 1516 and Foster Road intersections to give priority to westbound traffic.
  • Thursday, May 2. 9 a.m. until 3 p.m. Alternating westbound mainlane closures from Martinez Creek to Foster Road. Westbound traffic will then be shifted to the new permanent mainlanes.
I-410 – West San Antonio
  • Monday, April 29 until Wednesday, May 1. Nightly 8 p.m. to 5 a.m. The northbound I-410 frontage road from Bronco Lane to Marbach Road will be closed to remove low profile concrete barrier restripe the frontage road. DETOUR: Traffic will be detoured to the on-ramp before Marbach Road, continue on northbound I-410 and exit at SH 151 to get on I-410 northbound frontage road.
  • Monday, April 29 until Thursday, May 2. Daily 9 a.m. to 3 p.m. The left frontage road lane on southbound I-410 between Demya Drive and Bertetti Drive will be closed for staging equipment and dump trucks.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. The right frontage road lane on eastbound US 90 between Carlitos Way Street and I-410 will be closed for sidewalk work. DETOUR: Traffic will be detoured to continue on the eastbound frontage road, take the turnaround at Military Drive, and continue on the westbound frontage road to access the cloverleaf to I-410 southbound frontage road.
  • Monday, April 29 until Friday, May 3. Nightly 8 p.m. to 5 a.m. The eastbound US 90 frontage road between Loop 1604 to I-410 will be closed for asphalt work. The Ray Ellison Drive ramp will also be closed. DETOUR: Traffic traveling north will be detoured to the eastbound/northbound connector. Traffic traveling south will be detoured to continue on eastbound US 90, take the Military Drive exit ramp and turnaround and continue on the US 90 westbound frontage road and use the cloverleaf to I-410 southbound.
US 90 – West San Antonio
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. Alternating lanes in both directions at Red Musket Tr and Loop 1604 southbound frontage road for island work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3 p.m. The westbound to eastbound US 90 turnaround will be closed for bridge painting work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. Alternating northbound frontage road lanes between Big Mesa and Medio Creek will be closed for sidewalk, curb, mow strips and rip rap work.
  • Monday, April 29 until Friday, May 3. Daily, 9 a.m. to 3 p.m. The right lane in both directions at Dodge City and Loop 1604 southbound frontage road will be closed for island work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. Alternating southbound frontage road lanes between Dove Canyon and US 90 will be closed for sidewalk, curb, mow strips and rip rap work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. Alternating in both directions at Emory Peak and Loop 1604 southbound frontage road will be closed for island work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. The right lane in both directions at Spurs Ranch and Loop 1604 southbound frontage road will be closed for island work.
  • Monday, April 29 until 6 a.m. Nightly 9 p.m. to 6 a.m. The overpass at Marbach Road will be closed for overhead structure work.
SH 151 – Far West San Antonio
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lanes from I-410 to Military Drive will be closed for mill and overlay work. Various ramps will be closed as necessary.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3 p.m. Alternating eastbound frontage road lanes from Old Highway 90 to Westover Hills for metal beam guard rail installation work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 4 p.m. Alternating eastbound frontage roads lanes in both directions between Wiseman Boulevard and Military Drive will be closed to install concrete mow strip.
Loop 368 – Austin Highway
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 3 p.m. Alternating lanes in both directions at the intersection with North New Braunfels Avenue for traffic signal installation work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, April 29 until Friday, May 3. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, May 4. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
SH 16 – Bandera Road
  • Friday, April 26 until Saturday, April 27. 11 p.m. until noon. Full closure in both directions at Loop 1604. DETOURS: Southbound traffic diverted to Loop 1604 westbound frontage road, take the turnaround at Braun Road and right turn back to southbound SH 16; northbound traffic diverted to Loop 1604 frontage road, take the turnaround at FM 1560 (Hausman Road) and then right turn back to northbound SH 16.
  • Saturday, April 27 until Monday, April 29. Midnight until 5 a.m. Alternating lanes in both directions from Quincy Lee to Legends Trail for traffic signal work.
  • Sunday, April 28 until Friday, May 3. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions from Cooter Brown to HEB for final pavement marking work.
I-37 – Southern Region
  • Monday, April 29. 9 a.m. until 4 p.m. Southbound ramp to I-10 westbound for barrier setting work.
SH 16 – Southern Region
  • Current until Tuesday, April 30. Full time closure. Alternating lanes in both directions from FM 1332 to Atascosa/McMullen county line for milling and inlay, bridge rail and guard rail work.
  • Monday, April 29 until Friday, May 3. Daily 8 a.m. until 5 p.m. Alternating southbound lanes from Tilden to FM 624 (mile markers 682-690) for barrier work.
US 281 – Southern Region
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. to 3 p.m. The left lane in both directions between a quarter of mile before and after FM 1937 will be closed for concrete traffic barrier work.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 13 – WW White Road/West Military Drive
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 4 p.m. Southbound right lane from to E. Houston Street to Rice Road for sidewalk and driveway work.
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 4 p.m. Northbound right lane from Elmi Road to Springfield Road for sidewalk and driveway work.
  • Monday, April 29 until Thursday, May 2. Daily 9 a.m. until 4 p.m. Southbound right lane at intersection with Martin Luther King for sidewalk and driveway work.
US 87 – Rigsby Avenue
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 4 p.m. Westbound right lane from WW White to Covington Road for sidewalk and driveway work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
  • Monday, April 29 until Tuesday, April 30. 9 p.m. until 5 a.m. Alternating lanes in both directions between Charger Boulevard and Smokey Mo’s for striping work.
FM 140 – Atascosa County
  • Current until Friday, May 31. Daily 7 a.m. until 8 p.m. Both directions closed between SH 16 to La Parita Creek for drainage work.
Other Roads – Bexar County
  • Monday, April 29 until Friday, May 3. Daily 9 a.m. until 4 p.m. Southbound right lane of San Pedro Avenue from I-410 to West Rector for sidewalk and driveway work
  • Monday, April 29 until Tuesday, April 30. 9 p.m. until 5 a.m. All lanes of Borgfeld Avenue in both directions from Bulverde Road to US 281 for striping work.
  • Tuesday, April 30 until Wednesday, May 1. 9 p.m. until 5 a.m. All lanes of Borgfeld Avenue in both directions from Bulverde to US 281 for barrier setting work.
  • Saturday, May 4 until Friday, May 10. Continuous full closure 9 p.m. until 5 a.m. All lanes of westbound Encino Rio approaching US 281 for a traffic switch. DETOUR: traffic can only make right turns then use the turnaround north of Evans Road.

It's Here: SA's First DLT Intersection Opens This Weekend

Ready, San Antonio?
We appreciate your patience and understanding with the construction project at the intersection of Loop 1604 and SH 16 (Bandera Road).
We're talking about the new Displaced Left Turn (DLT) configuration at this very busy intersection, which at last count had an average daily traffic count of approximately 40,000 cars on Bandera and around 120,000 on Loop 1604.
It's a first-of-its-kind intersection for the TxDOT San Antonio District. For some of you who travel between the Alamo City and Austin, you may have already encountered this type of design at I-35 and SH 80/E. Hopkins St. in San Marcos.
Just as a quick reminder, this type of configuration offers drivers traveling up and down Bandera dedicated left-turn lanes (with their own traffic lights) to directly get on Loop 1604 frontage roads. That means that drivers on Bandera not needing to get on Loop 1604 will be able to continue straight through the intersection without having to stop. It also means there will no longer be left turns under the overpass from Bandera to Loop 1604.
Click here for a video simulation of what the DLT traffic flow looks like.
Our plan is to open the DLT over the course of this weekend, April 26-28. Given that some work still needs to be done (particularly syncing more than a dozen new traffic lights with the existing signal system), the intersection will be fully closed starting at 11 p.m. Friday with only right turns allowed in all directions on both roadways.
Crews will work all night long and, depending on the pace of progress, at some point on Saturday the frontage roads on Loop 1604 will be opened up to drivers -- but they will not be able to turn left to Bandera, which will remain closed in both directions (refer to detailed detour maps below).
The goal is to have the intersection fully opened up early Sunday morning, but that will depend on whether any unexpected issues/delays come up.
There will be off-duty police officers at various points all around the intersection helping direct traffic and, for the beginning of the full opening, officers will help guide drivers by leading them through the correct movements.
For a visual explanation of the intersection opening process, click here for a video livestream we conducted with our project staff.
Given the protocol we need to follow in order to have an orderly and safe opening of the new intersection, we are encouraging folks, if at all possible, to avoid the area over the weekend so they don't get stuck in traffic backups.
If you can't avoid it, again, do expect major delays. Here are the detour maps:
















Friday, April 19

UPCOMING CONSTRUCTION-RELATED CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, April 22 until Thursday, April 25. Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane between Redland Road and Bulverde Road (including entrance ramp in that section) for various tasks including excavation, paving and retaining wall work.
Loop 1604 – Northeast San Antonio
  • Tuesday, April 23 until Thursday, April 25. Nightly 9 p.m. until 5 a.m. Southbound-to-northbound turnaround at FM 218 (Pat Booker Road) for drill shaft work.
Loop 1604 – Northwest San Antonio
  • Monday, April 22 until Monday, April 29. Nightly 9 p m. until 5 a.m. Alternating frontage road lanes in both directions for pavement marking and striping work.
  • Friday, April 26 until Saturday, April 27. Midnight to 12 p.m. Full frontage road closure in both directions at SH 16 (Bandera Road) for traffic signal work.
  • Saturday, April 27 until Monday, April 29. Midnight to 5 a.m. Alternating frontage road lanes in both directions for traffic signal work.
Loop 1604 – West San Antonio
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 5 p.m. Northbound right frontage road lane from FM 1957 (Potranco Road) to SH 151 for sidewalk work.
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. to 3 p.m. Alternating lanes at FM 1957 (Potranco Road), Military Drive and Wiseman Boulevard will be closed for sign work.
  • Monday, April 22 until Saturday, April 27. Nightly 7 p.m. to 6 a.m. Alternating southbound frontage lanes between SH 151 and FM 1957 (Potranco Road) for paving and final surface work.
  • Monday, April 22 until Saturday, April 27. Nightly 9 p.m. to 5 a.m. Alternating northbound frontage lanes between FM 1597 (Potranco Road) and SH 151 for traffic switch over to new lane configuration and setting concrete traffic barriers.
  • Monday, April 22 until Saturday, April 27. Nightly 9 p.m. to 6 a.m. The right lane on northbound Loop 1604 at Marbach Road for overhead structure work.
  • Monday, April 22 until Thursday, April 25. Nightly 9 p.m. until 6 a.m. Southbound right lane on before Potranco Road to south of Medio Creek for overhead structure work.
Loop 1604 – South San Antonio
  • Monday, April 22 until Thursday, April 25. Daily 9 a.m. to 4 p.m. The intersection of Loop 1604 at South Flores for storm drain installation work. Only one side of the intersection will be worked on at a time.
  • Monday, April 22 until Thursday, April 25. Daily 9 a.m. to 4 p.m. The intersection of Loop 1604 at Priest Road for storm drain installation work. Only one side of the intersection will be worked on at a time.
I-10 – Northwest San Antonio/Bexar County/Kendall County
  • Monday, April 22 until Friday, April 26. Nightly 9 p.m. until 5 a.m. Left mainlane in both directions from SH 46 to US 87 for center median paving work.
  • Sunday, April 28 until Tuesday, May 14. Full-time closure of westbound Exit 550/Ralph Fair Road exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
  • Monday, April 29 until Monday, May 13. Full-time closure of eastbound Exit 552/Dominion Drive exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
I-10 – Far East San Antonio/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 3:30 p.m. Left westbound frontage road lane from Dietrich Road to Ackerman Road for storm drain installation.
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 3:30 p.m. Left westbound mainlane from FM 1516 to Martinez Creek for construction truck access.
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 3:30 p.m. Eastbound-to-westbound turnaround at FM 1516 for overpass construction.
  • Monday, April 22 until Friday, April 26. Nightly 7 p.m. until 5 a.m. Left westbound mainlane from FM 1516 to Martinez Creek and from Woodlake Parkway to Rosillo Creek for construction truck access.
  • Monday, April 22 until Friday, April 26. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from Rosillo Creek to Woodlake Parkway and from Martinez Creek to FM 1516 for construction truck access.
I-410 – West San Antonio
  • Wednesday, April 24 until Friday, April 26. Nightly 8 p.m. until 5 a.m. The northbound I-410 frontage road from Bronco Lane to Marbach Road will be closed to remove low profile concrete barrier restripe the frontage road. DETOUR: Traffic will be detoured to the on-ramp before Marbach Road, continue on northbound I-410 and exit at SH 151 to get on I-410 northbound frontage road.
SH 151 – Far West San Antonio
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. to 3 p.m. Alternating frontage roads lanes in both directions between I-410 to Westover Hills will be closed to install concrete mow strip.
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 3 p.m. Alternating eastbound frontage road lanes from Old Highway 90 to Westover Hills for metal beam guard rail installation work.
  • Tuesday, April 23 until Friday, April 26. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lanes from I-410 to Military Drive will be closed for mill and overlay work. Various ramps will be closed as necessary.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, April 22 until Friday, April 26. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, April 27. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
SH 16 – Bandera Road
  • Monday, April 22 until Friday, April 26. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Quincy Lee Drive and Legends Trail for pavement marking and striping work.
  • Friday, April 26 until Saturday, April 27. Midnight until noon. Full closure in both directions at Loop 1604. DETOURS: Southbound traffic diverted to Loop 1604 westbound frontage road, take the turnaround at Braun Road and right turn back to southbound SH 16; northbound traffic diverted to Loop 1604 frontage road, take the turnaround at FM 1560 (Hausman Road) and then right turn back to northbound SH 16.
  • Saturday, April 27 until Monday, April 29. Midnight until 5 a.m. Alternating lanes in both directions from Quincy Lee to Legends Trail for traffic signal work.
I-35 – Medina County
  • Monday, April 22. 9:30 a.m. until 3 p.m. Full mainlane closure at FM 471 (Exits 127-129) for DPS assistance work. DETOUR: Traffic diverted to frontage road at Exit 127, reentering mainlanes at next entrance ramp after FM 471 intersection.
SH 16 – Southern Region
  • Current until Tuesday, April 30. Full time closure. Alternating lanes in both directions from FM 1332 to Atascosa/McMullen county line for milling and inlay, bridge rail and guard rail work.
  • Monday, April 22 until Friday, April 26. Daily 8 a.m. until 5 p.m. Alternating southbound lanes from Tilden to FM 1962 for paving work.
US 281 – Southern Region
  • Monday, April 22 until Friday, April 26. Daily 9 a.m. until 3 p.m. Left lane in both directions at FM 1937 for barrier and asphalt work.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 13 – WW White Road/West Military Drive
  • Current until 4 p.m. Saturday, April 20. Daily 9 a.m. until 4 p.m. Southbound right lane from to E. Houston Street to Rice Road for sidewalk and driveway work.
  • Current until 4 p.m. Saturday, April 20. Daily 9 a.m. until 4 p.m. Northbound right lane from Elmi Road to Springfield Road for sidewalk and driveway work.
US 87 – Rigsby Avenue
  • Current until 4 p.m. Saturday, April 20. Daily 9 a.m. until 4 p.m. Westbound right lane from WW White to Covington Road for sidewalk and driveway work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
  • Wednesday, April 24 until Wednesday, April 25. 9 p.m. until 5 a.m. Right lane in both directions at Charger Boulevard for striping work.
FM 140 – Atascosa County
  • Current until Friday, May 31. Daily 7 a.m. until 8 p.m. Both directions closed between SH 16 to La Parita Creek for drainage work.
Other Roads – Bexar County
  • Current until 3 p.m. Saturday, April 20. Daily 9 a.m. until 3 p.m. Southbound right lane of San Pedro Avenue from Loop 410 to West Rector Avenue for sidewalk and driveway work.
  • Monday, April 29 until Tuesday, April 30. 9 p.m. until 5 a.m. All lanes of Borgfeld Avenue in both directions from Bulverde Road to US 281 for striping work.
  • Tuesday, April 30 until Wednesday, May 1. 9 p.m. until 5 a.m. All lanes of Borgfeld Avenue in both directions from Bulverde to US 281 for barrier setting work.

Friday, April 12

UPCOMING CONSTRUCTION-RELATED CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, April 14. Midnight until noon. Full westbound frontage road closure from Gold Canyon Drive to the US 281 northbound frontage road for beam work. DETOUR: Take the double left at Gold Canyon Drive, take the double left at Redland Road, use the Redland Road entrance ramp, take the Stone Oak Parkway exit ramp, use the turnaround at Stone Oak Parkway.
  • Monday, April 15 until Friday, April 18. Nightly 9 p.m. until 5 a.m. Eastbound left frontage road lane from Redland Road and Bulverde Road (including entrance ramps) for various tasks including excavation, paving and restriping.
  • Monday, April 15 until Thursday, April 18. Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane from Redland Road and Bulverde Road (including entrance ramps) for various tasks including excavation, paving and restriping.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road for retaining wall work.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Eastbound left lane closure from the US 281 northbound exit ramp to the Gold Canyon Road exit ramp for steel girder installation work.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 northbound exit ramp to the US 281 entrance ramp for steel girder installation work. DETOUR: Use the US 281 northbound exit ramp, pass through the US 281 intersections, use the US 281 entrance ramp.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Left and center lane closure of the westbound frontage road from the US 281 northbound exit ramp to the US 281 northbound frontage road, including the US 281 northbound exit ramp, for steel girder installation work.
  • Tuesday, April 16. 9 a.m. until 4 p.m. Various locations in both directions at intersection with Bulverde Road for traffic signal work.
Loop 1604 – Northeast San Antonio
  • Current until 9 p.m. Wednesday, April 17. Turnarounds in both directions at FM 218 (Pat Booker Road) for drill shaft work.
  • Monday, April 15 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Southbound left mainlane from SH 218 (Pat Booker Road) to Kitty Hawk for barrier pinning work.
Loop 1604 – Northwest San Antonio
  • Sunday, April 14 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. One eastbound frontage road lane from La Cantera/Peace Boulevard to Vance Jackson Road for milling and paving work.
  • Sunday, April 14 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. One mainlane in both directions from Bandera Road to Roger’s Ranch Road for bridge joint sealing work.
  • Sunday, April 14 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Eastbound and westbound cloverleaf ramps to I-10 for milling and paving work.
  • Monday, April 15 until Wednesday, April 17. Daily 9 a.m. until 3 p.m. One westbound frontage road lane from Vance Jackson Road to I-10 for mow strip work.
  • Monday, April 15 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from Security Service Credit Union to Taco Cabana for barrier removal work.
  • Monday, April 15 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlanes from Chili’s to HEB driveway for barrier removal work.
  • Monday, April 15 until Wednesday, April 17. Daily 9 a.m. until 3 p.m. One eastbound frontage road lane from NW Military Highway to Roger’s Ranch Road for mow strip work.
  • Tuesday, April 16 until Wednesday, April 17. 9 p.m. until 5 a.m. Full eastbound mainlane closure at Bitters Road (including entrance ramp before Bitters) for overhang work on Bitters overpass.
  • Wednesday, April 17 until Thursday, April 18. 9 p.m. until 5 a.m. Full eastbound mainlane closure from NW Military Highway to Blanco Road (including NW Military and Bitters entrance ramps) for overhang placement work at the new Huebner Road turnaround bridge.
  • Thursday, April 18 until Friday, April 19. 9 p.m. until 5 a.m. Full westbound mainlane closure from Blanco Road to Bitters Road (including Blanco, Stone Oak and US 281 entrance ramps) for overhang placement work at the new Huebner Road turnaround bridge.
Loop 1604 – West San Antonio
  • Monday, April 15 until Thursday, April 18. Daily 9 a.m. until 3 p.m. Alternating southbound mainlanes from Dove Canyon to US 90 for sidewalk, curb, mow strip and rip rap work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road lanes from FM 1957 (Potranco Road) to SH 151 for setting barrier and sidewalk work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 3 p.m. Southbound left frontage road lane from FM 1957 (Potranco Road) to SH 151 for exit/entrance ramp paving work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 3 p.m. Alternating frontage road lanes in both directions at Potranco Road, Military Drive and Wiseman Boulevard for sign installation work.
  • Monday, April 15 until Saturday, April 20. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road lanes from FM 1957 (Potranco Road) to SH 151 for setting barrier for traffic switch.
  • Tuesday, April 16 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from Alamo Ranch Parkway to Wiseman Boulevard for restriping and pavement marker installation work.
US 281 – North Central San Antonio
  • Sunday, April 14. Midnight until noon. Right lane closure from the Loop 1604 eastbound frontage road to the Loop 1604 westbound frontage road for beam work.
  • Sunday, April 14. Midnight until noon. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for beam work. DETOUR: take the Frontage Road exit ramp, continue through the intersections at Loop 1604 and take the Sonterra Boulevard entrance ramp.
  • Sunday, April 14 until Monday, April 15. Midnight until 5 a.m. Weekend full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for beam work
  • Monday, April 15 until Wednesday, April 17. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Sonterra Boulevard exit ramp to the Loop 1604 westbound frontage road for bridge work. DETOUR: Sonterra Boulevard traffic; Go north on US 281, take the turnaround south of Encino Rio and stay on southbound US 281. Southbound US 281 traffic; stay on southbound US 281, take the Donella Drive exit ramp, use the turnaround at Donella Drive and stay on the US 281 northbound frontage road.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions from Loop 1604 to Marshall Road for striping..
  • I-10 – Northwest San Antonio/Bexar County/Kendall County
  • Current until 4 p.m. Saturday, April 13. Right mainlane in both directions between FM 3351 (Ralph Fair Road) and Fair Oaks Parkway for ramp work.
  • Current until Thursday, April 18. Daily 9 a.m. until 3 p.m. Westbound left mainlane at Dominion Drive and entrance ramp for retaining wall work.
  • Current until Thursday, April 18. Daily 9 a.m. until 3 p.m. Eastbound left frontage road lane at Boerne Stage Road for traffic rail foundation work.
  • Sunday, April 14 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Left mainlane in both directions from SH 46 to US 87 for center median paving work.
  • Wednesday, April 17 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Southbound left mainlane from just north of Overlook Parkway to just south of Overlook Parkway for barrier work.
  • Sunday, April 28 until Tuesday, May 14. Full-time closure of westbound Exit 550/Ralph Fair Road exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
  • Monday, April 29 until Monday, May 13. Full-time closure of eastbound Exit 552/Dominion Drive exit ramp for lengthening and widening work to fit the expanded mainlane configuration.
I-10 – Far East San Antonio/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Sunday, April 14. 6 a.m. until 3 p.m. Alternating eastbound mainlanes from Foster Road to FM 1516. Eastbound traffic will then be shifted to the new permanent mainlanes on the new Woodlake Parkway overpass.
  • Sunday, April 14 until Friday, April 19. Nightly 7 p.m. until 5 a.m. Left westbound mainlane from FM 1516 to Martinez Creek and from Woodlake Parkway to Rosillo Creek for construction truck access and barrier work.
  • Sunday, April 14 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from Rosillo Creek to Woodlake Parkway and from Martinez Creek to FM 1516 for construction truck access.
  • Monday, April 15 until Thursday, April 18. Daily 9 a.m. until 3:30 p.m. Left westbound frontage road lane from Dietrich Road to Ackerman Road for box culvert installation.
  • Monday, April 15 until Thursday, April 18. Daily 9 a.m. until 3:30 p.m. Left westbound mainlane from FM 1516 to Martinez Creek for construction truck access.
  • Monday, April 15 until Thursday, April 18. Daily 9 a.m. until 3:30 p.m. Eastbound-to-westbound turnaround at FM 1516 for overpass construction.
  • Monday, April 15 until Thursday, April 18. Daily 7:30 a.m. until 7 p.m. Alternating eastbound mainlanes between SH 130 and US 183 for milling and inlay work.
I-35 – Northeast San Antonio
  • Saturday, April 13. Midnight until 8 a.m. Full northbound mainlane closure at North New Braunfels Avenue for bridge overhang bracket removal work.
I-410 – West San Antonio
  • Current until 5 a.m. Saturday, April 13. Frontage roads (one lane remains open) in both directions at Marbach Road (including intersection) for overhang removal work.
  • Saturday, April 13. 6 a.m. until 12 p.m. Left mainlane in both directions (from US 90 to Marbach Road northbound & from US 90 to Valley Hi southbound) for lighting work.
  • Sunday, April 14 until Monday, April 15. 8 p.m. until 5 a.m. Left mainlane in both directions (from US 90 to Marbach Road northbound & from US 90 to Valley Hi southbound) for lighting work.
  • Wednesday, April 17 until Saturday, April 20. Nightly 8 p.m. until 5 a.m. Full northbound frontage road closure from Marbach Road to SH 151 for milling and overlay work.
  • Sunday, April 14 until Friday, April 19. Nightly 8 p.m. until 5 a.m. Southbound left frontage road lane from Bertetti Drive to US 90 for direct connector work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 3 p.m. Southbound left frontage road lane from Demya Drive to Bertetti Drive for truck access.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 3 p.m. Northbound left frontage road lane from Landing Avenue to Airlift Avenue for truck access.
US 90 – West San Antonio
  • Current until Saturday, April 13. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from ½-mile west of Loop 1604 to ½-mile east of Loop 1604 for barrier removal work.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from ¼-mile east of Loop 1604 to ¼-mile west of Loop 1604 for various tasks including light pole installation work.
  • Sunday, April 14 until Friday, April 19. Nightly 8 p.m. until 5 a.m. Full eastbound mainlane closure at the eastbound-northbound connector to I-410 for direct connector work.
  • Sunday, April 14 until Monday, April 15. 8 p.m. until 5 a.m. Full westbound mainline closure from Colt Drive to I-410 and eastbound left mainlane from Carlitos Way to I-410 for light pole removal work.
  • Monday, April 15 until Friday, April 19. Nightly 8 p.m. until 5 a.m. Full eastbound mainlane closure from Loop 1604 to I-410 (including Ray Ellison exit) for asphalt work.
  • Monday, April 15 until Thursday, April 18. Daily 9 a.m. to 3 p.m. Westbound-to-eastbound turnaround at I-410 for bridge work and overhang removal work.
SH 151 – Far West San Antonio
  • Monday, April 15 until Friday, April 19 Daily 9 a.m. until 3 p.m. Alternating eastbound frontage road lanes from Old Highway 90 to Westover Hills for guard rail installation work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 4 p.m. Alternating westbound frontage road lanes from Old Highway 90 to I-410 for mow strip work.
  • Monday, April 15 until Friday, April 19. Daily 9 a.m. until 4 p.m. Alternating westbound frontage road lanes from I-410 to Military Drive for mow strip work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, April 15 until Friday, April 19. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, April 20. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
SH 16 – Bandera Road
  • Monday, April 15 until Friday, April 19. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions between Quincy Lee Drive and Legends Trail for barrier removal and lane striping work.
SH 16 – Southern Region
  • Current until Tuesday, April 30. Full time closure. Alternating lanes in both directions from FM 1332 to Atascosa/McMullen county line for milling and inlay, bridge rail and guard rail work.
  • Monday, April 15 until Friday, April 19. Daily 8 a.m. until 5 p.m. Alternating southbound lanes from Tilden to FM 1962 (mile markers 680 to 690) for paving work.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 13 – WW White Road/West Military Drive
  • Monday, April 15 until Saturday, April 20. Daily 9 a.m. until 4 p.m. Southbound right lane from to E. Houston Street to Rice Road for sidewalk and driveway work.
  • Monday, April 15 until Saturday, April 20. Daily 9 a.m. until 4 p.m. Northbound right lane from Elmi Road to Springfield Road for sidewalk and driveway work.
US 87 – Rigsby Avenue
  • Current Saturday, April 13. Daily 9 a.m. until 4 p.m. Two southbound lanes from I-10 to Rigsby Avenue for utility and drainage work.
  • Monday, April 15 until Saturday, April 20. Daily 9 a.m. until 4 p.m. Westbound right lane from WW White to Covington Road for sidewalk and driveway work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 140 – Atascosa County
  • Current until Friday, May 31. Daily 7 a.m. until 8 p.m. Both directions closed between SH 16 to La Parita Creek for drainage work.
Other Roads – Bexar County
  • Saturday, April 13 until Monday, April 15. 9 p.m. until 5 a.m. Alternating lanes of eastbound and westbound Evans Road, east of US 281 for striping work.
  • Monday, April 15 until Saturday, April 20. Daily 9 a.m. until 3 p.m. Southbound right lane of San Pedro Avenue from Loop 410 to West Rector Avenue for sidewalk and driveway work.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Left lane of eastbound and westbound Stone Oak Parkway, west of US 281 for barrier setup.
  • Monday, April 15 until Thursday, April 18. Nightly 9 p.m. until 5 a.m. Alternating lanes of eastbound and westbound Evans Road, at US 281 for striping.

Wednesday, April 10

I-10 Far East San Antonio: Traffic Switch Coming Up

As we've previously described in detail in our blog, there's quite a bit of construction activity taking place on I-10 in Far East San Antonio (two projects), part of a larger effort to improve and enhance I-10 out further to Guadalupe County and eventually all the way to Houston.

One of those two ongoing projects started in Fall 2016 and is expected to wrap by the end of this year. Improvements include: New bridge at Woodlake Parkway, intersection upgrades, new signals, reconfiguration of entrance/exit ramps and conversion of the frontage roads from two-way to one-way traffic.

Now that project is hitting an important milestone. This Saturday, April 13,  our contractor Texas Sterling Construction will switch I-10 eastbound traffic to the new mainlanes between Foster Road and FM 1516 (see map). 

Before the switch happens, there will be alternating lane closures from 6 a.m. to 3 p.m that day. Traffic will be switched to the newly constructed main lanes immediately upon completion of work in the afternoon. 

Please note that the switch taking effect means detours currently in place will be removed to allow drivers to transition onto the new mainlanes (which feature 12-foot lanes and 10-foot shoulders) in the afternoon. 

The newly constructed lanes enhance safety by giving drives improved sight distance and an increased clear zone to roadside obstacles such as signs and overhead sign bridge structures. 

You might be asking: What about the westbound mainlanes? A traffic switch for the westbound mainlanes is scheduled for later this month, essentially repeating this process only that it will take place on the other side of the highway.

Monday, April 8

Loop 337 Expansion: New Mainlanes Open & Traffic Switch

Tomorrow (Tuesday, April 9) morning after rush  hour, crews will open the new two southbound lanes on Loop 337 to drivers for roughly a one-mile stretch running from River Road to SH 46.

Once these have opened for this long-term traffic switch, crews will begin work on the existing lanes, with one northbound lane remaining open to traffic (see maps below for to get a better visual sense).

To access New Braunfels High School, southbound traffic will have a signalized intersection to make a left turn into the school entrance.

All traffic exiting New Braunfels High School must turn right onto northbound Loop 337. To head southbound, drivers will use the new signalized U-turn near Oakwood Baptist Church.

To access Oakwood Baptist Church, northbound traffic will use a new signalized U-turn north of the church to head southbound on Loop 337.

All traffic exiting Oakwood Baptist Church must turn right onto southbound Loop 337. To head northbound, drivers will use the new signalized U-turn near New Braunfels High School.

Road signs have been placed to direct drivers through the new roadway configuration.

We ask the traveling public to adhere to construction signage and remain aware when traveling through the work zone.

As always, weather may impact the timing of these closures. We appreciate your patience and understanding as crews work to improve safety and mobility in the area.

Construction for the Loop 337 Expansion project began in November 2017 and is anticipated to be completed in late 2021.

The construction project is about six miles long, from I-35 to Hillcrest Drive, and includes an upgrade to a 4-lane divided roadway with pedestrian accommodations and new bridges in various locations.



 




Friday, April 5

UPCOMING CONSTRUCTION-RELATED CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Eastbound left frontage road lane from Redland Road and Bulverde Road (including entrance ramps) for various tasks including excavation, paving and restriping.
  • Monday, April 8 until Thursday, April 11. Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane from Redland Road and Bulverde Road (including entrance ramps) for various tasks including excavation, paving and restriping,
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Full closure of the westbound to eastbound turnaround at US 281 to install bridge bents. DETOUR: Take left at the US 281 southbound frontage road and a left at the Loop 1604 eastbound frontage road.
Loop 1604 – Northeast San Antonio
  • Sunday, April 7 until Monday, April 8. 9 p.m. until 5 a.m. Northbound left mainlane from Kitty Hawk to SH 218 (Pat Booker Road) for barrier pinning work.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Southbound left mainlane from SH 218 (Pat Booker Road) to Kitty Hawk for barrier pinning work.
Loop 1604 – Northwest San Antonio
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. One eastbound frontage road lane from La Cantera/Peace Boulevard to Vance Jackson Road for milling and paving work.
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. One mainllane in both directions from Bandera Road to Roger’s Ranch Road for bridge joint sealing work.
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Eastbound and westbound cloverleaf ramps to I-10 for milling and paving work.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. One westbound frontage road lane from Vance Jackson Road to I-10 for mow strip work.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from Security Service Credit Union to Taco Cabana for barrier removal work.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlanes from Chili’s to HEB driveway for barrier removal work.
  • Thursday, April 11 until Friday, April 12. 9 p.m. until 5 a.m. Full eastbound mainlane closure from NW Military Highway to Blanco Road (including NW Military and Bitters entrance ramps) for new Huebner Road turnaround bridge work.
  • Thursday, April 11 until Friday, April 12. 9 p.m. until 5 a.m. Full westbound mainlane closure from Blanco Road to Bitters Road (including Blanco, Stone Oak and US 281 entrance ramps) for new Huebner Road turnaround bridge work.
  • Tuesday, April 16 until Wednesday, April 17. 9 p.m. until 5 a.m. Full eastbound mainlane closure at Bitters Road (including entrance ramp before Bitters) for overhang work on Bitters overpass.
  • Wednesday, April 17 until Thursday, April 18. 9 p.m. until 5 a.m. Full eastbound mainlane closure from NW Military Highway to Blanco Road Iincluding NW Military and Bitters entrance ramps) for overhang placement work at the new Huebner Road turnaround bridge.
  • Wednesday, April 17 until Thursday, April 18. 9 p.m. until 5 a.m. Full westbound mainlane closure from Blanco Road to Bitters Road (including Blanco, Stone Oak and US 281 entrance ramps) for overhang placement work at the new Huebner Road turnaround bridge.
Loop 1604 – West San Antonio
  • Current until 6 a.m. Saturday, April 6. Northbound left mainlane from Big Mesa to Marbach Road for Overhead Sign Bridge (OSB) work.
  • Current until 3 p.m.Saturday, April 6. Daily 9 a.m. until 3 p.m. Northbound left frontage road lane from FM 1957 (Potranco Road) to Wiseman Boulevard for resetting barrier work.
  • Current until 3 p.m. Saturday, April 6. Daily 9 a.m. until 3 p.m. Southbound left frontage road lane from SH 151 to FM 1957 (Potranco Road) for resetting barrier work
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 3 p.m. Alternating northbound mainlanes from Big Mesa to Medio Creek for sidewalk, curb, mow strip and rip rap work.
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 3 p.m. Alternating southbound mainlanes from Dove Canyon to US 90 for sidewalk, curb, mow strip and rip rap work.
  • Monday, April 8 until Saturday, April 13. Nightly 9 p.m. until 6 a.m. Northbound right mainlane at Marbach Road for Overhead Sign Bridge (OSB) work.
  • Monday, April 8 until Tuesday, April 9. 9 p.m. until 5 a.m. Alternating northbound frontage road lanes from FM 1957 (Potranco Road) to Military Drive for traffic switch preparation work.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. Northbound right frontage road lane from FM 1957 (Potranco Road) to SH 151 for sidewalk work.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. Southbound left frontage road lane from FM 1957 (Potranco Road) to SH 151 for exit/entrance ramp paving work.
  • Tuesday, April 9 until Saturday, April 13. Nightly 9 p.m. until 5 a.m. Left frontage road lane in both directions from Wiseman Boulevard to Military Drive for barrier work.
US 281 – North Central San Antonio
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp to install steel girders. DETOUR: take the Frontage Road exit ramp, take a right on the Loop 1604 westbound frontage road. If going north; use the turnaround at Gold Canyon Road and take a right on the northbound frontage road. If heading west; drive along the eastbound Loop 1604 frontage road through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from Loop 1604 eastbound frontage road to Loop 1604 westbound frontage road, including the westbound to eastbound turnaround at US 281 for beam work. DETOUR: take a right on the Loop 1604 eastbound frontage road, if going north; use the turnaround at Gold Canyon Road and take a right on the northbound US 281 frontage road.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp to install steel girders. DETOUR: take the Sonterra Boulevard exit ramp, drive along the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Sonterra Boulevard exit ramp to the Loop 1604 westbound frontage road to install bridge overhangs. DETOUR: Sonterra Boulevard traffic; go north on US 281, take the turnaround south of Encino Rio and stay on southbound US 281. Southbound US 281 traffic; stay on southbound US 281, take the Donella Drive exit ramp, use the turnaround at Donella Drive and stay on the US 281 northbound frontage road.
  • Monday, April 8 until Tuesday, April 9. 9 p.m. until 5 a.m. Southbound right lane from Cibolo Creek bridge to Borgfeld Avenue to barrier setting work.
  • Tuesday, April 9 until Wednesday, April 10. 9 p.m. until 5 a.m. Southbound left lane from Borgfeld Avenue to Overlook Parkway for barrier setting work.
  • Wednesday, April 10 until Thursday, April 11. 9 p.m. until 5 a.m. Southbound left lane from Overlook Parkway to Summer Glenn for barrier setting work.
  • Thursday, April 11 until Friday, April 12. 9 p.m. until 5 a.m. Southbound left lane from Overlook Parkway to Summer Glenn for barrier setting work.
  • Thursday, April 11 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions at Evans Road for striping work.
  • Saturday, April 13 until Monday, April 15. Full weekend closure from 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp to install steel girders. DETOUR: take the Frontage Road exit ramp, take a right on the Loop 1604 westbound frontage road. If going north; use the turnaround at Gold Canyon Road and take a right on the northbound frontage road. If heading west; drive along the eastbound Loop 1604 frontage road through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Saturday, April 13 until Monday, April 15. Full weekend closure from 9 p.m. until 5 a.m. Full southbound frontage road closure from the Loop 1604 eastbound frontage road to Loop 1604 westbound frontage road, including the westbound to eastbound turnaround at US 281 to erect concrete beams. DETOUR: take a right on the Loop 1604 eastbound frontage road, if going north; use the turnaround at Gold Canyon Road and take a right on the northbound US 281 frontage road.
  • Saturday, April 13 until Monday, April 15. Weekend alternating closure from 9 p.m. until 5 a.m. Alternating lanes in both directions at Evans Road will be closed for striping work.
  • Saturday, April 13 until Monday, April 15. Full weekend closure from 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp to install steel girders. DETOUR: take the Sonterra Boulevard exit ramp, drive along the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, April 13 until Monday, April 15. 9 p.m. until 5 a.m. Alternating lanes at Evans Road for striping work.
US 281 – South San Antonio
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. Left lane in both directions at FM 1937 (South Flores Road) pavement marking and barrier work.
I-10 – Northwest San Antonio/Bexar County/Kendall County
  • Current until 3 p.m. Saturday, April 6. Eastbound left frontage road lane at Dominion Drive for drilling work.
  • Current until 4 p.m. Saturday, April 6. Right mainlane in both directions from FM 3351 (Ralph Fair Road) to Fair Oaks Parkway (including exit and entrance ramps) for pavement work.
  • Monday, April 8. 9 a.m. until 4 p.m. Westbound right mainlane between FM 3351 (Ralph Fair Road) and Fair Oaks Parkway (including Exit 546 ramp) for seal and paving work.
  • Tuesday, April 9. 9 a.m. until 4 p.m. Eastbound right mainlane between FM 3351 (Ralph Fair Road) and Fair Oaks Parkway (including Exit 550 ramp) for seal and paving work.
  • Wednesday, April 10 until Saturday, April 13. Daily 9 a.m. until 4 p.m. Right mainlane in both directions between FM 3351 (Ralph Fair Road) and Fair Oaks Parkway for ramp work.
I-10 – Far East San Antonio/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Sunday, April 7 until Friday, April 12. Nightly 7 p.m. until 5 a.m. Left westbound mainlane from FM 1516 to Martinez Creek and from Woodlake Parkway to Rosillo Creek for construction truck access and installation of portable barriers.
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from Rosillo Creek to Woodlake Parkway and from Martinez Creek to FM 1516 for construction truck access and installation of portable barriers.
  • Monday, April 8. 9 a.m. until 3 p.m. Eastbound-to-westbound turnaround at Foster Road. DETOUR: Traffic will instead travel through the signalized intersection.
  • Monday, April 8. 9 a.m. until 3 p.m. Right southbound lane of Foster Road at the intersections of the eastbound and westbound frontage roads at I-10.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3:30 p.m. Left westbound frontage road lane from Dietrich Road to Ackerman Road for box culvert installation.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3:30 p.m. Left westbound mainlane from FM 1516 to Martinez Creek for construction truck access.
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 3:30 p.m. Eastbound-to-westbound turnaround at FM 1516 for overpass construction. Police officers will direct traffic through the intersection when the turnaround is closed.
  • Tuesday, April 9, 4 a.m. until Wednesday, April 10, 5 a.m. Westbound frontage road from Loop 1604 to FM 1516. DETOUR: Westbound frontage road through-traffic will take Weichold Road to FM 1516, then take FM 1516 south back to I-10. Local frontage road access will be available.
  • Thursday, April 11. 9 a.m. until 3 p.m. Alternating eastbound mainlane closures from Foster Road to FM 1516. Eastbound traffic will then be shifted to the new permanent mainlanes on the new Woodlake Parkway overpass.
  • Thursday, April 11 until Friday, April 12. 7 p.m. until 5 a.m. Full westbound mainlane closure at Ackerman Road (and Ackerman Road under I-10) for overpass construction. WESTBOUND MAINLANE DETOUR: All westbound traffic exits at Ackerman Road, travels through the intersection on the frontage road and re-enters mainlanes past Ackerman Road. ACKERMAN ROAD DETOUR: Northbound traffic on Ackerman Road takes the eastbound frontage road to Foster Road and turns around. Southbound traffic on Ackerman Road takes the westbound frontage road to WW White Road and turns around. 
I-10 – Guadalupe County
  • Monday, April 8 until Friday, April 12. Daily 7:30 a.m. until 7 p.m. Alternating eastbound lanes from SH 130 to US 183 for milling and inlay and guard rail work.
I-410 – West San Antonio
  • Current until 5 a.m. Friday, April 12. Alternating southbound mainlane and frontage road lanes from US 90 to Valley Hi (mainlanes) & US 90 to Bertetti Drive (frontage road) for direct connector work (mainlanes) and road widening (frontage road) work.
  • Current until 5 a.m. Friday, April 12. Full northbound mainlane closure at US 90 direct connector for overhang and barrier removal work.
  • Current until 5 a.m. Saturday, April 13. Frontage roads (one lane remains open) in both directions at Marbach Road (including intersection) for overhang removal work.
  • Sunday, April 7 until Friday, April 12. Nightly 8 p.m. until 5 a.m. Full southbound frontage road closure from the Marbach Road entrance ramp to Marbach Road for drainage work.
  • Monday, April 8 until Thursday, April 11. Daily 8 a.m. until 3 p.m. Northbound left frontage road lane from Westshire Drive to Marbach Road for barrier work.
  • Tuesday, April 9 until Friday, April 12. Daily 8 a.m. until 3 p.m. Southbound left frontage road lane from Zabra Drive to Bertetti Drive for truck access.
  • Thursday, April 11 until Friday, April 12. 9 p.m. until 5 a.m. Eastbound at WW White for light pole installation work.
  • Saturday, April 13. 6 a.m. until 12 p.m. Left mainlane in both directions (from US 90 to Marbach Road northbound & from US 90 to Valley Hi southbound) for lighting work.
  • Sunday, April 14 until Monday, April 15. 8 p.m. until 5 a.m. Left mainlane in both directions (from US 90 to Marbach Road northbound & from US 90 to Valley Hi southbound) for lighting work.
  • Wednesday, April 17 until Saturday, April 20. Nightly 8 p.m. until 5 a.m. Full northbound frontage road closure from Marbach Road to SH 151 for milling and overlay work.
US 90 – West San Antonio
  • Current until 5 a.m. Tuesday, April 12. Full eastbound mainlane and frontage road closure between Hunt Lane and I-410 (mainlanes) and from Ray Ellison to I-410 (frontage road) for direct connector work.
  • Current until 5 a.m. Tuesday, April 12. Full westbound mainlane closure from I-410 to Hunt Lane for direct connector painting work and overhang removal work.
  • Monday, April 8 until Saturday, April 13 . Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from ½-mile west of Loop 1604 to ½-mile east of Loop 1604 for barrier removal work.
  • Monday, April 8 until Saturday, April 12. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from ¼-mile east of Loop 1604 to ¼-mile west of Loop 1604 for various tasks including light pole installation work.
SH 151 – Far West San Antonio
  • Sunday, April 7 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lanes from I-410 to Military Drive for milling/overlay work.
  • Monday, April 8 until Friday, April 12 Daily 9 a.m. until 4 p.m. Alternating eastbound frontage road lanes from Old Highway 90 to I-410 for guard rail installation work.
  • Monday, April 8 until Friday, April 12 Daily 9 a.m. until 4 p.m. Alternating westbound frontage road lanes from Old Highway 90 to I-410 for mow strip work.
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. Alternating westbound frontage road lanes from I-410 to Military Drive for mow strip work.
I-37 –  Southern Region
  • Thursday, April 11 until Friday, April 12. 9 p.m. until 5 a.m. Northbound right mainlane at I-410 for light pole installation work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, April 8 until Friday, April 12. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, April 13. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
SH 16 – Bandera Road
  • Monday, April 8 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions between Quincy Lee Drive and Legends Trail for barrier removal work.
SH 16 – Southern Region
  • Current until Tuesday, April 30. Full time closure. Alternating lanes in both directions from FM 1332 to Atascosa/McMullen county line for milling and inlay, bridge rail and guard rail work.
FM 2252 – Nacagdoches Road
  • Current until 4 p.m. Monday, April 8. Southbound right lane between Fox Knoll and Toepperwein Road for sidewalk and driveway repair work.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
SS 421 – Culebra Road
  • Monday, April 8 until Friday, April 12. Daily 9 a.m. until 3 p.m. Alternating lanes in both directions from Goodrich Street until Hamilton Street for raised median installation work.
Loop 13 – WW White Road/West Military Drive
  • Current until 4 p.m. Saturday, April 6. Daily 9 a.m. until 4 p.m. Right lane in both directions from Rigsby Avenue to Sinclair Road for sidewalk and driveway work.
  • Current until 4 p.m. Saturday, April 6. Daily 9 a.m. until 4 p.m. Northbound right lane from Rice Road to E. Houston Street for sidewalk and driveway work.
  • Current until 4 p.m. Saturday, April 6. Daily 9 a.m. until 4 p.m. Southbound right lane from Hunnicutt Drive to Lord Road for sidewalk and driveway work.
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 4 p.m. Southbound right lane from to E. Houston Street to Rice Road for sidewalk and driveway work.
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 4 p.m. Southbound right lane from Elmi Road to Spring Ield Road for sidewalk and driveway work.
US 87 – Rigsby Avenue
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 4 p.m. Westbound right lane from WW White to Convington Road for sidewalk and driveway work..
  • Monday, April 8 until Saturday, April 13. Daily 9 a.m. until 4 p.m. Two southbound lanes from I-10 to Rigsby Avenue for utility and drainage work.
SH 46 – Boerne/Kendall County
  • Current until further notice (estimated 6-8 months). 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 140 – Atascosa County
  • Current until Friday, May 31. Daily 7 a.m. until 8 p.m. Both directions closed between SH 16 to La Parita Creek for drainage work.
Other Roads – Bexar County
  • Current until 5 a.m. Saturday, April 6. Closure of FM 1957 (Potranco Road), Military Drive and Wiseman Boulevard at Loop 1604 for surfacing and painting work under the mainlane overpasses/bridges (closure of one intersection at a time).
  • Current until Saturday, April 13. 6 a.m. until 7 p.m. Tarassa Drive intersection at FM 1976 closed for various tasks including milling and lime treatment.
  • Current until Saturday, April 13. 6 a.m. until 7 p.m. Branching Court intersection at FM 1976 closed for various tasks including milling and lime treatment.
  • Tuesday, April 9 until Saturday, April 20. 6 a.m. until 7 p.m. Glen Haven intersection at FM 1976 for utility work.
  • Thursday, April 11 until Friday, April 12. Nightly 9 p.m. until 5 a.m. Alternating lanes of eastbound and westbound Evans Road, east of US 281, for striping work.
  • Saturday, April 13 until Monday, April 15. Weekend alternating closure from 9 p.m. until 5 a.m. Alternating lanes of eastbound and westbound Evans Road, east of US 281 for striping work.