Pages

Friday, August 28

Upcoming Scheduled Construction Closures



Loop 1604 – North Central San Antonio

  • Friday, August 28 until Saturday, August 29. 9 p.m. to 5 a.m. Westbound ramp closures from Bulverde Rd. to Redland Rd. for mill and overlay work.
  • Friday, August 28 until Saturday, August 29. 9 p.m. to 5 a.m. Westbound frontage road lane closure from Redland Rd. to Bulverde Rd. for pavement improvements.
  • Sunday, August 30 until Thursday, September 3. Nightly 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Redland Rd. to Green Mountain Rd. for mill and overlay work.
  • Sunday, August 30 until Thursday, September 3. Nightly 9 p.m. to 5 a.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. for rail improvements.
  • Sunday, August 30 until Thursday, September 3. Nightly 9 p.m. to 5 a.m. Ramp closures, in both directions, from Redland Rd. to Bulverde Rd for asphalt work.
  • Monday, August 31 until Friday, September 4. Daily 9 a.m. to 4 p.m. Eastbound frontage road lane closure from Redland Rd. to Bulverde Rd. for erosion control.
  • Saturday, August 29 until Monday, August 31. Weekend overnight closure 2 a.m. until 5 a.m. Right lane eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for barrier work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from the US 281 north exit ramp to the Stone Oak Parkway exit ramp.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from the US 281 north exit ramp to the Stone Oak Parkway exit ramp.

 

Loop 1604 – Far East San Antonio

  • Thursday, August 27 until Friday, August 28. 9 p.m. to 6 a.m. Single southbound frontage road lane closure from I-35 to Pat Booker Rd. intersection for barrier setting.
  • Friday, August 28 until Saturday, August 29. 9:30 p.m. to 8 a.m. Northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for traffic switch.
  • Saturday, August 29 until Sunday, August 30. 12 a.m. to 6 a.m. Northbound exit and entrance ramps at Kitty Hawk Rd. for traffic switch.
  • Saturday, August 29. 12:00 a.m. to 6 a.m. Single northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for traffic switch.

 

US 281 – North Central San Antonio/Bexar County

  • Saturday, August 29 until Monday, August 31. Weekend continuous closure 2 a.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 29 until Monday, August 31. Weekend overnight closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Evans Road to Encino Rio for concrete paving.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to westbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn right on the westbound Loop 1604 frontage road and take the Loop 1604 entrance ramp.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 entrance ramp and use the Redland Road exit ramp.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for drainage work. DETOUR: Take the frontage road exit ramp and go through the Loop 1604 intersection.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Redland Road for bridge work. DETOUR: Use the turnaround at Loop 1604. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for concrete paving. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Left/center lane southbound mainlane closure from Sonterra Boulevard Loop 1604 for lighting work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Left lane southbound mainlane closure from Stone Oak Parkway to Evans Road for concrete paving.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Left lane northbound frontage road closure from Redland Road to Encino Rio for bridge work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from the Donella Drive entrance ramp to Redland Road for bridge work.
  • Sunday, August 30 until Friday, September 4. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from the Sonterra Boulevard entrance ramp to the Donella Drive exit ramp for bridge work.

 

Encino Rio – North Central San Antonio

  • Saturday, August 29 until Monday, August 31. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound crossing closure of Encino Rio under the US 281 mainlanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Friday, August 28 until Saturday August 29. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for asphalt work.
  • Sunday, August 30 until Tuesday, September 1. Nightly 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for asphalt work.
  • Tuesday, September 1 until Friday, September 4. Nightly 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Dominion Dr. to Camp Bullis Rd. for asphalt work.
  • Wednesday, September 2 until Friday, September 4. Daily 9 a.m. to 3 p.m. Full closure of westbound to eastbound turnaround at Dominion Dr. for asphalt work.
  • Thursday, September 3 until Friday, September 4. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for asphalt work.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Thursday, August 27 thru Saturday, August 29 from 7 p.m. to 5 a.m. each night. Ackerman Road intersection under I-10 closed to install beams for westbound bridge over Ackerman Road. DETOURS:
    • Northbound Ackerman traffic can take eastbound I-10 frontage road to Foster Road and take turnaround.
    • Southbound Ackerman traffic can take the westbound I-10 frontage road and continue to the northbound I-410 frontage road, turn around at Seguin Road and enter southbound I-410, and then take exit to I-10. 
  • Saturday, August 29. Westbound I-10 right lane closed between Foster Road and Ackerman Road from 4 a.m. to 12 p.m. to install beams for I-10 westbound bridge over Ackerman Road.
  • Monday, August 31 until Thursday, September 3. 7 a.m. to 7:30 p.m. Single mainlane closure, in both directions, from US 183 to FM 2438 for armor joint work.
  • Current until mid-September: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • Monday, August 31. 8:30 a.m. to 4 p.m. Westbound exit ramp closed to I-35 northbound for multi beam guard fence repairs.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Current until Saturday, September 5. 9 a.m. to 5:30 p.m. Alternating frontage road lane closures, in both directions, from Huebertus Rd. to Schwab Rd. for landscaping and soil work.
  • Sunday, August 30 until Friday, September 4. 9 p.m. to 5 a.m. Northbound mainlane closure from Business 35 bridge to FM 306 bridge for wall work.
  • Tuesday, September 1 until Wednesday, September 2. 9 a.m. to 3 p.m. Single mainlane closures, in both directions, from Guadalupe bridge to FM 306 bridge for road improvements.

 

I-37 – Central/Southeast San Antonio

  • Tuesday, September 1 until Thursday, September 4. 8:30 a.m. to 4 p.m. Northbound exit ramp closed at I-10 eastbound for mow strip installation.

 

I-410 – West San Antonio

  • Current until Monday, September 7. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall work.
  • Current until Wednesday, September 9. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Monday September 7. Daily 7:00 a.m. to 5:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Richland Hills for pouring concrete.
  • Current until Wednesday, September 9. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work. 
  • Current until Monday, September 7. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, August 31. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from SH-151 to US-90 for painting operations.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to US-90 for concrete placement.

 

US 90 – West San Antonio

  • Friday, August 28. 9 a.m. to 4 p.m. Westbound frontage road lane closure from Renwick Dr. to W. Rock St. for utility work.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating lanes, in both directions, from Loop 410 to Hunt Lane for concrete placement.
  • Current until Monday, August 31. Nightly 8 p.m. to 5 a.m. Alternating lanes, in both directions from Loop 410 to Hunt Lane for painting operations.
  • Saturday, August 22 until Friday, August 28. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Hunt Lane for sidewalk improvements.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Eastbound exit ramp to Enrique M. Barrera Parkway closed for guardrail improvements.
  • Current until Monday, September 4. Daily 9 a.m. to 3 p.m. Single frontage road lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail improvements.
  • Current until Monday, September 4. 8:30 p.m. to 6:00 a.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for pavement improvements.
 

SH 151 – West San Antonio

  • Current until Monday, September 7. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Monday, September 7. Daily 9:00 a.m. to 3:00 p.m. Alternating mainlane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Wednesday, September 9. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Current until Monday, September 7. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, August 24 until Monday, August 31. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 south to Loop 410 north for bridge rail demolition.

 

FM 1957 – Potranco Road

  • Current until Friday, September 4. Daily 9 a.m. to 4 p.m. Single eastbound lane closure from Stevens Parkway to 1,000 feet east of Stevens Parkway for curb and driveway construction.
  • Current until Wednesday, August 30. 24-hour closure. Single lane closure from 100 east of Stevens Parkway to SH 211 for curb and driveway construction.

 

SH 16 - Bandera Road 

  • Monday, August 31 until Friday, September 4. 9:30 a.m. to 3:30 p.m. Alternating lane closures, in both directions, from Bresnahan St. to Braun Rd. for utility work. 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 29 until Sunday, August 30. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, August 28 until Sunday, August 30. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • Sunday, August 30 until Tuesday, September 1. Nightly 9 p.m. to 5 a.m. Single westbound lane closure, from just east of N.W. Military Dr. (FM 1535) to just west of Lockhill Selma for the removal and installation of temporary pavement markings.
  • Monday, August 31 until Wednesday, September 2. Nightly 9 p.m. to 5 a.m. Double eastbound lane closure from just west of Lockhill Selma to just east of N.W. Military Dr. (FM 1535) for the removal and installation of temporary pavement markings.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

FM 218 – Pat Booker Road

  • Friday, August 28 until Monday, August 31. 8 p.m. to 6 a.m. Turn arounds closed, in both directions, at Loop 1604 for bridge demolition.
  • Friday, August 28 until Monday, August 31. 8 p.m. to 6 a.m. Full road closure, in both directions, at Loop 1604 for bridge demolition.

FM 78 - Bexar County 

  • Monday, August 31 until Friday, September 4. 9:30 a.m. to 3:30 p.m. Alternating lane closures, in both directions, from Woodlake Parkway to Firestone Parkway for utility work. 

Other Roads – Bexar County

  • Borgfeld Rd. Monday, August 31 until Tuesday, September 1. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. from US-281 to Bulverde Rd. for restriping.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
  • Tuesday, September 1 until Friday, September 4. 8 a.m. to 4 p.m. Single lane closure, in both directions, from ½ mile west of FM 311 to ½ mile east of FM 311 for illumination work.

 

RM/FM 1376 – Kendall County

  • Monday, August 31 until Saturday, September 5. Daily 7 a.m. to 7 p.m. Single lane closures, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction.
  • Sunday, August 30 until Friday, September 4. Nightly 8 p.m. to 5 a.m. Single lane closures, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for pavement work.

 


Tuesday, August 25

US 281 Openings: Redland Rd. Bypass Ramp & Signalized Underpass Intersection



 
On the evening of Wednesday, August 26, we will open the Redland Road bypass ramp for through-traffic looking to fly over the Redland Road intersection below and as a northbound US 281 entrance ramp.

Drivers will use the left lane of the northbound US 281 frontage road to enter the bypass ramp, but will have the option of staying on the frontage road and traveling over the signalized Redland Road intersection beneath or heading north on the US 281 mainlanes.



At this time, the signalized Redland Road underpass intersection at US 281 will also open.  

The signal lights at the north- and southbound US 281 frontage roads will be turned on to allow for safe passage of traffic underneath the bridge. 

The signals will also allow drivers to turn left in each direction as well as open both turnarounds.

While we make these changes, we will also have several overnight closures for August 26 beginning at 9 p.m.:


The southbound US 281 frontage road from Encino Rio to Redland Road will be closed.
Traffic will detour by taking the south- to northbound turnaround at Encino Rio, taking the north- to southbound turnaround at Evans Road and using the Evans Road entrance ramp to return to US 281 mainlanes.  

The southbound US 281 frontage road exit ramp to Redland Road will be closed. 
Traffic will detour by taking the southbound US 281 Donella Drive exit ramp, use the south- to northbound turnaround at Donella Drive and take the Donella Drive entrance ramp.

The north- to southbound turnaround at Encino Rio, as well as the west- to southbound Encino Rio left turn lane will be closed.
The detour for both will be to take the northbound US 281 frontage road and use the north- to southbound turnaround at Stone Oak Parkway. 

Please note that construction is weather permitting and subject to change.

You can stay informed of lane closures by receiving alerts to your e-mail by registering here or by following us on our Twitter feed .

Friday, August 21

Upcoming Scheduled Construction Closures


Loop 1604 – North Central San Antonio

  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the southbound US 281 frontage road.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from the US 281 north exit ramp to the northbound US 281 frontage road.

 

Loop 1604 – Northeast San Antonio

  • Friday, August 21 until Monday, August 24. Weekend closure 8 p.m. to 5 a.m. Single southbound mainlane closure at the Pat Booker Road bridge for bridge demolition.
  • Sunday, August 23 until Thursday, August 27. 9 p.m. to 6 a.m. Single lane closure, in both directions, from Redland Rd. to Green Mountain Rd. for mill and overlay work.
  • Sunday, August 23 until Thursday, August 27. 9 p.m. to 6 a.m. Alternating ramp closures, in both directions, from Redland Rd. to Green Mountain Rd. for mill and overlay work.
  • Sunday, August 23 until Friday, August 28. 8 p.m. to 5 a.m. Single mainlane closure, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail improvements. 
  • Monday, August 24 until Friday, August 28. 9 a.m. to 4 a.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for erosion control.

 

Loop 1604 – North West San Antonio

  • Sunday, August 23 until Monday, August 24. 9 p.m. to 5 a.m. Single lane closure on eastbound frontage road from Bandera Rd. to Hausman Rd. for pavement improvements.
  • Wednesday, August 25 until Thursday, August 27. 9 p.m. to 5 a.m. Eastbound Hausman Rd. exit ramp and Bandera Rd. entrance ramp will be closed for utility work. 

 

US 281 – North Central San Antonio/Bexar County

  • Saturday, August 22 until Monday, August 24. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 22 until Monday, August 24. Weekend continuous closure 2 a.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 22 until Monday, August 24. Weekend continuous closure 2 a.m. until 5 a.m. Right lane southbound mainlane closure from Evans Road to Encino Rio for concrete paving.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to westbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn right on the westbound Loop 1604 frontage road and take the Loop 1604 entrance ramp.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work. DETOUR: Take the southbound US 281 entrance ramp and use the Redland Road exit ramp.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for drainage work. DETOUR: Take the frontage road exit ramp and go through the Loop 1604 intersection.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for concrete paving. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from the Donella Drive entrance ramp to Redland Road for bridge work.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from the Sonterra Boulevard entrance ramp to the Donella Drive exit ramp for bridge work.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Sonterra Boulevard to Redland Road for striping and barrier work.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Encino Rio to the Evans Road exit ramp for concrete paving.
  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Redland Road to Loop 1604 for striping.
  • Saturday, August 29 until Monday, August 31. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 29 until Monday, August 31. Weekend continuous closure 2 a.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 29 until Monday, August 31. Weekend continuous closure 2 a.m. until 5 a.m. Right lane southbound mainlane closure from Evans Road to Encino Rio for concrete paving.

 

Encino Rio – North Central San Antonio

  • Saturday, August 22 until Monday, August 24. Weekend overnight closure 2 a.m. until 5 a.m. Westbound crossing closure of the west- to southbound US 281 left turn lane for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Saturday, August 29 until Monday, August 31. Weekend overnight closure 2 a.m. until 5 a.m. Westbound crossing closure of the west- to southbound US 281 left turn lane concrete paving. DETOUR: Use the turnaround at Evans Road.

 

Redland Road – North Central San Antonio

  • Monday, August 24 until Friday, August 28. Nightly 9 p.m. until 5 a.m. Alternating westbound crossing closure at US 281 for striping.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, August 28. Nightly, 7 p.m. to 6 a.m. Alternating mainlane closures, in both directions, from Cibolo Creek to SH-46 for asphalt work.
  • Current until Friday, August 28. Daily, 7 a.m. to 7 p.m. Alternating mainlane closures, in both directions, from SH-16 to Kerr/Kendall County Line for asphalt work.
  • Sunday, August 23 until Monday, August 24. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for asphalt work.
  • Monday, August 24 until Tuesday, August 25. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Ralph Fair Rd. (FM 3351) to Boerne Stage Rd. for asphalt work.
  • Monday, August 24. 8 a.m. to 5 p.m. Single eastbound lane closure from MM 522 to MM 524 for movement of traffic barrier.
  • Monday, August 24 until Thursday, August 27. Daily 7 a.m. to 3 p.m. Left lane closure of westbound frontage road from Dominion Dr. to Boerne Stage Rd. for installation of metal beam guard fence.
  • Monday, August 24 until Thursday, August 27. Daily 9 a.m. to 3 p.m. Full closure of the westbound exit ramp 548 from Ralph Fair Rd. to Old Fredericksburg Rd. for illumination improvements. DETOUR: Exit 550, travel on the westbound frontage road through the Ralph Fair Rd., and re-enter westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.  
  • Tuesday, August 25. 7 p.m. to 12 a.m. Full closure of eastbound mainlanes from MM 522 to MM 524 for removal of overhead sign. DETOUR: Exit 523 and travel through the intersection to return to mainlanes on the MM 524 ramp.
  • Tuesday, August 25 until Wednesday, August 26. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for asphalt work.
  • Wednesday, August 26 until Thursday, August 27. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Dominion Dr. to Camp Bullis Rd. for asphalt work.
  • Thursday, August 27 until Friday, August 28. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Pkwy for asphalt work.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until mid-September: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • Tuesday, August 24 until Friday, August 28. Nightly 9 p.m. to 6 a.m. I-10 westbound exit ramp to I-37 southbound closed from I-10W to Fair Ave. exit for barrier removal.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Monday, August 17 until Saturday, August 22. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for landscape, ramp and sidewalk work.
  • Monday, August 17 until Saturday, August 22. Daily 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for stripping work.
  • Monday, August 24 until Saturday, August 29. 9 a.m. to 5:30 p.m. Single lane closure on frontage roads, in both directions, from Huebertus Rd. to Schwab Rd. for landscaping and soil work.

 

I-37 – Central/Southeast San Antonio

  • Monday, August 24 until Thursday, August 27. 9 a.m. to 5 p.m. Southbound left lane closure from 1,000 feet before Loop 1604 to 1,000 feet after Loop 1604 for improvements to the concrete bridge rail.
  • Tuesday, August 25 until Wednesday, August 26. 8:30 a.m. to 4 p.m. I-37 northbound exit ramp to I-10 eastbound closed for mow strip installation.
  • Thursday, August 27. 8:30 a.m. to 4 p.m. I-37 southbound exit ramp to I-10 eastbound for mow strip installation.

 

I-410 – West San Antonio

  • Current until Monday, August 31. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, August 31. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Monday August 31. Daily 7:00 a.m. to 5:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Richland Hills for pouring concrete.
  • Current until Monday August 31. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation. 
  • Current until Monday, August 31. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, August 31. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from SH-151 to US-90 for painting operations.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to US-90 for concrete placement.

 

US 90 – West San Antonio

  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Alternating lanes, in both directions, from Loop 410 to Hunt Lane for concrete placement.
  • Current until Monday, August 31. Nightly 8 p.m. to 5 a.m. Alternating lanes, in both directions from Loop 410 to Hunt Lane for painting operations.
  • Saturday, August 22 until Friday, August 28. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Hunt Lane for sidewalk improvements.
  • Current until Monday, August 31. Daily 9 a.m. to 3 p.m. Eastbound exit ramp to Enrique M. Barrera Parkway closed for guardrail improvements.
  • Current until Monday, September 4. Daily 9 a.m. to 3 p.m. Single frontage road lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail improvements.
  • Sunday, August 23 until Monday, September 4. 8:30 p.m. to 6:00 a.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for pavement improvements.

 

SH 151 – West San Antonio

  • Current until Monday, August 31. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Monday, August 31. Daily 9:00 a.m. to 3:00 p.m. Alternating mainlane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Monday, August 31. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Current until Monday, August 31. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, August 24 until Monday, August 31. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 south to Loop 410 north for bridge rail demolition.

 

FM 1957 – Potranco Road

  • Current until Friday, September 4. Daily 9 a.m. to 4 p.m. Single eastbound lane closure from Stevens Parkway to 1,000 feet east of Stevens Parkway for curb and driveway construction.
  • Monday, August 24 until Wednesday, August 30. 24-hour closure. Single lane closure from 100 east of Stevens Parkway to SH 211 for curb and driveway construction

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, August 21 until Sunday, August 23. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 22 until Sunday, August 23. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, August 24 until Friday, August 28. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, August 24 until Friday, August 28. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 29 until Sunday, August 30. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, August 28 until Sunday, August 30. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.

 

US 87 – Bexar County

  • Current until Thursday, August 27. Northbound shoulder and right turn lane closed at Foster Road to allow pavement improvements.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

FM 218 – Pat Booker Road

  • Friday, August 21 until Monday, August 24. Weekend closure 8 p.m. to 5 a.m. Full street closure, in both directions, at Loop 1604 turnarounds for bridge demolition.
  • Friday, August 21 until Monday, August 24. Weekend closure 8 a.m. to 5 a.m. Full closure of Pat Booker Rd. and Loop 1604 turnarounds for bridge demolition.
  • Friday, August 28 until Monday, August 31. 8 p.m. to 6 a.m. Turn arounds closed, in both directions, at Loop 1604 for bridge demolition.
  • Friday, August 28 until Monday, August 31. 8 p.m. to 6 a.m. Full road closure, in both directions, at Loop 1604 for bridge demolition.

 

Other Roads – Bexar County

  • Bulverde Rd. Friday, August 28 until Monday, August 31. Full closure of Bulverde Rd. from US-281 to Borgfeld Rd.
  • Borgfeld Rd. Monday, August 31 until Tuesday, September 1. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. from US-281 to Bulverde Rd. for restriping.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday, August 22. Daily 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.

 

FM 1863 – Comal

  • Monday, August 24 until Friday, August 28. 8 a.m. to 7 p.m. Single lane closures, in both directions, from FM 46 to FM 3009 for roadway improvements.