Pages

Friday, March 26

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Saturday, March 27 until Monday, March 29. Weekend continuous closure 2 a.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving. DETOUR: Take the northbound US 281 exit ramp. 

Loop 1604 – South San Antonio

  • Monday, March 29 until Thursday, April 8. 8 a.m. to 5 p.m. Single mainlane closure, in both directions, from Elm Creek to Benton City Rd. for road improvements. 

Loop 1604 – North East San Antonio/Bexar County

  • Wednesday, March 31 until Thursday, April 1. 9 p.m. to 5 a.m. Full closure of Pat Booker Rd. from Village Oak to Athenian Dr. for traffic signal installation.
  • Thursday, April 1 until Friday, April 2. 8 p.m. to 8 a.m. Singe lane closure on southbound frontage road from Village Oak to Marco’s Pizza for traffic signal installation.
  • Thursday, April 1 until Friday, April 2. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Village Oak to Athenian Dr. for bridge work. 

US 281 – North Central San Antonio/Bexar County

  • Current until Monday, April 12. 9 a.m. to 4 p.m. Single northbound lane closure at Encino Commons for utility work.
  • Saturday, March 27. 7 a.m. to 5 p.m. Single southbound right lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, March 27. 7 a.m. to 5 p.m. Single southbound right lane closure from Overlook Parkway to Wilderness Oak for sidewalk improvements.
  • Saturday, March 27. 7 a.m. to 5 p.m. Single southbound mainlane closure at Bulverde Rd. for riprap work.
  • Saturday, March 27 until Monday, March 29. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, March 28 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 28 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 concrete paving.
  • Sunday, March 28 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 28 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 concrete paving.
  • Monday, March 29 until Tuesday, March 30. Overnight 9 p.m. until 5 a.m. Full mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Traffic will continue on the northbound US 281 mainlanes, take the northbound US 281 Evans Road exit ramp and use the turnaround to continue on the southbound US 281 frontage road.
  • Monday, March 29 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Full frontage road closure from Evans Road to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Traffic will use take southbound US 281, use the Loop 1604 south- to northbound turnaround, take the northbound US 281 mainlanes and use the Sonterra Boulevard entrance ramp.
  • Monday, March 29 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for beam setting. DETOUR: Traffic will use turn left at Marshall Road and another left onto the southbound US 281 frontage road.
  • Monday, March 29 until Wednesday, March 31. Nightly 9 p.m. until 5 a.m. Frontage road closure from Stone Oak Parkway to the southbound US 281 Stone Oak Parkway entrance ramp for beam setting. DETOUR: Traffic will use temporary new pavement to detour around the closure area returning to the southbound US 281 frontage road. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Thursday, March 25 9 a.m. until Sunday, March 28 9 p.m. Full closure of eastbound frontage road and entrance ramp at Scenic Loop Rd. for roadway reconstruction. DETOUR: Eastbound traffic will remain on the frontage road, travel over the new frontage road bridge, and travel through Balcones Creek Rd. and use the next entrance ramp.
  • Monday, March 29 until Friday, April 2. 7:30 a.m. to 5:30 p.m. Various lane closures, in both directions, from mile marker 512 to mile marker 520 for guardrail replacement.
  • Monday, March 29 until Friday, April 2. 7:30 a.m. to 5:30 p.m. Various lane closures, in both directions, from mile marker 513 to mile marker 508 for mow strip installation.
  • Wednesday, March 31. 9 a.m. to 3 p.m. Eastbound HOV lane closure, including shoulder, from Dominion Dr. to Camp Bullis Rd. for illumination work.
  • Wednesday, March 31. 9 a.m. to 3 p.m. Westbound HOV lane closure, including shoulder, from Camp Bullis Rd. to Dominion Dr. for illumination work.  

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, March 26 until Monday, March 29. Nightly from 9 p.m. to 5 a.m. Full highway closure in each direction on I-10 between Ackerman Road and Woodlake parkway for striping work. DETOURS:
    • Eastbound mainlane traffic can exit at Foster Road and continue through the frontage road to FM1516.
    • Westbound mainlane traffic will exit at Woodlake Parkway and continue through the frontage road to Ackerman Road.
  • Saturday, March 27. 7 a.m. to 3 p.m. Full westbound mainlane closure from Foster Rd. to Rosillo Creek for barrier work. 
  • Saturday, March 27. 12 a.m. to 5 p.m. Westbound right mainlane closure from Foster Rd. to Rosillo Creek for rail work.
  • Sunday, March 28 until Tuesday, March 30. Nightly 7 p.m. to 5 a.m. Southbound Loop 1604 closed at I-10 for bridge work. DETOUR: Southbound traffic will be directed to I-10 westbound frontage road and turn around at FM 1516. 
  • Monday, March 29. 9 a.m. to 3 p.m. Westbound Ackerman Rd. exit closed for barrier work. DETOUR: Westbound traffic to Ackerman Rd. can exit Woodlake Parkway and continue through westbound frontage road. 
  • Monday, March 29. 9 a.m. to 3 p.m. Westbound right lane closed from Foster Rd. to Rosillo Creek for barrier work. 
  • Tuesday, March 30. 9 a.m. to 3 p.m. Eastbound right lane closed from Loop 410 to FM 1516 for barrier work. 
  • Monday, March 29 until Friday, April 2. 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from W.W. White Rd. to Woodlake Parkway for striping operations.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, March 27. 8 a.m. to 5 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for sidewalk work.
  • Current until Saturday, March 27. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material delivery.
  • Current until Saturday, March 27. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for barrier movement.
  • Current until Saturday, March 27. 8 a.m. to 5 p.m. Single lane closure on southbound frontage roads from Hubertus Rd. to FM 2252 for sub-grade stabilization.
  • Saturday, March 27 until Sunday, March 29. 9 p.m. to 5 a.m. Single southbound mainlane closure from Conrad/Kohelenberg to FM 306 bridge for traffic switch.
  • Sunday, March 28 until Friday, April 2. 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for overhead sign replacement.
  • Sunday, March 28 until Monday, March 29. 9 p.m. to 5 a.m. Single southbound mainlane closure from Conrad/Kohelenberg to FM 306 bridge for traffic switch. 

US 90 – Central/West San Antonio

  • Sunday, March 28 until Monday, March 29. 9 p.m. to 5 a.m. Various eastbound lane closures from Cupples Rd. to Zarzamora St. for overhead sign replacement.
  • Tuesday, March 30 until Friday, April 2. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Nogalitos St. exit ramp to Nogalitos Rd. for concrete barrier setting.
  • Wednesday, March 31 to Thursday, April 1. 9 p.m. to 5 a.m. Multiple eastbound mainlane closures, from Cupples Rd. to S. Zarzarmora St. for overhead sign replacement.  

I-410 – North San Antonio

  • Current until Thursday, April 8. 9 a.m. to 4 p.m. Single left turn lane closed on eastbound frontage road from Jackson Keller Rd. to West Ave. for placement of communication lines.
  • Current until Thursday, April 8. 9 a.m. to 4 p.m. Single right turn lane closed on westbound frontage road from West Ave. to Speedway Dr. for placement of communication lines. 

I-410 – West San Antonio

  • Current until Saturday, March 27. 8 p.m. to 5 a.m. Full closure of intersection at W. Military Dr. for bridge demolition.
  • Current until Monday, March 29. 9 a.m. to 3 p.m. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, March 29. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for work on traffic rail.
  • Current until Monday, March 29. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Current until Monday, March 29. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
  • Current until Monday, March 29. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, March 29 until Monday, April 5. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, March 29 until Monday, April 5. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail work.
  • Monday, March 29 until Monday, April 5. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Monday, March 29 until Monday, April 5. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
  • Monday, March 29 until Monday, April 5. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, March 29 until Monday, April 5. 9 a.m. to 3 p.m. Single lane closure on southbound frontage road from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, Mach 29 until Monday, April 5. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Loop 410 to Ingram Rd. for underground box installation.  

SH 151 – West San Antonio

  • Current until Monday, March 29. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Current until Monday, March 29. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, March 29 until Monday, April 5. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, March 29 until Monday, April 5. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

FM 1535 – N.W. Military Highway

  • Saturday, March 27. 7 a.m. to 4 p.m. Double lane closures, in both directions, at Wurzbach Parkway intersection for median paving.
  • Monday, March 29 until Friday, April 30. Single northbound right lane closure from just south of Wagon Trail to Pond Hill Rd. for utility work.  
  • Monday, March 29 until Tuesday, March 30. 9 a.m. to 4 p.m. Southbound right turn lane closed at Huebner Rd. for utility work. 

PA 1502 – Wurzbach Parkway

  • Saturday, March 27. 7 a.m. to 4 p.m. Single westbound lane closed at Lockhill Selma Rd. intersection for median paving.  

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.  

Loop 13 – Military Drive

  • Monday, March 29 until Friday, April 2. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements.
  • Monday, March 29 until Friday, April 2. 8:30 a.m. to 3:30 p.m. Single lane closure, in both directions, from S. New Braunfels to Alsbrook Rd. for sidewalk improvements.  

Culebra Road – San Antonio

  • Monday, March 29 until Friday, April 2. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Rogers Rd. to Easterline for sidewalk improvements. 

SL 337 – Comal County

  • Current until Friday, April 2. 7 a.m. to 7 p.m. Single lane closure, in both directions, at River Road intersection for barrier setting.  

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.  

RM 1376 – Kendall County

  • Monday, March 29 until Saturday, April 3. 8:30 a.m. to 8:30 p.m. Single lane closures, in both directions, at various culvert locations from Indian Knoll to Walnut Way for road reconstruction.


Friday, March 19

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Saturday, March 20 until Sunday, March 21. Weekend continuous closure 9 p.m. until 9:00 p.m. Full westbound mainlane closure from Redland Road to US 281 for asphalt paving. DETOUR: Take the northbound US 281 exit ramp.
  • Saturday, March 20 until Sunday, March 21. Weekend continuous closure 9:00 p.m. until 9:00 p.m. Full eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving. Take the northbound US 281 exit ramp.

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, March 21 until Tuesday, March 23. Nightly 9 p.m. to 5 a.m. Full closure of northbound mainlanes from Pat Booker Rd. to I-35 exit ramp for the replacement of overhead sign structures. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, March 20. 6 a.m. to 5 p.m. Southbound right lane closed from Bulverde Rd. to Overlook Parkway for rock grading.
  • Saturday, March 20. 7 a.m. to 5 p.m. Southbound right lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk pouring.
  • Saturday, March 20. 5 a.m. to 6 p.m. Full closure of Ramblewood at US 281 intersection for roadway excavation.
  • Saturday, March 20. Weekend continuous closure 5 a.m. until 3 p.m. Two left lanes mainlane closure from the Loop 1604 underpass to Sonterra Boulevard.
  • Saturday, March 20. Weekend closure 6 a.m. until 12 p.m. Full southbound mainlane road closure from Sonterra Boulevard to Loop 1604 for concrete paving. DETOUR: Continue on the southbound US 281 frontage road and use the Loop 1604 frontage road.
  • Sunday, March 21 until Friday, March 26. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 21 until Friday, March 26. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, March 21 until Friday, March 26. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 21 until Friday, March 26. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, March 22 until Friday, March 26. Daily 8 a.m. until 5 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, March 22 until Friday, March 26. Daily 8 a.m. until 5 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, March 22 until Friday, March 26. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Evans Road to the Stone Oak/Tournament Players Club (TPC) Parkway exit ramp for concrete paving. DETOUR: Take southbound US 281, use the Loop 1604 turnaround to enter the northbound US 281 mainlanes and take the Sonterra Boulevard entrance ramp.
  • Monday, March 22 until Friday, March 26. 9 a.m. to 4 p.m. Southbound right turn lane to westbound Borgfeld Rd. closed for sidewalk and driveway construction.
  • Saturday, March 27 until Monday, March 29. Weekend closure 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend closure 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend closure 3 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, March 27 until Monday, March 29. Weekend closure 3 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.

Evans Road – North Central San Antonio

  • Saturday, March 20. Weekend closure 3 a.m. until 10 p.m. Alternating east- and westbound crossing closure at US 281.

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Monday, March 22 until Thursday, March 25. 7:30 a.m. to 5:30 p.m. Alternating lane closures, in both directions, from 1 mile east of Frederick’s Creek to 1 mile west of Frederick’s Creek in Kerry County for traffic switch.
  • Monday, March 22 until Friday, March 26. 7:30 a.m. to 5:30 p.m. Alternating lane closures, in both directions, from mile marker 513 to mile marker 508 in Kerr County for mowstrip installation.
  • Monday, March 22 until Friday, March 26. 7:30 a.m. to 5:30 p.m. Alternating lane closures, in both directions, from mile marker 512 to mile marker 520 in Kerr County for guardrail replacement.
  • Thursday, March 25 9 a.m. until Sunday, March 28 9 p.m. Full closure of eastbound frontage road and entrance ramp at Scenic Loop Rd. for roadway reconstruction. DETOUR: Eastbound traffic will remain on the frontage road, travel over the new frontage road bridge, and travel through Balcones Creek Rd. and use the next entrance ramp. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, March 20 from 5 a.m. to 9 p.m. Full westbound mainlane closure between Graytown and Loop 1604 for pavement work. Detour: Westbound traffic can exit at Graytown Road and reenter at Loop 1604.
  • Saturday, March 20 from 5 a.m. to 9 p.m. Westbound alternating closures between Loop 1604 and Foster road for striping work.
  • Saturday, March 20 from 5 a.m. to 9 p.m. Eastbound alternating closures from Foster Road to Woodlake Parkway for striping work.
  •  Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, March 21 until Friday, March 26. 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for replacement of overhead signs.
  • Monday, March 22 until Saturday, March 27. 8 a.m. to 5 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for sidewalk work.
  • Monday, March 22 until Saturday, March 27. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material delivery.
  • Monday, March 22 until Saturday, March 27. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for barrier movement.
  • Wednesday, March 24 until Friday, March 26. 9 p.m. to 5 a.m. Double northbound mainlane closure from Hubertus Rd. to Schwab Rd. for barrier movement.
  • Monday, March 22 until Saturday, March 27. 8 a.m. to 5 p.m. Single lane closure on southbound frontage roads from Hubertus Rd. to FM 2252 for sub-grade stabilization.
  • Wednesday, March 24 until Friday, March 26. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to Hubertus Rd. for striping operations. 

US 90 – Central/West San Antonio

  • Monday, March 22 until Thursday, March 25. Daily 9 a.m. to 5 p.m. Eastbound exit ramp to northbound General McMullen closed for bridge rail maintenance.
  • Monday, March 22. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road at Nogalitos Rd. for work on concrete barrier.   

I-410 – North San Antonio

  • Current until Thursday, April 8. 9 a.m. to 4 p.m. Single left turn lane closed on eastbound frontage road from Jackson Keller Rd. to West Ave. for placement of communication lines.
  • Current until Thursday, April 8. 9 a.m. to 4 p.m. Single right turn lane closed on westbound frontage road from West Ave. to Speedway Dr. for placement of communication lines. 

I-410 – West San Antonio

  • Current until Monday, March 22. 9 a.m. to 3 p.m. Alternating mainlane closure, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, March 22. 8 p.m. to 5 a.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail work.
  • Current until Monday, March 22. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Current until Monday, March 22. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge widening.
  • Current until Monday, March 22. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Sunday, March 21 until Saturday, March 27. 8 p.m. to 5 a.m. Full closure of intersection at W. Military Dr. for bridge demolition.
  • Monday, March 22 until Monday, March 29. 9 a.m. to 3 p.m. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, March 22 until Monday, March 29. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for work on traffic rail.
  • Monday, March 22 until Monday, March 29. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Monday, March 22 until Monday, March 29. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
  • Monday, March 22 until Monday, March 29. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, March 22 until Friday, March 26. 9 a.m. to 3 p.m. Single lane closure on southbound frontage road from Marbach Rd. to Culebra Rd. for bridge work. 

SH 151 – West San Antonio

  • Current until Monday, March 22. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, March 22. 9 a.m. to 3 p.m. Alternating lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, March 22 until Monday, March 29. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, March 22 until Monday, March 29. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

FM 1957 – Potranco Road

  • Current until Friday, March 26. 9 a.m. to 4 p.m. Single eastbound lane closure from SH 211 to Talley Rd. for placement of communication lines. 

FM 2696 – Blanco Road

  • Current until Tuesday, March 23. 9 a.m. to 4 p.m. Northbound right turn lane closed at Wurzbach Parkway intersection for placement of communication lines. 

Alamo Ranch Parkway – Bexar County

  • Monday, March 22 until Friday, March 26. 9 a.m. to 3 p.m. Single westbound lane closure from Loop 1604 to Lone Star Parkway for bridge work.  

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.  

SL 337 – Comal County

  • Tuesday, March 24 until Friday, April 2. 7 a.m. to 7 p.m. Single lane closure, in both directions, at River Road intersection for barrier setting. 

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.


Friday, March 12

UPCOMING SCHEDULED CONSTRUCTION CLOSURES


 

Loop 1604 – North Central San Antonio

  • Friday, March 19 until Sunday, March 21. Weekend continuous closure 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Boulevard to US 281 for asphalt work. DETOUR: Traffic will use the northbound US 281 exit ramp.
  • Friday, March 19 until Sunday, March 21. Weekend continuous closure 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Redland Road to US 281 for asphalt work. DETOUR: Traffic will use the northbound US 281 exit ramp. 

US 281 – North Central San Antonio/Bexar County

  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Continue north on the US 281 mainlanes, take the northbound US 281 Evans Road exit ramp, and use the turnaround to access the southbound US 281 frontage road.
  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Head south on the US 281 southbound frontage road, use the turnaround at Donella Drive to access the northbound US 281 frontage road and take the Donella Drive entrance ramp.
  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Friday, March 19 until Sunday, March 21. Weekend closure 9 p.m. until 5 a.m. Full southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving. DETOUR: Continue on the southbound US 281 frontage road and use the Loop 1604 frontage road.
  • Saturday, March 13. 6 a.m. to 5 p.m. Southbound right lane closed from Bulverde Rd. to Overlook Parkway for rock grading.
  • Saturday, March 13. 7 a.m. to 5 p.m. Southbound right lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk pouring.
  • Saturday, March 20. 6 a.m. to 5 p.m. Southbound right lane closed from Bulverde Rd. to Overlook Parkway for rock grading.
  • Saturday, March 20. 7 a.m. to 5 p.m. Southbound right lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk pouring. 

Evans Road – North Central San Antonio

  • Friday, March 19 until Sunday, March 21. Weekend closure 9 p.m. until 5 a.m. Alternating lanes in both directions crossing closure at US 281 for concrete paving. 

Encino Commons Boulevard – North Central San Antonio

  • Sunday, March 14 until Friday, March 19. Nightly 9 p.m. until 5 a.m. Alternating east- and westbound crossing closure of Encino Commons Boulevard at the northbound US 281 frontage road for concrete paving. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, March 13. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from Schwab Rd. to FM 1103 for guard rail improvements.
  • Tuesday, March 16. 9 a.m. to 5 p.m. Exit ramps to Loop 1604 closed, in both directions, for sign work.
  • Sunday, March 14 until Friday, March 19. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from US 90 to Olympia Parkway for replacement of overhead signs.
  • Saturday, March 13 until Sunday, March 14. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from Conrad and Kohelenberg and FM 306 for repairs.
  • Friday, March 12 until Saturday, March 13. 9 p.m. to 5 a.m. Single lane closure on frontage roads, in both directions, from Conrad and Kohelenberg to FM 306 for repair work. 

I-410 – West San Antonio

  • Current until Monday, March 15. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Monday, March 8 until Monday, March 15. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge widening.
  • Current until Monday, March 15. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Current until Monday, March 15. 9 a.m. to 3 p.m. Single mainlane closure, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, March 15. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail repair.
  • Monday, March 15 until Monday, March 22. 9 a.m. to 3 p.m. Alternating mainlane closure, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, March 15 until Monday, March 22. 8 p.m. to 5 a.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail work.
  • Monday, March 15 until Monday, March 22. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Monday, March 15 until Monday, March 22. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge widening.
  • Monday, March 15 until Monday, March 22. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work. 

SH 151 – West San Antonio

  • Current until Monday March 15. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, March 15. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, March 15 until Monday, March 22. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, March 15 until Monday, March 22. 9 a.m. to 3 p.m. Alternating lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work. 

FM 1957 – Potranco Road

  • Current until Friday, March 26. 9 a.m. to 4 p.m. Single eastbound lane closure from SH 211 to Talley Rd. for placement of communication lines. 

FM 1535 – N.W. Military Highway

  • Saturday, March 13. 7 a.m. to 4 p.m. Left lane and left turn lane closures, in both directions, at Wurzbach Parkway intersection for paving operations. 

PA 1502 – Wurzbach Parkway

  • Saturday, March 13. 7 a.m. to 4 p.m. Single westbound left turn lane closure at Lockhill Selma intersection for paving operations. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

Loop 13 – Military Drive

  • Monday, March 15 until Friday, March 26. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Quintana Rd. to Bynum Ave. for sidewalk installations.
  • Monday, March 15 until Friday, March 26. 8:30 a.m. to 3:30 p.m. Single lane closure, in both directions, from S. New Braunfels Ave. to Alsbrook Rd. for sidewalk installation.

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.