Pages

Tuesday, June 29

MAJOR CLOSURE COMING TO SH 46 AT THE I-10 INTERSECTION IN BOERNE

 


Beginning on Tuesday, July 6, the I-10 Kendall Extension project will move into the next phase of construction with several upcoming roadway and lane closures that are required to facilitate the completion of the new 6-lane bridge at SH 46 and I-10. This phase of construction is estimated to take place over 12 weeks.

The first six weeks of this construction phase will include the following closures on SH 46 from Home Depot to the I-10 eastbound frontage road:

  • Closure of the right-turn lane in front of Whataburger on approach to the eastbound frontage road; 
  • Traffic shift onto the temporary pavement; and, 
  • Closure of the Whataburger driveway.

During this phase, two-way traffic will be maintained on the approach to and across the existing SH 46 and I-10 bridge.

The second six weeks of construction will include additional closures as crews begin the reconstruction of roadway approaches to the SH 46 bridge. More information on additional closures will be shared in the coming weeks.

Once complete, this phase of construction will allow crews to shift traffic onto the portion of the new SH 46 bridge by Fall 2021. Following the traffic shift, crews will begin demolition of the old SH 46 bridge and construct the remainder of the new 6-lane bridge and approach. The new SH 46 bridge is currently estimated to be completed by Spring 2022. 

The I-10 Kendall Extension project is a $100 million investment to increase mobility and enhance safety for drivers on I-10 in Kendall County. The project includes plans to improve frontage roads, ramps, bridges, overpasses, and interchanges along I-10 from SH 46 to Fair Oaks Parkway in Kendall County.

Stay Connected

Friday, June 25

UPCOMING SCHEDULED CONSTRUCTION LANE CLOSURES

 


Loop 1604 – North San Antonio/Bexar County

  • Monday, June 28 until Friday, July 2. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, June 28 until Friday, July 2. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Current until Friday, July 23. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from Stone Oak Parkway to Blanco Rd. for utility work. 

Loop 1604 – South San Antonio/Bexar County

  • Monday, June 28 until Thursday, July 1. Daily 8 a.m. to 6 p.m. Single lane closure, in both directions, from Curran Rd. to Morin Rd. for roadway improvements. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closures from Hausman Rd. to Babcock Rd., including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for mainlane striping and barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the Babcock intersection and the exit ramp before Hausman Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closures from Babcock Rd. to I-10, including the exit ramp to La Cantera Parkway, for barrier setting. DETOURS: Traffic will be directed to use the exit before Babcock Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from I-10 to Babcock Rd., including the exit ramp to La Cantera Parkway and the entrance ramp from I-10, for barrier setting. DETOUR: Traffic will be directed to the exit ramp before La Cantera Parkway.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from Babcock Rd. to Hausman Rd., including the entrance ramp from Babcock Rd. and exit ramp to Kyle Seale Parkway, for barrier setting. DETOUR: Traffic will be directed to the entrance ramp after Hausman Rd. and the exit ramp before Babcock Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from Hausman Rd. to SH 16 (Bandera Rd.), including the entrance ramp from Hausman Rd. and the exit ramp to SH 16 (Bandera Rd.), for barrier setting. DETOUR: Traffic will be diverted to the entrance ramp after Bandera Rd. and the exit ramp before Kyle Seale Parkway.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from W. Hausman Rd. to SH 16 (Bandera Rd.) including the entrance ramp from W. Hausman Rd. and the exit ramp to SH 16 (Bandera Rd.) for barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the SH 16 (Bandera Rd.) intersection and the exit before Kyle Seale Pkwy.
  •  Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from Babcock Rd. to W. Hausman Rd. including the entrance ramp from Babcock Rd. and the exit ramp to Kyle Seale Pkwy. for restriping and barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the W. Hausman Rd. intersection and the exit before Babcock Rd.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from I-10 to La Cantera/Chase Hill Blvd. including the exit ramp to La Cantera/Chase Hill Blvd. and the entrance ramp from I-10 for barrier setting. DETOURS: Traffic will be directed to the exit ramp before La Cantera/Chase Hill Blvd. at 1604 frontage road exit, and the for the I-10 entrance ramp closure will continue straight through La Cantera/Chase Hill Blvd. to next on ramp.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from W. Hausman Rd. to Babcock Rd. including the entrance ramp from Kyle Seale Pkwy. and the exit ramp to Babcock Rd. for barrier setting. DETOURS: Traffic will be directed to the entrance ramp after the Babcock Rd. intersection and the exit ramp before W. Hausman Rd.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from Babcock Rd. to I-10 including the exit ramp to La Cantera/Chase Hill Blvd. for barrier setting. DETOURS: Traffic will be directed to the exit ramp before Babcock Rd. 

US 281 – North Central San Antonio/Bexar County

  • Current until Monday, June 28. Nightly 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. at US 281 intersection for roadway improvements.
  • Friday, June 25 until Saturday, June 26. 9 p.m. to 6 p.m. Single lane closure, in both directions, at Borgfeld Rd. for barrier movement.
  • Monday, June 28 until Friday, July 2. Continuous 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, June 28 until Friday, July 2. Continuous 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Monday, June 28 until Friday, July 2. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, June 28 until Friday, July 2. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Sunday, July 11. 7 a.m. to 4 p.m. Full closure of mainlanes, in both directions, at St. Mary’s St. for transferring of utility lines. Traffic will be stopped multiple times for 15 minute intervals. 

I-10 – Northwest San Antonio/Bexar County/Kendall County 

  • Sunday, June 27 until Friday, July 2. Nightly 9 p.m. to 5 a.m. Double westbound mainlane closure from UTSA Blvd. to Loop 1604 for mill and overlay work.
  • Thursday, July 1. 9 a.m. to 4 p.m. Single eastbound mainlane closure from US 87 to Scenic Loop Rd. for barrier setting. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Sunday, June 27 until Friday, July 2. Nightly 9 p.m. to 5 a.m. Full closure of eastbound mainlanes at Loop 1604 for bridge work. DETOUR: All eastbound traffic will exit I-10 at Loop 1604 and re-enter at the next entrance ramp.
  • Monday, June 28 until Tuesday, June 29. Daily 9 a.m. to 3 p.m. Double lane closure on westbound frontage road from Foster Rd. to Ackerman Rd. for barrier removal.
  • Tuesday, July 29 until Friday, July 2. Nightly 9 p.m. to 5 a.m. Single westbound mainlane closure and single westbound frontage road lane closure from FM 1516 to Woodlake Parkway for barrier removal. DETOUR: Westbound traffic to FM 1516 will exit at Woodlake Parkway and re-enter at next entrance ramp.
  • Thursday, July 1 until Friday, July 2. Alternating lane closures on frontage roads, in both directions, at the Ackerman Rd. intersection for traffic signal installation.
  • Current until Monday, July 5. Eastbound entrance ramp from FM 1518 closed for roadway improvements.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Current until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for curb demolition.
  • Monday, June 28 until Saturday, July 3. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, June 28 until Saturday, July 3. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, June 28 until Friday, July 2. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 1103 to Schwab Rd. for milling and overlay work.

I-410 – West San Antonio

  • Current until Monday, June 28. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, June 28. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, June 28. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, June 28. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, June 28 until Saturday, July 3. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Single northbound mainlane closure from W. Military Dr. to Culebra Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.

I-410 – South West San Antonio

  • Current until Saturday, June 26. 8:00 a.m. to 4:00 p.m. Single northbound lane closure from Flair Dr. to Aldrich Dr. for sidewalk improvements. 

SH 151 – West San Antonio

  • Current until Monday, June 28. Nightly. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Monday, June 21 until Monday, June 28. Nightly 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for beam setting.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.

Alamo Ranch Parkway – Bexar County

  • Friday, June 25 – 10 p.m. to Monday, June 28 – 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.
  • Friday, July 9 – 10 p.m. to Monday, July 12 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.
  • Friday, July 16 – 10 p.m. to Monday, July 19 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.

FM 1535 – N.W. Military Highway

  • Monday, June 28 until Friday, July 2. Daily 9 a.m. to 5 p.m. Single northbound lane closure from End Gate Lane to Loop 1604 for right of way preparation. 

Fredericksburg Road – Bexar County

  • Current until Saturday, June 26. 8 a.m. to 4 p.m. Single eastbound lane closure from Cliff Oaks to Callaghan Rd. for driveway and sidewalk improvements. 

SL 13 – Military Dr.

  • Current until Saturday, June 26. 8 a.m. to 4 p.m. Single eastbound lane closure from Quintana Rd. to Somerset Rd. for driveway and sidewalk improvements. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until Tuesday, July 29. 7 p.m. to 7 a.m. Alternating lane closures, in both directions, from Walzem Rd. to Loop 1604 for paving operations.
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

SH 46 – Kendall County

  • Monday, June 28. 9 a.m. to 3 p.m. Southbound right lane closed at eastbound I-10 frontage for detour placement. 

I-10 – Kerr County

  • Tuesday, June 29 until Wednesday, June 30. 9 a.m. to 5 p.m. Single lane closure on eastbound frontage road at FM 783 for bridge repair.


Friday, June 18

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North East San Antonio/Bexar County

  • Monday, June 21 until Tuesday, June 22. 9 p.m. to 5 a.m. Single southbound mainlane closure from I-35 to Shin Oak Dr. for traffic switch. The following ramps will also be closed: Southbound exit ramp from I-35 southbound; southbound exit ramp to Pat Booker Rd., and; southbound exit ramp before Pat Book Rd.
  • Tuesday, June 22 until Friday, June 25. Nightly 9 p.m. to 5 a.m. Full closure of the Pat Booker Rd. intersection at Loop 1604 for bridge work. 

FM 1560 – Hausman Road

  • Monday, June 21 until Friday, June 25. 7:30 a.m. to 5:00 p.m. Single lane closures from SH 16 to Loop 1604 for paving operations. 

Loop 1604 – South San Antonio/Bexar County

  • Tuesday, June 22. 9 a.m. to 5 p.m. Northbound and southbound exit ramps to Loop 1604 closed for sign work. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closures from Hausman Rd. to Babcock Rd., including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for mainlane striping and barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the Babcock intersection and the exit ramp before Hausman Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closures from Babcock Rd. to I-10, including the exit ramp to La Cantera Parkway, for barrier setting. DETOURS: Traffic will be directed to use the exit before Babcock Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from I-10 to Babcock Rd., including the exit ramp to La Cantera Parkway and the entrance ramp from I-10, for barrier setting. DETOUR: Traffic will be directed to the exit ramp before La Cantera Parkway.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from Babcock Rd. to Hausman Rd., including the entrance ramp from Babcock Rd. and exit ramp to Kyle Seale Parkway, for barrier setting. DETOUR: Traffic will be directed to the entrance ramp after Hausman Rd. and the exit ramp before Babcock Rd.
  • Sunday, June 20 until Friday, July 2. Weeknights 9 p.m. to 5 a.m. Alternating westbound mainlane closures from Hausman Rd. to SH 16 (Bandera Rd.), including the entrance ramp from Hausman Rd. and the exit ramp to SH 16 (Bandera Rd.), for barrier setting. DETOUR: Traffic will be diverted to the entrance ramp after Bandera Rd. and the exit ramp before Kyle Seale Parkway.
  • Monday, June 21 until Friday, June 25. Nightly 9 p.m. to 5 a.m. Single northbound mainlane closure, including single lane closure on frontage road, at Braun Rd. for barrier setting. 

US 281 – North Central San Antonio/Bexar County

  • Friday, June 18 until Monday, June 28. Nightly 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. at US 281 intersection for roadway improvements.
  • Friday, June 18. 9 p.m. to 5 a.m. Alternating northbound lane closures from Bulverde Rd. to Cibolo Creek for pavement markings and traffic switch.
  • Saturday, June 19. 7 a.m. to 5 p.m. Single southbound lane closure at Overlook Parkway for sidewalk improvements. 

I-10 – Northwest San Antonio/Bexar County 

  • Sunday, June 27 until Friday, July 2. 9 p.m. to 5 a.m. Double westbound mainlane closure from UTSA Blvd. to Loop 1604 for mill and overlay work. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, June 21 until Tuesday, June 22. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from FM 1516 to Weichold Rd. for bridge work. DETOUR: Traffic will exit I-10 at Loop 1604 and re-enter at next entrance.
  • Monday, June 21 until Friday, June 25. Nightly 9 p.m. to 5 a.m. Eastbound left lane closure at Loop 1604 for overpass work.
  • Monday, June 21 until Monday, July 5. Eastbound entrance ramp from FM 1518 closed for roadway improvements.
  • Sunday, June 27 until Friday, July 2. Nightly 9 p.m. to 5 a.m. Full closure of eastbound mainlanes at Loop 1604 for overpass work. DETOUR: Traffic will exit I-10 at Loop 1604 and re-enter at next entrance.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, June 20 until Friday, June 25. Nightly 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 1103 to Schwab Rd. for milling and overlay work.
  • Sunday, June 20 until Friday, June 25. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to Schwab Rd. for milling and overlay work.
  • Monday, June 21 until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, June 21 until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, June 21 until Saturday, June 26. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for curb demolition.
  • Tuesday, June 22 until Wednesday, June 23. 9 p.m. to 5 a.m. Single northbound mainlane closure at AT&T Center Parkway. 

I-410 – East San Antonio

  • Monday, June 21 until Tuesday, June 22. 9 p.m. to 5 a.m. Single southbound mainlane closure from I-10 to Houston St. 

I-410 – West San Antonio

  • Current until Monday, June 21. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Marbach Rd. to W. Military Dr. for bridge work.
  • Current until Monday, June 21. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
  • Current until Monday, June 21. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Monday, June 21. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, June 21 until Monday, June 28. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, June 21 until Monday, June 28. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, June 21 until Monday, June 28. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, June 21 until Monday, June 28. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 
  • Monday, June 21 until Friday, June 25. Nightly 8 p.m. to 5 a.m. Northbound exit ramp to Culebra Rd. closed for demolition work. 

I-410 – South West San Antonio

  • Current until Saturday, June 26. 8:00 a.m. to 4:00 p.m. Single northbound lane closure from Flair Dr. to Aldrich Dr. for sidewalk improvements. 

SH 151 – West San Antonio

  • Current until Monday, June 21. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, June 21. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, June 21. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, June 21 until Monday, June 28. Nightly. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Monday, June 21 until Monday, June 28. Nightly 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for beam setting. 

US 90 – West San Antonio

  • Wednesday, June 23 until Thursday, June 24. 9 p.m. to 5 a.m. Single eastbound mainlane closure at W. Military Dr. 

Alamo Ranch Parkway – Bexar County

  • Friday, June 25 – 10 p.m. to Monday, June 28 – 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.
  • Friday, July 9 – 10 p.m. to Monday, July 12 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.
  • Friday, July 16 – 10 p.m. to Monday, July 19 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge beams.

FM 1535 – N.W. Military Highway

  • Monday, June 21 until Friday, June 25. Daily 9 a.m. to 5 p.m. Single northbound lane closure from End Gate Lane to Loop 1604 for right of way preparation.   

Fredericksburg Road – Bexar County

  • Current until Saturday, June 26. 8 a.m. to 4 p.m. Single eastbound lane closure from Cliff Oaks to Callaghan Rd. for driveway and sidewalk improvements.

SL 13 – Military Dr.

  • Current until Saturday, June 26. 8 a.m. to 4 p.m. Single eastbound lane closure from Quintana Rd. to Somerset Rd. for driveway and sidewalk improvements. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

I-10 – Kerr County

  • Tuesday, June 22. 9 a.m. to 5 p.m. Single westbound mainlane closure at FM 783 for bridge repairs.