Pages

Friday, January 28

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North West San Antonio/Bexar County

  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the westbound frontage road from Old Fredericksburg Rd. to Agave Pass for utility work.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 30 until Saturday, February 2. Weeknights 9 p.m. until 5 a.m. Westbound frontage road right outside lane closure from IH-10 to Agave Pass for high mast illumination.
  • Sunday, January 30 until Wednesday, February 2. Weeknights 9 p.m. until 5 a.m. Westbound frontage road full closure from the Babcock Road entrance ramp to the Kyle Seale Parkway/Hausman Road exit ramp for high mast illumination.
  • Monday, January 31 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road outside lane closure from Hausman Road to John Peace Boulevard /La Cantera Parkway for sidewalk construction.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Current until Friday, February 4. 9 a.m. to 4 p.m. Single right lane closure on the westbound frontage road at Vance Jackson Ave. for utility work.
  • Tuesday, February 1 until Wednesday, February 2. 9 a.m. to 4 p.m. Single right lane closure on the eastbound frontage road at Vance Jackson Rd. for utility work.
  • Sunday, January 30 until Friday, February 4. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, January 30 until Friday, February 4. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term westbound mainlane closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Eastbound mainlane full closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 11 p.m. until 5 a.m. Periodic short term southbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 30 until Friday, February 4. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for barrier setting and striping.
  • Sunday, January 30 until Friday, February 4. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for barrier setting and striping. 

Loop 1604 – West San Antonio/Bexar County

  • Sunday, January 30. 5 a.m. to 2 p.m. Full closure of the mainlanes, in both directions, at Green Rd. for utility wire transfer. 

US 281 – North San Antonio/Bexar County

  • Saturday, January 29 until Sunday, January 30. Continuous 9 a.m. until 9 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, January 29 until Sunday, January 30. Continuous 9 a.m. until 9 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, January 30 until Thursday, February 3. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, January 30 until Thursday, February 3. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, January 30 until Friday, February 4. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, January 30 until Friday, February 4. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Saturday, February 5 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, February 5 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 signage installation and lane striping.
  • Sunday, February 6 until Thursday, February 10. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, February 6 until Thursday, February 10. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Tuesday, February 1 until Wednesday, February 2. 9 p.m. to 5 a.m. Full closure of lanes, in both directions, at Overlook Parkway for traffic signal work.  

I-10 – North West San Antonio/Bexar County 

  • Current until Friday, February 11. Surface ramp from westbound frontage road to eastbound Loop 1604 will be closed for utility work.
  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the eastbound frontage road at UTSA Blvd. for utility work.
  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the westbound frontage road at De Zavala Rd. for utility work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, January 28 through Friday, February 4. DAYTIME continuous alternating westbound I-10 single lane closures between Ackerman Road and I-410 from 8 a.m. to 5 a.m. each day for pavement repair.
  • Monday, January 31 until Tuesday, February 1. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures from Pfeil Rd. to FM 2538, including exit ramps, for asphalt work.
  • Tuesday, February 1 until Wednesday, February 2. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures from Pfeil Rd. to FM 2538, including exit ramps, for asphalt work.
  • Wednesday, February 2 until Thursday, February 3. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures from Pfeil Rd. to FM 2538, including exit ramps, for asphalt work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, January 30 until Monday, January 31. 8 p.m. to 5 a.m. Double northbound mainlane closure from north of the Watson bridge to south of the Conrads bridge for installing barriers and striping for traffic switch on the Conrads bridge.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Northbound exit ramp (168) closure to Weidner Road and single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work. Traffic should use the O’Connor Road exit ramp. Follow the detour signs.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Single lane closure on the southbound mainlanes from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Southbound entrance ramp closure from O’Connor Road to North Weidner Road for geotechnical and drilling work. Traffic should use the Weidner Road entrance ramp. Follow the detour signs.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Alternating northbound exit ramps (170B and 171) closures and single lane closure on the frontage road from Judson Road to Shin Oak Drive for geotechnical and drilling work. Drivers may use the exit prior to the closed exit. Follow the detour signs.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Single lane and shoulder closure on the southbound mainlanes between Olympia Boulevard and Forum Parkway for geotechnical and drilling work.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Single lane closure on the northbound mainlanes from Thousand Oaks Drive and O’Connor Road for geotechnical and drilling work.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Single lane closure on the southbound mainlanes from Thousand Oaks Drive and O’Connor Road for geotechnical and drilling work. 
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.  
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between North Weidner Road and O’Connor Road for geotechnical and drilling work. 
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work. 
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from O’Connor Road to North Weidner Road for geotechnical and drilling work.
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from North Weidner Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, January 31 until Friday, February 4. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, January 31 until Saturday, February 5. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for sidewalk, headwall and rail work. 

I-410 – North East San Antonio

  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Eastbound turnaround closure to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Westbound turnaround closure to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Various eastbound frontage road closures (including entrance ramp to I-410) from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work. Traffic should detour south on Austin Highway. Follow the detour signs to be routed to the alternate entrance ramp.
  • Sunday, January 30 until Friday, February 4. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road between I-35 Frontage Road Loop and NE Interstate 410 Loop for geotechnical and drilling work. 

I-410 – East San Antonio

  • Friday, January 28 through Saturday, February 5. DAYTIME continuous alternating southbound I-410 lane closures between Houston Street and Peggy Road from 9 a.m. to 5 p.m. each day for pavement repair. 
  • Saturday, January 29, from 8 a.m. to 3 p.m. Northbound I-410 exit to eastbound I-10 closed for overpass work. Click here for detour map. 

I-410 – West San Antonio

  • Current until Sunday, February 6. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Monday, January 31 until Monday, February 7. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the southbound exit ramp to Ingram Rd. for traffic switch.
  • Monday, January 31 until Monday, February 7. 9 a.m. to 5 p.m. Full closure of the southbound bypass ramp to W. Military Dr. for concrete work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Double lane closure on the northbound mainlanes from Ingram Rd. to Culebra Rd. for column work.
  • Monday, January 31 until Monday, February 7. 9 p.m. to 5 a.m. Southbound exit ramp to Marbach Rd. closed for painting operations.
  • Monday, January 31 until Monday, February 7. 9 a.m. to 3 p.m. Single southbound mainlane closure from W. Military Dr. to SH 151 for concrete work.
  • Monday, January 31 until Monday, February 7. Full closure of the turnarounds, in both directions, at Ingram Rd. for traffic switch.
  • Monday, January 31 until Monday, February 7. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from Meadow Breeze Dr. to SH 151 bridge work. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Loop 410 for bridge work.
  • Monday, January 31 until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

PA 1502 – Wurzbach Parkway

  • Tuesday, February 1 until Tuesday, February 8. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for striping operations. 

I-10 – Kendall County

  • Wednesday, February 2. 9 a.m. to 3 p.m. Westbound exit ramp 542 closed for sign work.
  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.

Friday, January 21

UPCOMING SCHEUDLED CONSTRUCTION CLOSURES

 

Loop 1604 – North East San Antonio/Bexar County

  • Monday, January 24 until Friday, January 28. 9 a.m. to 3 p.m. Northbound to southbound frontage road turnaround closed at Pat Booker Rd. for bridge work. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 23 until Monday, January 24. 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to La Cantera Parkway/John Peace Boulevard for dynamic message sign (DMS) removal. Eastbound mainlane traffic will exit at Hausman Road and continue on the frontage road until La Cantera Parkway/John Peace Boulevard.
  • Sunday, January 23 until Monday, January 24. 9 p.m. until 5 a.m. Eastbound entrance ramp from Bandera Road (SH 16) full closure for dynamic message sign (DMS) removal.
  • Sunday, January 23 until Monday, January 24. 9 p.m. until 5 a.m. Eastbound entrance ramp from Kyle Seale Parkway full closure for dynamic message sign (DMS) removal.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, January 23 until Friday, January 28. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, January 23 until Friday, January 28. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 11 p.m. until 5 a.m. Periodic short term southbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 23 until Friday, January 28. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for barrier setting and striping.
  • Sunday, January 23 until Friday, January 28. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for barrier setting and striping. 

US 281 – North San Antonio/Bexar County

  • Saturday, January 20 until Monday, January 24. Continuous 9 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, January 20 until Monday, January 24. Continuous 9 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, January 23 until Thursday, January 27. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, January 23 until Thursday, January 27. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, January 23 until Friday, January 28. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, January 23 until Friday, January 28. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Saturday, January 29 until Thursday, February 3. Continuous 9 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, January 29 until Thursday, February 3. Continuous 9 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 signage installation and lane striping.
  • Sunday, January 30 until Thursday, February 3. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, January 30 until Thursday, February 3. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping. 

I-37 – Central San Antonio

  • Current until Friday, January 28. 7 a.m. to 7 pm. Northbound exit ramp to Cesar Chavez Blvd. closed including the turnaround, for mill and inlay operations.
  • Current until Friday, January 28. 7 a.m. to 7 p.m. Northbound entrance ramp Commerce St. closed for mill and inlay operations.
  • Current until Friday, January 28. 7 a.m. to 7 p.m. Commerce St. southbound to northbound turnaround closed for mill and inlay operations.
  • Current until Friday, January 28. 7 a.m. to 7 p.m. Exit and entrance ramps to Florida/Carolina St. closed in both directions for mill and inlay operations. 

I-10 – North West San Antonio/Bexar County 

  • Sunday, January 23 until Monday, January 24. 5 p.m. to 5:30 a.m. Alternating lane closures, in both directions, from Pfeil Rd. to FM 2538 for barrier movement.
  • Current until Friday, February 11. Surface ramp from westbound frontage road to eastbound Loop 1604 will be closed for utility work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, January 23 until Friday, January 28. 9 a.m. to 4 p.m. Single northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work. 
  • Sunday, January 23 until Friday, January 28. 9 p.m. to 5 a.m. Northbound exit ramp closure (170B) and single frontage road lane closure from Judson Road to Toepperwein Road for geotechnical and drilling work. Traffic should use the Judson Road exit ramp (170A). 
  • Sunday, January 23 until Friday, January 28. 9 p.m. to 5 a.m. Northbound exit ramp closure (171) and single lane closure on the I-35 northbound frontage road from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work. Traffic should use the Toepperwein Road exit ramp (170B).  
  • Sunday, January 23 until Friday, January 28. 9 p.m. to 5 a.m. Single southbound lane closure between Olympia Parkway and Forum Parkway for geotechnical and drilling work. 
  • Monday, January 24 until Friday, January 28. 9 a.m. to 4 p.m. Single northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.  
  • Monday, January 24 until Friday, January 28. 9 a.m. to 4 p.m. Single northbound frontage road from North Weidner Road and O’Connor Road for geotechnical and drilling work. 
  • Monday, January 24 until Saturday, January 29. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for sidewalk, headwall and rail work.
  • Monday, January 24 until Wednesday, January 27. 8 p.m. to 5 a.m. Alternating southbound frontage road closure from FM 306 to west of Town Center Drive for mounted illuminated pavement marker installation.
  • Tuesday, January 25 until Thursday, January 28. 9 p.m. to 5 a.m. Southbound entrance ramp at Post Road for joint work on concrete rail. 

I-410 – North East San Antonio

  • Monday, January 24 until Friday, January 28. 9 a.m. to 4 p.m. Various median closures westbound between I-410 and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Single eastbound lane closure from Fratt Road to Interchange Parkway for geotechnical and drilling work. 
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Turnaround closure from the eastbound frontage road to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Turnaround closure from the westbound frontage road to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Shoulder closure at ramp connecting northbound Austin Highway to I-410 eastbound from Cross Creek Drive to Fratt Road for geotechnical and drilling work. 
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work. 
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Single westbound lane closure from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work.  
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Median closure along I-410 westbound frontage road from the I-410 Loop Interchange off ramp to Perrin Beitel Road for geotechnical and drilling work.  Traffic should use the Starcrest U-Turn to I-410 eastbound.
  • Monday, January 24 until Friday, January 28. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road for geotechnical and drilling work.   

I-410 – East San Antonio

  • Saturday, January 22, from 9 a.m. to 5 p.m. Alternating southbound I-410 single lane closures between FM 78 and Houston Street for pavement repair. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

PA 1502 – Wurzbach Parkway

  • Monday, January 24 until Tuesday, January 25. 9 p.m. to 5 a.m. Single westbound lane closure at the Lockhill Selma Rd. intersection for utility work. 

FM 1535 – N.W. Military Highway

  • Monday, January 24 until Friday, January 28. 9 a.m. to 4 p.m. Single northbound lane closure at the intersection of Wurzbach Parkway for equipment and material haul-off. 

Lockhill Selma Road – Bexar County

  • Monday, January 24 until Wednesday, January 26. 9 p.m. to 5 a.m. Single northbound lane closure at the Wurzbach Parkway intersection for utility work. 

SL 13 – S.W. Military Dr.

  • Monday, January 24 until Friday, January 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Altura Dr. to Pleasanton Rd. for driveway and sidewalk improvements. 

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.
  • Monday, January 24. 9 a.m. to 3 p.m. Westbound exit ramp 542 closed for sign installation.
  • Monday, January 24 until Friday, February 4. 9 a.m. to 4:30 p.m. Exit ramps closed in both directions from Balcones Creek to Scenic Loop Rd. for final pavement markings. 

FM 306 – Comal County

  • Monday, January 24 until Wednesday, January 26. 9 p.m. to 5 a.m. South to northbound turnaround closure for excavating and installing crash cushion pad.