Pages

Friday, April 28

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from IH-10 to La Cantera Parkway for bridge construction – westbound direct connector beam placement. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, May 1 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, April 30 until Monday, May 8. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Sunday, April 30 until Monday, May 8. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Sunday, April 30 until Monday, May 8. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, April 30 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, April 30 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, April 30 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, April 30 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Wednesday, May 3 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Blanco Road entrance ramp for setting panels at Panther Springs Creek.
  • Wednesday, May 3 until Friday, May 5. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from the Blanco Road exit ramp to the Blanco Road entrance ramp for setting panels at Panther Springs Creek.
  • Sunday, April 30 until Sunday, May 7. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround long term full closure at Loop 1604 and Lockhill Selma Road for drainage work. 

Loop 1604 – North East San Antonio/Bexar County

  • Current through Tuesday, May 2, long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Current through Monday, May 8, long-term closure (24/7). Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drilled shaft work. Traffic should use Lookout Road intersection.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should use next exit ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping. Traffic should use next exit ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. 

Loop 1604 – Far East Bexar County

  • Current until Saturday, May 13. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from FM 78 to Hanover Cove for installation of cable barrier system. 

I-10 – North West San Antonio/Bexar County

  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane full closure at the Loop 1604 interchange for overhead sign bridge structure removal. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlane exit ramp to eastbound Loop 1604 for barrier placement. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, April 30 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, May 1 until Friday, May 5. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, May 1 until Friday, May 5. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Wednesday, May 3 until Friday, May 5. 9 p.m. to 5 a.m. Alternating northbound mainlane closures at Hildebrand Ave. for barrier work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Current until Sunday, May 18 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Current until Monday, December 14 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Sunday, April 30 until Friday, May 5. 9:00 p.m. to 6:00 a.m. Right lane closure on northbound frontage road of I-35 from Judson Road to Gunn Road for pothole work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, northbound to southbound turnaround closure, exit ramp closure, traffic shift to the left on Evans Road, and entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Schertz Parkway to Corporate Drive for survey work. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for temporary pavement, striping, and barrier work. Traffic should follow detour.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and exit ramp closure of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work. Traffic should use prior exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for tree removal. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 at O’Connor Road for tree removal. Traffic should use next exit.
  • Sunday, April 30, until Friday, May 5, 9:00 PM to 06:00 AM. Right lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for pothole work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Judson Road for temporary pavement works. Traffic should use the next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for geotechnical investigation work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 at Judson Road for tree removal.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlane of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for earthwork and barrier work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for permanent widening, striping, and barrier work. Traffic should follow detour signs.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for permanent widening work.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes and alternating exit ramp closures of I-35 from Walzem Road to Crestway Drive for drilled shaft work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes and alternating exit ramp closures of I-35 from Walzem Road to Crestway Drive for drilled shaft work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlane and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical and drilled shaft work. Traffic to use next exit ramp.
  • Monday, May 1 until Saturday, May 6. 9 p.m. to 5 a.m. Two northbound and southbound I-35 mainlane closure from Conrads Bridge to Watson Bridge for striping and joint seal repair work.
  • Tuesday, May 2 until Friday, May 5. 9:00 p.m. to 5:00 a.m. Multiple right mainlane closures (2) and exit ramp closure on northbound mainlanes of I-35 to Olympia Parkway for pothole work. Traffic should use next exit. 

I-10 – East San Antonio/Bexar County

  • Sunday, April 30 until Monday, May 1. 9 p.m. to 5 a.m. Full westbound mainlane closure from Zuehl Rd. to FM 2538 for repairs.
  • Sunday, April 30 until Monday, May 1. 9 p.m. to 5 a.m. Full westbound frontage road closure from FM 1518 to Pfeil Rd. for repairs.
  • Monday, May 1 until Saturday, May 6. 8 p.m. to 6 a.m. Single westbound mainlane closure from Zuehl Rd. to Cibolo Creek for paving operations.
  • Friday, May 5 8 p.m. until Monday, May 8 5 a.m. Full closure of the mainlanes, in both directions, from FM 465 to Cibolo Creek for traffic switch.
  • Continuing through Monday, May 15. DAYTIME westbound I-10 frontage road alternating lane closures at Ackerman from 9 a.m. to 4 p.m. for overpass work.
  • Continuing through Wednesday, May 26. CONTINUOUS I-10 westbound frontage road left lane closure from Graytown Road to Loop 1604 continuous until 3 p.m. Wednesday, May 26. 

I-410 – North East San Antonio

  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drilled shaft work. Traffic to use next exit.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit. 

I-410 – East San Antonio

  • Friday, April 28, 8 p.m. to 5 a.m. and Sunday, April 30 through Saturday, May 6, 8 p.m. to 5 a.m. NIGHTLY alternating northbound and southbound I-410 mainlane closures each night from FM 78 (Old Seguin Rd.) to E. Houston Street Detour: Use next on-ramp
  • Continuing through Monday, May 15. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and Rigsby Ave. from 9 a.m. to 4 p.m. daily for bridge and roadway. (No closures on Sundays)
  • Continuing through Monday, May 15. DAYTIME. Full closure of Uecker Road at I-410 southbound frontage road from 9 a.m. to 4 p.m. daily for utility work. (No closures on Sundays) 

SH 16 – Bandera Road

  • Monday, May 1 until Friday, May 5. 9 a.m. to 3 p.m. Alternating lane closures at FM 1560 for utility work.
  • Monday, May 1 until Friday, May 5. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A. for concrete work. 

FM 1535 – N.W. Military Highway

  • Monday May 1 until Friday, May 5. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work. 

US 90 – West San Antonio/Bexar County/Medina County

  • Sunday, April 30 until Friday, May 19. 8:30 p.m. to 5 a.m. Alternating eastbound mainlane closures from Loop 410 to I-35 for overhead signal work.
  • Monday, May 1 until Friday, May 26. 8:30 p.m. to 5 a.m. Alternating closures of the entrance and exit ramps from Nogalitos St. to 36th St. for repairs. 

I-10 – Kendall County

  • Wednesday, May 3. 8:30 a.m. to 3:30 p.m. Single westbound mainlane closure at Rust Rd. for field testing.

SH 181 – Wilson County

  • Monday, May 1 until Saturday, May 6. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from Bexar County Line to Standish St. for installation of cable barrier system.
  • Monday, May 8 until Saturday, May 13. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from Bexar County Line to Standish St. for installation of cable barrier system.

Friday, April 21

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from IH-10 to La Cantera Parkway for bridge construction – westbound direct connector beam placement. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, April 24 until Monday, May 8. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, April 23 until Monday, May 8. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Sunday, April 23 until Monday, May 8. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, April 23 until Friday, April 28. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, April 23 until Friday, April 28. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, April 23 until Friday, April 28. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, April 23 until Friday, April 28. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Tuesday, April 25 until Thursday, April 27. Nightly. 9 p.m. until 5 a.m. Eastbound mainlane full closure from Lockhill Selma Road exit ramp until Lockhill Selma Road entrance ramp to set deck panels at Lockhill Selma Road.
  • Tuesday, April 25 until Thursday, April 27. Nightly. 9 p.m. until 5 a.m. Nightly. Westbound mainlane full closure from Lockhill Selma Road exit ramp until Lockhill Selma Road entrance ramp to set deck panels at Lockhill Selma Road.
  • Tuesday, April 25 until Thursday, April 27. Nightly. 9 p.m. until 5 a.m. Lockhill Selma Road full closure at the Loop 1604 intersection, including turnarounds to set deck panels at Lockhill Selma Road.
  • Sunday, April 23 until Sunday, April 30. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround long term full closure at Loop 1604 and Lockhill Selma Road for drainage work.
  • Friday, April 28 at 9 p.m. until Sunday, April 30 at 5 a.m. Eastbound mainlane full closure from NW Military Highway exit ramp to Blanco Road entrance ramp for bridge deck pour at Salado Creek.
  • Friday, April 28 at 9 p.m. until Sunday, April 30 at 5 a.m. Westbound mainlane full closure from Blanco Road exit ramp to NW Military Highway entrance ramp for bridge deck pour at Salado Creek.

Loop 1604 – North East San Antonio/Bexar County

  • Current through Tuesday, May 2, long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Current through Monday, May 8, long-term closure (24/7). Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 for barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds for striping and barrier. Traffic must exit Loop 1604 exit ramp to Lookout Rd and follow detour signs.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping. Traffic should use next exit ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Union Pacific Railroad to Nacogdoches Road for striping work. 

Loop 1604 – Far East Bexar County

  • Monday, April 24 until Saturday, May 13. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from FM 78 to Hanover Cove for installation of cable barrier system. 

I-10 – North West San Antonio/Bexar County

  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane full closure at the Loop 1604 interchange for overhead sign bridge structure removal. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlane exit ramp to eastbound Loop 1604 for barrier placement. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, April 23 until Friday, May 5. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, April 24 until Friday, May 5. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, April 24 until Friday, May 5. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Monday, April 24 until Friday, April 28. 7 a.m. to 1 p.m. Alternating lane closures on the northbound frontage road at Borgfeld Rd. for asphalt work.
  • Monday, April 24 until Friday, April 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Overlook Parkway for asphalt work.
  • Saturday, April 22. 7 a.m. to 1 p.m. Single northbound lane closure at Borgfeld Rd. for guardrail work.
  • Monday, April 24 until Friday, April 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Mountain Lodge for asphalt work.
  • Monday, April 24 until Friday, April 28. 7 a.m. to 5 p.m. Alternating lane closures, in both directions, from Borgfeld Rd. for asphalt work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Current until Sunday, May 18 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Current until Monday, December 14 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlanes, entrance ramp closure and left lane closure on northbound frontage road of I-35 from FM 1518 to Schertz Parkway for survey work. Traffic should use next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Schertz Parkway to Corporate Drive for survey work. Traffic should use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and exit ramp closure of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work. Traffic should use prior exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Judson Road for temporary pavement works. Traffic should use the next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound on Toepperwein Road at I-35 for barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlane of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for earthwork and barrier work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for permanent widening work.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes and alternating exit ramp closures of I-35 from Walzem Road to Crestway Drive for drill shaft work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow the detour signs to the available ramps.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlane and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical and drill shaft work. Traffic to use next exit ramp.
  • Sunday, April 30 until Saturday, May 6. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for permanent widening, striping, and barrier work. Traffic should follow detour signs. 

I-10 – East San Antonio/Bexar County

  • Friday, April 21 until Sunday, April 23. 8 p.m. to 6 a.m. Single westbound mainlane closure from Zuehl Rd. to Cibolo Creek for paving operations.
  • Sunday, April 23 until Monday, April 24. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from FM 1518 to Pfeil Rd. for repairs.
  • Sunday, April 23 until Monday, April 24. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Zuehl Rd. to FM 2538 for repairs.
  • Monday, April 24 until Tuesday, April 25. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Zuehl Rd. to Cibolo Creek for barrier installation.
  • Monday, April 24 until Friday, April 28. 8 p.m. to 6 p.m. Single westbound mainlane closure from Zuehl Rd. to Cibolo Creek for paving operations.
  • Continuing through Monday, May 1. DAYTIME westbound I-10 frontage road alternating lane closures at Ackerman from 9 a.m. to 4 p.m. for overpass work.
  • Continuing through Monday, May 1. NIGHTTIME westbound I-10 frontage road closure between Ackerman and Cornerway Blvd. from 9 p.m. to 5 a.m. for overpass work. I-10 on-ramp will also be closed. Detour: Westbound frontage road traffic to westbound I-10 will turn around at Ackerman, take the eastbound frontage road, turn around at Foster, and take the ramp to westbound I-10. (No closures Friday or Saturday nights).
  • Continuing through Wednesday, May 26. CONTINUOUS I-10 westbound frontage road left lane closure from Graytown Road to Loop 1604 continuous until 3 p.m. Wednesday May, 26. 

I-410 – North East San Antonio

  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drill shaft work. Traffic to use next exit.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, April 23 until Saturday, April 29. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use next entrance and prior exit. 

I-410 – East San Antonio

  • Saturday, April 15 through Monday, May 15. WEEKEND WORK. All southbound I-410 lanes from FM 78 (Old Seguin Rd.) to I-10 from 5 a.m. each Saturday to 5 a.m. each Monday to hang beams. Detour: Continuing southbound I-410 traffic will exit to westbound I-10, turnaround at W.W. White, and continue on the frontage road to the southbound I-410 entrance ramp at E. Houston St. Southbound traffic wanting to access eastbound I-10 will exit to westbound I-10, turnaround at W.W. White, and use the next entrance ramp to eastbound I-10.
  • Thursday, April 27. NIGHTTIME. Alternating northbound and southbound I-410 mainlane closures from FM 78 (Old Seguin Rd.) to I-10. Thursday night (4/27) 8 p.m. to 5 a.m. Friday night (4/28) 8 p.m. to 8 a.m. Detour: Use next on-ramp
  • Continuing through Monday, May 1. Periodic NIGHTTIME alternating northbound and southbound I-410 mainlane closures at I-10 interchange from 9 p.m. to 5 a.m. to build bridge. Detour: NB & SB I-410 traffic can take exit towards I-10 collector ramp and continue straight to reenter I-410. (No closures on Friday and Saturday nights).
  • Continuing through Monday, May 1. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and Rigsby Ave. from 9 a.m. to 4 p.m. for bridge and roadway. (No closures on Sundays) 

SH 16 – Bandera Road

  • Monday, April 24 until Friday, April 28. 9 a.m. to 3 p.m. Single lane closures, in both directions, at FM 1560 for utility work.
  • Monday, April 24 until Friday, April 28. 9 a.m.t o 3 p.m. Single lane closures, in both directions, from Loop 1604 to Circle A for utility work. 

FM 1535 – N.W. Military Highway

  • Sunday, April 23 until Friday, April 28. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for base repairs. 

US 90 – West San Antonio/Bexar County/Medina County

  • Current until Friday, April 28. 8:30 p.m. to 5 a.m. Alternating ramp closures, in both directions, from 36th ST. to Nogalitos Ave. for road repairs.
  • Monday, April 24 until Friday, April 28. 9 a.m. to 3 p.m. Single eastbound mainlane closure from FM 471 to Mechler Lane for cable barrier installation. 

I-10 – Kendall County

  • Wednesday, May 3. 8:30 a.m. to 3:30 p.m. Single westbound mainlane closure at Rust Rd. for field testing.
  • Tuesday, April 25. 9 a.m. to 3 p.m. Single eastbound mainlane closure at SH 46 for illumination work. 

SH 181 – Wilson County

  • Monday, April 24 until Saturday, April 29. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from Bexar County Line to Standish ST. for installation of cable barrier system.
  • Monday, May 1 until Saturday, May 6. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from Bexar County Line to Standish St. for installation of cable barrier system.
  • Monday, May 8 until Saturday, May 13. 8 a.m. to 4 p.m. Alternating lane closures, in both directions, from Bexar County Line to Standish St. for installation of cable barrier system.