Friday, July 8

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Tuesday, July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday, July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, July 8 at 10:00 p.m. until Saturday, July 9 at 12:00 p.m. Nightly. Eastbound mainlane closure from Babcock Road and La Cantera Parkway for bridge construction (at Chase Hill Boulevard).
  • Friday, July 8 at 10:00 p.m. until Saturday, July 9 at 12:00 p.m. Nightly. Full intersection closure at Loop 1604 and Chase Hill Boulevard/Brennen Avenue in both directions, including turnarounds for bridge construction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, July 10 until Friday, July 15. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, July 10 until Friday, July 15. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, July 10 until Friday, July 15. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, July 10 until Friday, July 15. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, July 11 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island demo and temporary traffic signal work.
  • Monday, July 11 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island demo and temporary traffic signal work.
  • Monday, July 11 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Highway for concrete island demo and temporary traffic signal work.
  • Monday, July 11 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for concrete island demo and traffic signal work.
  • Saturday, July 9 from 5 a.m. to 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for traffic signal work. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Eastbound-to-westbound turnaround closure at Lookout Road for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure of eastbound-to-westbound turnaround from Nacogdoches Road to Union Pacific Rail Road for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left lane closure of westbound-to-eastbound turnaround from Lookout Road to Union Pacific Rail Road for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Various lane closures of westbound frontage road from Lookout Road to Nacogdoches Road for geotechnical and drilling work.

US 281 – North San Antonio/Bexar County

  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, July 10 until Monday, July 11. 9 p.m. to 5 a.m. Alternating southbound mainlanes and ramps from FM 306 to Guadalupe River for paving work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left lane closure on the northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Northbound Olympia Parkway exit ramp (exit 173) closure and left lane closure on northbound frontage road from Forum Access to Olympia Parkway follow the detour signs.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Northbound FM 1518 exit ramp (exit 174A) closure and left lane closure on northbound frontage road of I-35 from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detour.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right northbound mainlane closure from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right northbound exit lane closure, Pat Booker Road exit ramp closure and left lane closure on northbound frontage road from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. Traffic must follow the detour signs.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Monday, July 11 until Thursday, July 14. 9:00 p.m. to 5:00 a.m. Right southbound lane closure and left lane closure on southbound frontage road between Judson Road and O’Conner Road for barrier work.
  • Monday, July 11 until Friday, July 12. 9 p.m. to 5 a.m. Alternating northbound mainlanes and ramps from Guadalupe River to FM 306 for paving work.
  • Tuesday, July 12 until Thursday, July 14. 9:00 p.m. to 5:00 a.m. Right southbound lane closure and left lane closure on southbound frontage road between Pat Booker Road and Ferrell Road for installation of barrier.
  • Wednesday, July 13 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Right southbound lane closure and closure of southbound entrance ramp and from Pat Booker Road to Ferrell Road for barrier work. All traffic must continue on southbound I-35 frontage road to access southbound I-35.
  • Wednesday, July 13 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound and eastbound Pat Booker Road from southbound I-35 frontage road to northbound I-35 frontage road for barrier work.
  • Wednesday, July 13 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Closure of Pat Booker Road exit ramp on southbound I-35 connector ramp from McMorris Boulevard to Pat Booker Road for barrier work. All traffic must continue southbound on I-35 and U-turn at Judson Road to access Pat Booker Road. 

I-10 – East San Antonio/Bexar County

  • Current until Friday, July 22. 6 a.m. to 4:30 p.m. Single lane closure on the westbound frontage road from Loop 1604 to FM 1516 for storm drain improvements.
  • Friday, July 8 – 8 p.m. until Saturday, July 9 – 12 p.m. Full closure of the westbound mainlanes at FM 1518 for bridge work.
  • Friday, July 8 – 8 p.m. until Saturday, July 9 – 7 p.m. Full closure of the eastbound mainlanes from Graytown Rd. to FM 1518 to bridge work. 

I-410 – East San Antonio

  • Continuing through Monday, July 18. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Monday, June 18. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, July 18. DAYTIME northbound I-410 frontage road left lane closure between East Houston Street and I-10 as well as I-10 eastbound frontage road between I-410 and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – West San Antonio

  • Current until Friday, July 15. 8 p.m. to 5 a.m. Single northbound mainlane closure from Culebra Rd. to W. Military Dr. for rail work. Exit ramp to W. Military Dr. will remain closed throughout the duration of the work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the N.W. Military Highway intersection for curb work.
  • Current until Friday, July 29. 9 a.m. to 3 p.m. Various lane closures, in both directions, at Wurzbach Parkway intersection for pothole and ITS work. 

Lockhill Selma Rd. – Bexar County

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in all directions, at the Wurzbach Parkway intersection for island and corner work. 

FM 1535 – N.W. Military Highway

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the Wurzbach Parkway intersection for paving operations. 

US 90 – Bexar County

  • Monday, July 11 until Friday, July 15. 9 a.m. to 5 p.m. Alternating mainlane and ramp closures, in both directions, at Montgomery Rd. for guard rail and mowstrip installation. 

Other – Bexar County

  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks Drive intersection to access southbound I-35 frontage road.
  • Sunday, July 10 until Friday, July 15. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound Austin Highway (Loop 368) from I-35 (exit 26) to Walzem Road for geotechnical and drilling work. 

SH 123 – Guadalupe County

  • Monday, July 11 until Thursday, July 14. 7 a.m. to 5 p.m. Single lane closures, in both directions, from SH 46 to FM 477 for guard rail repairs. 

FM 2252 – Nacogdoches Road

  • Monday, July 11 until Friday, July 15. 8 a.m. to 6 p.m. Alternating lane closures, in both directions, at the Evans Rd. intersection for signal work. 

FM 306 – Comal County

  • Monday, July 11 until Tuesday, July 12. 7 a.m. to 5 p.m. Alternating lane closure from I-35 southbound frontage road to Town Center Drive for installing signs.
  • Monday, July 11 until Wednesday, July 13. 8 p.m. to 5 a.m. Left turn lanes and turnarounds at I-35 for painting and panel work. 

FM 725 – Comal County

  • Current until Thursday, September 1. Full closure of the northbound to southbound turnaround at I-35 for operational improvements 

Friday, July 1

TRAFFIC SWITCH COMING TO I-10 AND SH 46 IN KENDALL COUNTY THE WEEK OF JULY 5TH

 


WHAT’S HAPPENING: The last stage of construction for the new BUS 87 bridge will necessitate transitioning the I-10 mainlane traffic from their current location to the segment that is currently a work area closed to traffic.  The mainlane transition will place the eastbound mainlanes back in their natural configuration and the westbound mainlanes will be south of their existing orientation.  This phase will require the temporary closure of the westbound entrance ramp from Scenic Loop. 

The transition is to construct the second half of the Bus 87 bridge while maintaining a safe passage for motorists and all construction personnel.  The entrance ramp will also undergo construction to complete its final configuration that will include a longer merge lane for motorists entering I-10.

DETOUR: The westbound entrance ramp traffic will utilize the westbound frontage road, across the BUS-87 intersection (ALL-WAY STOP), then onto the next available entrance ramp near SH-46.  

WHEN: The mainlane traffic switch will begin Tuesday July 5, 2022, at 9:00 PM, weather permitting. Multiple nights may be required to complete the work between the hours of 9 PM – 5 AM.

 

ADDITIONAL INFORMATION:   http://txdotsanantonio.blogspot.com/

TxDOT San Antonio (@TxDOTSanAntonio) / Twitter

UPCOMING SCHEUDLED CONSTRUCTION CLOSURES

 

Loop 1604 – North West San Antonio/Bexar County

  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Tuesday July 5 until Friday, July 15. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Tuesday July 5 until Friday, July 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Wednesday, July 6 until Saturday, July 9. Nightly 9 p.m. until 5 a.m. Left eastbound Loop 1604 mainlanes from Theater Boulevard to Trailcrest Street for camera work.
  • Wednesday, July 6 until Saturday, July 9. Nightly 9 p.m. until 5 a.m. Right westbound Loop 1604 mainlanes from Trailcrest Street to Theater Boulevard for camera work.
  • Tuesday, July 5 until Friday, July 8. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Tuesday, July 5 until Friday, July 8. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Tuesday, July 5 until Friday, July 8. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Tuesday, July 5 until Friday, July 8. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island demo and temporary traffic signal work.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island demo and temporary traffic signal work.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Highway for concrete island demo and temporary traffic signal work.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for concrete island demo and traffic signal work.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. Right turn lane closure along eastbound frontage road to Lockhill Selma Road for traffic signal work. The eastbound right lane will be able to take right turn at the intersection.
  • Tuesday, July 5 until Friday, July 8. Weekdays 9 a.m. until 3 p.m. Right turn lane closure at northbound Lockhill Selma Road intersection to eastbound frontage road for traffic signal work. Northbound Lockhill Selma Road right lane will be able to take right turn at the intersection. 

Loop 1604 – North East San Antonio/Bexar County

  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Westbound connector ramp closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work. All traffic must continue on northbound I-35 frontage road and make a U-turn at Forum Parkway to continue on southbound I-35 frontage road to access westbound Loop 1604.

US 281 – North San Antonio/Bexar County

  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Closure of Olympia Parkway exit ramp and left lane closure of northbound frontage road of I-35 from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic must use the Loop 1604 exit ramp (exit 172) and follow the detour signs.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Left lane closure on the northbound frontage road from Olympia Parkway to Pasatiempo geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m.  Northbound FM 1518 exit ramp (exit 174A) and left lane closure on the frontage road from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detour.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Right northbound lane closure from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Right northbound mainlane closure at FM 1518 (exit 171) exit ramp closure and left lane closure on the frontage road from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. Traffic must use the I-35 exit ramp (170B) and follow the detour signs.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks intersection to access southbound I-35 frontage road.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Left northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Left lane closure on the northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Right lane closure on the northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. The southbound connector ramp closure to southbound 1604 from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic must continue on southbound I-35 frontage road and U-turn at I-35 Access Road to northbound I-35 frontage road to access southbound Loop 1604.
  • Tuesday July 5 until Sunday July 10. 9:00 p.m. to 5:00 a.m. Right southbound lane closure between Judson Road and O’Conner Road for survey work.
  • Tuesday July 5 until Sunday July 10. 9:00 p.m. to 5:00 a.m.  Various lane closures on southbound frontage road from Pat Booker Road to Ferrell Road for removal of existing traffic equipment and ground box removal work
  • Tuesday July 5 until Sunday July 10. 9:00 p.m. to 5:00 a.m. Right southbound lane closure and left lane closure on southbound frontage road between Judson Road and O’Conner Road for barrier work and removal of traffic equipment.
  • Thursday July 7 until Thursday July 14. 9:00 p.m. to 5:00 a.m. Right southbound mainlane and left frontage road lane closure between Pat Booker Road and Ferrell Road for installation of barrier. 

I-10 – East San Antonio/Bexar County

  • Current until Friday, July 22. 6 a.m. to 4:30 p.m. Single lane closure on the westbound frontage road from Loop 1604 to FM 1516 for storm drain improvements.
  • Tuesday, July 5 until Friday, July 8. 8 p.m. to 6 a.m. Single eastbound mainlane closure from FM 2538 to FM 465 for barrier placement.
  • Continuing through Monday, July 4. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Monday, June 4. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, July 4. DAYTIME northbound I-410 frontage road left lane closure between East Houston Street and I-10 as well as I-10 eastbound frontage road between I-410 and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – North East San Antonio

  • Tuesday, July 5 until Friday, July 15. 7 p.m. to 7 a.m. Alternating eastbound mainlane closures from San Pedro Ave. to Nacogdoches Rd. for pavement repairs.
  • Tuesday July 5. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road from Perrin Creek to Perrin Beitel Road for guardrail work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound Loop 410 connector ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Left mainlane closure on westbound Loop 1604 from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Tuesday July 5 until Friday July 8. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound Austin Highway (Loop 368) from westbound Loop 410 (exit 26A) to Walzem Road for geotechnical and drilling work. 

I-410 – West San Antonio

  • Current until Monday, July 4. 7 p.m. to 5 a.m. Alternating full northbound mainlane closures from US 90 to Ingram Rd. for mill and overlay work.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating full closure of the Culebra Rd. intersection for column work.
  • Current until Monday, July 4. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions at Culebra Rd. for concrete work.
  • Current until Monday, July 4. 9 a.m. to 5 p.m. Full closure of the southbound to northbound turnaround at Culebra Rd. for draining work.
  • Current until Monday, July 4. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads in both directions from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Wednesday, July 6 until Friday, July 15. 8 p.m. to 5 a.m. Single northbound mainlane closure from Culebra Rd. to W. Military Dr. for rail work. Exit ramp to W. Military Dr. will remain closed throughout the duration of the work. 

SH 151 – West San Antonio

  • Current until Monday, July 4. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier removal. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the N.W. Military Highway intersection for curb work.
  • Tuesday, July 5 until Friday, July 29. 9 a.m. to 3 p.m. Various lane closures, in both directions, at Wurzbach Parkway intersection for pothole and ITS work. 

Lockhill Selma Rd. – Bexar County

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in all directions, at the Wurzbach Parkway intersection for island and corner work. 

FM 1535 – N.W. Military Highway

  • Current until Friday, July 15. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the Wurzbach Parkway intersection for paving operations. 

US 90 – Bexar County

  • Tuesday, July 5 until Friday, July 8. 9 a.m. to 5 p.m. Single mainlane closures, in both directions, at Montgomery Rd. for metal beam guard fence installation. 

SH 123 – Guadalupe County

  • Tuesday, July 5 until Friday, July 8. 7 a.m. to 5 p.m. Single lane closures, in both directions, from SH 46 to FM 477 for barrier placement. 

I-10 – Kendall County

  • Tuesday, July 5 until Friday, July 8. 9 p.m. to 5:30 a.m. Various mainlane closures, in both directions, from SH 46 to Scenic Loop Rd. for traffic shift. 

FM 725 – Comal County

  • Tuesday, July 5 until Thursday, September 1. Full closure of the northbound to southbound turnaround at I-35 for operational improvements