Pages

Friday, March 20

Next week's construction-related closures



I-10
  • Sunday-Friday, March 22-27. 8:30 p.m. until 5:30 a.m. nightly. Main lanes, both directions, between Huebner Road and UTSA Boulevard (northwest San Antonio). Alternating lanes will close for road work.
  • Sunday-Friday, March 22-27. 8:30 p.m. until 5:30 a.m. nightly. Frontage road, both directions between Loop 1604 and Huebner Road (northwest San Antonio). Alternating lanes will close for road work.
  • Monday-Friday, March 23-27. 9 a.m. until 4 p.m. daily. Frontage road, both directions, between Loop 1604 and Huebner Road (northwest San Antonio). Alternating lanes will close for road work.
  • Friday-Monday, March 27-30. 8:30 p.m. until 5:30 a.m. continuous. Eastbound main lanes between Loop 1604 and Huebner Road (northwest San Antonio). Alternating lanes will close, two lanes at a time, while crews restripe the road and shift traffic to its final configuration.
  • Friday-Monday, March 27-30. 8:30 p.m. until 5:30 a.m. continuous. Eastbound frontage road between Loop 1604 and Huebner Road (northwest San Antonio). Alternating lanes will close while crews do road work.
I-35
  • Monday-Friday, March 23-27. 9 a.m. until 4 p.m. daily. Northbound frontage road between Splashtown and Binz-Engleman (east San Antonio). The left lane will close while crews set up temporary light poles.
  • Monday-Friday, March 23-27. 9 a.m. until 3 p.m. daily. Southbound frontage road between Binz-Engleman and Seguin roads (east San Antonio). Alternating lanes will close while crews set up temporary light poles.
  • Sunday-Friday, March 22-27. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Rittiman and George Beach (northeast San Antonio). Alternating lanes will close while crews move barrier.
  • Sunday-Friday, March 22-27. 9 p.m. until 5 a.m. nighty. Southbound frontage road between Rittiman Road and George Beach (northeast San Antonio). Alternating lanes will close while crews repair the roadway.
  • Sunday-Friday, March 22-27. 9 a.m. until 3:30 p.m. daily. Southbound frontage road between Rittiman Road and George Beach (northeast San Antonio). Alternating lanes will close while crews repair the roadway.
  • Sunday-Friday, March 22-27. 9 a.m. until 3:30 p.m. daily. Southbound frontage road at Fratt Road (northeast San Antonio). The left lane will close while crews do concrete work.
  • Sunday-Friday, March 22-27. 9 a.m. until 3:30 p.m. daily. Northbound exit ramp to westbound I-410 (Windcrest). The right lanes will close while crews place guardrail and do concrete work.
  • Sunday-Friday, March 22-27. 9 p.m. until 5 a.m. nightly. Northbound main lanes between George Beach and Rittiman Road (northeast San Antonio). Alternating lanes will close while crews do roadwork.
  • Tuesday-Friday, March 24-27. 8 p.m. until 5:30 p.m. nightly. Northbound main lanes between FM 306 and Conrads-Kohlenberg Road (north New Braunfels). The two right lanes will close while crews move barrier and lay asphalt to open the new entrance ramp from FM 306.
  • Tuesday-Friday, March 24-27. 8 p.m. until 5:30 p.m. nightly. Southbound main lanes between Conrads-Kohlenberg Road and FM 306 (north New Braunfels). The right lane will close while crews place barrier.
I-410
  • Sunday-Friday, March 22-27. 9 p.m. until 5 a.m. daily. Eastbound exit ramp to northbound I-35 (Windcrest). The right lane will close while crews repair crash cushions.
  • Sunday-Friday, March 22-27. 9 p.m. until 5 a.m. nightly. Northbound connector to northbound I-35 (northeast San Antonio). All lanes will close while crews move barrier. Traffic will exit Space Center and move through the Rittiman Road intersection, then enter the northbound I-35 main lanes.
  • Sunday-Friday, March 22-27. 9 a.m. until 3:30 p.m. daily. Northbound frontage road between Binz-Engleman and Rittiman Road (northeast San Antonio). The left lane will close to provide access for trucking and to move barrier.
U.S. Hwy 281
  • Wednesday-Friday, March 25-27. 8 p.m. until 5 a.m. nightly. Southbound main lanes between I-410 and Hildebrand (north-central San Antonio). Three right lanes will close while crews repair the roadway.
  • Friday-Sunday, March 27-29. 8 p.m. until 10 a.m. nightly. Northbound main lanes between Hildebrand and I-410 (north-central San Antonio). Alternating lanes, three at a time, will close while crews repair the roadway.
  • Sunday-Monday, March 29-30. 8 p.m. until 5 a.m. Northbound main lanes between Hildebrand and I-410 (north-central San Antonio). Alternating lanes, three at a time, will close while crews repair the roadway.
Other roads
  • Monday-Monday, March 9-30. 8 a.m-5 p.m. continuous. Alameda Street, both directions, at Loop 1604 (northwest San Antonio). All lanes will close for three weeks while crews build the roadway. Traffic will reach Alameda Street off of Braun Road.
  • Monday, March 23. 9 a.m. until 3 p.m. Highway 46, both directions, at Business 87 (Boerne). Alternating lanes will close while crews reset barrier. Traffic will be intermittently halted for this work.
  • Monday-Friday, March 23-27. 9 a.m. until 3 p.m. daily. Northbound U.S. Highway 181 between Loop 1604 and Flying R Ranch Road (southeast Bexar County). The left lane will close while crews repair cable median barrier.
  • Monday-Friday, March 23-27. 9 a.m. until 3 p.m. daily. Southbound U.S. Highway 181 between South Presa and Max Road (southeast Bexar County). The left lane will close while crews repair cable median barrier.
  • Monday-Monday, March 23-30. 7 p.m. until 5 a.m. nightly. Medical Drive, both directions, between Ewing Halsell and Fairhaven (Medical Center). Alternating lanes will close for road work.
  • Monday-Monday, March 23-30. 7 p.m. until 5 a.m. nightly. Fredericksburg Road, both directions, between Louis Pasteur and Data Point (Medical Center). Alternating lanes will close for road work.
All closures are pending weather.