Pages

Friday, September 30

Next week's construction-related closures

I-10 – East San Antonio
  • Friday, September 30-Friday, October 7. 9 p.m. until 5 a.m. nightly. Westbound frontage roads between Gevers and South Hackberry. Alternating lanes will close while crews repair the pavement base. This closure includes the exit ramps to Pine Street and to Gevers Street. Traffic will follow the posted detour routes. 
I-35 – New Braunfels
  • Friday, October 7. 9 a.m. until 3 p.m. Northbound main lanes at York Creek. Alternating lanes will close while crews do concrete work. 
I-35 – Northeast San Antonio
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Southbound entrance ramp from Walzem Road. The ramp will close while crews work on overhead highway signs. Traffic will use the next available ramp. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Northbound exit to westbound I-410. Alternating lanes will close while crews do overhead bridge work. Traffic will exit Walzem and continue along the frontage road to reach I-410. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews widen the road. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between AT&T Center Parkway and Binz-Engleman. Alternating lanes will close while crews do finish work. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between Rittiman and Walzem. Alternating lanes will close while crews do road work. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between AT&T Center Parkway and Binz-Engleman. The left lane will close while crews do finish work. 
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Southbound exit ramp to southbound I-410. The ramp will close while crews do road work. Traffic will exit George beach, turn around and approach southbound I-410 from the northbound frontage road of I-35. 
  • Monday-Friday, October 3-7. 9 a.m. until 3:30 p.m. daily. Frontage roads, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews do road work. 
  • Monday-Friday, October 3-7. 9 a.m. until 3 p.m. daily. Frontage roads, both directions, between AT&T Center Parkway and Binz-Engleman. The left lane will close while crews do finish work. 
  • Monday-Friday, October 3-7. 9 a.m. until 3 p.m. daily. Turnarounds, both directions, at Salado Creek. The turnarounds will close while crews do finish work. Traffic will turn around at the next available intersection. 
I-35 – East San Antonio
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between I-410 and Broadway. Alternating lanes will close while crews resurface the road. 
  • Monday-Friday, October 3-7. 9 a.m. until 3 p.m. daily. Southbound main lanes between George Beach and Binz-Engleman. The left lane will close while crews work on guardrail.
I-35 – Downtown San Antonio
  • Sunday-Monday, October 2-3. 9 p.m. until 5 a.m. Northbound main lanes, upper level, between Brooklyn Avenue and the I-37/US 281 interchange. Alternating lanes will close while crews do repair work. This closure includes the entrance ramp from Brooklyn, the exit to I-37/US 281 and the exit to Broadway. Traffic will follow the posted detours. 
  • Sunday-Thursday, October 2-6. 8 p.m. until 5 a.m. nightly. Northbound main lanes between Broadway and I-410. Alternating lanes will close while crews resurface the road.
I-410 – Northeast San Antonio
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Eastbound exit ramp to Randolph Boulevard and the city of Windcrest. The ramp will close while crews do bridge work. Traffic will exit Thousand Oaks, turn around and return to Randolph Boulevard to reach its destination. 
I-410 – Northwest San Antonio
  • Saturday, October 1. 6 a.m. until 9 a.m. Southbound main lanes between Military Drive and Marbach Road. The two left lanes will close while crews move large construction equipment. 
US Hwy 281 – Central San Antonio
  • Sunday-Friday, October 2-7. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, between Airport and Josephine. The right two lanes will close while crews do bridge work. Ramps will close as needed. 
  • Monday-Friday, October 3-7. 11 a.m. until 4 p.m. daily. Northbound main lanes between I-35 and Mulberry. The right lane will close while crews do concrete work. Ramps will close as needed. 
Loop 1604 – North San Antonio
  • Tuesday, October 4. 9 a.m. until 3 p.m. Eastbound main lanes between Stone Oak Parkway and Blanco Road. The left lane will close while crews do dirt work. 
Loop 1604 – West San Antonio
  • Monday-Friday, October 3-7. 8 a.m. until 4 p.m. daily. Southbound main lanes between Emory Peak and Marbach Road. Alternating lanes will close while crews do road work. 
Loop 1604 – Northwest San Antonio
  • Current through Wednesday, October 19. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, at Hwy 151. Alternating lanes will close while crews do overhead bridge work. Traffic will use the frontage roads to reach its destination. 
  • Current through Wednesday, October 19. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Alamo Ranch Parkway. Alternating lanes will close as needed while crews do overhead bridge work. 
  • Saturday, October 1. 9 a.m. until 3 p.m. Southbound exit ramp to Culebra Road. The ramp will close while crews do dirt work. 
  • Saturday, October 1. 9 a.m. until 3 p.m. Northbound main lanes at Shaenfield Road. The left lane will close while crews repair a culvert. 
  • Saturday, October 1. 9 a.m. until 4 p.m. Southbound frontage road at Braun Road. The right lane will close while crews adjust water valves. 
  • Saturday, October 1. 9 a.m. until 4 p.m. Southbound frontage road at Tausch Farms. The right lane will close while crews adjust water valves. 
Hwy 151 – Northwest San Antonio
  • Friday-Saturday, September 30-October 1. 9 p.m. until 9 a.m. Westbound frontage road between I-410 and Potranco Road. All lanes will close while crews pour concrete overhead. Traffic will use West Military Road to reach its destination. 
  • Current through Friday, October 21. 9 p.m. until 5 a.m. nightly, weeknights only. Westbound frontage road between I-410 and Potranco Road. All lanes will close while crews pour concrete overhead. Traffic will use West Military Road to reach its destination. 
  • Current until December 2016. Westbound exit ramp to Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed. 
Other roads – Seguin
  • Current until Saturday, December 31. 9 a.m. until 4 p.m. daily. King Street, both directions, between Cedar Street and US 90. All lanes will close while crews install storm drains and rebuild the road. Traffic will use Hwy 123 as a detour. 
Other roads – Northeast San Antonio
  • Sunday-Friday, October 2-7. 9 p.m. until 5 a.m. nightly. Randolph Boulevard, both directions, between Crestway and I-35. Traffic will be reduced to a single lane, controlled by off-duty police, while crews do overhead bridge deck work. 
Other roads – South San Antonio
  • Sunday, October 18-Sunday, October 25. 9 a.m. until 5 p.m. daily. Northbound Palo Alto Road (state Highway 16) between South Zarzamora and I-410. The right lane will close while crews resurface the road. 
Other roads – Southeast San Antonio
  • Sunday, October 2. 9 a.m. until 5 p.m. Loop 13 (Southeast Military Road) between South Presa and Padre Drive. All lanes will close while UPRR crews replank the railroad crossing. Traffic will use South Presa, VFW Boulevard and Roosevelt Ave as a detour. 
All closures are pending weather.