Pages

Monday, September 12

This week's construction-related closures

Sorry we didn't get this posted before the weekend - we know many of you look to this to help guide your commutes for weekends and through your workweek. No real excuses; we had our hands full preparing for our morning event breaking ground on the Loop 1604 project (more on that in a later post).
Without further ado, here's what the week will hold:

I-10 – Fair Oaks Ranch
  • Monday-Wednesday, September 12-14. 9 p.m. until 5 a.m. nightly. Westbound main lanes between Ralph Fair Road and Fair Oaks Parkway. Alternating lanes will close while crews move barrier. 
  • Tuesday-Wednesday, September 13-14. Eastbound main lanes between Fair Oaks Parkway and Ralph Fair Road. Alternating lanes will close while crews stripe the road. 
I-10 – Downtown San Antonio
  • Wednesday-Thursday, September 14-15. 9 p.m. until 5 a.m. Main lanes, both directions, lower level, at the Frio Street exit. The left lane will close while crews do survey work. 
I-35 – New Braunfels
  • Thursday-Friday, September 15-16. 9 a.m. until 3 p.m. daily. Northbound main lanes between FM 306 and Conrads-Kohlenberg. Alternating lanes will close while crews do bridge work. 
I-35 – East San Antonio
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Northbound exit to westbound I-410. Alternating lanes will close while crews do overhead bridge work. Traffic will exit Walzem and continue along the frontage road to reach I-410. 
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews widen the road. 
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between AT&T Center Parkway and Binz-Engleman. Alternating lanes will close while crews do finish work. 
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between AT&T Center Parkway and Binz-Engleman. The left lane will close while crews do finish work. 
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between Rittiman and Walzem. Alternating lanes will close while crews do road work. 
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Southbound exit ramp to southbound I-410. The ramp will close while crews do road work. Traffic will exit George beach, turn around and approach southbound I-410 from the northbound frontage road of I-35. 
  • Monday-Thursday, September 12-15. 9 p.m. until 5 a.m. nightly. Southbound main lanes between I-410 and Broadway. The two right lanes will close while crews resurface the road. 
  • Monday-Friday, September 12-16. 9 a.m. until 3:30 p.m. daily. Frontage roads, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews do road work. 
  • Monday-Friday, September 12-16. 9 a.m. until 3 p.m. daily. Frontage roads, both directions, between AT&T Center Parkway and Binz-Engleman. The left lane will close while crews do finish work. 
I-35 – Downtown San Antonio
  • Monday-Thursday, September 12-15. 9 p.m. until 5 a.m. nightly. Northbound main lanes at US 281. The right lane will close while crews work on the guardrail. 
I-410 – Northeast San Antonio
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Eastbound exit ramp to Randolph Boulevard and the city of Windcrest. The ramp will close while crews do bridge work. Traffic will exit Thousand Oaks, turn around and return to Randolph Boulevard to reach its destination. 
I-410 – Northwest San Antonio
  • Monday-Friday, September 12-16. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Ingram and Culebra roads. The two right lanes will close while crews work on bridge support structures. 
US Hwy 90 – West San Antonio
  • Wednesday-Thursday, September 14-15. 8:30 p.m. until 5:30 a.m. Eastbound main lanes between Loop 1604 and I-410. The left lane will close while crews work on guardrail. 
  • Thursday-Friday, September 15-16. 8:30 p.m. until 5:30 a.m. Westbound main lanes between Loop 1604 and I-410. Alternating lanes will close while crews work on guardrail. 
US Hwy 281 – Central San Antonio
  • Sunday-Friday, September 11-16. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, between Airport and Josephine. The right two lanes will close while crews do bridge work. Ramps will close as needed. 
  • Sunday-Friday, September 11-16. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, between I-35 and I-410. The right two lanes will close while crews work on guardrail. Ramps will close as needed. 
  • Monday-Friday, September 12-16. 11 a.m. until 4 p.m. daily. Northbound main lanes between I-35 and Mulberry. The right lane will close while crews do concrete work. Ramps will close as needed. 
Loop 1604 – Northwest San Antonio
  • Tuesday-Thursday, September 13-15. 9 a.m. until 5 p.m. daily. Southbound frontage road at Alamo Ranch Parkway. The left lane will close while crews do concrete work. 
  • Wednesday-Thursday, September 14-15. 9 a.m. until 4 p.m. daily. Southbound exit ramp to Alamo Ranch Parkway. The ramp will close while crews do concrete work. Traffic will exit Culebra to reach Alamo Ranch. 
  • Saturday-Sunday, September 17-19. 7 a.m. until 7 p.m. continuous. Southbound frontage road at Alamo Ranch Parkway. All lanes will close while crews set bridge support beams overhead. Traffic will turn right onto Alamo Ranch Parkway, turn around at Westwood Loop, and re-enter the southbound frontage road from Alamo Ranch Parkway. Off-duty police will help facilitate the flow of traffic during this closure. 
Hwy 151 – West San Antonio
  • Current until Friday, September 16. 9 p.m. until 5 a.m. nightly. Eastbound frontage road between I-410 and Potranco Road. The left two lanes will close while crews do bridge work and set bridge deck panels. 
  • Current until Friday, September 23. 9 p.m. until 5 a.m. nightly. Westbound frontage road between I-410 and Potranco Road. All lanes will close while crews do overhead bridge work. Traffic will use Military Drive or Richland Hills to reach Potranco Road and local businesses. 
  • Current until December 2016. Westbound exit ramp to Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed. 
Other roads – Boerne
  • Current until Friday, September 16. 9 p.m. until 5:30 a.m. nightly. River Road, both directions, between Main Street and Esser Road. Alternating lanes will close while crews resurface the road. 
Other roads – Seguin
  • Wednesday, Sept. 14. 9 a.m. until 4 p.m. Austin Street, both directions, between the UPRR crossing and Seidemann Street. Traffic will be limited to one-lane, two-way while crews do road work. Flaggers will facilitate safe traffic flow while this closure is in place. 
Other roads – Northeast San Antonio
  • Sunday-Friday, September 11-16. 9 p.m. until 5 a.m. nightly. Randolph Boulevard, both directions, between Crestway and I-35. Traffic will be reduced to a single lane, controlled by off-duty police, while crews do overhead bridge deck work. 
Other roads – North San Antonio
  • Current until Tuesday, September 20. 9 p.m. until 5 a.m. nightly (weeknights only). Wurzbach Parkway, both directions, between Blanco Road and Northwest Military. The two left lanes will close while crews work on the concrete median barrier. 
All closures are pending weather.