Pages

Friday, October 28

Next week's construction-related closures

I-10 – East San Antonio
  • Monday, October 31-Friday, November 18. 7 p.m. until 7 a.m. nightly. Main lanes, both directions, between Foster Road and Martinez Creek. Alternating lanes will close while crews set barrier. 
I-10 – East San Antonio

  • Monday-Friday, October 31-November 4. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between I-35 and I-410. The right lane will close while crews work on guardrail.

    I-35 – New Braunfels
    • Sunday-Monday, October 30-31. 10 p.m. until 6 a.m. Southbound main lanes between the Comal-Hays county line and FM 306. Alternating lanes will close while crews lay asphalt. 
    • Monday-Friday, October 31-November 4. 9 p.m. until 6 a.m. nightly. Southbound main lanes between the Comal-Hays county line and FM 306. Alternating lanes will close while crews lay asphalt. 
    • Friday, November 4. 10 a.m. until 3 p.m. Southbound main lanes at York Creek. The left lane will close while crews pour concrete. 
    I-35 – Northeast San Antonio
    • Sunday-Friday, October 30-November 4. 9 p.m. until 5 a.m. nightly. Northbound exit to westbound I-410. Alternating lanes will close while crews do overhead bridge work. Traffic will exit Walzem and continue along the frontage road to reach I-410. 
    • Sunday-Friday, October 30-November 4. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews do road work. 
    • Sunday-Friday, October 30-November 4. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between Rittiman and Walzem. Alternating lanes will close while crews do road work. 
    • Monday-Friday, October 31-November 4. 9 a.m. until 3:30 p.m. daily. Frontage roads, both directions, between Rittiman and Walzem roads. Alternating lanes will close while crews do road work. 
    I-410 – Northeast San Antonio
    • Sunday-Friday, October 30-November 4. 9 p.m. until 5 a.m. nightly. Eastbound exit ramp to Randolph Boulevard and the city of Windcrest. The ramp will close while crews do bridge work. Traffic will exit Thousand Oaks, turn around and return to Randolph Boulevard to reach its destination. 
    I-410 – East San Antonio
    • Current through Friday, December 2. Southbound main lanes over North WW White. The right lane will close while crews repair damaged bridge rail. 
    I-410 – Northwest San Antonio
    • Friday-Saturday, October 28-29. 9 p.m. until 11 a.m. Southbound main lanes between Military Drive and Hwy 151. The left two lanes will close while crews work on bridge support columns. 
    • Sunday-Monday, October 30-31. 9 p.m. until 2 a.m. Northbound main lanes between Hwy 151 and Military Drive. Alternating lanes will close while crews move equipment. 
    US Hwy 281 – Central San Antonio
    • Sunday-Friday, October 30-November 4. 11 a.m. until 3 p.m. daily. Main lanes, both directions, between I-35 and I-410. Alternating lanes will close while crews work on guardrail. This closure includes ramps as needed. Traffic will follow the posted detour route. 
    • Sunday-Friday, October 30-November 4. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, between Airport and Josephine. Alternating lanes will close while crews do bridge work. This closure includes ramps as needed. Traffic will follow the posted detour route. 
    Loop 1604 – Northwest San Antonio
    • Friday-Saturday, October 28-30. 9 p.m. until 6 a.m. daily. Southbound frontage road at Alamo Ranch Parkway. All lanes will close while crews do overhead bridge work. Traffic will turn right onto Alamo Ranch Parkway, turn around and re-enter the frontage road to reach its destination. 
    • Friday-Monday, October 28-31. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Alamo Ranch Parkway. All lanes will close while crews do overhead bridge work. Traffic will turn right onto Alamo Ranch Parkway, turn around and re-enter the frontage road to reach its destination. 
    • Saturday-Sunday, October 29-30. 11:55 p.m. until 5 a.m. nightly. Southbound frontage road between Culebra Road and Alamo Ranch Parkway. All lanes will close while crews do overhead bridge work at Alamo Ranch Parkway. Traffic will use Westwood Loop to reach its destination. This closure includes the southbound exit to Alamo Ranch Parkway. Exiting traffic will use the Culebra Road exit. 
    • Monday, October 31. 9 a.m. until 4 p.m. Southbound exit ramp to Alamo Ranch Parkway. The ramp will close while crews work on guardrail. Traffic will exit Culebra Road and pass through the intersection to reach its destination. 
    • Tuesday, November 1. 9 a.m. until 4 p.m. Southbound main lanes at Culebra Road. The right lane will close while crews work on guardrail. 
    Hwy 151 – Northwest San Antonio
    • Friday-Thursday, October 28-November 3. 9 p.m. until 5 a.m. nightly. Frontage road, both directions, between Wiseman Boulevard and Culebra Road. Alternating lanes will close while crews resurface the road. 
    • Monday-Thursday, October 31-November 3. 9 a.m. until 4 p.m. daily. Westbound frontage road between Wiseman Boulevard and Loop 1604. The frontage road/ramp will close while crews do road work. Traffic will go east on Hwy 151 to Westover Hills and turn around to reach Loop 1604 and Culebra Road. This closure includes one lane of the Hwy 151 lanes as they reach the Loop 1604 connector. 
    • Current until Sunday, October 30. 9 p.m. until 5 a.m. nightly. Westbound main lanes between I-410 and Westover Hills Boulevard. The right lane will close while crews do survey work. This closure will include ramps. Traffic will follow the posted detour route. 
    • Current until December 2016. Westbound exit ramp to Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed. 
    Other roads – Seguin
    • Friday, October 28 at 8 p.m. until Sunday, October 30 at 6 p.m. Intersection of King and Cedar streets. The intersection will be closed to all through traffic while crews rebuild the intersection. Traffic will follow the posted detour route. 
    • Current until Saturday, December 31. 9 a.m. until 4 p.m. daily. King Street, both directions, between Cedar Street and US 90. All lanes will close while crews install storm drains and rebuild the road. Traffic will use Hwy 123 as a detour. 
    Other roads – Boerne
    • Sunday-Friday, October 30-November 4. 9 p.m. until 5 a.m. nightly. Scenic Loop Road, both directions, at I-10. Traffic will be reduced to one-way, controlled by off-duty officers while crews do roadwork. 
    Other roads – Southeast Bexar County
    • Sunday-Friday, October 30-November 4. 7 p.m. until 6 a.m. nightly. Northbound WW White between the intersection of WW White and SE Military and I-10. The right lane will close while crews resurface the road. 
    Other roads – Northwest San Antonio
    • Tuesday-Friday, November 1-4. 9 p.m. until 5 a.m. nightly. Military Drive, both directions, at I-410. All lanes will close while crews set bridge support beams overhead. Traffic will use the frontage roads and turnarounds to reach its destination. 
    All closures are pending weather.