Pages

Friday, December 15

Next week's construction-related closures

Note: the planned closure on I-10 at Fair Oaks Parkway for Dec. 15-16 has been postponed to January due to the poor weather forecast.

I-10 – Fair Oaks Ranch
  • Current until Friday, January 26. Westbound frontage road at Old Fredericksburg Road. All lanes will close while crews replace drain structures. Traffic will follow the signed detour route, including a temporary route under the new overpass at Old Fredericksburg, to reach its destination.
I-10 – Leon Springs
  • Sunday, December 17 at 9 p.m. until Monday, December 18 at 5 a.m. Main lanes, both directions, between Boerne Stage Road and La Cantera Parkway. Alternating lanes will close while crews mark the pavement for the workzone.
I-35 – Schertz
  • Current until October 2018. Frontage roads, both directions, at FM 1103. The right lane will close while crews replace the FM 1103 overpass bridge.
I-35 – East San Antonio
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Main lanes, both directions, between Thousand Oaks and George Beach. Alternating lanes will close, two at a time, while crews lay asphalt.
  • Saturday, December 16. 9 a.m. until 3 p.m. Southbound exit to eastbound I-410. The ramp will close while crews repair a crash cushion. Traffic will take the next exit and turn around to reach its destination.
I-37 – Downtown San Antonio
  • Current and continuous until March 2018 at 9 a.m. Northbound exit ramp to Florida and Carolina avenues (exit 140A). The ramp will close while crews rebuild the slope near the exit. Traffic will exit Cesar Chavez (exit 140B) and turn around to reach its destination.
I-410 – South San Antonio
  • Current until Friday, December 22. 9 a.m. until 4 p.m. daily. Main lanes, both directions, between Poteet Highway and Somerset Road. Alternating lanes will close while crews seal cracks in the road.
I-410 – West San Antonio
  • Current until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
  • Monday, December 18 at 8 p.m. until Tuesday, December 19 at 5 a.m. Northbound main lanes and frontage road between Marbach and Meadow Glade. The right lane of the main lanes, left lane of the frontage road will close while crews open a new temporary ramp.
U.S. Hwy 90 – West San Antonio
  • Sunday-Tuesday, December 17-19. 8 p.m. until 5 a.m. nightly. Westbound main lanes between I-410 and Hunt Lane. The right lane will close while crews set barrier.
  • Tuesday, December 19 at 8 p.m. until Wednesday, December 20 at 5 a.m. Westbound frontage road between I-410 and Hunt Lane. All lanes will close while crews drill bridge support structure foundations.
Hwy 151 – Northwest San Antonio
  • Current until Friday, December 22. 9 p.m. until 5 a.m. nightly. Westbound main lanes between I-410 and Hunt Lane. All lanes will close while crews build concrete bridge barriers and resurface the road to reopen the Hunt Lane exit ramp by Christmas.
  • Current until Friday, December 22. 9 a.m. until 3 p.m. daily. Westbound main lanes between I-410 and Hunt Lane. The right lane will close while crews remove concrete barrier and resurface the road to get the Hunt Lane exit ramp reopened by Christmas.
Loop 1604 – Northwest San Antonio
  • Current until Friday, January 26, 2018. North-to-south turnaround at Bandera Road. The turnaround will remain closed while crews do road work. Traffic will use the signalized intersection to turn around.
Other roads – Seguin
  • Monday, December 18 at 7 a.m. until Friday, December 22 at 7 p.m. North Austin Street, both directions, between Seideman and Railroad streets. All lanes will close while crews reconstruct the road. Through traffic will use Guadalupe Street to reach its destination.
Other roads – Helotes
  • Current until Sunday, December 31. Bandera Road, both directions, at FM 1560. All left- and right-turn lanes will close while crews do road work. Those turning onto FM 1560 or onto Circle A Trail will do so from the through lanes of traffic. Field staff will adjust signal timing as required.
Other roads – Southwest San Antonio
  • Current until Tuesday, December 19. 9 a.m. until 5 p.m. daily. Poteet-Jourdanton Freeway, both directions, between I-35 and I-410. The right lane will close while crews seal cracks in the road.
  • Current until Friday, December 22. 7 a.m. until 5 p.m. daily. Pearsall Road, both directions, between I-410 and Loop 13. Alternating lanes will close while crews seal cracks in the road.
  • Saturday, December 16 until Friday, December 22. 7 a.m. until 5 p.m. daily. West Military, both directions, between US Hwy 90 and I-35. Alternating lanes will close while crews seal cracks in the road.
All closures are pending weather.