Our apologies for not having this published the last couple of weeks. On the rainy side, we did have weather that pushed planned closures for the last two weekends....


I-10 – Fair Oaks Ranch
  • Current until Friday, March 23. Westbound frontage road at Old Fredericksburg Road. All lanes will close while crews replace drain structures. Traffic will follow the signed detour route, including a temporary route under the new overpass at Old Fredericksburg, to reach its destination.
I-10 – Leon Springs
  • Monday-Friday, February 26-March 2. 9 a.m. until 3 p.m. daily. Eastbound frontage road between Ralph Fair and Boerne Stage roads. The left lane will close while trucks enter and exit the road.
  • Tuesday-Thursday, February 27-March 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Dominion Drive and Ralph Fair Road. The right lane will close while crews remove bridge overhang and rail.
I-35 – Schertz
  • Current and continuous until October 2018. Frontage roads, both directions, at FM 1103. One lane will close while crews replace the FM 1103 overpass bridge.
I-37 – Downtown San Antonio
  • Current and continuous until March 2018 at 9 a.m. Northbound exit ramp to Florida and Carolina avenues (exit 140A). The ramp will close while crews rebuild the slope near the exit. Traffic will exit Cesar Chavez (exit 140B) and turn around to reach its destination.
I-410 – East San Antonio
  • Friday, March 2 at 9 p.m. until Monday, March 5 at 5 a.m. Southbound main lanes at Loop 13. All lanes will close while crews repair the pavement. Traffic will exit Loop 13 (WW White), turn left on Seale Road and turn left again onto the southbound frontage road of I-410.
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
I-410 – Northwest San Antonio
  • Current until Friday, March 2. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Hwy 151. All lanes will close while crews do overhead bridge work. Traffic will take the westbound frontage road of Hwy 151 to Ingram Road, turn around and use the eastbound frontage road to return to I-410 and reach its destination. This closure will not take place Friday or Saturday nights.
  • Current until Friday, March 2. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Hwy 151 and Military Drive. The two left lanes will close while crews work on the center median barrier.
  • Current until Friday, March 30. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Hwy 151. All lanes will close while crews do bridge work. Traffic will take the westbound frontage road of Hwy 151, turn around at Ingram Road and return to southbound I-410 via the eastbound frontage road of Hwy 151.
U.S. Hwy 90 – West San Antonio
  • Monday-Thursday, February 26-March 1. 9 p.m. until 5 a.m. nightly. Westbound main lanes at Loop 1604. All lanes will close while crews do overhead bridge work. Traffic will exit Loop 1604, pass through the intersection and re-enter the highway.
  • Monday-Friday, February 26-March 2. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between Rockgate and Colt. Alternating lanes will close while crews do concrete work and install light poles.
  • Monday-Friday, February 26-March 2. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between Leon Creek and Old US Hwy 90. Alternating lanes will close while crews do concrete work and install light poles.
  • Monday-Friday, February 26-March 2. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between Herbert and Leon Creek. The left lane will close while crews do concrete work and install light poles.
  • Monday-Friday, February 26-March 2. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between I-410 and Military Drive. The left lane will close while crews do concrete work.
  • Thursday-Sunday, March 1-4. 9 p.m. until 5 a.m. nightly. Eastbound main lanes at Loop 1604. All lanes will close while crews do overhead bridge work. Traffic will exit Loop 1604, pass through the intersection and re-enter the highway.
  • Friday, March 9 at 7 p.m. until Monday, March 12 at 5 a.m. Westbound frontage road at Loop 1604. All lanes will close while crews reconstruct the intersection. Traffic will turn right onto northbound Loop 1604, turn around at Marbach and return to US Hwy 90 to reach its destination.
U.S. Hwy 281 – North San Antonio
  • Monday-Friday, February 26-March 2. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Redland Road and Encino Rio. The right lane will close while crews restripe the road.
  • Monday-Friday, February 26-March 2. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Sonterra. The left lane will close while crews restripe the road and move barrier.
Highway 151
  • Current until Friday, March 2. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Military Drive and I-410. All lanes will close while crews install overhead highway signs. Traffic will exit the highway, continue along the frontage road and re-enter at the next available ramp.
Other roads – Helotes
  • Current until Tuesday, May 1 at noon. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination.
Other roads – Leon Springs
  • Tuesday-Thursday, February 27-March 1. 9 p.m. until 5 a.m. nightly. Boerne Stage Road, both directions, at I-10. All lanes will close while crews do overhead bridge work. Traffic will follow posted detour routes.
Other roads – Northwest San Antonio
  • Current until Friday, March 2. 9 a.m. until 3 p.m. daily. Southbound Northwest Military Highway between West Avenue and Ivywood Circle. The right lane will close while crews do concrete work.
All closures are pending weather.