Pages

Friday, March 23

Next week's construction-related closures

I-10 – Boerne
  • Sunday-Wednesday, March 25-28. 9 p.m. until 5 a.m. nightly. Eastbound main lanes at Scenic Loop. The left lane will close while crews set barrier.
I-10 – Fair Oaks Ranch
  • Current until Friday, April 27. Westbound frontage road at Old Fredericksburg Road. All lanes will close while crews replace drain structures. Traffic will follow the signed detour route, including a temporary route under the new overpass at Old Fredericksburg, to reach its destination.
I-10 – Leon Springs
  • Sunday-Tuesday, March 25-27. 9 p.m. until 5 a.m. nightly. Eastbound main lanes between Camp Bullis and La Cantera. The right lane will close while crews lay asphalt.
  • Friday, April 6 at 9 p.m. until Sunday, April 8 at 5 a.m. Main lanes, both directions, between Crista Bella and La Cantera Parkway. The left lane will close while crews move barrier.
  • Friday, April 13 at 9 p.m. until Sunday, April 15 at 5 a.m. Main lanes, both directions, between Boerne Stage Road and Camp Bullis. The left lane will close while crews move barrier.
I-35 – Austin area
  • Friday-Sunday, March 23-25. 11 p.m. until 10 a.m. nightly. Main lanes, both directions, at William Cannon Drive. All lanes will close while crews demolish portions of the bridge. Traffic will exit William Cannon Drive, continue along the frontage road and use the next available entrance ramp. This closure includes William Cannon Drive under I-35. Traffic on William Cannon Drive will turn right onto the frontage road and turn around to reach its destination.
  • Friday-Sunday, March 23-25. 10 p.m. until 8 a.m. nightly. Main lanes, both directions, at FM 3406. All lanes will close while crews set bridge support beams overhead. Traffic will exit the highway, follow the frontage road and re-enter the highway.
I-35 – New Braunfels
  • Sunday-Tuesday, March 25-27. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Schwab Road and FM 1337. The left lane will close while crews take samples of the roadway.
  • Monday, March 26 until Friday, April 6. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Schwab Road and FM 1337. The right lane will close while crews take samples of the roadway.
I-35 – Schertz
  • Current and continuous until October 2018. Frontage roads, both directions, at FM 1103. One lane will close while crews replace the FM 1103 overpass bridge.
  • Saturday, March 24 at 9 p.m. until Sunday, March 25 at 5 a.m. Northbound main lanes at FM 1103. All lanes will close while crews place bridge support beams overhead. Traffic will exit FM 1103, pass through the intersection and re-enter at the next available ramp.
  • Sunday, March 25 at 9 p.m. until Monday, March 26 at 5 a.m. Southbound main lanes at FM 1103. All lanes will close while crews place bridge support beams overhead. Traffic will exit FM 1103, pass through the intersection and re-enter at the next available ramp.
I-35 – Northeast San Antonio
  • Current until Monday, March 26. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between George Beach and Thousand Oaks. Alternating lanes will close as needed while crews do road work.
  • Current until Thursday, March 29. 7 a.m. until 5 p.m. daily. Turnarounds, both directions, at Rittiman Road. The turnarounds will close while crews do concrete work. Traffic will use the intersection to turn around and reach its destination.
I-35 – East San Antonio
  • Tuesday-Wednesday, March 27-28. 9 a.m. until 3 p.m. daily. Main lanes, both directions, between George Beach and Pine Street. The right lane will close while crews work on guardrail.
I-410 – Northeast San Antonio
  • Saturday, March 24. 7 a.m. until 9 p.m. Eastbound connector to northbound I-35. The right lane will close while crews lay asphalt.
I-410 – West San Antonio
  • Current until Friday, March 30. 8 p.m. until 5 a.m. nightly. Southbound frontage road at US Hwy 90. All lanes will close while crews do overhead bridge work. Traffic will go west on US Hwy 90, turn around at Hunt Lane and return to I-410 to reach its destination. This closure includes the right lane of the main lanes.
  • Current until Friday, March 30. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Valley Hi and Marbach. All lanes will close while crews do overhead bridge work. Traffic will exit US Hwy 90, continue along the frontage road and re-enter the road at the next available intersection.
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination.
  • Monday, March 26 until Friday, April 6. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between George Beach and Thousand Oaks. Alternating lanes will close while crews do road work.
I-410 – Northwest San Antonio
  • Current until Friday, March 30. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Hwy 151. All lanes will close while crews do bridge work. Traffic will take the westbound frontage road of Hwy 151, turn around at Ingram Road and return to southbound I-410 via the eastbound frontage road of Hwy 151.
  • Current until Friday, March 30. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Hwy 151 and Military Drive. All lanes will close while crews do bridge work. Traffic will exit Hwy 151, continue along the frontage road and re-enter the highway.
U.S. Hwy 281 – North San Antonio
  • Monday-Friday, March 26-30. 9 p.m. until 5 a.m. nightly. Southbound main lanes at Sonterra Boulevard. Alternating lanes will close while crews restripe the road. This closure includes the entrance ramp from Sonterra Boulevard. Traffic will use the entrance ramp from Donella Drive to reach its destination.
Loop 1604 – North San Antonio
  • Monday-Friday, March 26-30. 9 p.m. until 5 a.m. nightly. Westbound frontage road between Gold Canyon and US 281. Alternating lanes will close while crews restripe the road. This closure includes the ramp from westbound Loop 1604 to northbound US 281. Traffic will use the Gold Canyon-Redland Road exit to reach its destination.
Loop 1604 – West San Antonio
  • Friday, March 23 at 8 p.m. until Saturday, March 24 at 5 a.m. Northbound main lanes at US Hwy 90. The right lane will close while crews reset barrier.
  • Friday, March 23 at 8 p.m. until Saturday, March 24 at 5 a.m. Northbound main lanes at Marbach. The right lane will close while crews set barrier.
Other roads – Converse
  • Monday-Thursday, March 26-29. 9 a.m. until 4 p.m. daily. School Street, both directions, between FM 1516 and Station Street. All lanes will close while crews install a water line. Traffic will use Avenue G to reach its destination.
Other roads – Helotes
  • Current until Tuesday, May 1 at noon. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination.
Other roads – Boerne
  • Monday-Thursday, March 26-29. 9 p.m. until 5 a.m. nightly. Hwy 46, both directions, between Blanco and Anhall roads. Alternating lanes will close while crews set barrier. This closure means we will be using one-way traffic control using off-duty police.
Other roads – Leon Springs
  • Friday, April 13 at 9 p.m. until Sunday, April 15 at 5 a.m. Dominion Drive at I-10. All lanes will close while crews do overhead bridge work. Traffic will turn right onto the frontage road and turn around to reach its destination.
Other roads – Northwest San Antonio
  • Monday-Friday, March 26-30. 9 p.m. until 5 a.m. nightly. Bandera Road, both directions, between Loop 1604 and Stonecroft. Alternating lanes will close while crews move barrier and shift traffic lanes.
All closures are pending weather.