I-35 – Schertz
  • Monday, July 9 until Tuesday, July 10. 9 p.m. until 5 a.m. All northbound main lanes at FM 1103 will be closed to remove the bridge overhang brackets. They will also be performing pavement maintenance, replace missing reflective markers, and remove roadway debris along the barrier. DETOUR: Traffic will exit I-35 northbound main lane to the frontage road and enter I-35 northbound at the entrance just north of FM 1103. (Ramp is currently closed but will be open for closure to allow access to I-35 northbound). 
  • Tuesday, July 10 until Wednesday, July 11. 9 p.m. until 5 a.m. All southbound main lanes at FM 1103 will be closed to remove the bridge overhang brackets. They will also be performing pavement maintenance, replace missing reflective markers, and remove roadway debris along the barrier. DETOUR: Traffic will exit southbound at FM 1103 and enter I-35 southbound at entrance ramp past FM 1103. 
  • Saturday, July 14 until Sunday, July 15. 9 p.m. to 3 p.m.  All main lanes on both directions will be closed at FM 1103 for the complete removal of the FM 1103 bridge. DETOUR for I-35 northbound: Traffic will exit I-35 northbound main lane traffic to the frontage road at FM 1103. Traffic to remain on frontage road through FM 1103. The entrance ramp from FM 1103 to I-35 northbound will be open to traffic. DETOUR for I-35 southbound: Traffic will exit I-35 southbound main lanes to the frontage road at FM 1103 and enter I-35 southbound at the entrance ramp past FM 1103. 
I-10 – Boerne
  • Current until Tuesday, July 10. 9 p.m. until 5 a.m. The right westbound main lane between ½ mile west of Bus 87 to Scenic Loop will be closed for concrete traffic barrier work. 
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection. 
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination. 
  • Current until Friday, July 20. 9 p.m. until 5 a.m. All northbound main lanes between SH 151 and Culebra Road will be closed for asphalt overlay work. Traffic will need to exit SH 151; travel through the intersection and enter highway at Culebra Road. 
US 90 – West San Antonio
  • Monday, July 11 until Monday, July 30. 9 p.m. until 5 a.m. Alternating lanes east and westbound at Loop 1604 closed for installing brackets and concrete deck pour. The US 90 westbound frontage road turnaround to eastbound will also be closed. 
Loop 1604 – West San Antonio
  • Monday, July 11 until Monday, July 30. 9 p.m. until 5 a.m. All lanes will be closed at US 90 for installing brackets and concrete deck pour. The US 90 eastbound entrance ramp from Loop 1604 will also be closed. DETOUR: Traffic will take US 90 westbound, exit Montgomery and take turnaround. 
SH 16 (Bandera Road) - West San Antonio
  • Sunday, July 8 until Friday, July 13. 9 p.m. until 5 a.m. Alternating southbound lanes between FM 1604 and Legend Trails will be closed for pavement work. 
I-10 – West San Antonio
  • Saturday, July 14 until Sunday, July 15. 3 a.m. until 5 a.m. All eastbound main lane lanes closed between Dominion Drive and Camp Bullis Road for beam work at Dominion Drive. The underpass at Dominion Drive and entrance ramps will also be closed. DETOUR for I-10: Eastbound main lane traffic will exit at Dominion Drive and enter highway at Camp Bullis Road. DETOUR for Dominion Drive: Westbound traffic will detour at Boerne Stage Road and eastbound traffic will detour at Camp Bullis Road. 
U.S. Hwy 281 – Far North San Antonio
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. Alternating northbound main lanes will be closed between Donella Drive entrance ramp and Sonterra Boulevard exit ramp for restriping work. The Sonterra Boulevard exit ramp will be closed. Traffic will need to use the Donella Drive exit ramp. 
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road will be closed for southbound/westbound direct connector bent work. DETOUR: Traffic will take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp; take turnaround and turn left on the westbound frontage road. 
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. Alternating southbound main lanes will be closed between Sonterra Boulevard exit ramp and Loop 1604 for restriping work. The Sonterra Boulevard exit ramp will be closed. DETOUR: Traffic will use Donella Drive exit ramp and take the turnaround. 
  • Monday, July 9 until Friday, July 13. 9 p.m. until 5 a.m. The northbound right and center lanes will be closed between Sonterra Boulevard exit ramp and Sonterra Boulevard entrance ramp for northbound/westbound direct connector bent work. The Sonterra Boulevard exit ramp will be closed. 
  • Monday, July 9 until Friday, July 13. 9 p.m. until 5 a.m. The northbound right and center lanes will be closed between Donella Drive entrance ramp and Sonterra Boulevard exit ramp for northbound/eastbound direct connector bent work. The Donella Drive entrance ramp will be closed. DETOUR: Traffic will need to use the Loop 1604 entrance ramp. 
  • Tuesday, July 10 until Wednesday, July 11. 8 p.m. until 5 a.m. All northbound frontage road lanes between Loop 1604 and Sonterra Boulevard exit ramp for bridge beam work on the westbound/northbound direct connector. DETOUR: Traffic will use the US 281 southbound frontage road; use Donella Drive turnaround; and take the Donella Drive entrance ramp. 
  • Wednesday, July 11 until Friday, July 13. 8 p.m. until 5 a.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road will be closed for bridge beam work on the southbound/westbound direct connector. DETOUR: Traffic will take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp, take turnaround and turn left on the westbound frontage road. 
  • Thursday, July 12 until Friday, July 13. 8 p.m. until 5 a.m. All southbound main lanes will be closed between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road for southbound/westbound direct connector bent work. DETOUR: Traffic will need to take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp, take turnaround and turn left on the westbound frontage road. 
  • Saturday, July 14 until Monday, July 16. 3 a.m. until 5 a.m. All lanes at the intersection at Redland Road for intersection reconstruction. DETOUR: Traffic will use Ridgewood Parkway and Sonterra Boulevard. 
Loop 1604 – North San Antonio
  • Monday, July 9 until Wednesday, July 11. 8 p.m. until 5 a.m. All westbound frontage road lanes between Gold Canyon Drive and US 281 will be closed for bridge beam work on the westbound/northbound direct connector. The US 281 northbound exit will also be closed. DETOUR: Traffic will take double left at Gold Canyon Drive; take double left turn at Redland Road; use the Redland Road entrance ramp; take Stone Oak Parkway exit ramp and use the turnaround at Stone Oak Parkway. 
I-410 – Southwest San Antonio
  • Sunday, July 8 until Friday, July 13. 9 p.m. until 5 a.m. Alternating frontage road lanes on both directions between south of Valley Hi Drive and south of Pearsall Road will be closed for mill and inlay work. 
  • Wednesday, July 11 until Friday, July 13. 9 a.m. to 4 p.m. Two lanes frontage road lanes on both directions will be closed for boring work. 
Other roads – Boerne
  • Monday, July 2 until Tuesday, July 31. 9 a.m. until 4 p.m. Alternating main lanes closed in both directions of SH 46 between I-10 to the Kendall/Bandera County Line for guardrail work. 
Other roads – Converse
  • Monday, July 9 until Friday, August 3. 9 a.m. until 4 p.m. Complete closure of westbound FM 1516 from FM 78 and School Street for intersection work. DETOUR: Traffic will access westbound FM 1516 through the Converse Center Street. Eastbound FM 1516 will remain open. 
Other roads – Helotes
  • Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked. 