Pages

Friday, September 14

US 281 & Loop 1604 Closure

**WEATHER PERMITTING**

Demolition of existing retaining wall for this weekend will include closing the center and right lane of northbound US 281 from Donella Entrance Ramp to Sonterra Blvd. Entrance Ramp (includes closing the Sonterra Blvd. Exit Ramp) for Saturday (September 15, 2018) from 6 a.m. to 7 p.m. Traffic to use the Frontage Rd. Exit Ramp. Note that only one lane will remain open.

Construction of bridge structure, spanning over the westbound frontage road just East of US 281, from Sunday (September 16, 2018) 12 p.m. to Monday (September 17, 2018) 5 a.m. This will require full closure on Loop 1604 westbound frontage road - from Gold Canyon Drive to US 281 that includes the following detour: Taking a double left at Gold Canyon Drive, taking a double left a Redland Road, Using the Redland Road entrance ramp, using Stone Oak Parkway exit ramp, taking the turnaround at Stone Oak Parkway and taking the turnaround at US 281. 




You can receive information on lane closures straight to your e-mail inbox by registering here (link to http://eepurl.com/cXz2kr). Daily updates are sent out daily for the full closures.