Pages

Friday, March 1

UPCOMING CONSTRUCTION-RELATED CLOSURES

Loop 1604 – North Central San Antonio
  • Saturday, March 2. 7 a.m. until 5 p.m. Frontage roads in both directions at Bulverde Road (including the intersection) for traffic signal work. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Westbound frontage road full closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp to remove overhangs. DETOUR: Take the turnaround at US 281, continue east and take the Redland Road turnaround, use the Redland Road entrance ramp and take the ramp to Stone Oak Parkway. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Westbound frontage road full closure from Gold Canyon Road to US 281, including the US 281 northbound exit ramp, for beam and overhang work. DETOUR: Take the double left at Gold Canyon Drive, take the double left at Redland Road, use the Redland Road entrance ramp, take the Stone Oak Parkway exit ramp and use the turnaround at Stone Oak Parkway. 
  • Saturday, March 9 until Monday, March 11. Nightly 2 a.m. until 5 a.m. Westbound frontage road full closure from Gold Canyon Road to US 281, including the US 281 northbound exit ramp, for bridge deck work. DETOUR: Take the double left at Gold Canyon Drive, take the double left at Redland Road, use the Redland Road entrance ramp, take the Stone Oak Parkway exit ramp and use the turnaround at Stone Oak Parkway. 
Loop 1604 – Northeast San Antonio
  • Friday, March 1 until Monday, March 4. Nightly 9 p.m. until 5 a.m. Full mainlane closure in both directions from FM 218 (Pat Booker Road) to I-35 northbound and from Lookout Road to Kitty Hawk southbound as well as Pat Booker Road turnaround for bridge demolition work. 
  • Friday, March 1 until Friday, March 8. Daily 9 a.m. until 3 p.m. Northbound turnaround at FM 218 (Pat Booker Road) for bridge demolition work. 
  • Friday, March 8. 9 a.m. until 5 p.m. Southbound turnaround at FM 218 (Pat Booker Road) for bridge demolition work. 
  • Current until 12 p.m. Wednesday, March 6. Northbound-to-southbound turnaround at FM 218 (Pat Booker Road) for bridge demolition work. 
  • Current until 5 a.m. Monday, March 4. Southbound-to-northbound turnaround at FM 218 (Pat Booker Road) for bridge demolition work. 
  • Friday, March 1 until Saturday, March 2. 9 p.m. until 9 a.m. Full mainlane closure in both directions from I-35 to Kitty Hawk for bridge demolition work. 
  • Saturday, March 2 until Sunday, March 3. 9 p.m. until 11 a.m. Full mainlane closure in both directions from I-35 to Kitty Hawk for bridge demolition work. 
  • Sunday, March 3 until Monday, March 4. 9 p.m. until 5 a.m. Full mainlane closure in both directions from I-35 to Kitty Hawk for bridge demolition work. 
  • Sunday, March 3 until Friday, March 8. 9 p.m. until 5 a.m. Left southbound mainlane from FM 218 (Pat Booker Road) to FM 1976 for barrier work. 
  • Wednesday, March 6 until Friday March 8. 12 p.m. until 3 p.m. Southbound-to-northbound turnaround at FM 218 (Pat Booker Road) for bridge demolition work. 
  • Thursday, March 7 until Friday, March 8. 9 p.m. until 5 a.m. Southbound right mainlane from Kitty Hawk to FM 1976 for barrier work. 
Loop 1604 – Northwest San Antonio
  • Sunday, March 3 until Friday, March 8. Nightly 9 p.m. until 5 a.m. One eastbound and one westbound frontage road lane from SH 16 (Bandera Road) to I-10 for milling and paving work. 
  • Sunday, March 3 until Friday, March 8. Daily 9 a.m. until 3 p.m. One eastbound mainlane from SH 16 (Bandera Road) to NW Military Highway for mow strip work. 
  • Sunday, March 3 until Friday, March 8. Nightly 9 p.m. until 5 a.m. One westbound mainlane from SH 16 (Bandera Road) to NW Military Highway for mow strip work. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 4 p.m. One westbound frontage road lane from Lockhill Selma Road to I-10 for mow strip work. 
  • Thursday, March 7 until Friday, March 8. 9 p.m. until 5 a.m. Full mainlane closure in both directions at Bitters Road/Rogers Ranch Road (including overpass) for turnaround bridge deck work. 
Loop 1604 – West San Antonio
  • Friday, March 1 until Saturday, March 2. 9 p.m. until 5 a.m. Right northbound frontage road lane from North Ellison Drive to SH 151 for traffic switch from current entrance ramp to new entrance ramp. 
  • Monday, March 4. 9 a.m. until 3 p.m. Left southbound frontage road lane from Military Drive to Westcreek Drive for barrier work. 
  • Monday, March 4 until Saturday, March 9. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road lanes from Caracol Creek to Military Drive for lane configuration switch work. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 3 p.m. Turn lanes in both directions at Potranco Road, Military Drive and Wiseman Boulevard for curb island and sidewalk work. 
  • Monday, March 4 until Saturday, March 30. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road lanes between US 90 and Medio Creek for concrete work. 
  • Monday, March 11 until Saturday, March 30. Daily 9 a.m. until 3 p.m. Alternating southbound frontage road lanes from Medio Creek to Red Musket for culvert, median islands and guard rail work. 
US 281 – North Central San Antonio
  • Saturday, March 2 until Monday, March 4. Full weekend closure 2 a.m. until 5 a.m. Full northbound closure from the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for beam work. DETOUR: Use the Frontge Road exit ramp, take a right turn on the Loop 1604 eastbound frontage road, take the turnaround and Gold Canyon Road, go west on the Loop 1604 westbound frontage road, turn right on the US 281 northbound frontage road. 
  • Saturday, March 2 until Monday, March 4. Full weekend closure 9 p.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for bridge work. DETOUR: take the Frontage Road exit ramp and proceed through the Loop 1604 intersection. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Full northbound closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp for steel girder installation work.DETOUR: take the frontage road exit ramp and turn right on the Loop 1604 eastbound frontage road. If going north; use the turnaround at Gold Canyon Road and take a right on the northbound frontage road. If going west; drive along the eastbound frontage road, through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. One northbound turn lane at Evans Road. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for bridge work. DETOUR: take the Frontage Road exit ramp and proceed through the Loop 1604 intersection. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Full northbound closure from the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for bridge work. DETOUR: use the Sonterra Boulevard exit ramp, continue through the Loop 1604 intersection and use the Donella Drive entrance ramp. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Full southbound closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for steel girder installation work. 
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Sonterra Boulevard exit ramp to the Loop 1604 westbound frontage road. DETOUR: Sonterra Boulevard traffic will go north on US 281, take the turnaround south of Encino Rio and stay on southbound US 281. All southbound US 281 mainlane traffic will take the Donella Drive exit ramp, use the turnaround at Donella Drive and stay on the northbound frontage road. 
  • Saturday, March 9 until Monday, March 11. Full weekend ramp closure 2 a.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for bridge work. DETOUR: take the Frontage Road exit ramp and proceed through the Loop 1604 intersection. 
I-10 – Northwest San Antonio/Bexar County/Kendall County
  • Current until Saturday, March 2. Daily 9 a.m. until 4 p.m. Right mainlane in both directions from Fair Oaks Parkway to FM 3351 (Ralph Fair Road) for ramp work.. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 4 p.m. Right mainlane in both directions from Fair Oaks Parkway to FM 3351 (Ralph Fair Road) for ramp work. 
  • Thursday, March 7. 9 a.m. until 3 p.m. Eastbound right mainlane from Boerne Stage Road to Dominion Drive for barrier work. 
  • Saturday, March 9. 5 a.m. until 4 pm. Left mainlane in both directions from Fair Oaks Parkway until FM 3351 (Ralph Fair Road) for barrier work and permanent crash cushion installation work. 
I-10 – Far East San Antonio
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
  • Saturday, March 2, 12 a.m. until 9 p.m. Right eastbound mainlane at Foster Road for pavement work (as well as brief intermittent closures of the eastbound entrance ramp from Foster). When ramp is closed, drivers seeking to enter the eastbound mainlanes must remain on the frontage road and use the entrance ramp east of the Loop 1604 intersection. 
  • Sunday, March 3 until Friday, March 8. Nightly 7 p.m. until 5 a.m. Left westbound mainlane from Loop 1604 to FM 1516 and from Foster Road to just west of I-410 for construction truck access. 
  • Sunday, March 3 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from just west of I-410 to Foster Road and from FM 1516 to Loop 1604 for construction truck access. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 3:30 p.m. One left-turn lane from frontage roads and outside lane of Ackerman Road under I-10 in both directions for overpass construction work. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 3:30 p.m. Eastbound-to-westbound turnaround at FM 1516 for overpass construction work. 
  • Thursday, March 7 until Friday, March 8. 7 p.m. until 5 a.m. Full westbound mainlane closure from Foster Road to Ackerman Road for bridge construction at Rosillo Creek. DETOUR: Westbound traffic will take the Ackerman Road exit to the frontage road and re-enter the mainlanes just prior to the Ackerman Road intersection. 
I-35 – Northeast San Antonio/Bexar County/Comal County
  • Wednesday, March 6 until Thursday, March 7. 9 p.m. until 6 a.m. Full mainlane closure in both directions at FM 1103 (Exit 178) for bridge work. 
I-410 – West San Antonio
  • Current until Thursday, March 7. Daily 9 a.m. until 3 p.m. Right northbound frontage road lane from Meadow Bend Drive to Meadow Glade Drive for debris removal work. 
  • Current until Thursday, March 7. Daily 9 a.m. until 3 p.m. Left northbound frontage road lane from Landing Avenue to Airlift Avenue for direct connector work. 
  • Current until Friday, March 8. 8 p.m. until 5 a.m. Two frontage road lanes in both directions at Marbach Road (including the intersection) for various tasks including installing panels, installing overhangs and pouring concrete. 
  • Current until Friday, March 8. Nightly 8 p.m. until 5 a.m. Full southbound and northbound mainlane closure and left frontage road lane from US 90 to Valley Hi/Marbach Road (mainlanes) & from US 90 to Bertetti Drive (frontage road) for Overhead Sign Bridge (OSB) and frontage road widening work. 
US 90 – West San Antonio
  • Current until Saturday, March 2. Nightly 9 p.m. until 5 a.m. Eastbound mainlanes at Loop 1604 for barrier work. 
  • Current until Friday, March 8. Nightly 8 p.m. until 5 a.m. Full eastbound mainlane and frontage road closure from Ray Ellison Drive to I-410 (mainlanes) & from Loop 1604 to I-410 (frontage road) for barrier, asphalt and road widening work. 
  • Current until Saturday, March 9. Nightly 8 p.m. until 5 a.m. Eastbound left frontage road at I-410 for barrier and rail work. 
  • Sunday, March 3 until Friday, March 8, Nightly 9 p.m. until 5 a.m. Eastbound mainlanes at Loop 1604 for barrier work. 
  • Sunday, March 3 until Friday, March 8, Nightly 8 p.m. until 5 a.m. Full westbound mainlane and frontage road closure from I-410 to Horal Street for direct connector work. 
SH 151 – Far West San Antonio
  • Sunday, March 3 until Friday, March 8. Nightly 8 p.m. until 5 a.m. Alternating eastbound frontage road lanes from Military Drive to Callaghan Road for milling and inlay work. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 4 p.m. Alternating eastbound frontage road lanes from Castroville Road to Ingram Road (intersections closed at Old Highway 90, Callaghan Road, Marbach Road, Pinn Road and Military Drive) for curb ramp work. 
  • Monday, March 4 until Friday, March 8. Daily 9 a.m. until 4 p.m. Alternating westbound frontage road lanes from Westover Hills to Wiseman Boulevard for guard rail installation work. 
FM 1560 – Hausman Road
  • Current until Monday, March 25. Daylong closure of the dedicated right-turn lane from FM 1560 (Hausman Road) to SH 16 (Bandera Road) for utility work/road excavation. 
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, March until Saturday, March 9. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access. 
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle). 
US 87 – Rigsby Avenue
  • Current until Friday, March 15. Daily 9 a.m. until 4 p.m. Two southbound lanes from Rigsby Avenue to Hampton Avenue for drainage work. 
  • Monday, March 4 until Saturday, March 9. Right westbound lane from Bonair road to WW White Road for sidewalk and driveway work. 
  • Monday, March 4 until Saturday, March 9. Right eastbound lane from Odessa Drive to Bonair Road for sidewalk and driveway work. 
Loop 13 – WW White Road
  • Monday, March 4 until Saturday, March 9. Right northbound lane from Ida Creek to Rigsby Avenue for sidewalk and driveway work. 
I-37 – South Region
  • Monday, March 4 until Wednesday, March 6. Daily 9 a.m. until 5 p.m. Southbound left mainlane at FM 791/Atascosa River for beam repair work. 
FM 140 – Atascosa County
  • Monday, March 11 until Friday, May 31. Daily 7 a.m. until 8 p.m. Both directions closed between SH 16 to La Parita Creek for drainage work. 
Other Roads – Bexar County
  • Monday, March 4 until Friday, March 8. Nightly 9 p.m. until 5 a.m. Alternating lanes of eastbound and westbound Evans Road, west of US 281 for intersection work.