Loop 1604 – North Central San Antonio
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for overhang work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for overhang work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northwest San Antonio
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. One frontage road lane in both directions from SH 16 (Bandera Road) to Roger’s Ranch Road for pavement marking installation work.
  • Monday, July 29 until Tuesday, July 30. 9 p.m. until 5 a.m. Alternating frontage road lanes in both directions between 7-11 and Chili’s for traffic signal and Overhead Sign Bridge (OSB) work.
  • Wednesday, July 31 until Friday, August 2. Daily 9 a.m. until 3 p.m. Eastbound left mainlane from SH 16 (Bandera Road) to FM 1560 (Hausman Road) for barrier setting work.
Loop 1604 – Northeast San Antonio
  • Monday, July 29 until Saturday, August 3. Daily 8 a.m. until 4 p.m. Left frontage road lane in both directions between Redland Road and Bulverde Road for truck/material access.
  • Wednesday, July 24 until Thursday, July 25. Nightly 7 p.m. until 5 a.m. Turnarounds at SH 218 (Pat Booker Road) in both directions for bridge deck pour.
  • Wednesday, July 24 until Thursday, July 25. Nightly 9 p.m. until 5 a.m. Northbound left frontage road lane from Athenian Drive to Forum Crossing driveway for bridge deck pour.
Loop 1604 – West San Antonio
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 3 p.m. The northbound exit ramp at Wiseman Boulevard for concrete curb work.
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 5 p.m. Alternating lanes at FM 1957 (Potranco Road), Military Drive, and Wiseman Boulevard for sign, curb/directional island work.
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 7 p.m. Alternating southbound frontage road lanes between SH 151 to south of FM 1957 (Potranco Road) for paving turn lanes, rip rap and soil retention work.
  • Monday, July 29 until Saturday, August 2. Daily 9 a.m. to 7 p.m. Alternating northbound frontage road lanes between south of FM 1957 (Potranco Road) to SH 151 for driveway and curb work.
  • Monday, July 29 until Saturday, August 3. Nightly 7 p.m. to 5 a.m. The northbound frontage road shoulder and center lane between FM 1957 (Potranco Road) to SH 151 for milling work.
  • Monday, July 29 until Saturday, August 10. Daily 9 a.m. to 4 p.m. Alternating southbound mainlanes between south of FM 1957 (Potranco Road) to just south of US 90 for punch list repairs, mowstrip work.
  • Monday, July 29 until Saturday, August 10. Daily 8 a.m. to 7 p.m. Alternating southbound mainlanes between south of FM 1957 (Potranco Road) to just south of US 90 for sidewalk, curb, mowstrip and rip rap work.
  • Monday, July 29 until Saturday, August 10. Daily 8 a.m. to 7 p.m. Alternating northbound mainlanes between south of FM 1957 (Potranco Road) to just south of US 90 for punch list repairs and mowstrip work.
  • Monday, July 29 until Saturday, August 10. Daily 8 a.m. to 7 p.m. Alternating northbound mainlanes between south of FM 1957 (Potranco Road) to just south of US 90 for pavement marking work.
US 281 – North Central San Antonio
  • Sunday, July 28 until Friday, August 2. Nightly 12 a.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp for deck pour work. DETOUR: Take the Frontage Road exit ramp, continue through the Loop 1604 intersection and take the Sonterra Boulevard entrance ramp.
  • Sunday, July 28 until Friday, August 2. Nightly 12 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for deck pour work. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for concrete work.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete work.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Left/Center southbound mainlane closure at Redland Road and US 281 for beam setting.
  • Wednesday, July 31 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Right/Center southbound mainlane closure from Evans Road to Encino Rio for retaining wall work.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Friday, July 26 until Monday, July 29. Full weekend closure 9 p.m. until 5 a.m. Left mainlane in both directions between FM 3351 (Ralph Fair Road) and Dominion Drive for bridge work.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions from SH 46 to Scenic Loop Road for replacing buttons/reflectors and asphalt work.
I-10 – Far East San Antonio/Bexar County/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the summer. DETOUR: Eastbound I-10 and southbound I-410 traffic wishing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Friday, July 26 until Saturday, July 27. 9 a.m. to 3 p.m. daily. Right westbound mainlane from Martinez Creek Bridge to Foster Road for barrier setting work.
  • Friday, July 26 until Monday, July 29. Full weekend closure 7 p.m. to 5 a.m. All southbound lanes of Loop 1604 at I-10 for box culvert installation. DETOUR: Southbound traffic on Loop 1604 will go west to FM 1516 and turn around to get back on Loop 1604.
  • Friday, July 26 until Monday, July 29. Full weekend closure 9 p.m. to 5 a.m. One alternating eastbound mainlane from Woodlake Parkway to just west of Loop 1604 to implement traffic switch to new concrete mainlanes.
  • Saturday, July 27. 12 a.m. to 9 p.m. All eastbound mainlanes from FM 1516 to Loop 1604 to implement traffic switch to new concrete mainlanes. DETOUR: All eastbound mainlane traffic will take the FM 1516 exit, travel through both the FM 1516 and Loop 1604 intersections, and re-enter I-10 after Loop 1604. Police officers will be directing traffic at the intersections during this time.
  • Saturday, July 27 until Monday, July 29. 9 p.m. to 5 a.m. One lane of eastbound traffic will re-open and shift to the new concrete pavement, then the exit ramp from I-10 to FM 1516 will be closed to allow crews to tie the ramp into the new concrete mainlanes. DETOUR: Eastbound motorists seeking to access FM 1516 should instead exit at Loop 1604 and take the westbound frontage road back to FM 1516.
  • Monday, July 29 until Friday, August 2. 9 a.m. to 3 p.m. daily. Right eastbound mainlane from Loop 1604 to Graytown Road to place barrier.
  • Monday, July 29 until Thursday, August 1. Daily 7:30 a.m. until 7 p.m. Alternating mainlanes in both directions from SH 130 to US 183 for milling/asphalt and guard fence installation work.
I-10 – Central San Antonio
  • Sunday, July 28 until Monday, July 29. 8:30 p.m. until 5 a.m. Westbound right mainlane from Nogalitos Street to I-35 exit ramp for guard fence installation work along exit ramp.
  • Monday, July 29 until Friday, August 2. Nightly 8:30 p.m. until 5 a.m. Eastbound right mainlane from I-35 to US 90 exit ramp for guard fence installation work along US 90 westbound mainlane shoulder.
  • Monday, July 29 until Wednesday, July 31. Nightly 8:30 p.m. until 5 a.m. Westbound right mainlane from South Flores Street to I-35 exit ramp for mow strip work along US westbound mainlane shoulder.
I-35 – Northeast San Antonio & Comal County
  • Sunday, July 28 until Monday, July 29. 8 p.m. until 5 a.m. Full southbound mainlane closure at Walters Avenue (including entrance ramp) for overhang bracket removal work.
  • Sunday, July 28 until Monday, July 29. 9 p.m. until 5 a.m. Northbound right and center mainlanes (and shoulder) from FM 2252 to Schwab Road for removal of existing striping and installation of temporary pavement markings.
  • Monday, July 29 until Tuesday, July 30. 9 p.m. until 5 a.m. Northbound left and center mainlanes (and shoulder) from FM 2252 to Schwab Road for removal of existing striping and installation of temporary pavement markings.
  • Wednesday, July 31 until Saturday, August 3. Nightly 9 p.m. until 5 a.m. Northbound right and center mainlanes (and shoulder) FM 2252 to Schwab Road for traffic barrier installation work.
I-410 – West San Antonio
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 4 p.m. One southbound frontage road lane between Demya Drive and Bertetti Drive for staging equipment.
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 4 p.m. One northbound frontage road lane between Bronco Lane and Latigo Drive for staging equipment.
US 90 – West San Antonio
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 4 p.m. One westbound frontage road lane between Tomar Drive and Hunt Lane for staging equipment.
  • Monday, July 29 until Saturday, August 3. Daily 8 a.m. to 7 p.m. The left westbound mainlane east and west of Loop 1604 for mow strip work. DETOUR: Traffic will exit Loop 1604, detour through US 90 westbound frontage road and use the next entrance after Loop 1604.
  • Monday, July 29 until Saturday, August 3. Daily 8 a.m. to 7 p.m. The left eastbound mainlane ½ west to ½ east of Loop 1604 for mow strip work. DETOUR: Traffic will have to travel on westbound US 90 to Montgomery Road, turnaround and enter eastbound to access eastbound US 90.
SH 16 – Bandera Road
  • Monday, July 29 until Tuesday, July 30. 9 p.m. until 5 a.m. Alternating lanes in both directions from Quincy Lee to Legend Trail for traffic signal and Overhead Sign Bridge (OSB) work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, July 29 until Friday, August 2. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, August 3. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Monday, July 29 until Friday, August 2. Daily 7 a.m. to 3 p.m. The northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
  • Monday, July 29 until Friday, August 2. Daily 9 a.m. to 5 p.m. The southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 13 – WW White Road/West Military Drive
  • Monday, July 29 until Saturday, August 3. Daily 9 a.m. until 4 p.m. Right lane in both directions from Springfield Road to Seale Road for sidewalk and driveway work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
  • Monday, July 29 until Friday, August 9. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions from Sharon Drive West to Champion Boulevard for traffic switch and intersection reconstruction (at SH 46 and Charger Boulevard) work.
SH 16 – McMullen County
  • Monday, July 29 until Friday, August 2. Daily 8 a.m. until 5 p.m. Alternating southbound lanes from Tilden to FM 624 (mile markers 680-690) for guard fence installation and excavation work.
Other Roads – Bexar County
  • Friday, July 26 until Monday, July 29. Nightly 9 p.m. until 5 a.m. Full closure in both directions of Boerne Stage Road at I-10 (including the frontage road intersections) for bridge work.
  • Friday, July 26 until Saturday, July 27. 9 p.m. until 5 a.m. Southbound left lane of New Braunfels Avenue at I-35 for utility work.
  • Sunday, July 28 until Friday, August 2. Nightly 9 p.m. until 5 a.m. Alternating eastbound crossing closure west of US 281 for storm sewer work.
  • Saturday, August 3. Weekend day 7 a.m. until 7 p.m. Alternating eastbound crossing closure west of US 281 for storm sewer work.