UPCOMING SCHEDULED CLOSURES -- NONE OVER LABOR DAY WEEKEND
Loop 1604 – North Central San Antonio
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for bridge span work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for bridge span work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 Entrance Ramp.
Friday, September 6 until Monday, September 9. Full weekend closure 9 p.m. until 5 a.m. Full westbound frontage road closure from Gold Canyon Road to the US 281 northbound frontage road for utility work. DETOUR: Take a double left at Gold Canyon Road, take a double left at Redland Road, use the Redland Road entrance ramp, take the Stone Oak Parkway exit ramp, use the turnaround at Stone Oak Parkway.
Saturday, September 7 until Monday, September 9. Full weekend closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
Saturday, September 7 until Monday, September 9. Full weekend closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 Entrance Ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
Tuesday, September 3 until Saturday, September 14 (excluding Sundays). Daily 8 a.m. until 4 p.m. Westbound left frontage road lane between Redland Road and Bulverde Road for truck/material access.
Loop 1604 – Northwest San Antonio
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Eastbound frontage road from SH 16 (Bandera Road) to Roger’s Ranch Road for pavement marking installation work.
Tuesday, September 3 until Friday, September 6. Daily 9 a.m. until 5 p.m. Eastbound frontage road from SH 16 (Bandera Road) to Roger’s Ranch Road for riprap and mow strip work.
Loop 1604 – West San Antonio
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 3 p.m. Alternating northbound frontage road between south of US 90 to just south of FM 1957 (Potranco Road) for closeout item work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 3 p.m. Alternating northbound mainlanes between south of US 90 to just south of FM 1957 (Potranco Road) for closeout item work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 3 p.m. Alternating southbound mainlanes between south of FM 1957 (Potranco Road) to just south of US 90 for closeout item, sidewalk, curb, mow strip and rip rap work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 5 p.m. The northbound Wiseman Boulevard exit ramp for beam curb work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 7 p.m. Alternating northbound frontage road lanes between south of FM 1957 (Potranco Road) to SH 151 for driveway and sign work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 7 p.m. Alternating southbound frontage road lanes between SH 151 to south of FM 1957 (Potranco Road) for driveway and sign work.
Tuesday, September 3 until Saturday, September 7. Nightly 7 p.m. to 5 a.m. Alternating northbound frontage road lanes between SH 151 to south of FM 1957 (Potranco Road) for milling and paving work.
Tuesday, September 3 until Saturday, September 7. Nightly 7 p.m. to 5 a.m. Alternating lanes in both directions at FM 1957 (Potranco Road), Military Drive and Wiseman Boulevard for milling and final pavement work.
US 281 – North Central San Antonio
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp for direct connector work. DETOUR: Take the Frontage Road exit ramp, continue on the US 281 northbound frontage road through the Loop 1604 intersections and and use the Sonterra Boulevard entrance ramp.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the Southbound Frontage Road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for utility work and safety enhancements.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge, PCP, retaining wall work and safety enhancements.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure of one of two left turn lanes at Evans Road for utility work.
Saturday, September 7 until Monday, September 9. Weekend continuous 2 a.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp for direct beam work. DETOUR: Take the Frontage Road exit ramp, if heading north on US 281, take a right on the Loop 1604 eastbound frontage road, use the turnaround at Gold Canyon Road and take a right at the Northbound Frontage Road. If heading west on the Eastbound Frontage Road, go through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
Saturday, September 7 until Monday, September 9. Weekend continuous 2 a.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard entrance ramp for direct beam work. DETOUR: Take the Frontage Road exit ramp, continue on the US 281 Northbound Frontage Road through the Loop 1604 intersections and use the Sonterra Boulevard entrance ramp.
Saturday, September 7 until Monday, September 9. Weekend continuous 2 a.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for beam work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 Southbound Frontage Road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
Tuesday, September 3 until Thursday, September 5. Nightly 9 p.m. until 6 a.m. One frontage road lane in both directions at Balcones Creek for barrier setting work.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions from SH 46 to Scenic Loop Road for barrier placement and pavement marking work in preparation for traffic switch.
I-10 – Far East San Antonio/Bexar County/Guadalupe County
Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the summer. DETOUR: Eastbound I-10 and southbound I-410 traffic wishing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around and take the northbound frontage road to Ackerman Road.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane from Rosillo Creek bridge to Woodlake Parkway for concrete truck access and drainage work.
Wednesday, September 4 until Thursday, September 5. 7:30 a.m. until 7 p.m. Alternating eastbound mainlanes from SH 130 to US 183 for asphalt work.
Monday, September 9 until Wednesday, September 11. Nightly 7 p.m. until 5 a.m. Ackerman Road will be closed in both directions under I-10 for concrete beam placement. DETOUR: Northbound Ackerman Road traffic will take the I-10 eastbound frontage road to Foster Road, turn around, and take the I-10 westbound frontage road back to Ackerman Road. Southbound Ackerman Road traffic will take the I-10 westbound entrance ramp just west of Ackerman, stay in the right lane, take the I-410 South connecting ramp, travel southbound on I-410, exit to FM 1346/E. Houston St., turn around, and take the northbound frontage road back to Ackerman Road.
Monday, September 9 until Friday, September 27. Daily 7 a.m. until 5 p.m. Woodlake Parkway will be closed at the I-10 westbound frontage road. DETOUR: Traffic wishing to access the Horizon Pointe subdivision will continue traveling on the westbound frontage road, turn right on Foster Road, and take another right on Sierra Sunset to return to Woodlake Parkway.
I-10 – Central San Antonio
Tuesday, September 3 until Friday, September 6. Nightly 8:30 p.m. until 5 a.m. Westbound left mainlane at I-37 (including I-37 southbound ramp) for guard fence installation work.
I-35 – Northeast San Antonio & Comal County
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. until 3 p.m. Right frontage road lane in both directions between Austin Street and New Braunfels Avenue for sidewalk and driveway work.
Tuesday, September 3 until Wednesday, September 4. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlanes between Schwab Road and FM 1103 for barrier installation work.
Wednesday, September 4 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road lanes between FM 1103 and Schwab Road for barrier installation work.
Friday, September 6 until Saturday, September 7. 9 p.m. until 5 a.m. Alternating southbound frontage road lanes between Schwab Road and FM 1103 for barrier installation work.
I-410 – West San Antonio
Tuesday, September 3 until Thursday, September 5. Daily 9 a.m. to 3 p.m. The left eastbound frontage road between Ray Ellison Drive to I-410 to set equipment for work under the connector.
Tuesday, September 3 until Saturday, September 7. Daily 8 a.m. to 7 p.m. The left westbound mainlane between just east of Loop 1604 to just west of US 90 for mowstrip work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 3 p.m. Alternating eastbound frontage road between west of Loop 1604 to east of Loop 1604 island ramp work.
Tuesday, September 3 until Friday, September 6. Nightly 8 p.m. to 5 a.m. All westbound mainlanes between I-410 to Hunt Lane for rail and single slope concrete barrier work. DETOUR: Traffic will continue on the frontage road to access the next entrance ramp.
US 90 – West San Antonio
Tuesday, September 3 until Thursday, September 5. Daily 9 a.m. to 3 p.m. The left eastbound frontage road between Ray Ellison Drive to I-410 to set equipment for work under the connector.
Tuesday, September 3 until Saturday, September 7. Daily 8 a.m. to 7 p.m. The left westbound mainlane between just east of Loop 1604 to just west of US 90 for mowstrip work.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. to 3 p.m. Alternating eastbound frontage road between west of Loop 1604 to east of Loop 1604 island ramp work.
Tuesday, September 3 until Friday, September 6. Nightly 8 p.m. to 5 a.m. All westbound mainlanes between I-410 to Hunt Lane for rail and single slope concrete barrier work. DETOUR: Traffic will continue on the frontage road to access the next entrance ramp.
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. until 3 p.m. Eastbound right frontage road lane from Springvale Drive to West Military Road for sidewalk and driveway work.
PA 1502 – Wurzbach Parkway
City of San Antonio closure for Hardberger Park Landbridge project. Monday, September 2 until Friday, September 6. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
City of San Antonio closure for Hardberger Park Landbridge project. Saturday, September 7. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
FM 1560 – Hausman Road
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Eastbound left lane from SH 16 to Loop 1604 for utility work.
Spur 371 – General Hudnell Drive
Tuesday, September 3 until Friday, September 6. Daily 7 a.m. to 3 p.m. The northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
Tuesday, September 3 until Friday, September 6. Daily 9 a.m. to 5 p.m. The southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
Loop 13 – WW White Road
Tuesday, September 3 until Saturday, September 7. Daily 9 a.m. until 4 p.m. Northbound right lane from Emil Road to Springfield Road for sidewalk and driveway work.
FM 1976 – Walzem Road
Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
SH 46 – Boerne/Kendall County
Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
I-37 – Atascosa County
Current until 10 p.m. Saturday, August 31. Alternating northbound mainlanes from Mile Marker 108 to Mile Marker 117 for paving work.
Other Roads – Bexar County
Wednesday, September 4 until Friday, September 6. Nightly 9 p.m. until 5 a.m. All lanes in both directions of Wilderness Parkway at US 281 for restriping work.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound crossing closure East of US 281 for traffic phasing.
Tuesday, September 3 until Friday, September 6. Nightly 9 p.m. until 5 a.m. Alternating westbound crossing closure East of US 281 for traffic phasing.