Pages

Friday, September 13

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure between US 281 north exit ramp and the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Monday, September 16 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure between the US 281 north exit ramp and the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure between US 281 north exit ramp and the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure between the US 281 north exit ramp and the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
  • Current until 4 p.m. Saturday, September 14. Westbound left frontage road lane between Redland Road and Bulverde Road for truck/material access.
  • Monday, September 16 until Saturday, September 28 (except Sundays). Daily 8 a.m. until 4 p.m. Westbound left frontage road lane between Redland Road and Bulverde Road for truck/material access.
  • Monday, September 16 until Saturday, September 28 (except Sundays). Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane at Redland Road for concrete work.
  • Thursday, September 19 until Friday, September 20. 9 p.m. until 5 a.m. Full westbound mainlane closure at FM 2252 (Nacagdoches Road) for barrier and overhang removal work and guard fence installation work.
  • Friday, September 20 until Saturday, September 21. 10 p.m. until 5 a.m. Full eastbound mainlane closure at FM 2252 (Nacagdoches Road) for overhang removal work.
Loop 1604 – Northwest San Antonio
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating frontage road lanes in both directions between Golden Corral and Discount Tire for taking asphalt core work.
  • Monday, September 16 until Tuesday, September 17. 9 p.m. until 5 a.m. Alternating westbound frontage road lanes at Huebner Road for paving work.
  • Tuesday, September 17 until Wednesday, September 18. 9 p.m. until 5 a.m. Alternating westbound frontage road lanes at Bitters Road/Roger’s Ranch Road for paving work.
  • Wednesday, September 18 until Thursday, September 19. 9 p.m. until 5 a.m. Alternating eastbound frontage road lanes at Bitters Road/Roger’s Ranch Road for paving work.
Loop 1604 – West San Antonio
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 5 p.m. Alternating lanes in both directions at FM 1957 (Potranco Road), Military Drive, and Wiseman Boulevard for sign work.
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 7 p.m. Alternating northbound frontage road lanes between south of FM 1957 (Potranco Road) to SH 151 for driveway and sign work.
Loop 1604 -- South San Antonio
  • Monday, September 16 until Friday, September 20. Daily  9 a.m. until 3 p.m. Eastbound right mainlane from FM 1303 to I-37 for base repair work.
US 281 – North Central San Antonio
  • Saturday, September 14. 3 a.m. until 7 p.m. Right northbound mainlane closure from Sonterra Boulevard to Redland Road for sidewalk placement.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for sidewalk, bridge work and safety enhancements.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Right southbound frontage road closure from Sonterra Boulevard to the Loop 1604 westbound frontage road for drainage work.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for direct connector work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
  • Monday, September 16 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for direct connector work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
  • Monday, September 16 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge, retaining work and safety enhancements.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Encino Rio to Evans Road for traffic phasing.
  • Friday, September 20 until Monday, September 23. Full weekend closure 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure of one of the left turn lanes at Evans Road for traffic phasing.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, go through the Loop 1604 intersection and use the Sonterra Boulevard entrance ramp.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for direct connector work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
US 281 – South San Antonio
  • Tuesday, September 17 until Thursday, September 19. Nightly 8 p.m. until 5 a.m. Full mainlane closure in both directions from FM 2537 to Rockport Road for beam placement work.
-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Fair Oaks Parkway and Old Fredericksburg Road (including the Fair Oaks Parkway ramp temporarily) for milling and paving work.
  • Sunday, September 15 until Thursday, September 19. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Camp Bullis Road and La Cantera Parkway for moving barrier work.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Scenic Loop Road and SH 46 for work on the US 87 bridge/overpass.
I-10 – Far East San Antonio/Bexar County/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the fall. DETOUR: Eastbound I-10 and southbound I-410 traffic needing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Current until Friday, September 27. 5 p.m. Woodlake Parkway will be closed at the I-10 westbound frontage road. DETOUR: Traffic wishing to access the Horizon Pointe subdivision will continue traveling on the westbound frontage road, turn right on Foster Road, and take another right on Sierra Sunset to return to Woodlake Parkway.
  • Sunday, September 15 until Monday, September 16. 9 p.m. to 5 a.m. Left mainlane in both directions between Foster Road and Woodlake Parkway for concrete truck access.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. to 5 a.m. Left eastbound frontage road from Ackerman Road to Foster Road.
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. to 5 a.m. Eastbound exit ramp to Foster Road. DETOUR: Eastbound motorists wishing to access Foster Road will remain on I-10 and exit to FM 1516, take the turnaround under FM 1516, enter the I-10 westbound mainlanes, and exit to Foster Road.
  • Monday, September 16 until Thursday, September 19. Daily 7:30 a.m. until 7 p.m. Alternating mainlanes in both directions between SH 130 and US 183 for asphalt and guard fence work.
I-10 – Central San Antonio
  • Sunday, September 15 until Monday, September 16. Nightly 8:30 p.m. until 5 a.m. Westbound right mainlane at I-37 (including I-37 northbound exit ramp) for guard fence installation work.
  • Monday, September 16 until Tuesday, September 17. Nightly 8:30 p.m. until 5 a.m. Westbound left mainlane at I-37 (including I-37 southbound exit ramp) for guard fence installation work.
I-35 – Northeast San Antonio & Comal County
  • Sunday, September 15 until Thursday, September 19. Nightly 9 p.m. until 5 a.m. Northbound right mainlane between FM 1103 and Schwab Road for material hauling work.
  • Wednesday, September 18 until Thursday, September 19. Daily 9 a.m. until 5 p.m. Alternating northbound frontage road lanes between Kowald Lane to Post Road for drainage work.
  • Thursday, September 19 until Saturday, September 21. Nightly 9 p.m. until 5 a.m. Southbound right mainlane between FM 1103 and Schwab Road for milling work.
I-410 – West San Antonio
  • Sunday, September 15 until Friday, September 20. Nightly 8 p.m. to 5 p.m. All northbound mainlanes between the Marbach Road exit ramp to the SH 151 entrance ramp for single slope concrete barrier work. DETOUR: Traffic will use the frontage road to access the next entrance ramp.
  • Sunday, September 15 and Friday, September 20. Nightly 8 p.m. to 5 a.m. All southbound mainlanes between the US 90 exit ramp to the US 90 bridge for removing single slope concrete barrier.
  • Monday, September 16. Daily 10 a.m. to 2 p.m. All northbound frontage road lanes between the entrance ramp past Marbach Road to SH 151 for staging concrete trucks for sidewalk work. The northbound exit ramp to SH 151 will also be closed. DETOUR: Traffic on the frontage road will enter the mainlanes and exit at the next exit.
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 3 p.m. The left southbound frontage road lane between Demya Drive to Pilar Drive for staging equipment.
US 90 – West San Antonio
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 3 p.m. The left westbound frontage road lane between Tomar Drive to Hunt Lane for staging trucks and rip-rap work.
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 3 p.m. The left eastbound frontage road lane between Ray Ellison Boulevard to I-410 for staging trucks and rip-rap work.
  • Monday, September 16 until Saturday, September 21. Daily 9 a.m. to 3 p.m. The right eastbound frontage road lane between Springvale Drive to W. Military Drive for sidewalk and driveway work.
  • Monday, September 16 until Saturday, September 21. Daily 9 a.m. to 3 p.m. The right westbound frontage road lane between W. Military Drive to Colt Drive for sidewalk and driveway work.
I-37 – Central/South San Antonio
  • Monday, September 16 until Saturday, September 21. Daily 9 a.m. until 3 p.m. Southbound left mainlane from Loop 1604 to the San Antonio River for base and paving work.
  • Tuesday, September 17 until Friday, September 20. Nightly 8:30 p.m. until 5 a.m. Alternating southbound mainlanes at I-10 (including I-10 eastbound exit ramp) for guard fence installation work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, September 16 until Friday, September 20. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, September 21. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Monday, September 16 until Friday, September 20. Daily 7 a.m. to 3 p.m. The northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
  • Monday, September 16 until Friday, September 20. Daily 9 a.m. to 5 p.m. The southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
SH 16 – Bandera Road
  • Sunday, September 15 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions between Quincy Lee and Legend Trail for taking asphalt core work.
Loop 353 – New Laredo Highway
  • Monday, September 16. 1 p.m. until 4 p.m. Alternating lanes in both directions at Indian Creek for pouring rail walls.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 474 – Blanco Road/City of Boerne/Kendall County
  • Monday, September 16 until Friday, September 20. Daily 8:30 a.m. until 3:30 p.m. Right lane in both directions between Business 87 to Stonegate Road for tree trimming, culvert cleaning and bridge rail work.
FM 474 – Esser Road/Kendall County
  • Monday, September 16 until Friday, September 20. Daily 8:30 a.m. until 3:30 p.m. Southbound right lane between Blanco Road and Hidden Haven Road for handrail repair work.
SH 16 – McMullen County
  • Monday, September 16 until Friday, September 20. Alternating southbound lanes from FM 1962 to McMullen/Duval county line (mile markers 686-700) for barrier and excavation work.
Other Roads – Bexar County
  • Current until Friday, September 27. Full-time extended closure 7 a.m. until 5 p.m. All lanes of Woodlake Parkway at the I-10 westbound frontage road. DETOUR: Traffic wishing to access the Horizon Pointe subdivision will continue traveling on the westbound frontage road, turn right on Foster Road, and take another right on Sierra Sunset to return to Woodlake Parkway.
  • Saturday, September 14. Full weekend closure 2 a.m. until 10 a.m. Full westbound closure of Encino Rio Road approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
  • Monday, September 16 until Friday, September 20. Nightly 9 p.m. until 5 a.m. Full westbound closure of Encino Rio Road approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
  • Monday, September 16 until Monday, September 30. Daily 9 a.m. until 3 p.m. All lanes in both directions of West Byrd Lane at Loop 1604 for frontage road work.
  • Tuesday, September 17 until Thursday, September 19. Nightly 9 p.m. until 5 a.m. All lanes of Wilderness Parkway in both directions at US 281 for striping work.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating eastbound lanes of Evans Road east of US 281 for traffic phasing.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating westbound lanes of Evans Road east of US 281 for traffic phasing.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full westbound lanes of Encino Rio Road approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road