Pages

Friday, December 6

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Saturday, December 7. Full weekend closure 2 a.m. until 2 p.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, December 7. Full weekend closure 2 a.m. until 2 p.m. Full eastbound frontage road closure at the east- to westbound turnaround for direct connector work.
  • Saturday, December 7. Full weekend closure 8 a.m. until 2 p.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Eastbound frontage road turnaround closure at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
  • Saturday, December 14 until Monday, December 16. Full weekend closure 2 a.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, December 14 until Monday, December 16. Full weekend closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for new guard rail installation work.
  • Sunday, December 8 until Thursday, December 12. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure between Redland Road and Green Mountain Road (including exit ramps) for pavement repair work.
  • Monday, December 9 until Thursday, December 12. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure between Redland Road and Green Mountain Road (including exit ramps) for pavement repair work.
  • Tuesday, December 10 until Saturday, December 14. Nightly 9 p.m. until 5 a.m. Westbound left frontage road lane between Bulverde Road and Redland Road for embankment work.
Loop 1604 – Northwest San Antonio
  • Monday, December 9 until Friday, December 13. Daily 9 a.m. until 3 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for truck and equipment access.
Loop 1604 – West San Antonio
  • Monday, December 9 until Tuesday, December 10. Daily 9 a.m. to 3 p.m. The right southbound mainlane between FM 1957 (Potranco Road) and Medio Creek for electrical work.
US 281 – North Central San Antonio
  • Saturday, December 7. 7 a.m. until 5 p.m. Northbound right mainlane at Overlook Parkway for setting barrier work.
  • Saturday, December 7. Full weekend closure 2 a.m. until 2 p.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, December 7. Full weekend closure 4 a.m. until 2 p.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, December 7. 6 a.m. until 2 p.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
  • Saturday, December 7. 6 a.m. until 12 p.m. Southbound right mainlane closure at Stone Oak Parkway for retaining wall work.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road and turn right on the northbound frontage road. If heading west, continue on the eastbound frontage road through the Gold Canyon Road intersection, use the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Saturday, December 14 until Monday, December 16. Full weekend closure 2 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, December 14 until Monday, December 16. Full weekend closure 2 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Monday, December 9 until Wednesday, December 11. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Balcones Creek Bexar/Kendall county line and Fair Oaks Parkway for guard rail repair/upgrade work.
  • CPS Energy closure. Tuesday, December 10 until Friday, December 13. Daily 8:30 a.m. until 5 p.m. Eastbound frontage road between Fair Oaks Parkway and Balcones Creek (Bexar/Kendall county line) for overhead line removal work.
  • Tuesday, December 10 until Friday, December 13. Daily 9 a.m. until 3 p.m. Turnarounds in both directions at Boerne Stage Road for bridge work.
  • Saturday, December 14 until Sunday, December 15. 6 p.m. until 12 p.m. Full eastbound mainlane closure at Boerne Stage Road for bridge work. DETOUR: Traffic diverted to Ralph Fair Road exit onto frontage road, through Ralph Fair Road intersection (Ralph Fair Road closed in both directions over I-10) then through Boerne Stage Road intersection (Boerne Stage Road closed in both directions under I-10) and reenter mainlanes through entrance ramp east of Boerne Stage Road.
  • Saturday, December 14 until Sunday, December 15. 9 p.m. until 12 p.m. Full westbound frontage road closure at Boerne Stage Road (including turnaround) for bridge work.
I-10 – Central San Antonio
  • Friday, December 13. 9 a.m. until 3 p.m. Eastbound right mainlane between Nogalitos Street and I-35 (including I-35 southbound entrance ramp) for guard fence installation work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the fall. DETOUR: Eastbound I-10 and southbound I-410 traffic needing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Sunday, December 8 until Monday, December 9. 8 p.m. until 5 a.m. FM 1516 in both directions under I-10 for bridge panel placement. DETOUR: Southbound FM 1516 traffic will take the westbound I-10 frontage road and turn around at Foster Road. Northbound FM 1516 traffic will take the eastbound I-10 frontage road and turn around at Loop 1604. Police officers will provide traffic control at the FM 1516 and Loop 1604 intersections.
  • Monday, December 9. 9 a.m. until 12 p.m. Eastbound entrance ramp east of Foster Road will be closed. DETOUR: Eastbound frontage road traffic needing to access I-10 will continue along the frontage road until the next entrance ramp after Loop 1604.
  • Monday, December 9 until Friday, December 13. Nightly 9 p.m. to 5 a.m. The right eastbound mainlane of I-10 at the connecting ramp from northbound I-410 for concrete paving truck access. The connecting ramps from northbound and southbound I-410 to eastbound I-10 will also be closed. DETOUR: Southbound I-410 drivers wishing to access eastbound I-10 will exit at FM 1346/E. Houston Street, turn around, travel on the northbound I-410/eastbound I-10 frontage road through the Ackerman Road intersection, and enter the eastbound I-10 mainlanes east of Ackerman. Northbound I-410 drivers wishing to access eastbound I-10 will exit at FM 1346/E. Houston Street, travel on the northbound I-410/eastbound I-10 frontage road through the Ackerman Road intersection, and enter the eastbound I-10 mainlanes east of Ackerman.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Current until Friday, December 20. Full-time closure. Southbound frontage road intersection at North Kowald Lane (including North Koward Lane closure) for culvert work.
  • Tuesday, December 10 & Thursday, December 12. 9 a.m. until 3 p.m. Right mainlane and shoulder in both directions at I-10 interchange for guard fence installation work.
I-37 – Central San Antonio
  • Sunday, December 8 until Monday, December 9. 8:30 p.m. until 5 a.m. Northbound right mainlane between Fair Road and I-10 (including I-10 exit ramp) for guard fence repair work.
  • Monday, December 9 until Friday, December 13. Nightly 8:30 p.m. until 5 a.m. Southbound left mainlane and shoulder between Boyer Street and I-10 interchange (including I-10 eastbound exit ramp) for guard fence installation work.
I-410 – West San Antonio
  • Friday, December 6 until Monday, December 9. Full weekend closure 8 p.m. to 5 a.m. All southbound mainlanes between Culebra Road exit to the Marbach Road entrance ramp for striping and concrete barrier work. The SH 151 connector ramp will also be closed. DETOUR: Traffic on I-410 will be detoured to the frontage road and follow the posted detour.
  • Monday, December 9 until Friday, December 20. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between SH 151 to US 90 for staging equipment and trucks.
  • Wednesday, December 11 until Thursday, December 12. 8 p.m. until 1 a.m. Southbound right mainlane between the US 90 entrance ramp to entrance of southbound-to-westbound flyover  for illumination work.
  • Thursday, December 12. 1 a.m. until 5 a.m. Southbound right mainlane between SH 151 to Marbach Road entrance ramp for sign installation work.
  • Thursday, December 12 until Friday, December 13. All southbound mainlanes at US 90 interchange for illumination work.
  • Friday, December 13. 8 p.m. until 5 a.m. Alternating southbound frontage road lanes between SH 151 and Marbach Road exit ramp for striping and barrier work.
US 90 – West San Antonio
  • Monday, December 9 until Friday, December 20. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between I-410 to Hunt Lane for staging equipment and trucks.
SH 16 – Bandera Road
  • Monday, December 9 until Friday, December 13. Southbound right lane between Legend Trail and Cooter Brown’s for rail work.
FM 3351 – Ralph Fair Road
  • Saturday, December 14 until Sunday, December 15. 9 p.m. until 12 p.m. Full closure in both directions (including turnarounds) at I-10 for bridge work. DETOUR: Westbound traffic diverted to I-10 westbound frontage road to Old Fredericksburg turnaround to I-10 eastbound mainlanes; eastbound traffic diverted to I-10 eastbound frontage road, continue through Boerne Stage Road intersection (Boerne Stage Road closed in both directions under I-10) to Dominion Drive turnaround.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Sunday, December 8. 9 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, December 9 until Friday, December 13. Daily 9 p.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, December 14. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. to 5 a.m. Alternating lanes in both directions between Frio City Road and Quintana Road for asphalt patching work.
  • Monday, December 9 until Friday, December 13. Daily 7 a.m. to 7 p.m. Alternating lanes in both directions between Frio City Road and Quintana Road for asphalt patching work.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Other Roads – Bexar County
  • Sunday, December 8 until Friday, December 13. Nightly 9 p.m. until 5 a.m. Full westbound closure of Encino Rio approaching the US 281 intersection for bridge work. DETOUR: Turn right on the US 281 northbound frontage road and use the north- to southbound turnaround after Evans Road.
  • Tuesday, December 10 until Friday, December 13. Daily 9 a.m. until 3 p.m. Alternating lanes of Boerne Stage Road in both directions at I-10 for bridge work.
  • Saturday, December 14 until Sunday, December 15. 9 p.m. until 12 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge work. DETOUR: Westbound traffic diverted to Ralph Fair Road turnaround; eastbound traffic diverted to Dominion Drive turnaround.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 1376 – Sisterdale Road (Kendall County)
  • Monday, December 9 until Friday, December 13. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions between Indian Knoll Road and US 87 for culvert work.
SH 16 – McMullen County
  • Monday, December 9 until Friday, December 13. Daily 8 a.m. until 5 p.m. Alternating southbound lanes between FM 1962 to McMullen-Duval County line (mile markers 686-700) for widening and excavation work.