Pages

Friday, April 10

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left lane westbound frontage road closure from the north US 281 exit ramp to the northbound US 281 frontage road.
  • Saturday, April 18 until Monday, April 20. Continuous 2 a.m. until 5 a.m. Right lane westbound frontage road closure from US 281 to the Stone Oak Parkway exit ramp.
Loop 1604 – Northeast San Antonio
  • Sunday, April 12 until Thursday, April 16. Nightly 6 p.m. until 6 a.m. Full mainlane closure in both directions between Bulverde Road and Green Mountain Road for milling and overlay work.
  • Monday, April 13 until Friday, April 17. Daily 6 a.m. until 6 p.m. One westbound frontage road lane between Redland Road and Bulverde Road for barrier removal work.
  • Monday, April 13 until Friday, April 17. Nightly 8 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guard rail and mow strip work.
  • Sunday, April 19 until Thursday, April 23. Nightly 6 p.m. until 6 a.m. Full mainlane closure in both directions between Bulverde Road and Green Mountain Road for milling and overlay work.
Loop 1604 – Northwest San Antonio
  • Friday, April 17. 9 a.m. until 4 p.m. Left frontage road lane between Champion Gate and FM 1560 (Hausman Road) for asphalt work.
Loop 1604 – West San Antonio
  • Wednesday, April 15 until Thursday, April 17. Daily 9 a.m. to 3 p.m. The southbound direct connector ramp to US 90 eastbound for cable installation. DETOUR: Traffic will need use the frontage road.
Loop 1604 – Far East San Antonio
  • None scheduled.
Loop 1604 – South San Antonio
  • None scheduled.
US 281 – North Central San Antonio/Bexar County
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Encino Rio.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak Parkway for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Stone Oak Parkway for bridge work. DETOUR: Use the next turnaround south of Stone Oak /Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Encino Rio both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Encino Rio.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Encino Rio both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Evans Road.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround at Encino Rio.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
  • Saturday, April 18 until Monday, April 20. Full weekend closure 2 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Encino Rio.
  • Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround at Encino Rio.
US 281 – South San Antonio
  • None scheduled.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Saturday, May 2. Daily 7 a.m. until 7 p.m. One mainlane in both directions between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
  • Current until Friday, April 17. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
  • Sunday, April 12 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between SH 46 and Scenic Loop Road for barrier moving work and pavement marking work.
  • Saturday, April 18. 6:30 a.m. until 5 p.m. Eastbound right mainlane between Scenic Loop Road and Balcones Creek (Bexar/Kendall county line) including turnaround for beam setting work on Balcones Creek bridge.
  • Monday, April 20 until Friday, April 24. Daily 7 a.m. until 5 p.m. Westbound left mainlane between La Cantera Parkway and FM 3351 (Ralph Fair Road) for barrier removal work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
  • Saturday, April 11. 6 a.m. to 8 p.m. Right westbound mainlane between Pfeil Road and Graytown Road for paving work on shoulder.
  • Monday, April 13 until Tuesday, April 14. Daily 9 a.m. to 4 p.m. Right eastbound mainlane from I-410 to Ackerman Road for paving work on shoulder.
  • Monday, April 13 until Friday, April 17. Daily 6 a.m. to 4 p.m. Right mainlane in both directions between Graytown Road and Pfeil Road for barrier placement and paving work on shoulders.
I-10 – Central San Antonio
  • None scheduled.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County.
  • None scheduled.
I-37 – Central/South San Antonio
  • Monday, April 13 until Thursday, April 16. Daily 9 a.m. until 5 p.m. Northbound right mainlane at Goliad Road for bridge repair work.
I-410 – West San Antonio
  • Current until Monday, April 13. Daily 9 a.m. to 3 p.m. The left lane in both directions between W. Military Drive to Marbach Road for drill shaft work.
  • Current until Monday, April 13. Nightly 9 p.m. to 5 a.m. The left lane in both directions between the exit ramp of SH 151 to just south of SH 151 for drilling and pouring drill shafts.
  • Current until Monday, April 27. Full weekend closure 8 p.m. to 5 a.m. Alternating full closure in both directions between US 90 to Valley Hi Drive for mill and inlay operations. NORTHBOUND DETOUR: Traffic will be detoured to take the exit to US 90, continue on the northbound frontage road through the Marbach Road intersection, and utilize the entrance ramp past Marbach Road to access the mainlanes. SOUTHBOUND DETOUR: Traffic traveling south will be detoured to take the exit ramp to Marbach Road, continue on the southbound frontage road through the Marbach Road intersection, and use the entrance ramp before Valley Hi Drive to access the mainlanes.
  • Current until Friday, May 1. Nightly 8 p.m. to 5 a.m. Alternating mainlanes in both directions between US 90 to Valley Hi Drive for mill and inlay operations.
  • Current until Friday, May 1. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between SH 151 to US 90 for staging equipment and trucks.
  • Monday, April 13 until Monday, April 20. Daily 9 a.m. to 3 p.m. Alternating lanes in both directions between Marbach Road to Ingram Road for underground pipe work.
  • Tuesday, April 14 until Monday, April 20. Daily 9 a.m. to 3 p.m. The left lane in both directions between W. Military Drive and Marbach Road for column work.
  • Tuesday, April 14 until Monday, April 20. Nightly 8 p.m. to 6 a.m. The left lane in both directions between Marbach Road to Ingram Road for column work.
US 90 – West San Antonio
  • Current until Friday, May 1. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between Hunt Lane bridge to US 90 bridge for staging equipment, trucks and ground rock.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, April 13 until Friday, April 17. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Loop 13 – SW Military Drive
  • Monday, April 13 until Friday, April 18. Daily 9 a. m. to 5 p.m. One lane in both directions between Old Pearsall Road to Rockgate Drive for guardrail and signal improvements.
FM 2252 – Nacagdoches Road
  • None scheduled.
FM 1560 – Hausman Road
  • Exit ramp from Loop 1604 eastbound closed for approximately two months starting Monday, March 16.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • None scheduled.
US 87 – Roland Avenue
  • None scheduled.
Spur 421 – Bandera Road
  • Monday, April 13 until Saturday, April 18. Nightly 7 p.m. to 7 a.m. One lane in both directions between I-410 to Cheryl Drive for milling and paving work.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • Monday, April 13 until Friday, April 17. Nightly 9 p.m. until 5 a.m. Full westbound crossing closure at US 281 for bridge work. DETOUR: Head right on northbound US 281 and take the next turnaround.
  • Current until Friday, May 8. Daily 7 a.m. until 5:30 p.m. Full closure of Borgfeld Drive in both directions at US 281 for intersection roadway work.
Loop 337 – New Braunfels/Comal County
  • None scheduled.
FM 1863 – Comal County
  • None scheduled.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
FM 2252 – Comal County
  • None scheduled.
SH 46 – Guadalupe County
  • None scheduled.
FM 78 – Guadalupe County
  • None scheduled.
FM 1518 – Schertz/Cibolo Guadalupe County
  • Current until Friday, April 24. Nightly 8 p.m. until 6 a.m. One lane in both directions between Wiederstein Road and First Street for milling and paving work.
US 90A – Seguin/Guadalupe County
  • None scheduled.
SH 123 – Seguin/Guadalupe County
  • Current until Monday, April 13. One lane in both directions at US 90A for traffic light pole work.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • None scheduled.
I-35 – Atascosa County/Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • None scheduled.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
  • Monday, April 13 until Friday, April 24. Daily 7 a.m. to 6 p.m. One lane in each direction at FM 311 for seal coat, level up and overlay.
RM/FM 1376 – Kendall County
  • Current until 7 p.m. Saturday, April 11. Various locations in both directions between North School Street and ½-mile north of Wasp Creek Road for culvert work.
  • Monday, April 13 until Saturday, April 18. Daily 8:30 a.m. until 7 p.m. Various locations in both directions between North School Street and ½-mile north of Wasp Creek Road for culvert work.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • None scheduled.
SH 16 – McMullen County
  • Monday, April 13 until Friday, April 17. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.