Loop 1604 – North Central San Antonio
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Left lane westbound frontage road closure from the US 281 north exit ramp to the northbound US 281 frontage road.
  • Saturday, May 30 until Monday, June 1. Full weekend closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, May 30 until Monday, June 1. Full weekend closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
  • Current until Friday, May 22. Nightly 8 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for mill/paving, guardrail and mow strip work.
  • Tuesday, May 26 until Thursday, May 28. Nightly, 7 p.m. to 6 a.m. Varying single lane closure, in both directions, between Redland Road and Green Mountain Road for barrier work. 
  • Tuesday, May 26 until Friday, May 29. Nightly, 8 p.m. to 5 a.m. Single lane closures, in both directions, from Green Mountain Road and I-35 Cloverleaf ramps for road work. 
  • Tuesday, May 26 until Friday, May 29. Nightly 8 p.m. to 5 a.m. Single lane closures, in both directions, between Green Mountain Road and I-35 Cloverleaf ramps for guardrail work. 
Loop 1604 – Northwest San Antonio
  • Tuesday, May 26 until Saturday, May 30. Weekdays 8:30 a.m. to 5:00 p.m. Alternating lanes of eastbound frontage road from SH 16 (Bandera Road) to FM 1560 (Hausman Road) for asphalt work.
  • Thursday, May 28 until Friday, May 29. Daily 10 a.m. to 3 p.m. Outside eastbound mainlane from SH 16 (Bandera Road) to FM 1560 (Hausman Road) for asphalt work.
Loop 1604 – West San Antonio
  • None scheduled.
Loop 1604 – Far East San Antonio
  • None scheduled.
Loop 1604 – South San Antonio
  • None scheduled.
US 281 – North Central San Antonio/Bexar County
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Saturday, May 30 until Monday, June 1. Full weekend closure 2 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Saturday, May 30 until Monday, June 1. Full weekend closure 2 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, May 30 until Monday, June 1. Weekend closure 2 a.m. until 5 p.m. Left lane northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Saturday, May 30 until Monday, June 1. Weekend closure 2 a.m. until 5 p.m. Left lane southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Saturday, May 30 until Monday, June 1. Weekend closure 2 a.m. until 5 p.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
Encino Rio – North Central San Antonio
  • Tuesday, May 26 until Friday, May 29. Nightly 9 p.m. until 5 a.m. Full westbound crossing closure at US 281 for bridge work. DETOUR: Head right on northbound US 281 and take the next turnaround.
US 281 – South San Antonio
  • None scheduled.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Thursday, May 28. Westbound frontage road between Balcones Creek and Scenic Loop Road will be converted to one-way traffic. 
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Beginning Wednesday, May 27 at 9 a.m. Existing eastbound entrance ramp from Loop 1604 will close. Motorists can use newly constructed entrance ramp just east of old ramp.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
I-10 – Central San Antonio
  • None scheduled.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Tuesday, May 26 until Friday, May 29. Nightly 7 p.m. to 6 a.m. Southbound mainlane closure from FM 306 Overpass to Business I-35 Overpass for barrier work.
  • Tuesday, May 26, 7 p.m. to 6 a.m. Northbound mainlane closure from FM 2252 to Schwab Road for concrete barrier work.
I-37 – Central/South San Antonio
  • Tuesday, May 26 until Wednesday, May 27. Daily 8:30 a.m. to 4 p.m. Southbound mainlane closure from E. Houston St. to past Commerce St. for guardrail installation.
  • Thursday, May 28, 8:30 a.m. to 4 p.m. Southbound mainlane closure at E. Cesar Chavez exit ramp for guardrail installation.
  • Friday, May 29, 8 a.m. to 4 p.m. Northbound mainlane closure at exit ramp from I-10 for guardrail installation.
I-410 – West San Antonio
  • Current until Saturday, May 23. Nightly 8 p.m. to 5 a.m. Alternating mainlane closure from Marbach Rd. to Culebra Rd in both directions for barrier work.
  • Current until Monday, May 25. Daily 9 a.m. to 3 p.m. One southbound frontage road lane between NW Crossroads and W. Military Drive for concrete riprap removal.
  • Current until Monday, May 25. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between Marbach Road and Ingram Road and turnarounds at W. Military Drive for storm drain and hauling spoil work.
  • Tuesday, May 26 until Monday, June 1. Daily 9 a.m. to 3 p.m. Alternating lane closures on frontage road in both directions from Marbach Road to Ingram Road and the Military Drive turnarounds for storm drain work.
  • Tuesday, May 26 until Monday, June 1. Daily 9 a.m. to 3 p.m. One southbound frontage road lane between NW Crossroads and Military Drive for concrete work. DETOUR: Traffic will continue straight through the Military Drive intersection.
  • Tuesday, May 26 until Monday, June 1. Nightly 8 p.m. to 5 a.m. Alternating mainlane closure in both directions from Marbach Road to Culebra Road for barrier work.
  • Current until Sunday, May 31. Weekend closure 7 p.m. to 6 a.m. Alternating full closure in both directions between US 90 to Marbach Road (NORTHBOUND) and Marbach Road and Valley Hi Drive (SOUTHBOUND) for mill and inlay, and striping operations. NORTHBOUND DETOUR: Traffic will be detoured to take the exit to US 90, continue on the northbound frontage road through the Marbach Road intersection, and utilize the entrance ramp past Marbach Road to access the mainlanes. SOUTHBOUND DETOUR: Traffic traveling south will be detoured to take the exit ramp to Marbach Road, continue on the southbound frontage road through the Marbach Road intersection, and use the entrance ramp before Valley Hi Drive to access the mainlanes. Several ramps within the limits will also be closed.
  • Current until Friday, May 29. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between SH 151 to US 90 for staging equipment and trucks.
US 90 – West San Antonio
  • Current until Friday, May 29. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment, trucks and ground rock.
SH 151 – West San Antonio
  • Current until Monday, May 25. Nightly 8 p.m. to 5 a.m. The left lane in each direction between I-410 to Ingram Road for barrier work.
  • Tuesday, May 26 until Monday, June 1. Daily 9 a.m. to 3 p.m. Alternating lane closures on frontage road in both directions from Loop 410 to Ingram Road for construction work. Both the eastbound and westbound turnaround will be closed. DETOUR: Eastbound and westbound turnaround traffic will be detoured to the 410/151 intersection to take two left turns.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, May 25 until Friday, May 29. Weeknight closure 9 p.m. to 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Tuesday, May 26 until Friday, May 29. Weekday closure 9 a.m. to 4 p.m. One lane in both directions, as needed, approximately 0.5 miles from FM 1535 (NW Military Hwy) to approximately 0.25 miles from FM 2696 (Blanco Road) for construction vehicle entry.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, May 29 until Monday, June 1. Weekend closure 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 1 until Friday, June 5. Weekday closure 9 a.m. to 4 p.m. One lane in both directions, as needed, approximately 0.5 miles from FM 1535 (NW Military Hwy) to approximately 0.25 miles from FM 2696 (Blanco Road) for construction vehicle entry.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 1 until Friday, June 5. Weekday closure 9 p.m. to 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to utilize West Avenue and Lockhill Selma Road.
Loop 13 – SW Military Drive
  • Tuesday, May 26 until Friday, May 29. Daily, 9 a.m. to 5 p.m. Single lane closures, in both directions,  from Old Pearsall Road to Rockgate Drive for concrete work. 
  • Tuesday, May 26 until Friday, May 29. Nightly, 7 p.m. to 5 a.m. Single lane closures, in both directions, from Old Pearsall Road to Rockgate Drive for asphalt work. 
FM 2252 – Nacogdoches Road
  • None scheduled.
FM 1560 – Hausman Road
  • Exit ramp from Loop 1604 eastbound closed for approximately two months starting Monday, March 16.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • None scheduled.
US 87 – Roland Avenue
  • None scheduled.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • None scheduled.
FM 306 – New Braunfels/Comal County
  • None scheduled.
Loop 337 – New Braunfels/Comal County
  • None scheduled.
TX 46/FM 311 – Comal County
  • None scheduled.
FM 1863 – Comal County
  • None scheduled.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
FM 2252 – Comal County
  • None scheduled.
SH 46 – Guadalupe County
  • None scheduled.
FM 78 – Guadalupe County
  • None scheduled.
FM 1518 – Schertz/Cibolo Guadalupe County
  • None scheduled.
US 90A – Seguin/Guadalupe County
  • None scheduled.
SH 123 – Seguin/Guadalupe County
  • None scheduled.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • None scheduled.
I-35 – Atascosa County/Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • None scheduled.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Monday, May 25 until Saturday May 30. Daily, 7 a.m. to 7 p.m. One lane closure in both directions from School Street to 0.5 miles past Wasp Creek Road for culvert work.
FM 1333 – Atascosa County
  • None scheduled.
FM 140 – Atascosa County
  • None scheduled.
SH 16 – McMullen County
  • None scheduled.
FM 3009 – Comal County
  • Tuesday, May 26 until Friday, May 29. Daily 8 a.m. to 5 p.m. Alternating lane closure from FM 2252 to Tri-County Parkway for pavement repairs.
I-10 –Kerr County
  • Wednesday, May 27, 8 a.m. to 7 p.m. One lane closure in both directions, including entrance and exit ramps, from 1,000 feet east of SH 41 to 1,000 feet west of SH 41 for road work. DETOUR: Traffic will use the next interchange (SH 27 or FM 479).
  • Thursday May 28, 8 a.m. to 7 p.m. One lane closure in both directions, including entrance and exit ramps, from 1,000 feet east of FM 479 to 1,000 feet west of FM 479 for road work. DETOUR: Traffic will use the next interchange (FM 479 or FM 1338).