Pages

Friday, July 17

Upcoming Scheduled Construction Closures


Loop 1604 – North Central San Antonio

  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US-281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US-281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.

 

Loop 1604 – Northeast San Antonio

  • Current until Saturday July 18. 9 p.m. to 12 p.m. Single northbound mainlane closure at Pat Booker Rd. bridge to prevent debris from getting into traffic.  
  • Sunday, July 19 until Friday, July 24. 8 p.m. to 5 a.m. Single lane closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail improvements.
  • Tuesday, July 21. 9 a.m. to 5 p.m. Northbound exit ramp to Lookout Rd. closed for concrete barrier setting.
  • Tuesday, July 21. 9 a.m. to 5 p.m. Lookout Rd. entrance ramp at northbound frontage road closed for concrete barrier setting.

 

Loop 1604 – Northwest San Antonio

  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single eastbound mainlane closure from Bandera Rd. to Hausman Rd. to place pavement markings.
  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single lane closure on eastbound frontage road from Bandera Rd. to Hausman Rd. to place pavement markings.
  • Tuesday, July 21 until Wednesday, July 22. 7 p.m. to 5 a.m. Single eastbound mainlane closure from FM 1560 to SH-16 for concrete barrier installation.

 

Loop 1604 – West San Antonio

  • None scheduled.

 

Loop 1604 – Far East San Antonio

  • Saturday, July 18. 7 a.m. to 5 p.m. Single northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for barrier removal.

 

Loop 1604 – South San Antonio

  • None scheduled.

 

US 281 – North Central San Antonio/Bexar County

  • Friday, July 17 until Saturday, July 18. Weekend closure 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Saturday, July 18. 7 a.m. to 3 p.m. Alternating southbound lane closures from 500 feet north of Marshall Rd. to 500 feet south of Marshall Rd. for traffic signal improvements.
  • Saturday, July 18. 7 a.m. to 3 p.m. Alternating northbound lane closures, in both directions, from 500 feet north of Wilderness Oak to 500 feet south of Wilderness Oak for placement of coping.
  • Saturday, July 18 until Sunday, July 19. Weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 4 a.m. until 5 a.m. Right lane southbound frontage road closure from Encino Rio to Sonterra Boulevard.
  • Saturday, July 18 until Sunday, July 19. Weekend continuous closure 7 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 18 until Sunday, July 19. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work. DETOUR: Take the southbound US 281 mainlanes and use the Redland Road exit ramp.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Loop 1604. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Redland Road for concrete paving. DETOUR: Use the turnaround at Loop 1604. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for concrete paving. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Right turn lane northbound frontage road closure at Redland Road for concrete paving.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound frontage road closure at Encino Rio both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Right/center lane northbound frontage road closure from Redland Road to Encino Rio for lighting work.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Two right lanes southbound frontage road closure from Redland Road to Loop 1604 for drainage and grading work.

 

Encino Rio – North Central San Antonio

  • None scheduled.

 

US 281 – South San Antonio

  • None scheduled.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.
  • Friday, July 17, until Saturday, July 18. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for milling and overlay. DETOUR: All traffic take exit 555 onto eastbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway re-enter the eastbound mainlanes at ¼ mile east of La Cantera Parkway.
  • Sunday, July 19 until Monday, July 20. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for milling and overlay. DETOUR: All traffic take exit 550 onto the eastbound frontage road through Ralph Fair Road (FM 3351) intersection, re-enter the eastbound main lanes a 1/4 of a mile east of Ralph Fair Road (FM 3351).
  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Scenic Loop Rd. to Fair Oaks Parkway for paving and removal of concrete traffic barrier.
  • Monday, July 20 until Tuesday, July 21. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Ralph Fair Rd. (FM 3351) to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 550 onto the eastbound frontage road through Ralph Fair Road (FM 3351) intersection, re-enter the eastbound main lanes a 1/2 of a mile east of Boerne Stage Road.
  • Monday, July 20 until Friday, July 24. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from 1,000 feet before Huebner Rd. to Huebner Rd. for utility work.
  • Tuesday, July 21 until Wednesday, July 22. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the eastbound frontage road through Dominion Dr. intersection, past Dominion Dr. re-enter the eastbound mainlanes at 1 ½ of a mile east of Dominion Dr.
  • Wednesday, July 22 until Friday, July 24. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes between Dominion Dr. and La Cantera Parkway for milling and overlay. DETOUR: All traffic take exit 554 onto the eastbound frontage road through Camp Bullis Rd. intersection, past Camp Bullis Rd. re-enter the eastbound mainlanes at 1 mile east of Camp Bullis Rd.
  • Sunday, July 26 until Monday, July 27. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Road for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway, re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Monday, July 27 until Tuesday, July 28. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the westbound frontage road through Dominion Dr. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Tuesday, July 28 until Wednesday, July 29. 8 p.m. to 6 a.m. Full closure of westbound mainlanes between Dominion Dr. and Boerne Stage Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Rd. intersection, past Ralph Fair Rd. re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Wednesday, July 29 until Thursday, July 30. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. and Ralph Fair Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Road intersection, past Ralph Fair Rd. intersection re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Thursday, July 30 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. to Old Fredericksburg Rd. for milling and overlay. DETOUR: All traffic take exit 550 onto the westbound frontage road through Ralph Fair Rd. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, July 20 until Friday, July 24. Nightly 7 p.m. to 5 a.m. East and westbound left lanes closed between FM 1516 and Graytown Rd. to move traffic barriers.
  • Friday, July 24 until Monday, July 27. Weekend closure 7 p.m. to 5 a.m. All eastbound mainlanes closed at Loop 1604 for overpass work. DETOUR: I-10 traffic can exit at Loop 1604, stay on the frontage road through the intersection, and reenter eastbound I-10 after Loop 1604.
  • Friday, July 24 until Monday, July 27. Weekend closure 7 p.m. to 5 a.m. Loop 1604 closed under I-10 for overpass work. DETOURS: Northbound Loop 1604 traffic can take the I-10 eastbound frontage road and turn around at Pfiel Rd. Southbound Loop 1604 traffic can take the I-10 westbound frontage road and turn around at FM 1516.
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • None scheduled.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Sunday, July 19 until Monday, July 20. 9 p.m. to 4 a.m. Single northbound mainlane closure at Eisenhauer Rd. for steel beam rocker repair.

 

I-37 – Central/South San Antonio

  • None scheduled.

 

I-410 – West San Antonio

  • Current until Monday, July 20. 9 a.m. to 3 p.m. Single lane closure of the southbound frontage road from N.W. Crossroads to Military Dr. to remove concrete riprap.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Culebra Rd. for barrier installations.
  • Current until Monday, July 20. 9 a.m. to 3p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Ingram Rd. for wall and drainage work.  
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating northbound frontage road closures from SH-151 to Marbach Rd. for equipment staging.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating southbound frontage road lane and shoulder closures, including ramps, from SH-151 to Marbach Rd.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to 3 p.m. for equipment staging.
  • Current until Monday, July 13. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, July 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging.

 

US 90 – West San Antonio

  • Current until Friday, July 24. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from ½ mile before 36th St. to past the 36th St. exit for concrete traffic barrier work.
  • Monday, July 20 until Friday, July 24. 9 a.m. to 3 p.m. Single lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.
  • Tuesday, July 21 until Wednesday, July 22. 7 p.m. to 5 a.m. Mainlane closures, in both directions, at 36th St. for barrier removal.
  • Wednesday, July 22. 9 a.m. to 3 p.m. Westbound mainlane, shoulder and exit closures at 36th St. for unloading overhead signs. DETOUR: Traffic will be detoured to the Acme Rd. exit ramp to continue the frontage road and utilize the turnaround.
  • Sunday, July 26 until Monday, July 27. 9 p.m. to 5 a.m. Full rolling closure of westbound mainlanes at 36th St. for column and sign installations.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging.

 

SH 151 – West San Antonio

  • Current until Monday, July 20. 8 p.m. to 5 a.m. Full closure of westbound mainlanes from Loop 410 to Ingram Rd for bridge work. DETOUR: Traffic will travel on SH-151 westbound frontage road, continue through Loop 410 and SH-151 intersection, and take the next entrance ramp to SH-151 westbound mainlanes.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Ingram Rd. to Loop 410 for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns.
  • Current until Monday, July 20. 9 a.m. to 3 p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Loop 410 and Ingram Rd for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns.

 

SH 16 – Bandera Road

  • None scheduled.

 

FM 471 – Culebra Road

  • None scheduled.

 

FM 3351 – Ralph Fair Road

  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for pavement repairs.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 17 until Sunday, July 19. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Friday, July 17 until Sunday, July 19. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 18 until Sunday, July 19. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.
  • Monday, July 20. 10 a.m. to 12 p.m. Full closure, in both directions, from Lockhill Selma Rd. to 500 feet west of Lockhill Selma Rd. for utility work.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 20 until Friday, July 24. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 20 until Friday, July 24. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 24 until Sunday, July 26. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 25 until Sunday, July 25. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 27 until Friday, July 31. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 27 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 31 until Sunday, August 2. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 1 until Sunday, August 2. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
 

Loop 13 – S.W. Military Drive

  • Sunday, July 19 until Friday, July 24. 7 p.m. to 5 a.m. Alternating lane closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt milling and paving.

 

FM 2252 – Nacogdoches Road

  • None scheduled.

 

FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.

 

SH 218 – Pat Booker Road

  • Friday, July 17 until Monday, July 20. 8 p.m. to 5 a.m. Full closure, in both directions, at Loop 1604 intersection for bridge demolition.
  • Friday, July 17 until Monday, July 20. 9 a.m. to 5 a.m. Full closure of southbound to northbound turnaround at Loop 1604 for equipment staging and bridge demolition.

 

Spur 371 – General Hudnell Drive

  • None scheduled.

 

FM 78 – Bexar County

  • None scheduled.

 

US 87 – Roland Avenue

  • None scheduled.

 

Spur 421 – Bandera Road

  • None scheduled.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Loop 353 – New Laredo Highway

  • None scheduled.

 

SS 371 – General Hudnell Drive

  • None scheduled.

 

Other Roads – Bexar County

  • Marbach Rd. Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging.
  • Marbach Rd. Current until Saturday, July 18. 8 p.m. to 5 a.m. Alternating lane closures, in both directions at Marbach Rd and Loop 410 intersection for equipment staging.
  • Weichold Rd. Monday, July 20 until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr.
  • Borgfeld Rd. Sunday, July 19 until Monday, July 20. 6 p.m. to 5 a.m. Full closure, in both directions, from US-281 to Bulverde for placement of coping.
  • Bulverde Rd. Monday, July 27 until Saturday, August 1. 7 a.m. to 10 p.m. Full closure, in both directions, from 300 feet west of US-281 to US-281 for water main work.

 

FM 306 – New Braunfels/Comal County

  • None scheduled.

 

Loop 337 – New Braunfels/Comal County

  • None scheduled.

 

TX 46/FM 311 – Comal County

  • None scheduled.

 

FM 1863 – Comal County

  • None scheduled.

 

FM 2673 – Canyon Lake/Comal County

  • None scheduled.

 

FM 1516 – South Seguin Road/Converse

  • None scheduled.

 

FM 2252 – Comal County

  • None scheduled.

 

SH 46 – Guadalupe County

  • None scheduled.

 

FM 78 – Guadalupe County

  • None scheduled.

 

FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.

 

US 90A – Seguin/Guadalupe County

  • None scheduled.

 

SH 123 – Seguin/Guadalupe County

  • None scheduled.

 

Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.

 

I-35 – Atascosa County/Frio County

  • None scheduled.

 

US 181 – Floresville/Wilson County

  • None scheduled.

 

US 87 – Wilson County

  • None scheduled.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday, July 18. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction.
  • Monday, July 20 until Saturday, July 25. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work.

 

RM 474 – Blanco Road/Kendall County

  • None scheduled

 

FM 1333 – Atascosa County

  • None scheduled.

 

FM 140 – Atascosa County

  • None scheduled.

 

SH 16 – McMullen County

  • None scheduled.

 

FM 3009 – Comal County

  • Sunday, July 19 until Friday, July 24. 6 p.m. to 6 a.m. Single eastbound lane closure from FM 78 to FM 2252 to allow for laying asphalt.

 

I-10 – Kerr County

  • None scheduled.

 

FM 1044 – Comal County

  • None scheduled.