Pages

Friday, July 24

Upcoming Scheduled Construction Closures



Loop 1604 – North Central San Antonio

  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. to perform rail foundation.
  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for curb pouring.

 

Loop 1604 – Northeast San Antonio

  • Sunday, July 26 until Friday, July 31. Nightly 8:00 p.m. to 5 a.m. Single lane and ramp closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail, striping and sign improvements.
  • Sunday, July 26 until Thursday, July 30. Nightly 9:00 p.m. to 6:00 a.m. Single lane closure on northbound frontage road from Palisades to Pat Booker Rd. for barrier movement. 
  • Sunday, July 26 until Wednesday, July 29. Nightly 9:00 p.m. to 6:00 a.m. Single lane closure on northbound frontage road from Byrd Rd. to FM 1976 for barrier movement. 
  • Sunday, July 26 until Thursday, July 30. Nightly 7:00 p.m. to 6:00 a.m. Single lane closures on southbound frontage road from Pat Booker to Kitty Hawk for barrier movement. 
  • Sunday, July 26 until Friday, July 31. Nightly 7:00 p.m. to 6:00 a.m. Single lane closure of southbound frontage road from Mathom to FM 1976 for barrier movement. 

 

US 281 – North Central San Antonio/Bexar County

  • Tuesday, July 28 until Wednesday, July 29. 9:00 a.m. to 4:00 p.m. Right lane closure on southbound frontage road from Loop 1604 to Henderson Pass for communication line work.
  • Friday, July 24 until Saturday, July 25. Weekend overnight closure 9 p.m. until 5 a.m. Northbound mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Take the frontage road exit ramp and continue through the Loop 1604 intersection.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for concrete work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the otherr turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Encino Rio to the Evans Road exit ramp for concrete paving.
  • Saturday, July 25. Weekend continuous closure 7 a.m. until 4 p.m. Alternating northbound frontage road closure from Loop 1604 to Sonterra Boulevard for lighting work.
  • Saturday, July 25. Weekend continuous closure 7 a.m. until 4 p.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work.
  • Monday, July 27 until Tuesday, July 28. Overnight closure 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 27 until Tuesday, July 28. Overnight closure 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 mainlane entrance ramp and use the Redland Road exit ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the Sonterra Boulevard entrance ramp for safety enhancements. DETOUR: Continue along the southbound frontage road through the Loop 1604 intersection and take the Donella Drive entrance ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Right/center lane southbound mainlane closure from the Sonterra Boulevard entrance ramp to Loop 1604 for drainage work.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Right lane northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Friday, July 31 until Monday, August 3. Weekend continuous closure 9 p.m. until 5 a.m. Left lane northbound mainlane closure from Sonterra Boulevard to the Redland Road bypass ramp.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane southbound mainlane closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Saturday, August 1. Full weekend continuous closure 7 a.m. until 4 p.m. Full southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work. DETOUR: Take the Donella Drive exit ramp, use the south- to northbound turnaround at Donella Drive, continue on the northbound US 281 frontage road, turn right on the Sonterra Boulevard Access Road, head west on Sonterra Boulevard, turn right on the Sonterra Boulevard Access Road and turn right on the southbound US 281 frontage road.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.
  • Friday, July 24 until Saturday July 25. 10:00 p.m. to 8 a.m. Full closure of westbound mainlanes from La Cantera Parkway and Camp Bullis Rd. for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road, through La Cantera Parkway intersection, past La Cantera Parkway and re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Sunday, July 26 until Monday, July 27. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Road for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway, re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Single lane closure, in both directions, from Scenic Loop Rd. to Fair Oaks Parkway for the removal of concrete traffic barrier.
  • Monday, July 27 until Tuesday, July 28. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the westbound frontage road through Dominion Dr. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Tuesday, July 28 until Wednesday, July 29. 8 p.m. to 6 a.m. Full closure of westbound mainlanes between Dominion Dr. and Boerne Stage Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Rd. intersection, past Ralph Fair Rd. re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Tuesday, July 28 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Full frontage road closure, in both directions at Balcones Creek Road turnaround for bridge repairs.
  • Wednesday, July 29 until Thursday, July 30. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. and Ralph Fair Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Road intersection, past Ralph Fair Rd. intersection re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Thursday, July 30 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. to Old Fredericksburg Rd. for milling and overlay. DETOUR: All traffic take exit 550 onto the westbound frontage road through Ralph Fair Rd. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, July 24. Nightwork from 7 p.m. to 5 a.m. East and westbound left lanes closed between FM 1516 and Graytown Road to move traffic barriers.
  • Monday, July 27 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Eastbound right lane closed at various locations between Loop 410 and FM 1516 to paint retaining walls at Ackerman Road, Rosillo Creek, and Martinez Creek.
  • Monday, July 27 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Westbound right lane closed between Loop 410 and W.W. White Road for striping and traffic shift of westbound mainlanes closer to median.
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. ALL eastbound lanes closed at Loop 1604 for overpass work. DETOUR: I-10 traffic can exit at Loop 1604, stay on the frontage road through the intersection, and reenter eastbound I-10 after Loop 1604. (Originally scheduled for June 24-27 but postponed due to pending weather)
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. Loop 1604 closed under I-10 for overpass work. DETOURS: Northbound Loop 1604 traffic can take the I-10 eastbound frontage road and turn around at Pfiel Rd. Southbound Loop 1604 traffic can take the I-10 westbound frontage road and turn around at FM 1516. (Originally scheduled for June 24-27 but postponed due to pending weather)
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Saturday, August 1 until Sunday, August 2. 9:00 p.m. to 5:00 a.m. Double lane closure on northbound mainlanes from FM 1106 bridge to Conrad and Kohelenberg Bridge for barrier installation.

 

I-410 – West San Antonio

  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to US-90 for equipment staging.
  • Current until Monday, August 3. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, August 3. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging.
  • Monday, July 27 until Monday August 3. Daily 9:00 a.m. to 3:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for removal of concrete riprap.
  • Monday, July 27 until Monday August 3. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.  
  • Monday, July 27 until Friday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on southbound frontage road from Military Dr. to SH-151 for work on communication lines.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on northbound frontage road from SH-151 to Military Dr. for work on communication lines.

 

I-410 – Northwest San Antonio

  • Tuesday, July 28. 9:00 a.m. to 4:00 p.m. Right turn lane closure at Loop 345 (Fredericksburg Rd.) for utility work.

 

US 90 – West San Antonio

  • Sunday, July 26 until Monday, July 27. 9 p.m. to 5 a.m. Full rolling closure of westbound mainlanes at 36th St. for column and sign installations.
  • Monday, July 27 until Tuesday, July 28. 9 p.m. to 5 a.m. Closure of westbound exit ramp and frontage road at General McMullen Dr. for overhead sign bridge installation. DETOUR: Traffic will continue US-90 westbound mainlanes, take the 36th St. exit ramp, continue on the westbound frontage road up to the 36th St. turnaround, take US-90 eastbound mainlanes and use the eastbound to northbound cloverleaf at General McMullen Dr.
  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete mowstrip improvements.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging.

 

SH 151 – West San Antonio

  • Monday, July 27 until Monday, August 3. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, July 27 until Monday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Monday, July 27 until Monday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Ramp closure at northbound Loop 410 exit to Military Dr. for work on communication lines.

 

FM 1957 – Potranco Rd.

  • Monday, July 27. 9:00 a.m. to 4:00 p.m. Single northbound lane closure from Emerald Glade to Tibury Parkway for work on communication lines.

 

FM 3351 – Ralph Fair Road

  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for milling and inlay work.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 24 until Sunday, July 26. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 25 until Sunday, July 25. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 27 until Friday, July 31. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 27 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 31 until Sunday, August 2. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 1 until Sunday, August 2. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.

 

Loop 13 – S.W. Military Drive

  • Sunday, July 26 until Friday, July 31. Nightly 7:00 p.m. to 5 a.m. Single lane closure, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt milling and paving.

 

Spur 371 – General Hudnell Drive

  • Monday, July 27 until Friday, July 31. Daily 7:00 a.m. to 5:00 p.m. Single lane closure, in both directions, from Billy Mitchell Blvd. to US-90 for guardrail work.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Monday, July 27 until Wednesday, July 29. Nightly 9:00 p.m. to 6:00 a.m. Ramp closure from right lane of southbound Loop 1604 to Meadowland for duct bank work. 
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

SH 218 - Pat Booker Rd.

  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 6:00 a.m. Single eastbound lane closure from Village Oak to Loop 1604 for barrier movement. 


Loop 345 – Fredericksburg Rd.

  • Tuesday, July 28. 9:00 a.m. to 4:00 p.m. Single southbound lane closure from Loop 410 to Hillcrest for utility work.

 

Other Roads – Bexar County

  • Marbach Rd. Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging.
  • Weichold Rd. Current until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr.
  • Bulverde Rd. Monday, July 27 until Saturday, August 1. 7 a.m. to 10 p.m. Full closure, in both directions, from 300 feet west of US-281 to US-281 for water main work.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday August 1. Weekdays 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.


FM 3009 - Comal County 

  • Sunday, July 26 until Friday, July 31. Nightly 6:00 p.m. to 6:00 a.m. Single eastbound lane closure from FM 78 to FM 2252 for asphalt work. 


FM 1044 – Comal County

  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 5 a.m. Single southbound lane closure from just south of Loma Verde Dr. to just south of Lou Ann Dr. for pavement repairs.