Pages

Friday, September 11

Upcoming Scheduled Construction Closures

 


 

Loop 1604 – North Central San Antonio

  • Sunday, September 13 until Thursday, September 17. 9 a.m. to 4 p.m. Single eastbound lane closure on frontage road from Redland Rd. to Bulverde Rd. for erosion control.
  • Sunday, September 13 until Thursday, September 17. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Redland Rd. to Green Mountain Rd. for asphalt work.
  • Sunday, September 13 until Thursday, September 17. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Bulverde Rd. to Redland Rd. for asphalt work. DETOUR: Traffic will be diverted to the frontage road and will re-enter the mainlanes after Redland Rd.
  • Sunday, September 13 until Thursday, September 17. 9 p.m. to 5 a.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. to allow for foundation pouring.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Right lane eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for safety work. Detour by using the Redland Rd exit ramp and take the next turnaround.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Left/center eastbound mainlane closure from the US 281 north exit ramp to the southbound US 281 frontage road. Detour by using the Gold Canyon Road turnaround.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Right lane westbound frontage road closure from the US 281 north exit ramp to the northbound US 281 frontage road.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for reconstruction. DETOUR: Take the Redland Road exit ramp and use the next turnaround.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from the US 281 north exit ramp to the northbound US 281 frontage road. DETOUR: Use the Redland Road/Gold Canyon Road exit ramp.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from the US 281 north exit ramp to the Stone Oak Parkway exit ramp.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from the US 281 north exit ramp to the Stone Oak Parkway exit ramp.
  • Friday, September 18 until Monday, September 21. Full weekend overnight closure 9 p.m. until 5 a.m. Eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work. DETOUR: Take the Redland Road exit ramp and use the next turnaround.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.

 

Loop 1604 – North West San Antonio

  • Wednesday, September 16 until Friday, September 18. 9 p.m. to 5 a.m. Single eastbound lane closed on frontage road, including ramps, from Bandera Rd. to Hausman Rd. for utility work.

 

US 281 – North Central San Antonio/Bexar County

  • Thursday, September 10 until Saturday, September 12. 9 p.m. to 5 a.m. Single southbound lane closure from Cibolo Creek bridge to 1,000 feet north of Cibolo Creek bridge for barrier movement.
  • Friday, September 11 until Monday, September 14. Continuous closure 9 p.m. to 5 a.m. Full street closure from US 281 and Mountain Lodge to 1,000 feet west of US 281 and Mountain Lodge for pavement markings and curb ramps.
  • Friday, September 11 until Monday, September 14. 9 p.m. to 5 a.m. Full closure of Bulverde Road from US 281 intersection to just west of US 281 for traffic switch.
  • Tuesday, September 15 until Wednesday, September 16. 9 p.m. to 5 a.m. Single northbound mainlane closure from Bulverde Rd. to 1,350 feet south of Bulverde Rd. for barrier movement.
  • Wednesday, September 16 until Thursday, September 17. 9 p.m. to 5 a.m. Single southbound mainlane closure from Marshall Rd. to 1,000 feet north of TPC Parkway for barrier placement.
  • Thursday, September 17 until Friday, September 18. 9 p.m. to 5 a.m. Single southbound mainlane closure from Cibolo Creek bridge to just north of Cibolo Creek bridge for barrier movement.
  • Thursday, September 17 until Friday, September 18. 9 p.m. to 5 a.m. Single northbound mainlane closure from 1,000 feet south of Marshall Rd. to Marshall Rd. for barrier placement.
  • Friday, September 18. 9 p.m. to 5 a.m. Single southbound mainlane closure from 1,000 feet south of Marshall Rd. to Marshall Rd. for barrier movement.
  • Friday, September 18 until Saturday, September 19. 9 p.m. to 5 a.m. Single southbound mainlane closure from 500 feet north of Marshall Rd. to 500 feet south of Marshall Rd. for milestone completion.
  • Friday, September 18 until Saturday, September 19. Single northbound mainlane closure from Cibolo Creek bridge to 1,000 feet north of Cibolo Creek for barrier movement.
  • Friday, September 18 until Monday, September 21. 9 p.m. to 5 a.m. Full closure of Bulverde Road from US 281 to just west of US 281 for asphalt widening.
  • Saturday, September 12 until Monday, September 14. Full weekend overnight closure 2 a.m. until 5 a.m. Southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/ Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Saturday, September 12 until Monday, September 14. Full weekend overnight closure 2 a.m. until 5 a.m. Southbound mainlane closure of the south- to westbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/ Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn right on the westbound Loop 1604 frontage road and take the Loop 1604 entrance ramp.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Left lane northbound frontage road closure from Sonterra Boulevard to Redland Road for concrete paving.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Left lane southbound frontage road closure from Redland Road to Sonterra Boulevard for concrete paving.
  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Evans Road to Encino Rio for concrete paving.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for bridge work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the Sonterra Boulevard exit ramp for drainage work. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Turn left on the southbound US 281 frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 entrance ramp and use the Redland Road exit ramp.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Left lane southbound mainlane closure from Stone Oak Parkway to Evans Road for concrete paving.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Evans Road for concrete paving.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Left lane southbound frontage road closure from Evans Road to Encino Rio for concrete paving.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from the Donella Drive entrance ramp to Redland Road for bridge work.
  • Monday, September 14 until Friday, September 18. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from the Sonterra Boulevard entrance ramp to the Donella Drive exit ramp for bridge work.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 3 a.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 3 a.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 3 a.m. until 5 a.m. Left lane southbound mainlane closure from Stone Oak Parkway to Evans Road for concrete paving.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 3 a.m. until 5 a.m. Left lane southbound frontage road closure from Evans Road to Encino Rio for concrete paving.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating northbound frontage road closure from the Donella Drive entrance ramp to Sonterra Boulevard for bridge work.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to the Donella Drive entrance ramp for bridge work

 

Encino Rio – North Central San Antonio

  • Saturday, September 12 until Monday, September 14. Weekend overnight closure 2 a.m. until 5 a.m. Westbound crossing closure of the west- to southbound left turn lane for concrete paving. DETOUR: Use the turnaround at Evans Road.
  • Friday, September 18 until Monday, September 21. Full weekend overnight closure 3 a.m. until 5 a.m. Westbound crossing closure of the west- to southbound left turn lane for concrete paving. DETOUR: Use the turnaround at Evans Road.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Friday, September 11 until Saturday, September 12. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. La Cantera Parkway for asphalt work.
  • Sunday, September 13 until Friday, September 18. Nightly 8 p.mm. to 6 a.m. Full closure of eastbound mainlanes from Dominion Dr. to Camp Bullis Rd. for asphalt work.
  • Friday, September 18 until Saturday, September 19. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for asphalt work.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, September 12: Eastbound I-10 entrance ramp from Loop 1604 closed from 6 a.m. to 7 p.m. DETOUR: Use Pfeil Road entrance ramp.
  • Monday, September 14 until Thursday, September 17. 7 a.m. to 7:30 p.m. Single lane closure, in both directions, from US 183 until FM 2438 for sign placement.
  • Current until mid-September: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Tuesday, September 8 until Saturday, September 12. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for concrete work.
  • Tuesday, September 8 until Saturday, September 12. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for concrete work.
  • Tuesday, September 8 until Saturday, September 12. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road for improvements to sidewalks, ramps and driveways.
  • Monday, September 14 until Saturday, September 19. 9 a.m. to 5:30 p.m. Single lane closure n southbound frontage road from Schwab Rd. to FM 1103 for striping and landscape work.
  • Monday, September 14 until Saturday, September 19. 9 a.m. to 5:30 p.m. Single lane closure of northbound frontage road from FM 1003 to Schwab Rd. for concrete and landscape work.
  • Tuesday, September 15 until Thursday, September 17. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from FM 1003 to Schwab Rd. for barrier movement.
  • Wednesday, September 16 until Friday, September 18. 9 p.m. to 5 a.m. Single lane closure on southbound frontage road from Schwab Rd. to FM 1103 for barrier movement.

 

I-410 – West San Antonio

  • Current until Monday, September 14. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall work.
  • Current until Wednesday, September 9. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Monday September 14. Daily 7:00 a.m. to 5:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Richland Hills for pouring concrete.
  • Current until Monday, September 14. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work. 
  • Current until Monday, September 14. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, September 14. Nightly 8 p.m. to 5 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.

 

US 90 – West San Antonio

  • Current until Friday, September 18. Daily 9 a.m. to 3 p.m. Single frontage road lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail improvements.
  • Current until Friday, September 18. 7:30 p.m. to 6:00 a.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for pavement improvements.

 

SH 151 – West San Antonio

  • Current until Monday, September 14. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Monday, September 14. Daily 9:00 a.m. to 3:00 p.m. Alternating mainlane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Wednesday, September 9. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Current until Monday, September 14. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Thursday, September 10 until Saturday, September 12. 8 p.m. to 6 a.m. Full closure in both directions from N.W. Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should use West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, September 12 until Sunday, September 13. 8 p.m. 6 a.m. Full closure in both directions from N.W. Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should travel on West Ave. and Lockhill Selma Rd.
  • Saturday, September 12. 7 a.m. to 4 p.m. Single eastbound lane closure from west of Lockhill Selma Rd. to east of N.W. Military Dr. for barrier installation.
  • Saturday, September 12. 7 a.m. to 4 p.m. Single westbound lane closure from east of N.W. Military Dr. to west of Lockhill Selma Rd. for barrier installation.
  • Monday, September 14 until Tuesday, September 15. 9 p.m. to 5 a.m. Single westbound lane closure from N.W. Military to Lockhill Selma Rd. for barrier installation.
  • Monday September 14 until Wednesday, September 16. 9 p.m. to 5 a.m. Single eastbound lane closure from Lockhill Selma Rd. to N.W. Military Dr. for barrier installation.
  • Tuesday, September 15 until Wednesday. September 16. 9 p.m. to 5 a.m. Single westbound lane closure from N.W. Military Dr. to Lockhill Selma Rd. for barrier installation.
  • Wednesday, September 16 until Thursday, September 17. 9 p.m. to 5 a.m. Single eastbound lane closure from Lockhill Selma Rd. to N.W. Military Dr. for barrier installation.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
  • Sunday, September 13 until Saturday, September 19. 6 p.m. to 7 a.m. Single lane closures, in both directions, from Loop 1604 to Hilltop Rd. for barrier placement.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday, September 12. Daily 7 a.m. to 7 p.m. Single lane closures, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction.

 

FM 1341 – Kerry County

  • Monday, September 14 until Friday, September 18. 8 a.m. to 6 p.m. Alternating lane closures, in both directions, from ¼ mile north of I-10 to ¼ mile south of I-10 for asphalt work.