Pages

Friday, October 16

Upcoming Scheduled Construction Closures

 


Loop 1604 – North Central San Antonio

  • Sunday, October 18 until Thursday, October 22. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Bulverde Rd. to Green Mountain Rd. for bridge joint cleaning and sealing.
  • Monday, October 19 until Friday, October 23. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Redland rd. to Bulverde Rd. for erosion control.
  • Monday, October 19 until Thursday, October 22. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Bulverde Rd. to Green Mountain Rd. for cleaning and striping operations.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for asphalt work.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work.
  • Monday, October 19. Overnight closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to northbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the next exit and use the next turnaround onto the westbound Loop 1604 frontage road.
  • Monday, October 19. Overnight closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the Stone Oak Parkway exit ramp and turn right on the southbound US 281 frontage road.
  • Monday, October 19. Overnight closure 2 a.m. until 5 a.m. Full westbound mainlane closure of the west- to northbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the Gold Canyon Road exit ramp and turn right on the northbound US 281 frontage road.
  • Monday, October 19. Overnight closure 2 a.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the next exit and use the turnaround onto the eastbound Loop 1604 frontage road. 

Loop 1604 – Far East San Antonio

  • Friday, October 16 until Saturday, October 17. 9 a.m. to 4 p.m. Southbound to northbound turnaround closed at Pat Booker Road for bridge work.
  • Saturday, October 17 until Sunday, October 18. 9 a.m. to 4 p.m. Northbound to southbound turnaround lane closed at Pat Booker Road for bridge work.
  • Monday, October 19 until Wednesday, October 21. 9 p.m. to 5 a.m. Northbound to southbound turnaround closed at Pat Booker Rd. for bridge work.
  • Wednesday, October 21 until Friday, October 23. 9 p.m. to 5 a.m. Southbound to northbound turnaround closed at Pat Booker Rd. for bridge work.

 Loop 1604 – South San Antonio

  • Monday, October 12 until Thursday, October 22. Daily 8 a.m. to 5 p.m. Alternating lane closures, in both directions, from the Medina River to I-35 for road improvements.

 US 281 – North Central San Antonio/Bexar County

  • Friday, October 16. 9 a.m. to 5 a.m. Full closure of lanes in both directions at Overlook Parkway intersection for bridge cap setting.
  • Saturday, October 17. 6 a.m. to 6 p.m. Single southbound lane closure from Bexar/Comal County Line to Borgfeld Rd. for sidewalk construction.
  • Saturday, October 17. Weekend continuous closure 2 a.m. until 12 a.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/ Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 17. Weekend continuous closure 2 a.m. until 12 a.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 17. Weekend continuous closure 4 a.m. until 3 p.m. Full northbound frontage road closure from Loop 1604 to the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Head west on the westbound Loop 1604 frontage road, turn left on the southbound US 281 frontage road use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the Sonterra Boulevard exit ramp for asphalt work. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Redland Road for asphalt work.
  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road from the Redland Road exit ramp to Loop 1604 for concrete paving.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m.  Alternating southbound mainlane from Evans Road to the Donella Drive entrance ramp.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane from the Donella Drive entrance ramp to Evans Road.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Redland Road for concrete paving.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from the Sonterra Boulevard exit ramp to Loop 1604 for concrete paving.
  • Monday, October 19 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Encino Rio to Stone Oak/Tournament Players Club (TPC) Parkway for a concrete paving.
  • Friday, October 23 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Full southbound mainlane closure from Sonterra Boulevard to the Donella Drive entrance ramp to for striping. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Friday, October 23 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for striping. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.

 Evans Road – North Central San Antonio

  • Saturday, October 17. Weekend continuous closure 2 a.m. until 12 a.m. Alternating westbound crossing closure of Evans Road at US 281 for concrete paving.
  • Saturday, October 17. Weekend continuous closure 2 a.m. until 12 a.m. Alternating eastbound crossing closure of Evans Road at US 281 for concrete paving. 

Encino Rio – North Central San Antonio

  • Sunday, October 18 until Friday, October 23. Nightly 9 p.m. until 5 a.m. Full westbound crossing closure from westbound Encino Rio to southbound US 281 for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.

 I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Friday, October 16 until Saturday, October 17. 10 p.m. to 8 a.m. Full closure of westbound mainlanes from Boerne Stage Road to Ralph Fair Road for asphalt work.
  • Saturday, October 17. 9 a.m. to 3 p.m. Full closure of westbound exit ramp to Old Fredericksburg Rd. for removal of concrete traffic barrier.
  • Monday, October 19 until Friday, October 30. Daily 9 a.m. to 3 p.m. Single lane closure of westbound mainlanes from La Cantera Parkway to Ralph Fair Rd. for painting operations.

 I-10 – Central San Antonio

  • Wednesday, October 21 until Friday, October 23. 8:30 a.m. to 4:00 p.m. Eastbound entrance ramp to the northbound I-37 exit ramp closed for mow strip installation.
  • Thursday, October 22 until Friday, October 23. 8:30 a.m. to 4:00 p.m. Westbound entrance ramp to the southbound I-37 exit ramp closed of mow strip installation.

 I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Thursday, October 15 from 10:00 p.m. to 5:00 a.m. Westbound I-10 frontage road left lane closed between Foster Road and Rosillo Creek for Rosillo Creek Bridge deck pour. Westbound exit ramp to Ackerman Road also closed. DETOUR: Use Woodlake Parkway exit ramp.
  • Monday, October 19 until Friday, October 23. 8 a.m. to 4 p.m. Full closure of westbound entrance and exit ramps from Loop 1604 to FM 1516 for asphalt placement. DETOUR: Mainlane detour will be redirected to Woodlake Parkway exit ramp. Westbound frontage road traffic to remain on right lane.
  • Current until further notice. East and westbound I-10 frontage road traffic have right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until mid-November: Westbound I-10 exit ramp to Foster Road closed. DETOUR: Use Woodlake Parkway exit ramp.
  • Current until late-October: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Monday, October 19 until Saturday, October 24. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hurbertus Rd. for flatwork.  

 I-410 – West San Antonio

  • Monday, October 12 until Monday, October 19. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Monday, October 12 until Monday, October 19. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring.
  • Monday, October 12 until Monday, October 19. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, October 12 until Monday, October 19. 8 p.m. to 5 a.m. Alternating full mainlane closures, in both directions, from Marbach Rd. to Military Dr. for bent work.
  • Monday, October 12 until Monday, October 19. 8 a.m. to 5 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for beam setting.
  • Monday, October 19 until Monday, October 26. 9 a.m. to 3:00 p.m. Alternating frontage road lane closures, from Marbach Rd. to Ingram Rd., including the Culebra Rd. turnarounds, for retaining wall work.
  • Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring.
  • Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Alternating full closures of mainlanes, in both directions, from Marbach Rd. to Military Dr. for work on direct connectors.
  • Monday, October 19 until Monday, October 26. 8 a.m. to 5 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for beam setting.
  • Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Marbach Rd. to Ingram Rd. for work on direct connectors.
  • Saturday, October 24 until Sunday, October 25. 7 a.m. to 7 p.m. Full closure of northbound frontage road from Military Dr. to Culebra Rd. for installation of drainage system.
  • Sunday, October 25. 9 a.m. to 4 p.m. Full closure of mainlanes and frontage roads, in both directions, from Marbach Rd. to US 90 for utility line transfers.

 US 90 – West San Antonio

  • Sunday, October 11 until Friday, October 23. 7:30 p.m. to 6 a.m. Alternating lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Monday, October 12 until Friday, October 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.
  • Sunday, October 18 until Friday, October 23. 7:30 p.m. to 6 a.m. Single lane closure on frontage road, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Monday, October 19 until Friday, October 23. 9 a.m. to 3 p.m. Single lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.

SH 151 – West San Antonio

  • Friday, October 16 - 8 p.m. until Monday, October 19 - 5 a.m. Full closure of mainlanes, in both directions, from Ingram Rd. to W. Military Dr. for construction of flyover ramps.
  • Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating single mainlane closures, in both directions, from Ingram Rd. to Loop 410 for work on direct connectors.
  • Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Ingram Rd. for work on direct connectors.
  • Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for work on direct connectors.
  • Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full mainlane closure and SH 151 turnarounds, in both directions, from Ingram Rd. to Loop 410 for work on direct connectors.

 SH 218 – Pat Booker Road

  • Sunday, October 18 until Monday, October 19. 9 p.m. to 5 a.m. Full closure of westbound lanes from Athenian Dr. to Village Oak Dr. for bridge work.
  • Monday, October 19 until Wednesday, October 21. 9 p.m. to 5 a.m. Full closure of eastbound lanes from Village Oak Dr. to Athenian Dr. for bridge work.  
  • Wednesday, October 21 to Friday, October 23. 9 p.m. to 5 a.m. Full closure of westbound lanes from Athenian Dr. to Village Oak Dr. for bridge work.

 FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 RM 1376 – Kendall County

  • Monday, October 19 until Saturday, October 24. Daily, 8:30 a.m. to 7 p.m. Single lane closures, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.

 US 87 – Wilson County

  • Current until Friday, October 30. 6:30 a.m. to 7 p.m. Alternating lane closures, in both directions, from FM 539 to SH 123 for pavement improvements.

RM 32 – Comal County

  • Current until Saturday, October 31. 6:30 a.m. to 7 p.m. Single eastbound lane closures from FM 484 to Carpers Creek for roadway improvements.