UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Friday, May 7 until Sunday, May 9. Weekend continuous 9 p.m. until 5 p.m. Full eastbound mainlane closure of the eastbound direct connector ramp to southbound US 281 for asphalt paving. DETOUR: Use the northbound US 281 exit ramp and take a right on the southbound US 281 frontage road.
  • Friday, May 7 until Sunday, May 9. Weekend continuous 9 p.m. until 5 p.m. Full westbound mainlane closure of the westbound direct connector ramp to southbound US 281 for asphalt paving. DETOUR: Use the northbound US 281 exit ramp and take a left on the southbound US 281 frontage road.
  • Monday, May 10 until Friday, May 14. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the eastbound direct connector ramp to southbound US 281 for striping. DETOUR: Use the northbound US 281 exit ramp and take a right on the southbound US 281 frontage road.
  • Monday, May 10 until Friday, May 14. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the westbound direct connector ramp to southbound US 281 for asphalt paving. DETOUR: Use the northbound US 281 exit ramp and take a left on the southbound US 281 frontage road.
  • Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
  • Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for asphalt paving. 

Loop 1604 – Far East San Antonio/Bexar County

  • Saturday, May 8. 5 a.m. to 3 p.m. Full closure of mainlanes at I-10 intersection for bridge work. DETOUR: Northbound traffic will take I-10 eastbound frontage road and turnaround at Pfeil Rd. Southbound traffic will take I-10 westbound frontage road and turnaround at FM 1516. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, May 9 until Monday, May 10. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Palisades Dr. to Pat Booker Rd. for traffic switch.
  • Tuesday, May 11 until Wednesday, May 12. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Palisades Dr. to Pat Booker Rd. for traffic switch. 

Loop 1604 – North West San Antonio/Bexar County

  • Monday, May 10 until Friday, May 21. Weekday Nights 9 p.m. to 5 a.m. Eastbound entrance ramp from La Cantera Parkway closed for barrier setting and re-striping. DETOUR: Traffic will continue on eastbound Loop 1604 frontage road and enter mainlanes after the I-10 intersection.
  • Monday, May 10 until Friday, May 21. Weekday Nights. 9 p.m. to 5 a.m. Eastbound exit ramp to Vance Jackson Rd. closed for barrier setting and re-striping. DETOUR: Traffic will exit at La Cantera Parkway and continue through the La Cantera Parkway intersection. 

Loop 1604 – South San Antonio/Bexar County

  • Monday, May 10 until Thursday, May 13. 8 a.m. to 5 p.m. Single lane closure, in both directions, from Senior Rd. to Morin Rd. for road improvements. 

US 281 – North Central San Antonio/Bexar County

  • Monday, May 10 until Friday, May 14. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to Basse Rd. for overhead sign replacements.
  • Monday, May 10 until Friday, May 14. 9 a.m. to 3 p.m. Single eastbound lane of Overlook Parkway at US 281 closed for sidewalk improvements
  • Friday, May 14 until Friday, May 21. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. at US 281 intersection for drainage installation.
  • Saturday, May 8 until Sunday, May 9. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 8 until Sunday, May 9. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, May 10 until Friday, May 14. Continuous 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, May 10 until Friday, May 14. Continuous 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Encino Rio.
  • Monday, May 10 until Friday, May 14. Continuous 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Use the turnaround at Marshall Road.
  • Monday, May 10 until Friday, May 14. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for painting, landscaping, and asphalt paving.
  • Monday, May 10 until Friday, May 14. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for painting, landscaping, and asphalt paving.
  • Monday, May 10 until Friday, May 14. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for sign installation.
  • Monday, May 10 until Friday, May 14. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for sign installation.
  • Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 15. 7 a.m. to 5 p.m. Single southbound lane closure from Borgfeld Rd. to Bulverde Rd. for demolition. 

Stone Oak Parkway – North Central San Antonio

  • Friday, May 7 until Saturday, May 8. Weekend overnight 9 p.m. until 5 p.m. Alternating eastbound crossing closure at the US 281 intersection for a traffic switch.
  • Friday, May 7 until Saturday, May 8. Weekend overnight 9 p.m. until 5 p.m. Alternating westbound crossing closure at the US 281 intersection for a traffic switch. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Friday, May 14 – 9 p.m. to Monday, May 17 – 5 a.m. Full closure of mainlanes from SH 46 to Scenic Loop Rd. for demolition of US 87 bridge. Lanes under Scenic Loop Rd. bridge will also be closed. DETOUR: Traffic will be directed to frontage roads. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, May 8. 7 a.m. to 5 p.m. Single westbound mainlane closure from Martinez Creek to Woodlake Parkway for pipe installation.
  • Monday, May 10 until Tuesday, May 11. 8:30 p.m. to 5:30 p.m. Single westbound mainlane closure from FM 2538 to Pfeil Rd. for barrier movement.
  • Monday, May 10 until Friday, May 14. 7 p.m. to 5 a.m. Double left mainlane closures, in both directions, from Loop 1604 to Saltrillo Creek for material hauling.
  • Wednesday, May 12 until Thursday, May 13. 8:30 p.m. to 5:30 a.m. Alternating westbound mainlane closures from Zuehl Rd. to Pfeil Rd. for barrier movement.
  • Thursday, May 13 until Friday, May 14. 8:30 p.m. to 5:30 a.m. Alternating westbound mainlane closures from Zuehl Rd. to Pfeil Rd. for barrier movement.
  • Saturday, May 15. 5 a.m. to 9 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for barrier movement asphalt operations.
  • Current until Thursday, July 1. Westbound frontage road left lane closed between Foster Road and Rosillo Creek from noon to 5 p.m. for embankment work. Westbound Ackerman Road exit also closed from noon to 5 p.m. DETOUR: Westbound traffic wanting to exit to Ackerman may use Foster Road exit.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Monday, May 10 until Friday, May 1. 9 p.m. to 5 am. Double southbound mainlane closure from Schwab Rd. to FM 1103 for milling and overlay work.
  • Tuesday, May 11 until Saturday, May 22. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Lane to Parkway intersection for work on retaining wall. 

I-410 – West San Antonio

  • Current until Monday, May 10. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
  • Current until Monday, May 10. 8 p.m. to 5 a.m. Full closure of mainlane, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, May 10. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for underground work.
  • Current until Monday, May 10. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Loop 410 to Ingram Rd. for wall improvements.
  • Current until Monday, May 10. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, May 10. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Current until Monday, May 10. 8 p.m. to 5 a.m. Double lane closure on southbound frontage roads from SH 151 to Lakeside Parkway for bridge work.
  • Current until Monday, May 10. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, May 10 until Monday, May 17. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, May 10 until Monday, May 17. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, May 10 until Monday, May 17. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.   

SH 151 – West San Antonio

  • Current until Monday, May 10. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, May 10 until Monday, May 17. Nightly 8 p.m. to 5 a.m. Full closure of westbound frontage road until Loop 410 to bridge rail demolition.
  • Monday, May 10 until Monday, May 17. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work. 

FM 471 – Culebra Road

  • Monday, May 10 until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Mountain View to Les Harrison Dr. for sidewalk improvements.

Loop 13 – Military Drive

  • Monday, May 10 until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements. 

SH 218 – Pat Booker Road

  • Sunday, May until Wednesday, May 12. 9 p.m. to 5 a.m. Full closure of eastbound lanes from Village Oak Dr. to Athenian Dr. for traffic switch. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Tuesday, May 11 until Friday, May 21. 8 a.m. to 5 p.m. Alternating northbound lane closures from Toepperwein Rd. to Hilltop Rd. for paving operations.
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.