Pages

Friday, July 30

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, August 1 until Thursday, August 5. 9 p.m. to 5 a.m. Single northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for barrier removal.
  • Sunday, August 1 until Monday, August 2. 9 p.m. to 5 a.m. Northbound entrance from Kitty Hawk Rd. closed for barrier removal.
  • Tuesday, August 3 until Thursday, August 5. 9 p.m. to 5 a.m. Northbound entrance ramp from Kitty Hawk Rd. closed for barrier removal.
  • Thursday, August 5 until Friday, August 6. 9 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Pat Booker Rd. to Palisades Dr. for barrier removal.
  • Monday, August 2 until Wednesday, August 4. 9 a.m. to 3 p.m. Single lane closure on the southbound frontage road from Pat Booker Rd. to Palisades Dr. for concrete pouring. 

Loop 1604 – North West San Antonio/Bexar County

US 281 – North Central San Antonio/Bexar County

  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  •  Saturday, July 31 until Sunday, August 1. 6 p.m. to 5 a.m. Alternating lane closures at Marshall Rd. for striping operations.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single northbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Sunday, August 1. 9 p.m. to 5 a.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Sunday, August 1. 9 p.m. to 5 a.m. Single northbound lane closure from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Monday, August 2 until Thursday, August 5. 8:30 p.m. to 5:00 a.m. 3 northbound left mainlanes closed at Basse Rd. for bridge repairs.
  • Saturday, August 7 until Sunday, August 8. 7 p.m. to 7 a.m. Single northbound lane closure from Evans Rd. to TPC Parkway for beam setting.
  • Monday, August 2 until Friday, August 6. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road at Caleta Beach for utility work.
  • Tuesday, August 3 until Thursday, August 5. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road at Paso Del Norte for utility work. 

I-10 –East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Sunday, August 1 until Sunday, August 8. 5 a.m. to 7 p.m. Alternating lane closures at Trainer Hale Rd. for drill shaft work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.

US 90 – Bexar County

  • Monday, August 2 until Friday, August 6. 9 a.m. to 5 p.m. Single eastbound lane closure from Marian St. to Nogalitos Rd. for barrier removal.
  • Monday, August 2 until Thursday, August 5. 8 a.m. to 6 p.m. Double mainlane closures, in both directions, from Media County line to Montgomery Rd. for roadway replacement. The first crossover west of SH 211 and the westbound exit ramp to SH 211 will also be closed.
  • Wednesday, August 4 until Thursday, August 5. 8 p.m. to 5 a.m. Westbound exit ramp to southbound I-35 closed for lighting installation.
  • Thursday, August 5 until Friday, August 6. 8 p.m. to 5 a.m. Eastbound exit ramp to southbound I-35 closed for lighting installation. 

I-37 – Central San Antonio/Bexar County 

  • Monday, August 2 until Tuesday, August 3. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for lighting installation.
  • Tuesday, August 3 until Wednesday, August 4. 8 p.m. to 5 a.m. Northbound exit ramp to westbound I-10 closed for lighting installation. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to Hubertus Rd. for material haul-off.
  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Sunday, August 1 until Monday, August 2. 8 p.m. to 5 a.m. Southbound lower level mainlanes closed in downtown San Antonio. Single left mainlane closure on upper level also closed. Double mainlane closure on eastbound I-10 ramp to I-35 south.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off. 

I-410 – East San Antonio

  • Sunday, August 1 until Friday, August 6. 9 p.m. to 5 a.m. Various mainlane closures from I-35 to I-10 for overhead sign replacements.
  • Friday, July 30 thru Tuesday, August 3. NIGHT WORK. Northbound right lane closed at E. Houston St. from 9 p.m. to 5 a.m. each night for barrier work.
  • Friday, July 30 thru Tuesday, August 3. NIGHT WORK. Northbound entrance ramp from E. Houston St. closed from 9 p.m. to 5 a.m. each night. Entrance ramp detour: Traffic can continue on northbound frontage road, turn around at Ackerman Road, and use northbound I-410 entrance ramp from westbound I-10.
  • Current until August 20. Southbound frontage road left lane closed from I-10 to E. Houston St. for reconstruction.

I-410 – West San Antonio

  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Saturday, August 7. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, August 1 until Monday, August 2. 6 p.m. to 5 a.m. Full closure of the northbound mainlanes from Marbach Rd. to SH 151, including the Marbach Rd. entrance ramp, for bridge work. 

I-410 – Southwest San Antonio

  • Monday, August 2 until Wednesday, August 4. 10 p.m. to 5 a.m. Single mainlane closure, in both directions, from Old Pearsall Rd. to Ray Ellison Blvd. for striping operations.
  • Monday, August 2 until Friday, August 6. 10 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Old Pearsall Rd. to Ray Ellison Blvd. for striping operations.   

SH 151 – West San Antonio

  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

SL 13 – Military Dr.

  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from Bardwell Dr. to Alsbrook Dr. for sidewalk improvements.
  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from New Laredo Hwy. to Somerset Rd. for sidewalk improvements. 

SH 211 – Bexar County

  • Monday, August 2 until Thursday, August 5. 8 a.m. to 6 p.m. Alternating lane closures from Potranco Rd. to US 90 for roadway replacement.
  • Thursday, August 5. 8 a.m. to 6 p.m. Full closure of SH 211 at FM 1957 for roadway replacement. 

Alamo Ranch Parkway – Bexar County

  • Friday, July 30 10 p.m. to Monday, August 2 5 a.m. Westwood Loop intersection closed for bridge work.
  • Friday, August 6 10 p.m. to Monday, August 9 5 a.m. Westwood Loop intersection closed for bridge repairs. 

FM 1535 – N.W. Military Highway

  • Saturday, July 31. 7 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paving operations.
  • Monday, August 2. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paving operations.

FM 2252 – Bexar County

  • Thursday, August 5 until Friday, August 6. 7 p.m. to 7 a.m. Full closure of intersection at Evans Rd. for installation of bridge beams. DETOUR: Traffic will be directed to use FM 3009 to access I-35, Evans Rd. of Lookout Rd.

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 345 – Fredericksburg Rd.

  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements.

US 87 – Rigsby Road

  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Pecan Valley Rd. to Ancel Rd. for sidewalk improvements. 

SH 16 – Bandera Road

  • Friday, August 6. 8:30 a.m. to 1 p.m. Right northbound lane closed from Linkwood Dr. to Eckhert Rd. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-35 – Medina County

  • Current until Monday, August 9. 7 a.m. to 9 p.m. Single southbound mainlane closure from SH 173 to Francisco Perez Creek for bridge repairs.