Pages

Friday, September 17

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North East San Antonio/Bexar County

Loop 1604 – Far East San Antonio/Bexar County

  • Sunday, September 19 until Thursday, September 23. 9 p.m. to 5 a.m. Full closure of the I-10 intersection for bridge repairs. Traffic will be detoured on the frontage roads. 

Loop 1604 – North Central San Antonio/Bexar County

  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, September 20 until Friday, September 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, September 20 until Friday, September 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Thursday, September 23 until Thursday, September 30. Weeknights 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from SH 16 (Bandera Rd.) to W. Hausman Rd. for illumination work. DETOUR: Traffic will be directed to the frontage roads.
  • Thursday, September 23 until Thursday, September 30. Weeknights 9 p.m. to 5 a.m. Eastbound exit ramp to W. Hausman Rd. closed for illumination work. DETOUR: Traffic will utilize the exit rampt to SH 16 (Bandera Rd.).
  • Current until Friday, September 30. Right turn lane on eastbound frontage road closed from Brenen Ave to PeaCe Blvd. for utility work.
  • Current until Saturday, October 9. Weeknights 9 p.m. to 5 a.m. Alternating mainlane closures from SH 16 (Bandera Rd.) to I-10 for barrier installation. One lane to remain open at all times.
  • Current until Saturday, October 9. 9 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installations. One lane to remain open at all times. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, September 20. Daytime 8:30 a.m. until 4:30 p.m. Left lane northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for illumination inspection.
  • Monday, September 20. Daytime 8:30 a.m. until 4:30 p.m. Left lane southbound mainlane closure from Stone Oak Parkway to Loop 1604 for illumination inspection.
  • Monday, September 20 until Friday, September 24. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, September 20 until Friday, September 24. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, September 17 9 p.m. until Monday, September 20 5 a.m. Full closure of the eastbound mainlanes from Foster Rd. to Woodlake Parkway for pavement repairs. The entrance ramp to Foster Rd. and the exit ramp to Woodlake Parkway will also be closed.
  • Friday, September 17 9 p.m. until Saturday, September 18 7 p.m.. Full closure of the mainlanes, in both directions, at FM 2538 for bridge demolition.
  • Friday, September 17 until further notice. Full closure of FM 2538 over I-10 for bridge work.
  • Wednesday, September 22 until Friday, September 24. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Foster Rd. to Woodlake Parkway for sign installations.
  • Saturday, September 25. 5 a.m. to 9 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for roadway work.
  • Sunday, September 26 until Friday, October 1. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for roadway work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, September 19 until Friday, September 24. 7 a.m. to 7 p.m. Various southbound frontage road shoulders from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 a.m. to 4 p.m. Single southbound frontage road from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 a.m. to 4 p.m. Single southbound frontage road lane from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Various southbound exit ramps from Weidner Road to Whirlwind Drive for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Single southbound mainlane from Weidner Road to I-410 for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Double southbound frontage road from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Southbound exit ramp and right mainlane from FM 3009 (Roy Richard Drive) to Retama Parkway for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Single southbound mainlane from Mid Cities Parkway to Pawlin Drive for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Single southbound frontage road from FM 3009 (Roy Richard Drive) to Corporate Drive for geotechnical and drilling work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Triple northbound mainlane closure from S. Guadalupe River to FM 306 for milling and paving work.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 2252 to FM 1103 (Hubertus Road) for paving work.
  • Monday, September 20 until Saturday, September 25. 9 a.m. to 5:30 p.m. Single lane closure on the frontage road, in both directions, from FM 2252 to FM 1103 (Hubertus Road) for import and material haul-off.
  • Monday, September 20 until Saturday, September 25. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Tuesday, September 21 until Friday, September 24. 7 a.m. to 5 p.m. Double southbound frontage road from Crownpoint Dr. to Judson Road for geotechnical and drilling work.
  • Tuesday, September 21 until Friday, September 24. 7 a.m. to 5 p.m. Double southbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Tuesday, September 21 until Friday, September 24. 7 a.m. to 5 p.m. Double southbound mainlanes from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Tuesday, September 21 until Friday, September 24. 9 a.m. to 4 p.m. Double southbound frontage road from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Wednesday, September 29 until Thursday, September 30. 8 p.m. to 5 a.m. Double mainlane closure, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, September 30 until Friday, October 1. 8 p.m. to 5 a.m. Full southbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit.
  • Friday, October 1 until Saturday, October 2. 8 p.m. to 5 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Watson off-ramp.
  • Saturday, October 2 until Sunday, October 3. 8 p.m. to 5 a.m. Full northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and enter the highway from Watson Ln.
  • Sunday, October 3 until Monday, October 4. 8 p.m. to 5 a.m. Double northbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use the Kohlenberg Rd. entrance ramp. 

I-410 – North East San Antonio

  • Current until Sunday, September 19. 9 a.m. to 5 p.m. Right eastbound frontage road shoulder from Haskin Dr. to Quail Creek for surveying work.
  • Current until Sunday, September 19. 9 a.m. to 5 p.m. Right westbound mainlane shoulder from I-35 to Harry Wurzbach Rd. for surveying work.

I-410 – East San Antonio

  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to I-10 for overhead sign replacements. 

I-410 – West San Antonio

  • Current until Monday, September 27. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, September 27. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 

I-410 – Southwest San Antonio

  • Sunday, September 19 until Tuesday, September 21. 9 p.m. to 5 a.m. Single northbound mainlane closure from Brookshire Dr. to Valley Hi Dr. for barrier setting.
  • Sunday, September 19 until Friday, September 24. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Valley Hi Dr. to Ray Ellison Blvd. for barrier setting.
  • Current until Friday, September 24. 9 p.m. to 5 a.m. Single lane closures on the Valley Hi Dr. overpass for paint removal.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Loop 410 for bridge work. DETOUR: Traffic will be detoured to frontage roads.
  • Current until Monday, September 27. 8 p.m.t o 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.  

Alamo Ranch Parkway

  • Monday, September 20 until Tuesday, September 21. 9 p.m. to 5 a.m. Full closure of the intersection at Westwood Loop for bridge work.
  • Tuesday, September 21 until Wednesday, September 22. 9 p.m. to 5 a.m. Full closure of the intersection at Westwood Loop for bridge work.

PA 1502 – Wurzbach Parkway

  • Monday, September 20 until Friday, September 24. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for curb improvements.

FM 1535 – N.W. Military Highway

  • Monday, September 20 until Friday, September 24. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for material haul-off.
  • Monday, September 20 until Friday, September 24. 9 a.m. to 5 p.m. Single lane closures, in each direction, from Loop 1604 to Huebner Rd. for utility work. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

US 87 – Rigsby Road

  • Current until Saturday, September 18. 7 a.m. to 7 p.m. Double lane closure, in both directions, from Roland Ave. to Loop 410 for roadway repairs. 

US 181 – Bexar County

  • Current until Saturday, September 18. 7 a.m. to 7 p.m. Right shoulder closures, in both directions, from Richter Rd. to the CPS Plant for ditch work. 

SH 46 – Kendall County

  • Current until October 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-10 – Kendall County

  • Current until October 2021. Full closure of the eastbound frontage road at I-10. DETOUR: Traffic will be detoured on SH 46.