Pages

Friday, September 24

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Monday, September 27 until Thursday, September 30. 9 p.m. to 5 a.m. Eastbound and westbound flyover ramps to southbound US 281 closed for bridge repairs at Donella Dr.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, September 27 until Friday, October 1. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for fence installation.
  • Monday, September 27 until Friday, October 1. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for fence installation.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Thursday, September 30. Weeknights 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from SH 16 (Bandera Rd.) to W. Hausman Rd. for illumination work. DETOUR: Traffic will be directed to the frontage roads.
  • Current until Thursday, September 30. Weeknights 9 p.m. to 5 a.m. Eastbound exit ramp to W. Hausman Rd. closed for illumination work. DETOUR: Traffic will utilize the exit ramp to SH 16 (Bandera Rd.).
  • Current until Friday, September 30. Right turn lane on eastbound frontage road closed from Brenen Ave to Peave Blvd. for utility work.
  • Current until Saturday, October 9. Weeknights 9 p.m. to 5 a.m. Alternating mainlane closures from SH 16 (Bandera Rd.) to I-10 for barrier installation. One lane to remain open at all times.
  • Current until Saturday, October 9. 9 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installations. One lane to remain open at all times. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 25 until Sunday, September 26. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, September 27 until Friday, October 1. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, September 27 until Friday, October 1. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, September 25. 9 a.m. to 4 p.m. Westbound exit ramp to northbound Loop 410 closed for guard rail repairs. DETOUR: Traffic will be detoured to the southbound Loop 410 ramp to the eastbound I-10 ramp to the northbound Loop 410 ramp.
  • Saturday, September 25. 5 a.m. to 9 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for roadway work.
  • Saturday, September 25. 6 a.m. to 5 p.m. Single lane closures, in both directions, from Pfeil Rd. to Saltrillo Creek for retaining wall and barrier work.
  • Sunday, September 26 until Friday, October 1. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for roadway work.
  • Thursday, September 30 until Friday, October 1. 9 p.m. to 5 a.m. Single westbound mainlane closure from Graytown Rd. to Loop 1604 for bridge work.
  • Friday, October 1 8:30 p.m. until Sunday, October 3 5:30 a.m. Alternating mainlane closures from FM 2538 to Zuehl Rd. for barrier installation and asphalt operations.
  • Sunday, October 3 until Frida, October 10. 8:30 p.m. to 5:30 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for asphalt operations.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, September 26 until Monday, September 27. 9 p.m. to 5 a.m. Full closure of the southbound ramp to westbound I-10, including the entrance ramps from San Pedro Ave. and McCullough Ave., for bridge repairs.
  • Sunday, September 26 until Monday, September 27. 9 p.m. to 5 a.m. Single southbound closure to I-10 westbound at Finesilver for bridge joint rail work.
  • Sunday, September 26 until Wednesday, September 29. 9 a.m. to 4 p.m. Single southbound frontage road lane closure from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 26 until Wednesday, September 29. 9 p.m. to 5 a.m. Various southbound exit ramps closure from Weidner Road to Whirlwind Drive for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 a.m. to 4 p.m. Single southbound mainlane closure from Weidner Road to I-410 for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 a.m. to 4 p.m. Single southbound frontage road closure from Mid Cities Parkway to N. Evans Road for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 a.m. to 4 p.m. Single southbound frontage road closure from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 a.m. to 7 p.m. Single southbound frontage road lane closure from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 a.m. to 4 p.m. Single southbound frontage road closure from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound frontage road from Weidner Road to I-410 for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Double southbound frontage road closure from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Various southbound frontage road shoulders closure from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Triple northbound mainlane closure from S. Guadalupe River to FM 306 for milling and paving work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Southbound exit ramp and right mainlane closure from FM 3009 (Roy Richard Drive) to Retama Parkway for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound mainlane closure from Mid Cities Parkway to Pawlin Drive for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound frontage road closure from FM 3009 (Roy Richard Drive) to Corporate Drive for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound frontage road closure at Schertz Parkway for geotechnical and drilling work.
  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound exit ramp closure to O’Connor Road for geotechnical and drilling work.
  • Monday, September 27 until Friday, October 1. 9 a.m. to 5 p.m. Double southbound frontage road closure from Crownpoint Dr. to Judson Road for geotechnical and drilling work.
  • Monday, September 27 until Friday, October 1. 9 a.m. to 5 p.m. Double southbound frontage road closure from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, September 27 until Friday, October 1. 9 a.m. to 5 a.m. Single southbound frontage road closure from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Monday, September 27 until Friday, October 1. 9 p.m. to 5 a.m. Double southbound mainlane closure from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Monday, September 27 until Friday, October 1. 9 p.m. to 5 a.m. Single southbound mainlanes from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, September 27 until Saturday, October 2. 9 a.m. to 5:30 p.m. Single lane closure on the frontage road, in both directions, from FM 2252 to FM 1103 (Hubertus Road) for import and material haul-off.
  • Monday, September 27 until Saturday, October 2. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Wednesday, September 29 until Thursday, September 30. 8 p.m. to 5 a.m. Double mainlane closure, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, September 30 until Friday, October 1. 8 p.m. to 5 a.m. Full southbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit.
  • Friday, October 1 until Saturday, October 2. 8 p.m. to 5 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Watson off-ramp.
  • Saturday, October 2 until Sunday, October 3. 8 p.m. to 5 a.m. Full northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and enter the highway from Watson Ln.
  • Sunday, October 3 until Monday, October 4. 8 p.m. to 5 a.m. Double northbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use the Kohlenberg Rd. entrance ramp. 

I-410 – East San Antonio

  • Saturday, September 25. 7 a.m. to 3 p.m. Single southbound mainlane closure from Houston St. to Rigbsy Ave. for guardrail repairs.
  • Sunday, September 26 until Friday, October 1. Various mainlane closures, in both directions, from I-35 to I-10 for overhead sign replacements. 

I-410 – West San Antonio

  • Current until Monday, September 27. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, September 27. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Saturday, October 2. 5 a.m. to 8 p.m. Full closure of the northbound mainlanes at SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Saturday, October 2. 5 a.m. to 8 p.m. Southbound ramp to westbound SH 151 ramp closed for bridge and striping work. 

I-410 – Southwest San Antonio

  • Sunday, September 26 until Friday, October 1. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from Valley Hi Dr. to Ray Ellison Blvd. for barrier setting.
  • Monday, September 27 until Friday, October 1. Single lane closure on the northbound frontage road from Valley Hi Dr. to Ray Ellison Blvd. for drainage work. 
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd.  

SH 151 – West San Antonio

  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Loop 410 for bridge work. DETOUR: Traffic will be detoured to frontage roads.
  • Current until Monday, September 27. 8 p.m.t o 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.   

SH 211 – Bexar County

  • Monday, September 27 until Thursday, September 30. 9 a.m. to 5 p.m. Single lane closures, in both directions, from Briggs Ranch to just south of Us 90 for roadway repairs. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

US 181 – Bexar County

  • Current until Saturday, October 30. 7 a.m. to 7 p.m. Single lane closures, in both directions, from I-37 to Spur 122 for guardrail and mowstrip repairs. 

Hildebrand Ave. – Bexar County

  • Monday, September 27. 9 a.m. to 5 p.m. Alternating lane closures from Brackenridge Rd. to US 281 for mill and overlay work. 

SH 46 – Kendall County

  • Current until October 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-10 – Kendall County

  • Current until October 2021. Full closure of the eastbound frontage road at I-10. DETOUR: Traffic will be detoured on SH 46.