Pages

Friday, October 15

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 

Loop 1604 – North Central San Antonio/Bexar County

  • Monday, October 25 until Thursday, October 28. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road at Lockhill Selma for utility work.
  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, October 18 until Friday, October 22. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, October 18 until Friday, October 22. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Thursday, October 21. Weekdays 9 a.m. to 3 p.m. Westbound to eastbound turnaround at W. Hausman Rd. closed for bridge widening.
  • Current until Saturday, October 23. Weeknights 9 p.m. to 5 a.m.  Alternating lane closures on the frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installation.
  • Current until Saturday, October 23. Weeknights 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installation.
  • Monday, October 18 until Sunday, November 30. 9 a.m. to 3 p.m. Alternating full closure of the turnarounds at Kyle Seale Parkway, in both directions, for bridge widening construction.
  • Monday, October 18 until Friday, October 29. 9 a.m. to 3 p.m. Single lane closures on the eastbound frontage road from Chase Hill Blvd. to La Cantera Parkway for utility work. 

W. Hausman Rd. – Bexar County

  • Current until Monday, October 18. Full closure of the eastbound lanes from Loop 1604 to Kyle Seale Parkway for utility work. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 16 until Sunday, October 17. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, October 18 until Friday, October 22. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, October 18 until Friday, October 22. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 23 until Sunday, October 24. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, October 15 8:30 a.m. to Sunday, October 17 5:30 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to FM 1518 for barrier installation and asphalt work.
  • Friday, October 15 until Tuesday, October 19. 8:30 p.m. to 5:30 a.m. Alternating eastbound mainlane closures from FM 2538 to Zuehl Rd. for barrier installation.
  • Sunday, October 17 until Thursday, October 21. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to FM 1518 for barrier installation and asphalt work.
  • Sunday, October 17 until Tuesday, October 19. 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Loop 1604 for bridge work.
  • Monday, October 18 thru Thursday, October 21 from 7. p.m. to 5 a.m. EACH NIGHT. Eastbound I-10 ramp to southbound I-410 closed for pavement work. Detour: Exit at W.W. White and follow southbound I-410 frontage road to Houston Street entrance ramp.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Friday, October 15 until Saturday, October 16. 8 p.m. to 9 a.m. Full southbound mainlane closure at Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit and reenter at the next entrance ramp.
  • Saturday, October 16 until Sunday, October 17. 8 p.m. to 9 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Watson exit ramp and use next entrance ramp.
  • Sunday, October 17 until Monday, October 18. 8 p.m. to 5 a.m. Full northbound mainlane closure at Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and reenter the highway from Watson Ln.
  • Sunday, October 17 until Monday, October 18. 9 p.m. to 5 a.m. Single southbound closure to I-10 westbound at Finesilver for bridge deck work.
  • Sunday, October 17 until Friday, October 22. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 (Hubertus Road) for milling and asphalt work.
  • Sunday, October 17 until Friday, October 22. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 (Hubertus Road) for milling and asphalt work.
  • Sunday, October 17 until Friday, October 22. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 (Hubertus Road) to FM 1103 for milling and asphalt work.
  • Monday, October 17 until Monday, October 18. 8 p.m. to 5 a.m. Double northbound mainlane closure at Conrads Ln. for bridge demolition. DETOUR: Frontage road traffic will use the FM 306 entrance ramp.
  • Monday, October 18 until Thursday, October 21. 9 p.m. to 5 a.m. Single southbound closure over I-410 for bridge concrete rail work.
  • Monday, October 18 until Saturday, October 23. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road, from FM 2252 to FM 1103 (Hubertus Road) for mill, overlay and import and material haul-off.
  • Monday, October 18 until Saturday, October 23. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road, from FM 2252 to Schwab Road for mill, overlay and sidewalks, driveways and material haul-off and delivery.
  • Monday, October 18 until Saturday, October 23. 9 a.m. to 5:30 p.m. Double southbound lane frontage road closure, from FM 1103 (Hubertus Road) to FM 2252 for mill, overlay and sidewalks, and curb demolition. 

I-410 – East San Antonio

  • Saturday, October 16 until Sunday, October 17. 5 a.m. to 5 p.m. Alternating southbound mainlane closures from I-10 to Houston St. exit ramp for traffic switch.
  • Saturday, October 16 until Sunday, October 17. 5 a.m. to 5 p.m. Alternating lane closures on the southbound frontage road at Rigsby Rd. for traffic switch.
  • Sunday, October 17 until Thursday, October 21. 9 p.m. to 5 a.m. Various alternating mainlane closures from I-35 to I-10 for overhead sign replacements.
  • Sunday, October 17 until Tuesday, October 19. 7 p.m. to 5 a.m. Alternating northbound mainlane closures from Houston St. to I-10 for pavement operations.
  • Monday, October 18 until Thursday, October 21. 7 p.m. to 5 a.m. Alternating southbound mainlane closures from Binz-Engleman Rd. to Houston St. for pavement operations. 

I-410 – West San Antonio

  • Current until Monday, October 25. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, October 25. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, October 25. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge and wall work.
  • Current until Monday, October 25. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, October 17 until Sunday, October 24. 8 p.m. to 5 a.m. Full closure of the Culebra Rd. intersection for bridge work. 

I-410 – Southwest San Antonio

  • Sunday, October 17 until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
  • Wednesday, October 20 until Thursday, October 21. 9 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Valley Hi Dr. to Medina Base Rd.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, October 25. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, October 25. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd.to Loop 410 for bridge work.
  • Sunday, October 17 until Sunday, October 31. 8 p.m. to 5 a.m. Alternating full closures of the mainlanes, in both directions at Loop 410 for painting operations. 

FM 1535 – N.W. Military Highway

  • Saturday, October 16 until Saturday, October 23. Single northbound lane closure at the Wurzbach Parkway for utility work. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 2252 – Nacogdoches Rd.

  • Sunday, October 17 until Monday, October 18. 7 p.m. to 7 a.m. Full closure, in both directions, at the Evans Rd. intersection for bridge work.

US 181 – Bexar County

  • Current until Saturday, October 30. 7 a.m. to 7 p.m. Single lane closures, in both directions, from I-37 to Spur 122 for guardrail and mow strip repairs. 

SH 46 – Kendall County

  • Current until October 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed.  

I-10 – Kendall County

  • Current until October 2021. Full closure of the eastbound frontage road at I-10. DETOUR: Traffic will be detoured on SH 46.
  • Sunday, October 17 until Wednesday, October 20. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, at the Scenic Loop Rd. intersection for milling and overlay operations.
  • Tuesday, October 19 until Friday, October 22. 9 p.m. to 5 a.m. Single eastbound mainlane closure from Scenic Loop Rd. to Balcones Creek for final overlay work.
  • Tuesday, October 19 until Friday, October 22. 9 p.m. to 5 a.m. Single westbound mainlane closure from Scenic Loop Rd. to Balcones Creek for final overlay work.
  • Friday, October 22 until Sunday, October 24. 9 p.m. to 5 a.m. Single westbound mainlane closure at exit 543 for final overlay work.