Pages

Friday, November 19

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for concrete paving.
  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for concrete paving.
  • Monday, November 22 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from Loop 1604 to US 281 for signage installation.
  • Monday, November 22 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, November 22 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term eastbound frontage road lane closure from the Blanco Road exit ramp to the Blanco intersection for RW372 Phase 1.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Blanco intersection for RW372 Phase 1.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term eastbound mainlane closure from the Blanco Road exit ramp to the Blanco intersection for RW372 Phase 1.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term westbound mainlane closure from the Blanco Road exit ramp to the Blanco intersection for RW372 Phase 1.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term northbound Blanco Road closure at the Loop 1604 intersection for RW372 Phase 1.
  • Saturday, November 20 8 a.m. until 4 p.m. Periodic short term southbound Blanco Road closure at the Loop 1604 intersection for RW372 Phase 1.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Sterling Browning Road to Trailcrest Street for striping.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Drive to Bitters Road for striping.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Bitters Road to Tradesman Drive for striping.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Huebner Road to Blanco Road for barrier setting.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Blanco Road to Huebner Road for barrier setting.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from Shavano Ranch Road to Sonterra Place for barrier setting.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Blanco Road to Voigt Drive for barrier setting.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Blanco Bluffs Drive to the 1604 intersection for existing median removal.
  • Sunday, November 21 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from the 1604 intersection to Blanco Bluffs Drive for existing median removal. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • Monday, October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • Tuesday, November 9 until Tuesday, November 23. Weekdays 9 a.m. until 4 p.m. westbound frontage road lane closure from Hausman Road entrance ramp to Bandera Road exit ramp for high mast illumination installation.
  • Thursday, November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
  • Thursday, November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Loop 1604 to Stone Oak Parkway for concrete paving.
  • Monday, November 22 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, November 22 until Wednesday, November 24. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, November 22 until Wednesday, November 24. 8:30 p.m. to 5:30 a.m.  Full closure of westbound mainlanes at FM 2538 for bridge work.
  • Tuesday, November 30 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road from Foster Rd. to FM 1516 for utility work.
  • Tuesday, November 23, from 9 a.m. to 3 p.m. Eastbound I-10 rolling single lane closures from FM 1516 to Pfeil Road for road cleanup.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Friday, November 19 until Sunday, November 21, 9 p.m. to 7 a.m. Full southbound mainlane closure at Conrads Lane for beam installation work. DETOUR: Traffic will be routed to the frontage road.
  • Sunday, November 21 until Tuesday, November 23. 8 a.m. to 7 p.m. Various lane closures of the median between Loop 1604 eastbound to I-35 southbound mainlanes and frontage road, from Gateway Place to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound mainlanes ramp to I-35 southbound mainlanes and frontage road, from Gateway Boulevard to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single southbound frontage road lane closure from Walzem Road to Crestwind Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single median closure of the I-35 southbound frontage road and the Loop 1604 westbound frontage road, between Gateway Boulevard to I-35 Junction for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. lane closures from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various lane closures from Loop 1604 eastbound frontage road ramp to I-35 frontage road southbound from Gateway Boulevard to McMorris Boulevard for geotechnical and drilling work. 
  • Sunday, November 21 until Tuesday, November 23 9 a.m. to 4 p.m. Single lane closure from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various lane closure from Loop 1604 eastbound frontage road to I-35 southbound frontage road from IKEA-RBFCU Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Whirlwind Drive to Walzem Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various southbound frontage road closures from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various lane closures from Loop 1604 eastbound to I-35 northbound from IKEA-RBFCU Parkway to I-35 northbound for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various lane closures on the eastbound Loop 1604 exit ramp to I-35 southbound from Gateway Place to Gateway Boulevard. for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various lane closures including the entire cloverleaf ramp from Loop 1604 westbound to I-35 southbound for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 23. 9 p.m. to 5 a.m. Double southbound mainlane and ramps (as needed) closure from FM 306 to S. Guadalupe River for milling and paving work.
  • Monday, November 22 until Tuesday, November 23. 8 a.m. to 5 p.m. Single southbound frontage road from FM 306 to Nissan Way for sidewalk work.
  • Monday, November 22 until Wednesday, November 24. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to FM 1103 (Hubertus Rd.) for cleaning and landscape work.
  • Monday, November 22 until Wednesday, November 24. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to Schwab Rd. for cleaning, landscape, striping, sidewalk and driveway work.
  • Monday, November 22 until Wednesday, November 24. 9 a.m. to 5:30 p.m. Single southbound frontage road from FM 1103 (Hubertus Rd.) to FM 2252 for cleaning and landscape work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single southbound closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single southbound frontage road closure from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
  • Monday, November 22 until Tuesday, November 23. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Retama Parkway to to N Evans Road for geotechnical and drilling work. 

I-410 – Northeast San Antonio

  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Shoulder closure eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single eastbound frontage road lane closure from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Shoulder westbound lane closure from Fratt Road to Ellis Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Shoulder closure on eastbound frontage road from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Eastbound shoulder on the frontage road from Vicar Drive to the I-410 Loop interchange with Austin Highway for geotechnical and drilling work. 
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Shoulder closure westbound frontage road from the I-410 Loop Interchange to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various median closures westbound and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various westbound median closures on the frontage road and I-410, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various westbound frontage road shoulder closures from Austin Hwy to I-410 for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Various westbound frontage road shoulder closures from Austin Hwy to I-410 before joining the I-410 Loop for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single westbound frontage road closure from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single westbound lane closure on the mainlanes from Post Oak Road to Norwich Drive for geotechnical and drilling work.
  • Sunday, November 21 until Tuesday, November 23. 9 a.m. to 4 p.m. Single westbound lane closure on the frontage road from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single eastbound mainlane closure from N New Braunfels Avenue to Nacogdoches Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various eastbound lane closures from entrance ramp from Cripple Creek Street to Ira Lee Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single eastbound lane closure from Ira Lee Road to Silverstar Street for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single eastbound lane closure from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various eastbound frontage road closures (including entrance ramp to I-410) from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single eastbound lane closure from Fratt Road to Interchange Parkway for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Eastbound entrance ramp closure and frontage road closures from Quail Creek Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Turnaround closure from eastbound frontage road to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Turnaround closure from westbound frontage road to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various eastbound frontage road lane closures (including I-410 entrance ramp) from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Exit ramp closure connecting eastbound I-410 to southbound Austin Highway, as well as shoulder closures on both sides of the ramp for geotechnical and drilling work.  
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various westbound closures, including ramp connecting northbound Austin Hwy to westbound I-410 from Cross Creek Drive to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various eastbound closures, including ramp connecting northbound Austin Hwy to eastbound I-410 from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single lane closure westbound from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Various median closures westbound and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work. 
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Westbound frontage road ramp closure from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 21 until Wednesday, November 24. 9 p.m. to 5 a.m. Single westbound lane closure on the mainlanes from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work. 

I-410 – West San Antonio

  • Current until Monday, November 22. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, November 22. 8 p.m. to 5 a.m. Full closure of the northbound frontage road lanes from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, November 22. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, November 22. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, November 22 until Monday, November 29. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, November 21 until Monday, December 6. 8 p.m. to 5 a.m. Full closure of the Culebra Rd. intersection at  Loop 410 for bridge work. 

I-410 – Southwest San Antonio

  • Current until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, November 22. 8 p.m. to 5 a.m. Alternating full closures of the mainlanes, in both directions, at Loop 410 for bridge work.
  • Current until Monday, November 22. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Full alternating mainlane closures, in both directions, at Loop 410 for bridge work.
  • Monday, November 22 until Monday, November 29. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work. 

Alamo Ranch Parkway – Bexar County

  • Friday, November 19 until Monday, November 22. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Loop 1604 to Lone Star Parkway for paving operations. 

US 181 – Bexar County

  • Current until Tuesday, November 23. 7 a.m. to 7 p.m. Single lane closures, in both directions, from Wilson County Line to I-37 for road repairs. 

FM 2252 – Nacogdoches Rd.

  • Saturday, November 20. 7 a.m. to 10 p.m. Alternating lane closures, in both directions at the Evans Rd. intersection for asphalt work. 

I-10 – Kendall County

  • Saturday, November 20. 4 a.m. to 5 p.m. Single eastbound mainlane closure from SH 87 to Scenic Loop Rd. for paving operations.
  • Tuesday, November 23. 9 a.m. to 1 p.m. Single eastbound mainlane closure from SH 8 to Scenic Loop Rd. for barrier removal an striping.
  • Current until December 2021. Full closure of the eastbound exit 540 ramp to SH 46/Bandera Rd. for roadway construction. DETOUR: Traffic will be diverted to the US-87 exit ramp and use the Scenic Loop Rd. turnaround. 

SH 123 – Guadalupe County

  • Current until Wednesday, November 24. 8 a.m. to 6 p.m. Alternating lane closures, in both directions, near Zion Hill Rd. for paving operations.