Pages

Friday, December 10

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for concrete paving.
  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for concrete paving.
  • Sunday, December 12 until Friday, December 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Vance Jackson Road to US 281 exit ramp for barrier setting.
  • Sunday, December 12 until Friday, December 17. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Vance Jackson Road for barrier setting.
  • Sunday, December 12 until Friday, December 17. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane to Huebner Road for median demolition, barrier setting and temporary pavement.
  • Sunday, December 12 until Friday, December 17. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane for median demolition, barrier setting and temporary pavement.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW370 Phase 1.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW370 Phase 1.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW370 Phase 1.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Blanco Road intersection for RW370 Phase 1.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Blanco Road closure at the Loop 1604 intersection for RW370 Phase 1.
  • Sunday, December 12 until Friday, December 17. Nightly 11 p.m. until 5 a.m. Periodic short term southbound Blanco Road closure at the Loop 1604 intersection for RW370 Phase 1. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Saturday, December 18. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Current until Saturday, December 18. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Current until Saturday, December 18. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • Current until Saturday, December 18. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • Current until Saturday, December 18. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
  • Current until Saturday, December 18. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
  • Current until Thursday, December 16. Weekdays 9 a.m. until 5 p.m. Eastbound frontage road lane closure from Chase Hill Boulevard to John Peace Boulevard for welding and stringing pipe. 

US 281 – North Central San Antonio

  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, December 11 until Sunday, December 12. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Walzem Road to Crestwind Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Whirlwind Drive to Walzem Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road of I-35 from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane and entrance ramp closures on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between North Weidner Road and O’Connor Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between Wayland Way and O’Connor Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between O’Connor Road and Bladau Bishop for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between O’Connor Road and Bladau Bishop for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road between O’Connor Road and Judson Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Turnaround closure from the northbound frontage road to southbound frontage road between Joe Lee Street and North Weidner Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Turnaround closure from the southbound frontage road to northbound frontage road and single lane closure on the northbound frontage road between North Weidner Road and Bomar Lane for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane and entrance ramp closure on the northbound I-35 frontage road between O’Connor Road and Bladau Bishop for geotechnical and drilling work.
  • Monday, December 13 until Tuesday, December 14. 9 a.m. to 3 p.m. Single southbound mainlane closure from Schwab Road to Schwab Road for power wire work.
  • Monday, December 13 until Tuesday, December 14. 9 p.m. to 5 a.m. Various lane closures on the northbound mainlanes from Loop 1604 to Olympia Parkway including the northbound entrance ramp from Loop 1604 and the I-35 northbound Olympia Parkway exit ramp for overhead sign bridge inspection. 
  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
  • Monday, December 13 until Saturday, December 18. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to FM 1103 (Hubertus Rd.) for cleaning and landscape work.
  • Monday, December 13 until Saturday, December 18. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to Schwab Rd. for cleaning, landscape, striping, sidewalk and driveway work.
  • Monday, December 13 until Saturday, December 18. 9 a.m. to 5:30 p.m. Single southbound frontage road from FM 1103 (Hubertus Rd.) to FM 2252 for cleaning and landscape work. 

I-410 – Northeast San Antonio

  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Westbound shoulder closure along from Fratt Road to Ellis Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Shoulder closure along the eastbound frontage road from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Shoulder closure along the westbound frontage road from the I-410 Loop Interchange to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Various median closures westbound between the I-410 frontage road and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Various westbound median closures between the I-410 frontage road and I-410, between the I-410 Loop Interchange and Perrin Beitel Road entrance ramp for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road between the 368 Ramp and the I-410 Loop for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Shoulder closure on the westbound frontage road from Austin Highway to I-410 before joining the I-410 Loop for geotechnical and drilling work. 
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road along from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure on I-410 westbound from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Entrance ramp closure to I-410 eastbound and single lane closure from Cripple Creek Street to Ira Lee Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure eastbound from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure eastbound from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Various eastbound frontage road closures (including entrance ramp to I-410) from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure eastbound from Fratt Road to Interchange Parkway for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Eastbound entrance ramp closure and frontage road shoulder closures from Quail Creek Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Turnaround closure from I-410 eastbound frontage road to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Turnaround closure from I-410 westbound frontage road to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Various eastbound frontage road lane closures (including I-410 entrance ramp) from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Exit ramp closure connecting eastbound I-410 to southbound Austin Highway for geotechnical and drilling work. 
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure on the entrance ramp that connects northbound Austin Highway to the I-410 westbound frontage road between Cross Creek Drive and Vicar Drive for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Entrance ramp closure connecting northbound Austin Highway to I-410 eastbound between Cross Creek Drive and Fratt Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Various median closures westbound between the I-410 frontage road and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Westbound frontage road entrance ramp closure on the from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure on the westbound mainlanes from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single lane closure on the westbound mainlanes from Post Oak Road to Norwich Drive for geotechnical and drilling work. 

I-410 – East San Antonio

  • Current until Monday, December 13. 9 a.m. to 3 p.m. Single right lane closure on the southbound frontage road from E. Houston St. to Rigsby Rd. for road work.
  • Monday, December 13, from 8 a.m. to 5 p.m. Alternating southbound I-410 single lane closures between Houston Street and Rigsby Avenue for striping.
  • Monday, December 13, from 9 a.m. to 11 a.m. Southbound I-410 exit ramp to Rigsby closed for striping. DETOUR: I-410 southbound traffic to Rigsby Avenue can take next exit to Southcross Road, turn around at intersection, and continue on northbound I-410 frontage road to Rigsby Avenue. 

I-410 – West San Antonio

  • Current until Monday, December 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, December 13. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, December 13. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, December 13. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, December 13 until Tuesday, December 14. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, December 13 until Tuesday, December 14. 9 a.m. o 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Sunday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full closure of the Culebra Rd. intersection for signal work.
  • Sunday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full closure of the W. Military Dr. intersection for demolition work. 

I-410 – Southwest San Antonio

  • Sunday, December 12 until Monday, December 13. 9 p.m. to 5 a.m. Single southbound mainlane closure from Ray Ellison Blvd. to Old Pearsall Rd. for asphalt work.
  • Wednesday, December 15. 2 p.m. to 4 p.m. Alternating lane closures at the intersection of Valley Hi Dr. intersection for concrete pouring.
  • Current until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, December 13. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, December 13. 8 p.m. to 5 a.m. Alternating full closures on the mainlanes, in both directions, at Loop 410 for bridge work.
  • Current until Monday, December 13. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Monday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full alternating mainlane closures, in both directions, at Loop 410 for bridge work.
  • Monday, December 13 until Tuesday, December 14. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

FM 1502 – Wurzbach Parkway

  • Sunday, December 12 until Saturday, December 18. 9 a.m. to 4 p.m. Single westbound lane closure from Elm Creek to Lockhill Selma Rd. for barrier shifting.
  • Sunday, December 12 until Friday, December 17. 9 p.m. to 5 a.m. Single westbound lane closure from Elm Creek to Lockhill Selma Rd. for barrier shifting.
  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single westbound lane closure at N.W. Military Highway for curb improvements. 

FM 1535 – N.W. Military Highway  

  • Monday, December 13 until Friday, December 17. 9 a.m. to 4 p.m. Single northbound lane closure at Wurzbach Parkway for curb and sidewalk improvements. 

I-10 – Kendall County

  • Current until December 2021. Full closure of the eastbound exit 540 ramp to SH 46/Bandera Rd. for roadway construction. DETOUR: Traffic will be diverted to the US-87 exit ramp and use the Scenic Loop Rd. turnaround.