Loop 1604 – West San Antonio/Bexar County

  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single southbound lane closure at SH 151 for utility work.

Loop 1604 – North West San Antonio/Bexar County

  • Tuesday, March 22 until Monday, March 28. Weeknights 9 p.m. until 5 a.m. Eastbound IH-10 to Westbound Loop 1604 ramp full closure for barrier setting and striping.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Kyle Seale Parkway to Bandera Road (SH 16) for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Northbound Kyle Seale Parkway full closure at the Loop 1604 intersection for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Southbound Kyle Seale Parkway full closure at the Loop 1604 intersection for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Monday, March 28 until Thursday, March 31. Weeknights 9 p.m. until 5 a.m. Westbound Loop 1604 exit ramp to La Cantera Parkway full closure for barrier setting.
  • Sunday, March 27 until Tuesday, March 29. Weeknights 9 p.m. until 5 a.m. Eastbound Loop 1604 entrance ramp from La Cantera Parkway full closure for high mast illumination.
  • Monday, March 28 until Thursday, March 31. Weeknights 9 p.m. until 5 a.m. Westbound IH-10 to Westbound Loop 1604 cloverleaf ramp full closure for barrier setting.
  • Monday, March 28 until Thursday, March 31. Weeknights 9 p.m. until 5 a.m. Eastbound IH-10 to Westbound Loop 1604 ramp full closure for barrier setting.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 3 p.m. Westbound frontage road outside lane closure from IH-10 to Hausman Road for high mast illumination.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road outside lane closure from Hausman Road to John Peace Boulevard /La Cantera Parkway for sidewalk construction.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Northbound Babcock Road full closure at the Loop 1604 intersection for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Southbound Babcock Road full closure at the Loop 1604 intersection for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Babcock Road for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Babcock Road for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Southbound La Cantera Parkway/John Peace Boulevard full closure at the Loop 1604 intersection for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for storm drains.
  • Friday, March 18 until Monday, March 28. Weekends only 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for storm drains.
  • Friday, March 25 until Monday, April 4. Weekends only 9 p.m. until 5 a.m. Northbound La Cantera Parkway/John Peace Boulevard full closure at the Loop 1604 intersection for storm drains.
  • Friday, April 1 at 10 p.m. until Sunday, April 2 at 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: deck pour.
  • Friday, April 1 at 10 p.m. until Sunday, April 2 at 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: deck pour.
  • Friday, April 1 at 10 p.m. until Sunday, April 2 at 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: deck pour.
  • Friday, April 1 at 10 p.m. until Sunday, April 2 at 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: deck pour.
  • Friday, April 1 at 10 p.m. until Sunday, April 2 at 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: deck pour.

Loop 1604 – North Central San Antonio/Bexar County

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single westbound mainlane closure from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Northbound entrance ramp closure from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. Follow the detour signs.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Southbound entrance ramp closure from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic will make a U-turn at I-35 Access Road to northbound frontage road to eastbound Loop 1604. Follow the detour signs.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Cloverleaf westbound ramp closure to I-35 southbound between Gateway Boulevard and Pat Booker Road for geotechnical and drilling work. Traffic on Loop 1604 westbound will take Lookout Road exit and make a U-turn to Loop 1604 eastbound to I-35 southbound.
  • Monday March 28 until Tuesday, March 29. 9 a.m. to 4 p.m. Shoulder closure on the northbound frontage road from Nacogdoches Road to the turnaround near the railroad for utility potholing.
  • Monday, March 28 until Tuesday, March 29. 9 a.m. to 4 p.m. Mobile operations on mainlanes in both directions from Green Mountain Road to Kitty Hawk for topographic survey.
  • Monday, March 28 until Wednesday, March 30. 9 a.m. to 4 p.m. Mobile operations on mainlanes in both directions, for paint samples of lead and asbestos.  
  • Wednesday, March 30. 9 a.m. to 4 p.m. Shoulder closure on the southbound frontage road north of the turnaround near the railroad for utility potholing.
  • Wednesday, March 30. 9 a.m. to 4 p.m. Shoulder and single lane closure the southbound frontage road from Lookout Road exit ramp to Lookout Road intersection for utility potholing.
  • Wednesday, March 30. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage from Gateway Boulevard to Gateway Place for utility potholing. 

US 281 – North San Antonio/Bexar County

  • Sunday, March 27 until Friday, April 8. 9 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Overlook Parkway to Wilderness Oak for demolition work.
  • Sunday, March 27 until Thursday, March 31. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, March 27 until Thursday, March 31. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, March 27 until Friday, April 1. Continuous 9 p.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, March 27 until Friday, April 1. Continuous 9 p.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, March 28 until Thursday March 31. 8 p.m. to 6 a.m. Full closure of the mainlanes, in both directions, at FM 1518 for bridge work. Traffic will be diverted to the frontage roads.
  • Thursday, March 31 from 7:30 p.m. to 6:00 a.m. All east mainlanes and westbound left lane closed from Graytown Road to 1604 for bridge work. Eastbound 1604 entrance ramp also closed. DETOUR: Eastbound I-10 traffic may take Graytown/Pfeil exit ramp, continue on the frontage road, use the Pfeil entrance ramp.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Turnaround from south to northbound frontage road between FM 1518 and Chelsea Place for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Northbound exit ramp (171) closure from Pat Booker Road and single lane closure on northbound frontage road from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. Drivers must use the Toepperwein Road exit (170B).
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Northbound frontage road closure from Phoenix Avenue intersection to Forum Parkway intersection for geotechnical and drilling work. Traffic should use the Loop 1604 westbound to I-35 northbound. Follow the detour signs.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m.  Northbound exit ramp for O’Connor Road (169) and single frontage road lane closure from Wayland Way to O’Connor Road for geotechnical and drilling work. Drivers must use the Weidner Road exit (168). Follow the detour signs.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single southbound mainlane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single northbound mainlane closure from Fratt Road to Windcrest Drive for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single northbound mainlane closure on from Chelsea Place to Plaza Drive for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Single northbound mainlane closure from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m. Double lane closure on northbound frontage road from Bomar Lane to Judson Road for geotechnical and drilling work.
  • Monday, March 28 until Tuesday, March 29. 9 p.m. to 5 a.m. Northbound entrance ramp from O’Connor Road and single frontage road lane closure from O’Connor Road to Bladau Bishop for geotechnical and drilling work. Traffic should use the Toepperwein Road entrance ramp. Follow the detour signs.
  • Monday, March 28 until Wednesday, March 30. 9 a.m. to 4 p.m. Mobile operations on the frontage roads in both directions for paint samples of lead and asbestos.  
  • Monday, March 28 until Thursday, March 31. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Landmark 35 Drive to Judson Road intersection for wall investigation.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Double lane closure on northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road at Pat Booker Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on westbound Pat Booker Road at northbound frontage road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from I-35 Access Road to Converse Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road of from O’Connor Road to Bladau Bishop for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from O’Conner Road exit ramp to Bladau Bishop for wall investigation work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Pasatiempo Road to Valhalla Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from North Weidner Road to O’Connor Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound I-35 frontage road from O’Connor Road to Judson Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Chelsea Place to Legacy Oaks Parkway for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Legacy Oaks Parkway to Schertz Parkway for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Schertz Parkway to Plaza Drive for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on Fratt Road from the southbound frontage road to Interchange Parkway for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, March 28 until Friday, April 1. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for sidewalk and handrail work.
  • Tuesday, March 29 until Wednesday, March 30. 9 p.m. to 5 a.m. O’Connor Road southbound exit ramp (169) closure for geotechnical and drilling work. Traffic should use the Weidner exit ramp (168). Follow the detour signs.
  • Thursday, March 31 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from I-35 Access Road intersection to Albrecht Lane for utility potholing. 

I-410 – North East San Antonio

  • Sunday, March 27 until Friday, April 1. 9 p.m. to 5 a.m.  Eastbound entrance ramp closure from Perrin Beitel for geotechnical and drilling work. Traffic should use Austin Highway to I-35 for entrance ramp. Follow the detour signs.
  • Monday, March 28 until Wednesday, March 30. 9 a.m. to 4 p.m. Mobile operations on mainlanes in both directions for paint samples of lead and asbestos.  
  • Thursday, March 31. 9 a.m. to 4 p.m. Single lane closure on the eastbound-to-westbound turnaround at Perrin Beitel Road for utility potholing. 

I-410 – East San Antonio

  • Continuing through Monday, March 28. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work. 
  • Continuing through Monday, March 28. Northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work.
  • Current until Monday, March 28. Northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work. 

I-410 – West San Antonio

  • Current until Monday, March 28. 9 a.m. to 5 p.m. Closure of the southbound bypass ramp to W. Military Dr. for concrete work.
  • Current until Monday, March 28. 8 p.m. to 5 a.m. Double northbound mainlane closures from Ingram Rd. to Culebra Rd. for column work.
  • Current until Monday, March 28. 9 p.m. to 5 a.m. Full closure of the southbound exit ramp to Marbach Rd. for bridge work.
  • Current until Monday, March 28. 9 a.m. to 3 p.m. Single southbound mainlane closure from W. Military Dr. to SH 151 for concrete work.
  • Current until Monday, March 28. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd for concrete work.
  • Current until Monday, March 28. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal and curb work.
  • Current until Monday, March 28. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd for concrete work.
  • Current until Monday, March 28. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for barrier removal.
  • Sunday, March 27. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, just south of Marbach Rd. for utility work. Traffic will be stopped intermittently throughout the day in 15 minute intervals.
  • Monday, March 28 until Monday, April 4. 8 p.m. to 5 a.m. Alternating mainlane closures from Marbach Rd. to Ingram Rd. for painting operations.
  • Monday, March 28 until Monday, April 4. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for barrier removal.
  • Monday, March 28 until Monday, April 4. 9 a.m. to 5 p.m. Full closure of the southbound bypass ramp to W. Military Dr. for construction operations.
  • Monday, March 28 until Monday, April 4. 9 p.m. to 5 a.m. Full closure of the southbound bypass rap to Marbach Rd. closed for painting operations.
  • Monday, March 28 until Monday, April 4. 9 a.m. to 3 p.m. Single southbound lane closure from W. Military Dr. to SH 151 for concrete work.
  • Monday, March 28 until Monday, April 4. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Monday, March 28 until Monday, April 4. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

US 90 – West San Antonio/Bexar County

  • Monday, March 28 until Friday, April 1. 9 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Montgomery Rd. for bridge work. Traffic will be diverted to the frontage roads. 

SH 151 – West San Antonio

  • Current until Monday, March 28. 8 p.m. to 5 a.m. Full alternating closure of the mainlanes, in both directions, at Loop 410 for bridge work.
  • Current until Monday, March 28. 9 a.m. to 3 p.m. Alternating westbound mainlane closure at Loop 410 for pipe work.
  • Monday, March 28 until Monday, April 4. 8 p.m. to 5 a.m. Alternating full closures of the mainlanes, in both directions, at Loop 410 for painting operations.
  • Monday, March 28 until Monday, April 4. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from W. Military Dr. to Ingram Rd. for pipe work. 

PA 1502 – Wurzbach Parkway

  • Monday, March 28 until Friday, April 1. 9 a.m. to 4 p.m. Single lane closure, in each direction, at Lockhill Selma Rd. intersection for island work.
  • Current until Thursday, March 31. Eastbound ramp closure at Vista Del Norte for rail improvements.
  • Sunday, April 3. 9 p.m. to 5 a.m. Full closure of the eastbound lanes from N.W. Military Highway to Blanco Rd. for sign removal. 

Loop 337 – Comal County

  • Monday, March 28 until Friday, April 1. 8 a.m. to 5 p.m. Single northbound lane closure at River Rd. for bridge work. 

SH 123 – Guadalupe County

  • Current until Friday, April 15. 7 a.m. to 5 p.m. Single lane closures, in both directions, from Wilson County Line to 5 miles north of Wilson County Line for paving operations.

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.