Loop 1604 – North West San Antonio/Bexar County 

  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends. 
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Babcock Road to La Cantera Parkway for bridge construction. Only one full mainlane closure to occur per direction, per night. Excluding weekends
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from La Cantera Parkway to Babcock Road for bridge construction. Only one full mainlane closure to occur per direction, per night. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 to set portable concrete barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) to set portable concrete barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends. 
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding weekends.
  • Friday, November 11 at 9 p.m. until Monday, November 14 at 5 a.m. Full weekend closure. Westbound mainlane closure between Kyle Seale Parkway and Bandera Road for traffic switch and relocation of concrete traffic barrier. Only one full mainlane closure to occur per direction, per night.

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and NW Military Highway for drilling shafts.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Westbound mainlanes full closure from Blanco Road exit ramp to Bitters Road entrance ramp for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Eastbound frontage road periodic short term, full closure from Salado Creek to Huebner Road for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Westbound frontage road periodic short term, full closure from Huebner Road to Salado Creek for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Eastbound mainlane periodic short term, full closure from Bitters Road exit ramp to Blanco Road entrance ramp for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Northbound Bitters Road periodic short term, full closure at Loop 1604 intersection for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 11 p.m. until 5 a.m. Southbound Bitters Road periodic short term, full closure at Loop 1604 intersection for retaining wall excavation work and temporary illumination.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Right lane closure on southbound Blanco Road from W. Blanco Road to Talavera Parkway for barrier setting.
  • Sunday, November 6 until Friday, November 11. Nightly 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and W. Bitters Road for dirt excavation.
  • Monday, November 7 until Friday, November 11. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround full closure at Loop 1604 and Lockhill Selma Road for bridge widening construction.
  • Monday, November 7 until Friday, November 11. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and NW Military Highway for concrete placement for drilling shafts.
  • Sunday, November 6 until Sunday, November 13. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Lockhill Selma for bridge widening construction. 

Loop 1604 – North East San Antonio/Bexar County 

  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Nacogdoches Road to Union Pacific Railroad for earth work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Loop 1604 mainlane from I-35 to Nacogdoches Road for barrier work.

I-10 – North West San Antonio/Bexar County

  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, November 6 until Friday, November 18. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Daily alternating frontage closures. One lane to remain open at all times. Excluding Weekends.
  • Monday, November 7 until Monday, November 21. Weekdays 9 1.m. until 3 p.m. Alternating eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Daily alternating frontage closures. One lane to remain open at all times. Excluding Weekends. 

US 281 – North San Antonio/Bexar County

  • Friday, November 18 until Sunday, November 20. 12 a.m. to 7 p.m. Single lane closure on the northbound frontage road from Borgfeld Rd. to Bulverde Rd. for asphalt work. 
  • Saturday, November 19 until Sunday, November 20. 7 a.m. to 7 p.m. Single lane closure on the southbound frontage road from Borgfeld Rd. to Wilderness Oak for asphalt work.
  • Thursday, November 10. 7 a.m. to 7 p.m. Alternating lane closures on the northbound frontage road from Bulverde Rd. to Borgfeld Dr. for asphalt work.  

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County 

  • Sunday, November 6 until Wednesday, November 9. 9:00 p.m. to 5:00 a.m. Right lane and right turn lane closure on northbound frontage road of I-35 from Utopia Boulevard to Pasatiempo for geotechnical work.
  • Sunday, November 6 until Wednesday, November 9. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure for survey work. Southbound I-35 to westbound Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to westbound Loop 1604.
  • Sunday, November 6 until Wednesday, November 9. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 and southbound I-35 to eastbound Loop 1604 connector ramps closure for survey work. Traffic must exit Retama Parkway and follow the detour signs to eastbound or westbound Loop 1604.
  • Sunday, November 6 until Wednesday, November 9. 9:00 p.m. to 5:00 a.m. Southbound I-35 connector ramp to Pat Booker Road closure for survey work. Traffic must exit south Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, November 6 until Wednesday, November 9. 9:00 p.m. to 5:00 a.m. Southbound I-35 frontage road to Pat Booker Road closure for survey work. Traffic must use entrance ramp before IKEA-RBFCU Parkway to exit Pat Booker Road and follow detour signs.
  • Sunday, November 6 until Thursday, November 10. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for survey work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, November 6 until Saturday, November 12. 9:00 p.m. to 5:00 a.m. Southbound I-35 and eastbound Loop 1604 connector ramp closure for survey work. Southbound I-35 traffic to eastbound Loop 1604 must exit at westbound Loop1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, November 6 until Saturday, November 12. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for survey work. Westbound Loop 1604 traffic to southbound I-35 must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, November 6 until Saturday, November 12. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 frontage road from Crestway Drive to Thousand Oaks Drive for geotechnical work. 
  • Sunday, November 6 until Saturday, November 12. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp closure for survey work. Eastbound Loop 1604 traffic to northbound I-35 must use Pat Booker Road exit and follow the detour signs to access northbound I-35.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector at Loop 1604 interchange and westbound Loop 1604 to southbound I-35 connector closure for survey work. Traffic must west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Right mainlane closure on southbound I-35 and southbound I-35 entrance ramp closure from Pat Booker Road to Toepperwein Road for drill shaft work. Traffic must use next entrance ramp to access I-35.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 from Forum Parkway to Ferrell Road for survey work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Multiple right lane (2) closures and alternating ramp closure on southbound I-35 from Forum Parkway to Ferrell Road for survey work. 
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound I-35 frontage road from McMorris Boulevard to Pat Booker Road for survey work. 
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Right lane closures (3) and entrance ramp closure on southbound I-35 mainlane from Ferrell Road to Toepperwein Road for striping work. Traffic must use next ramp.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane and left lane closure on northbound frontage road of I-35 from O’Connor Road to Judson Road for installation of traffic monitoring equipment. 
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Right lane closures (3) and ramp closures on southbound I-35 mainlane from Toepperwein Road to Judson Road for striping work. Traffic must use next ramp.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Right mainlane and exit ramp closure on southbound I-35 from Toepperwein Road to Judson Road for barrier work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Left mainlane closures (3) on southbound I-35 from Pat Booker Road to O’Connor Road for striping work. 
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 and exit ramp closure from Pat Booker Road to Judson Road for drill shaft work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Toepperwein Road from southbound frontage road of I-35 to northbound frontage road of I-35. for drill shaft work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Multiple left lane (2) closures on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for drill shaft work.
  • Sunday, November 6 until Sunday, November 13. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for drill shaft preparation work.

I-10 – East San Antonio/Bexar County 

  • Thursday, March 31 from 7:30 p.m. to 6:00 a.m. All east mainlanes and westbound left lane closed from Graytown Road to 1604 for bridge work. Eastbound 1604 entrance ramp also closed. DETOUR: Eastbound I-10 traffic may take Graytown/Pfeil exit ramp, continue on the frontage road, use the Pfeil entrance ramp.
  • Saturday, November 5. DAYTIME I-10 westbound full mainlane closure between Pfeil Road and Scenic Lake Drive from 5 a.m. to 3 p.m. for barrier work. Detour: Westbound I-10 traffic will take the Graytown/Pfeil exit, use the westbound I-10 frontage road, and reenter after Loop 1604.
  • Wednesday, November 9 through Friday, November 11. NIGHTTIME I-10 eastbound full mainlane closure between FM 1516 and Weichold Road from 9 p.m. to 5 a.m. for barrier work. Detour: Eastbound I-10 traffic will take the Loop 1604 exit, use the eastbound I-10 frontage road, and reenter after Loop 1604.
  • Continuing through Monday, November 7. NIGHTTIME I-10 westbound full mainlane closure between Pfeil Road and FM 1516 from 9 p.m. to 5 a.m. for ramp work. Detour: Westbound I-10 traffic will take the Graytown/Pfeil exit, use the westbound I-10 frontage road, and take the FM 1516 on-ramp.
  • Continuing through Wednesday, November 9. NIGHTTIME westbound I-10 frontage road left and middle lane closure at Ackerman Road from 9 p.m. to 5 a.m. 
  • Continuing through Friday, November 11. DAYTIME westbound I-10 frontage alternating closures at Ackerman Road from 9 a.m. to 4 p.m. 
  • Continuing through Friday, November 18. NIGHTTIME I-10 eastbound exit to Ackerman closed from 9 p.m. to 5 a.m. for ramp work. Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at intersection, and use westbound frontage road back to Ackerman.  
  • Continuing through Friday, November 18. I-10 westbound frontage road dedicated left turn lane at the Loop 1604 intersection closed continuously until 5 a.m. November 18. 
  • Continuing through Friday, November 18, I-10 eastbound ramp to southbound I-410 closed continuously until 4 p.m November 18. Detour: Eastbound I-10 traffic to southbound I-10 may exit at W.W. White, take the I-10 eastbound frontage road to I-410 southbound frontage road, and use the E. Houston Street on-ramp. 
  • Sunday, November 6 until Monday, November 7. 7 p.m. to 6 a.m. Single westbound mainlane closure from FM 465 to Zuehl Rd. for shoulder work. 
  • Monday, November 7 until Thursday, November 10. 8 p.m. to 6 a.m. Single westbound lane closure from FM 465 to Zuehl Rd. for barrier movement. 
  • Friday, November 11 until Saturday, November 12. 8 p.m. to 6 a.m. Single westbound lane closure from FM 465 to Zuehl Rd. for barrier movement. 
  • Saturday, November 12. 5 a.m. to 9 p.m. Single mainlane closures, in both directions, from Zuehl Rd. to Santa Clara for traffic switch. 

I-410 – East San Antonio

  • Continuing through Monday, March 28. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work.  
  • Continuing through Friday, November 18. DAYTIME northbound and southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 9 a.m. to 4 p.m. for bridge and road work.  
  • Continuing through Wednesday, November 30 (except for November 23-27). Nighttime northbound I-410 frontage road left lane closures between East Houston Street and Peggy Drive from 9 p.m. to 5 a.m. for bridge work.  
  • Continuing through Friday, November 18, (except for Friday and Saturday nights). NIGHTTIME northbound I-410 mainlanes closed between E. Houston Street and I-10 on-ramp from 9 p.m. to 5 a.m. for overpass work. E. Houston Street entrance ramp to northbound I-410 also closed. Detour: Exit at E. Houston Street, take I-10 northbound frontage to Ackerman, turn around, and take westbound I-10 back to northbound I-410.
  • Continuing through Friday, November 18. NIGHTTIME northbound I-410 ramp to eastbound I-10 closed from 9 p.m. to 5 a.m. for overpass work. Detour: Northbound I-410 traffic to eastbound I-10 will take the I-410 northbound to I-10 westbound cloverleaf ramp, then the I-10 westbound to I-10 southbound cloverleaf ramp, and finally the I-410 southbound to I-10 eastbound cloverleaf ramp.
  • Continuing through Saturday, November 19. NIGHTTIME northbound I-410 frontage road closure from East Houston Street on-ramp to eastbound I-10 from 9 p.m. to 5 a.m. (No closures Friday or Saturday night.)  Detour: Northbound I-410 traffic to Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman. 

I-410 – West San Antonio

  • Current until Monday, November 14. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads in both directions from Bandera Rd. to Marbach Rd. 
  • Current until Monday, November 21. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from Bandera Rd. to SH 151 for bridge work. 
  • Current until Saturday, November 19. 9 a.m. to 5 p.m. Single northbound mainlane closure from Marbach Rd. to SH 151 for safety rail work. 
  • Current until Monday, November 14. 9 a.m. to 4 p.m. Southbound exit ramp to Ingram Rd. closed for safety rail work. 
  • Current until Monday, November 14. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road from Bandera Rd. to Marbach Rd. for mill and overlay work. 

SH 16 – Bandera Road

  • Monday, November 7 until Friday, November 11. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Diamond K Trail to Loop 1604 for utility work. 

FM 1535 – N.W. Military Highway 

  • Current until Thursday, November 24. 7 a.m. to 6 p.m. Alternating lane closures from Loop 1604 to Huebner Rd. for utility work. 
  • Monday, November 7 until Friday, November 11. 7 a.m. to 6 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work. 

PA 1502 – Wurzbach Parkway 

  • Current until Wednesday, November 30. 9 a.m. to 3 p.m. Various lane closures, in both directions, from Blanco Rd. to Thousand Oaks for ITS work. 

FM 471 – Bexar County

  • Current until Wednesday, November 9. Single northbound lane closure from Old FM 471 S to Old FM 471 N for construction of drainage crossing. Traffic will be detoured to Old FM 471. 

Blanco Road – Bexar County 

  • Monday, November 7 until Tuesday, December 22. 9 a.m. to 4 p.m. Alternating lane closures, in both directions, from Loop 410 to Lariat Dr. for sidewalk improvements. 

SH 46 – Comal County

  • Sunday, November 6 until Friday, November 18. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Bentwood Dr. to Farhills Dr. for striping operations. 

FM 1103 – Guadalupe County

  • Current until Friday, November 11. 9 a.m. to 3 p.m. Single lane closures, in both directions, from I-35 to Old Wiederstein Rd. for traffic switch. 
  • Current until Friday, November 11. 9 p.m. to 5 a.m. Single lane closures, in both directions, from I-35 to Old Wiederstein Rd. for drainage work. 

FM 306 – Guadalupe County

  • Monday, November 7 until Thursday, November 10. 8 a.m. to 3 p.m. Single northbound lane closure at the Guadalupe River for bridge work. 

FM 725 – Guadalupe County 

  • Monday, November 14 until Friday, November 18. 8 a.m. to 5 p.m. Single lane closures, in both directions, from Lake Creek Dr. to Grove Lane for paving operations.