Pages

Thursday, December 22

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Tuesday, December 27 until Friday, December 30. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for sidewalk construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Tuesday, December 27 until Friday, December 30. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for sidewalk construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

Loop 1604 – North East San Antonio/Bexar County

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Sunday, February 5. Long term closure (24/7). Left lane closure on southbound I-35 frontage road between Pat Booker Road and Toepperwein Road for drill shaft, column, and cap work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure of eastbound I-410 connector ramp to northbound I-35 mainlane for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Right shoulder closure on westbound frontage road of I-410 between Randolph Boulevard and I-35 for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound frontage road of I-35 connector ramp from Windcrest Drive to Tradewind Drive for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 frontage road and right shoulder closure on exit ramp between Walzem Road and Crestwind Drive for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane between Walzem Road and Crestwind Drive for drilling work.
  • Monday, January 2 until Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound I-410 mainlane between I-35 and Perrin Beitel for drilling work.
  • Monday, January 2 until Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound Fratt Road between frontage road of I-35 and Interchange Parkway for drilling work.
  • Monday, January 2 until Friday, January 6. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 between Starlight Terrace and Weidner Road for drilling work.
  • Monday, January 2 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 between Crestway Drive and Starlight Terrace for drilling work.
  • Tuesday, January 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane from Walzem Road to Crestwind Drive for drilling work.
  • Tuesday, January 3. 9:00 p.m. to 5:00 a.m. Left lane closure of northbound I-35 frontage road between Windcrest Drive and Tradewind Drive for drilling work.
  • Tuesday, January 3 until Thursday, January 5. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound I-410 connector ramp to northbound I-35 mainlane for drilling work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Judson Road to O’Connor Road for tree removal and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes and left lane closure on northbound frontage of I-35 from O’Connor Road to Judson Road for tree removal.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for drill shaft and drainage work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound mainline of I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for drill shaft preparation work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 connector ramp to westbound I-410 for drilling work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right shoulder closure of northbound I-35 mainlane between Crestwind Drive and Windcrest Drive for drilling work. 

I-10 – East San Antonio/Bexar County

  • Continuing through Friday, January 13. Eastbound I-10 ramp to southbound I-410 closed continuously until 4 p.m. January 13. Detour: Eastbound I-10 traffic to southbound I-10 may exit at W.W. White and stay on frontage road to E. Houston Street on-ramp.
  • Tuesday, January 3 through Friday, January 6. DAYTIME. Southbound Loop 1604 two left lanes closed at I-10 intersection from 9 a.m. to 3 P.m. for overpass work 

I-410 – North East San Antonio

  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound frontage road of I-410 and eastbound I-410 entrance ramp closure from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) and entrance ramp closure on eastbound I-410 frontage road from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on westbound I-410 mainlines and exit ramp closure between I-35 and Perrin Beitel for striping and barrier work. Traffic should use prior exit.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway to westbound I-410 frontage road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right shoulder closure on eastbound I-410 mainlane between Perrin Beitel and Interchange Parkway for drilling work. 

I-410 – East San Antonio

  • Wednesday, December 28. NIGHTTIME. Northbound I-410 ramp to eastbound I-10 closed from 12 a.m. to 3 a.m. for ramp work. Detour: Traffic will take the northbound I-410 to the westbound I-10 cloverleaf ramp, then the westbound I-10 to southbound I-410 cloverleaf ramp, and finally to the I-410 southbound to I-10 eastbound cloverleaf ramp. 

I-410 – West San Antonio

  • Monday, January 2 until Monday, January 16. 8 pm. To 5 a.m. Alternating closures of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for asphalt operations.
  • Monday, January 2 until Monday, January 16. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from Bandera Rd. to SH 151 for bridge and sign work.
  • Monday, January 2 until Monday, January 16. Southbound exit ramp to Ingram Rd. closed for rail work. 

PA 1502 – Wurzbach Parkway

  • Current until Saturday, December 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Blanco Rd. to Thousand Oaks Dr. for road work. 

FM 2252 – Nacogdoches Road

  • Thursday, January 5 until Friday, January 6. 9 p.m. to 5 a.m. Full closure of lanes, in both directions, at Evans Rd. intersection for bridge work.