Loop 1604 – North West San Antonio/Bexar County

  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway entrance ramp to Vance Jackson Road exit ramp for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from IH-10 to Babcock Road for bridge construction – westbound direct connector beam placement. Excluding weekends. Only one full mainlane closure to occur per direction.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 13 until Monday, March 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, March 12 until Monday, March 27. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Northbound Blanco Road right lane closure at the Loop 1604 intersection, between the eastbound and westbound frontage road for temporary traffic signal work. Left through lane will remain open.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Northbound Blanco Road right turn lane closure onto eastbound frontage road temporary traffic signal work.
  • Sunday, March 12 until Friday, March 17. Nightly 9 p.m. until 5 a.m. Westbound frontage road right turn closure onto northbound Blanco Road for temporary traffic signal work. 
  • Monday, March 13 until Friday, March 17. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and Lockhill Selma Road for electrical work.
  • Monday, March 13 until Friday, March 17. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround short term full closure at Loop 1604 and NW Military Highway for electrical work.
  • Monday, March 13 until Sunday, March 26. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround long term full closure at Loop 1604 and Lockhill Selma Road for drainage work.
  • Friday, March 10 at 9 p.m. until Saturday, March 11 at 5 a.m. Nightly, Weekend Only. Westbound mainlane full closure from Bitters Road exit ramp to NW Military Rd. entrance ramp for setting girders at the Salado Creek bridge.
  • Friday, March 17 at 9 p.m. until Saturday, March 18 at 5 a.m. Nightly, Weekend Only. Westbound mainlane full closure from Blanco Road Exit Ramp until Blanco entrance ramp to for bridge deck pour at northbound Blanco Road bridge.
  • Friday, March 17 at 9 p.m. until Saturday, March 18 at 5 a.m. Nightly, Weekend Only. Eastbound mainlane full closure from Blanco Road Exit Ramp until Blanco entrance ramp to for bridge deck pour at northbound Blanco Road bridge. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from IKEA-RBFCU Parkway to I-35 for barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drill shaft work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 for barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound Loop 1604 mainlanes to IKEA-RBFCU Parkway for barrier work. Traffic should use previous exit ramp.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Lookout Road turnaround.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Wednesday, March 15 through Monday, April 10 long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlane closure between eastbound IH-10 exit ramp and eastbound Loop 1604 on ramp from westbound IH-10 for concrete traffic barrier relocation. Nightly closures. Excluding weekends. Only one full mainlane closure to occur per direction, per night.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10. Nightly closures. Excluding weekends.
  • Sunday, March 12 until Friday, March 24. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604. Nightly closures. Excluding weekends.
  • Monday, March 13 until Friday, March 24. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 13 until Friday, March 24. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Thursday, March 9 until Monday, March 13. 9 a.m. to 3 p.m. Various lane closures on the frontage roads at Borgfeld Rd. for intersection work.
  • Wednesday, March 15. 9 p.m. to 5 a.m. Single lane closure on the northbound frontage road at Stone Oak Parkway for barrier removal.
  • Thursday, March 16. 9 p.m. to 5 a.m. Single lane closure on the southbound frontage road at Borgfeld Rd. for barrier removal.
  • Tuesday, March 14. 9 a.m. to 3 p.m. Closure of westbound lanes at Bulverde Rd. for paving operations. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday March 25 long term closure (24/7). Left lane closure on southbound frontage road of I-35 from Whirlwind Drive to Randolph Boulevard for drainage work.
  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Sunday, March 12 until Wednesday, March 15. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound I-35 mainlane, left shoulder closure on I-35 entrance ramp and left lane closure on northbound I-35 frontage road from Schertz Parkway to Roy Richard Drive for pothole work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Rolling closure project-wide for pothole repair.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Rolling closure project-wide for litter and debris operation.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road closure of I-35 from Olympia Parkway to Gateway Boulevard for temporary pavement, striping, and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for striping, barrier work, and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Olympia Parkway at southbound frontage road of I-35 for striping, barrier, and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Old Austin Road from Chippewa Boulevard to southbound frontage road of I-35 for striping, barrier, and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 to westbound Loop 1604 connector ramp for striping, barrier, and temporary pavement work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 connector ramp to Pat Booker Road closure for bridge substructure work. Traffic must exit south Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Pat Booker Road to Toepperwein Road for structures work. Traffic should follow detour signs.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound frontage road of I-35 from Pat Booker Road to Toepperwein Road for barrier and striping work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for tree removal work. Traffic should use next exit.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlanes, alternating entrance and exit ramp closures and left lane frontage road closure from O’Connor Road to Pat Booker Road for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Bludau-Bishop Road to Gunn Road, right lane closures on southbound and northbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for barrier and striping work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for barrier and striping work. Traffic should use next entrance and exit.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for barrier and striping work. Traffic should use next entrance and exit.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Left lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for temporary ramp construction and drainage work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound mainlanes of I-35 and exit ramp closure to Randolph Boulevard between Thousand Oaks Drive and Walzem Road for striping and barrier work. Traffic should use prior exit ramp.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Thousand Oaks Drive to Walzem Road for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlane and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical and drill shaft work. Traffic to use next exit ramp.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Pat Booker Road to Toepperwein Road for structures work.
  • Monday, March 13 through Thursday, May 11 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Monday, March 13 through Monday, November 27 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work. 

I-10 – East San Antonio/Bexar County

  • Friday, March 10 until Monday, March 13. 8 p.m. to 5 a.m. Rolling closure of the westbound frontage road from Santa Clara Rd. to Cibolo Creek for traffic switch.
  • Friday, March 17. 3 a.m. to 8 a.m. Full closure of the westbound frontage road from FM 2538 to Woman Hollering Creek for bridge work.
  • Continuing through Saturday, April 1. NIGHTTIME alternating eastbound and westbound I-10 full mainlane closures between W.W. White Road and Ackerman Road from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights.)
  • Continuing through Saturday, April 1. DAYTIME westbound I-10 frontage road alternating lane closure at Ackerman Road. from 9 a.m. to 4 p.m. for overpass work.
  • Continuing through Monday, March 13. NIGHTTIME westbound I-10 frontage road closure at I-410 northbound on-ramp from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Westbound I-10 to I-410 and northbound I-410 to westbound I-10 ramps will remain open. Detour: Westbound frontage road traffic will take the westbound I-10 to the northbound I-410 ramp, continue on northbound I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through Saturday, April 1. NIGHTTIME westbound I-10 frontage road closure between Ackerman Road and Cornerway Boulevard from 9 p.m. to 5 a.m. for overpass work. (No closures Friday or Saturday nights) I-10 on-ramp will also be closed. Detour: Westbound frontage road traffic to westbound I-10 will turn around at Ackerman, take the eastbound frontage road, turn around at Foster Road, and take the ramp to westbound I-10.
  • Continuing through Saturday, April 1. NIGHTTIME I-10 eastbound exit to Ackerman Road closed from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at the intersection, and use the westbound frontage road back to Ackerman.  

I-410 – North East San Antonio

  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right mainlane closures (2) and exit ramp closure on westbound I-410 between I-35 and Perrin Beitel for striping and barrier work. Traffic should use next exit.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit. 

I-410 – North West San Antonio

  • Sunday, March 12. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at Fredericksburg Rd. for utility work. Traffic will be stopped in 15 minute intervals intermittently throughout the day. 

I-410 – East San Antonio

  • Friday, March 10. NIGHTTIME northbound I-410 full mainlane closures between I-10 and E. Houston Street from 9 p.m. to 5 a.m. Detour: Northbound I-410 traffic will take the E. Houston Street exit, take I-10 northbound frontage road to Ackerman road, turn around, and take I-10 westbound back to I-410.
  • Saturday, March 11. Northbound I-410 on-ramp from E. Houston Street will be permanently closed. The Rigsby Avenue entrance ramp will remain open.
  • Continuing through Saturday, April 1. NIGHTTIME alternating northbound and southbound I-410 full mainlane closures at I-10 interchange from 9 p.m. to 5 a.m. Detour: NB & SB I-410 traffic take exit towards I-10 collector ramp and continue straight to reenter I-410.
  • Continuing through Saturday, April 1. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and Rigsby Avenue from 9 a.m. to 4 p.m. (No closures on Friday and Saturday nights.)
  • Continuing through Saturday, April 1. NIGHTTIME northbound I-410 frontage road closure from Eastgate Street to Ackerman Road from 8 p.m. to 5 a.m. Detour: Northbound I-410 frontage traffic wanting to access Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take the westbound frontage road to Ackerman.  
  • Continuing through Saturday, April 1. NIGHTTIME. Northbound I-410 ramps to eastbound and westbound I-10 closed from 9 p.m. to 5 a.m. for ramp work. (Only one ramp will be closed at a time. No closures on Friday and Saturday nights.) Detour: Northbound I-410 traffic to eastbound I-10 will take the westbound I-10 cloverleaf ramp, follow the westbound I-10 to southbound I-410 cloverleaf ramp, and finally use the I-410 southbound to I-10 eastbound cloverleaf ramp. Northbound I-410 traffic to westbound I-10 will continue on I-410, exit at FM 78, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through Monday, March 27. NIGHTTIME alternating northbound and southbound I-410 lane closures between FM 78 (Old Seguin Rd.) and East Houston Street from 9 p.m. March 3 continuously thru 5 a.m. Monday, March 27. Seek alternate routes.
  • Saturday, March 11. DAYTIME northbound I-410 ramp to westbound I-10 closed from 5 a.m. to 6 p.m. for road and sign work. Detour: Northbound I-410 traffic to westbound I-10 will continue on I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through, Sunday, March 19. NIGHTTIME southbound I-410 full mainlane closures between I-10 and E. Houston Street from 9 p.m. to 5 a.m. (No closures on Friday and Saturday nights.) Detour: southbound I-410 traffic will take W.W. White exit, turn around, take I-10 eastbound frontage road, and reenter southbound I-410 at the next entrance ramp.
  • Continuing through, Saturday, April 1. NIGHTTIME alternating northbound I-410 lane closures between E. Houston Street and I-10 from 9 p.m. to 5 a.m. (No closures on Friday and Saturday nights.) 

I-410 – West San Antonio

  • Current until Friday, March 31. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from Bandera Rd. to Marbach Rd. for overhead sign work.
  • Current until Friday, March 31. 8 p.m. to 5 a.m. Alternating full closures of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for mill and overlay work.
  • Current until Friday, March 31. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for top soil work.
  • Current until Friday, March 31. 9 a.m. to 4 p.m. Full closure of the northbound mainlanes from SH 151 to W. Military Dr. for overhead sign work.
  • Sunday, March 12 until Monday, March 13. 9 p.m. to 5 a.m. Single lane closure on westbound Valley Hi Rd. for concrete work.
  • Monday, March 13 until Wednesday, March 15. 9 p.m. to 5 a.m. Single lane closure on the northbound frontage road at Valley Hi Rd. for road repairs. Exit ramp to Valley Hi Rd. will also be closed.
  • Sunday, April 2 until Monday, April 3. 9 p.m. to 5 a.m. Single lane closure on eastbound Valley Hi Rd. for concrete work. 

I-410 – South San Antonio

  • Sunday, March 12 until Wednesday, March 15. 7 a.m. to 4:30 p.m. Full closure of the mainlanes, in both directions, from Pleasanton Rd. to Roosevelt Dr. for utility work. Traffic will be stopped in 15 minute intervals throughout the day.
  • Wednesday, March 15 until Thursday, March 16. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at Villamain Rd. and Southton Rd. for sign replacements.
  • Monday, March 13 until Tuesday, March 14. 8 a.m. to 5 p.m. Single eastbound mainlane closure from Somerset Rd. to S. Presa Rd. for bridge repairs.
  • Monday, March 13 until Friday, March 17. 8 a.m. to 5 p.m. Single westbound mainlane closures from Somerset Rd. to S. Presa for bridge repairs. 

SH 151 – West San Antonio

  • Current until Friday, March 31. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Loop 410 to Ingram Rd. for top soil work.
  • Current until Friday, March 31. 8 p.m. to 5 a.m. Full closure of the westbound mainlanes from W. Military Dr. to Potranco Rd. for overhead sign installation.
  • Sunday, March 12. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, from at Wiseman Blvd. for utility work. Traffic will be stopped in 15-minute intervals intermittently throughout the day. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, March 31. 9 a.m. to 3 p.m. Various lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway work. 

FM 1535 – Northwest Military Highway

  • Monday, March 13 until Friday, March 17. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for concrete work. 

SH 16 – Bandera Road

  • Sunday, March 12 until Friday, March 17. 8 p.m. to 6 a.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work.
  • Monday, March 13 until Friday, March 17. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work. 

US 90 – West San Antonio/Bexar County

  • Tuesday, March 14 until Friday, March 31. 8:30 p.m. to 5 a.m. Alternating closures of the entrance and exit ramps, in both directions, from 36th St. to Cupples Rd. for repairs.
  • Monday, March 13 until Wednesday, March 15. 8:30 p.m. to 5 a.m. Full closure of the westbound mainlanes from W. Military Dr. to Loop 410 for repairs.
  • Sunday, March 12 until Wednesday, March 22. 8:30 p.m. to 5 a.m. Single eastbound mainlane closure from W. Military Dr. to Old Highway 90 for guardrail replacements. 

SH 123 – Guadalupe County

  • Current until April 3. 7:30 a.m. to 5 p.m. Single southbound lane closure from FM 477 to Land Ranch Rd. for striping operations. 

FM 78 – Guadalupe County

  • Friday, March 10 until Monday, March 13. 9 p.m. to 5 a.m. Full closure of lane, in both directions, from CR 311 to FM 1044 for emergency repairs. 

I-10 – Kendall County

  • Wednesday, March 29 until Thursday, March 30. 9 a.m. to 3 p.m. Single lane closures, in both directions, from Scenic Loop Rd. to SH 46 for painting operations.