Pages

Friday, December 8

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. Loop 1604 and Babcock Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from La Cantera Parkway to IH-10 eastbound frontage road for illumination post removal. Alternating lane closures. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 eastbound frontage road to La Cantera Parkway for illumination post removal. Alternating lane closures. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Kyle Seale Parkway to the Braun Road entrance ramp for barrier relocation. Alternating lane closures. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from La Cantera Parkway to IH-10 eastbound frontage road for concrete beam placement. Daily alternating closures.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to Babcock Road for traffic barrier, sidewalk construction and beam placement/bridge construction. One lane to remain open at all times. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from Babcock Road to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. One lane to remain open at all times. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, December 11 until Monday, December 18. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Monday, December 11 until Monday, December 18. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend closure. Westbound right lane closure from Kyle Seale Parkway to the Braun Road entrance ramp for an entrance ramp reversal.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend full closure. Westbound entrance ramp full closure after Hausman Road for an entrance ramp reversal. The existing entrance ramp from Hausman Road will close permanently while a new permanent entrance ramp from Hausman Road will open simultaneously at the conclusion of the weekend lane closures.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend full closure. Westbound exit ramp full closure to Bandera Road for an entrance ramp reversal.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Weekend full closure. Westbound exit ramp full closure to Braun Road for an entrance ramp reversal. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, December 10 until Friday, December 15.  Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, December 10 until Friday, December 15.  Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Monday, December 11 until Wednesday, December 13.  Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from the Lockhill Selma Road exit ramp to IH-10 for setting girders on the direct connector.
  • Sunday, December 10 until Sunday, December 17. Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for wall construction under bridge. This closure will remain in place for approximately 4 weeks.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Full weekend closure. Vance Jackson Road northbound mainlane full closure at the Loop 1604 bridge  for setting steel girders. Lane closures to remain in place for the entire duration. Off-duty officers to direct traffic through intersections.
  • Friday, December 15 at 9 p.m. until Monday, December 18 at 5 a.m. Full weekend closure. Vance Jackson Road southbound mainlane full closure at the Loop 1604 bridge  for setting steel girders. Lane closures to remain in place for the entire duration. Off-duty officers to direct traffic through intersections.
  • Friday, December 15 at 8 p.m. until Monday, December 18 at 5 a.m. Full weekend closure. Westbound right/auxiliary mainlane closure from the Lockhill Selma Road exit ramp to the frontage road/IH-10 intersection for setting steel girders. Lane closures to remain in place for the entire duration. Off-duty officers to direct traffic through intersections.
  • Friday, December 15 at 8 p.m. until Monday, December 18 at 5 a.m. Full weekend closure. Westbound entrance ramp full closure from Lockhill Selma Road for setting steel girders. The westbound exit ramp to the frontage road/IH-10 intersection will remain OPEN. Lane closures to remain in place for the entire duration. Off-duty officers to direct traffic through intersections. 

Loop 1604 – North East San Antonio/Bexar County

Loop 1604 – West San Antonio/Bexar County

  • Monday, December 18 until Wednesday, December 20. 9 a.m. to 4 p.m. Alternating lane closures at Culebra Rd. for road repairs. 

I-10 – North West San Antonio/Bexar County

  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. IH-10 eastbound exit ramp to the Loop 1604 westbound collector-distributor full closure for bridge construction. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. IH-10 eastbound frontage road entrance ramp from Loop 1604 eastbound full closure for bridge construction. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to Camp Bullis Road for bridge construction. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to the Loop 1604 interchange for bridge construction. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road lane closure from the Loop 1604 interchange to UTSA Boulevard for bridge construction. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Loop 1604 eastbound collector distributor exit ramp to IH-10 eastbound mainlane (cloverleaf) full closure for bridge construction (drill shafts). Nightly full closure. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m. Loop 1604 westbound collector distributor exit ramp to IH-10 eastbound mainlane (cloverleaf) full closure for bridge construction (drill shafts). Nightly full closure. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10:30 p.m. until 5 a.m.
  • Alternating IH-10 westbound frontage road closure from La Cantera Parkway to Camp Bullis Road full closure for illumination post installation. Nightly alternating closures. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 10 p.m. until 5 a.m.
  • IH-10 eastbound frontage road full closure from the Loop 1604 westbound frontage road to the Loop 1604 eastbound frontage road for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, December 10 until Friday, December 15. Nightly 9 p.m. until 5 a.m.
  • Loop 1604 westbound collector distributor exit ramp to IH-10 westbound mainlane full closure for bridge construction. Nightly full closure. Excluding weekends.
  • Monday, December 11 until Friday, December 15. Daily 9 a.m. until 3 p.m. Alternating IH‑10 eastbound frontage road lane closure from the Loop 1604 interchange to UTSA Boulevard for bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

I-10 – East San Antonio/Bexar County/Guadalupe County

  • Monday, December 11. NIGHTTIME westbound I-10 full mainlane closure from Pfeil Road to FM 1515 from 8 p.m. to 5 a.m. for striping. Detour: I-10 westbound traffic will take the Pfeil Rd. exit and travel on frontage road to next entrance ramp.
  • Tuesday, December 12. NIGHTTIME eastbound I-10 rolling full mainlane closures from Loop 1604 to Graytown Road from 9 p.m. to 5 a.m. for striping.
  • Tuesday, December 12. NIGHTTIME I-10 eastbound frontage road alternating single lane closures at Loop 1604 from 9 p.m. to 5 a.m.
  • Friday, December 15 through Sunday, December 17. CONTINUOUS northbound and southbound Loop 1604 closed continuously at I-10 from 8 p.m. 12/15 until 5 a.m. 12/18 for bridge demo. Detour:
  • Southbound Loop 1604 traffic may take I-10 westbound frontage road, turn around at FM 1516, and use I-10 eastbound frontage road back to Loop 1604.
  • Northbound Loop 1604 traffic may take I-10 eastbound frontage road, turn around at Pfeil Road, and use I-10 westbound frontage road back to Loop 1604. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Sunday, December 10, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt Road for construction work.
  • Current until Saturday, December 23 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current until Saturday, February 3, 2024, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current through Saturday, February 3, 2024 long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.
  • Current until Sunday, September 8, 2024, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at Evans Road and full closure of westbound Evans Road at I-35 for striping, barrier, drainage, and temporary pavement work. Traffic should use Corporate Drive intersection.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at Evans Road and full closure of westbound Evans Road at I-35 for striping, barrier, drainage, and temporary pavement work. Traffic should use Corporate Drive intersection.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound I-35 entrance ramp from I-35 connector ramp from westbound Loop 1604 for utilities work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for construction work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for striping and barrier work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive for construction work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp closure of I-35 from O’Connor Road to Tech Com Drive for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Tech Com Drive to Weidner Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic should use next available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound I-410 exit ramp to southbound I-35 frontage road and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound I-410 exit ramp to southbound I-35 frontage road and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound frontage road at I-35 for drainage work.
  • Monday, December 11 until Friday, December 15. 9:00 a.m. to 3:00 p.m. Left lane closure on I-35 northbound and southbound mainlanes from Corporate Drive to Roy Richard Drive for utility work. 

I-410 – North East San Antonio

  • Current until Friday, February 16, 2024, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work. Traffic should use next entrance ramp.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Randolph Boulevard for barrier setting.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Full closure of entrance ramp on westbound frontage road and exit ramp of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and barrier work.
  • Sunday, December 10 until Saturday, December 16. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp. 

I-410 – East San Antonio/Bexar County

  • Current until Wednesday, December 20. Daily 9 a.m. to 4 p.m. . Single southbound mainlane closure at Sinclair Rd. for bridge repairs. Full closure of Sinclair Rd. under the overpass. 

FM 1535 – Northwest Military Highway

  • Monday, December 11 until Friday, December 15. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and sidewalk construction. 

US 90 – West San Antonio/Bexar County

  • Current until Friday, December 22. 9 a.m. to 3 p.m. Turn arounds closures in both directions under Leon Creek Bridge for overhead work.
  • Monday, December 11 until Wednesday, December 13. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Cupples Rd. to W. Military Dr. for road repairs. 

SH 151 – West San Antonio/Bexar County

  • Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closures on the frontage roads, in both directions, at Potranco Rd. for utility work.
  • Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closure on the westbound frontage road from Potranco Rd. to Loop 1604 for utility work.
  • Current until Friday, December 15. 9 a.m. to 3 p.m. Single lane closures on the frontage roads, in both directions, at Ingram Rd. for utility work. 

I-10 – Kendall County

  • Current until Sunday, December 10. 9 a.m. to 3 p.m. Alternating rolling mainlane closures, in both directions, from Scenic Loop Rd. to Fredericks Creek for vegetation work.
  • Current until Sunday, December 10. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Scenic Loop Rd. to Fredericks Creek for vegetation work.
  • Wednesday, December 13. 9 a.m. to 3 p.m. Single eastbound mainlane closure from US 87 to Scenic Loop Rd.