Pages

Friday, February 2

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector-distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Babcock Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 and La Cantera Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 5 until Monday, February 19. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, February 4 until Monday, February 19. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, February 4 until Friday, February 9. Nightly 12 a.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, February 4 until Friday, February 9. Nightly 12 a.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, February 4 until Friday, February 9. Nightly 12 a.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, February 4 until Friday, February 9. Nightly 12 a.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Sunday, February 4 until Saturday, February 10. Nightly 10 p.m. until 5 a.m. Vance Jackson northbound lane full closure on bridge over Loop 1604 for direct connector deck preparation.
  • Sunday, February 4 until Saturday, February 10. Nightly 10 p.m. until 5 a.m. Vance Jackson southbound lane full closure on bridge over Loop 1604 for direct connector deck preparation.
  • Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from the Vance Jackson Road exit ramp to the Lockhill Selma Road entrance ramp for steel girders on eastbound direct connector.
  • Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5 a.m. IH-10 westbound mainlane exit ramp/direct connector full closure to Loop 1604 eastbound mainlane for steel girders on eastbound direct connector.
  • Monday, February 5 until Saturday, February 10. Nightly 9 p.m. until 5 a.m. IH-10 eastbound mainlane cloverleaf exit (southwest cloverleaf) full closure to Loop 1604 eastbound for steel girders on eastbound direct connector.
  • Monday, February 5 until Wednesday, February 7. Nightly 9 p.m. until 5 a.m. Westbound frontage road right lane closure from the Stone Oak Parkway entrance ramp to Panther Springs Creek for drilled shaft for bridge widening.
  • Sunday, February 4 until Sunday, February 11. Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for wall construction under bridge. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, February 4 until Tuesday, February 6, 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds for striping. Traffic must exit Loop 1604 exit ramp to Lookout Road and follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for construction work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for column cap work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on eastbound frontage road of Loop 1604 and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway for column cap work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place, full closure on southbound I-35 to westbound Loop 1604 connector ramp, and exit ramp closure to frontage road for column cap work. Traffic should follow detour signs.
  • Monday, February 5 through Thursday, February 15, long term (24/7). Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for bridge demolition work. Traffic should use Lookout Road intersection.
  • Saturday, February 10 until Tuesday, February 20, long term (24/7). Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for bridge demolition work. Traffic must use Nacogdoches Road turnaround.
  • Saturday, February 10 until Tuesday, February 20, long term (24/7). Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for bridge demolition work. Traffic should use Lookout Road intersection. 

Loop 1604 – West San Antonio/Bexar County

  • Monday, February 5 until Friday, February 9. 9 a.m. to 3 p.m. Closure of turn arounds, in both directions, at FM 471 for bridge work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for drill shaft construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange and UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to the La Cantera Parkway entrance ramp for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 4 until Friday, February 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, February 5 until Friday, February 16. Weekdays 9 a.m. until 3 p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604 westbound frontage road for temporary pavement construction. Daily closures.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. Loop 1604 westbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. Loop 1604 eastbound frontage road full closure between the IH-10 eastbound and westbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. Loop 1604 westbound frontage road full closure between the IH-10 westbound and eastbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 9 at 9 p.m. until Monday, February 12 at 5 a.m. Full weekend closure. IH-10 westbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections. 

I-10 – East San Antonio

  • Current through April. The westbound I-10 entrance ramp from Ackerman will be closed from 9 a.m. January 18 through March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes may turn around at Ackerman, continue on the eastbound frontage road, and use the Foster turnaround to access the westbound I-10 entrance ramp at Foster.
  • Tuesday, February 6 until Thursday, February 8. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from FM 1518 to FM 2538 for pavement repairs. 

I-35 – Central San Antonio

  • Sunday, February 4 until Saturday, February 10. 9 p.m. to 5 a.m. Alternating southbound mainlane closures from St. Mary’s St. to San Pedro Ave. for maintenance operations. 

I-35 – Northeast San Antonio/New Braunfels/Comal County

  • Current through Monday, February 12, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.
  • Current until Thursday, February 29, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Friday, March 8, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for permanent widening and drainage work.
  • Current through Wednesday, April 24, long term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Current through Monday, May 20, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current through Thursday, July 4, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
  • Current through Saturday, August 3, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road for construction work.
  • Current until Sunday, September 8, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, February 4, 9:00 p.m. to 5:00 a.m. Alternating multiple lane closure (2) on northbound mainlanes and exit ramp closure of I-35 from Judson Road to Toepperwein Road for milling and overlay operations.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next available ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, and exit ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 connector ramps to Loop 1604 and full closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple mainlane closures (3) on northbound I-35, entrance ramp closure, and alternating exit ramps closure from Judson Road to Shin Oak Drive for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive for construction work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for bridge structure work.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Northbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Toepperwein Road at I-35 for column cap form work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for drainage and structures work. Traffic should use the next exit and entrance ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound frontage road at I-35 for drainage work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Left lane closure southbound frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, February 4 until Saturday, February 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Monday, February 5, 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound I-35 mainlanes from Olympia Parkway to Schertz Parkway for milling and overlay operations.
  • Monday, February 5, 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Alamo Parkway to N Evans Road for milling and overlay operations.
  • Monday, February 5, 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Toepperwein Road to Judson Road for beam setting.
  • Monday, February 5, 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for beam setting. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Monday, February 5 until Tuesday, February 6, 9:00 a.m. to 3:00 p.m. Left lane closure on northbound mainlanes of I-35 from Judson Road to Pat Booker Road for illumination work.
  • Tuesday, February 6, 12:00 p.m. to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans Road to Retama Parkway for cap staging.
  • Tuesday, February 6, 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap setting.
  • Tuesday, February 6, 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for cap setting. Traffic should follow detour signs.
  • Wednesday, February 7, 12:00 p.m. to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans Road to Retama Parkway for cap staging.
  • Wednesday, February 7, 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap setting.
  • Wednesday, February 7, 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for cap setting. Traffic should follow detour signs.
  • Thursday, February 8, 12:00 p.m. to 12:00 a.m. Right lane closure on southbound frontage road of I-35 from Evans Road to Retama Parkway for cap staging.
  • Thursday, February 8, 8:00 p.m. to 6:00 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap setting.
  • Thursday, February 8, 8:00 p.m. to 6:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for cap setting. Traffic should follow detour signs. 

I-410 – North East San Antonio

I-410 – East San Antonio

  • Current until Friday, February 9. 9 p.m. to 5 a.m. Full closure of the southbound mainlanes at W.W. White Rd. for beam repairs.
  • Monday, February 5. NIGHT WORK. The southbound I-410 collector at the I-10 interchange will be closed from 9 p.m. to 5 a.m. to clean inlets. 

FM 1535 – Northwest Military Highway

  • Monday, February 5 until Friday, February 9. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and sidewalk construction.  

PA 1502 – Wurzbach Parkway

  • Current until Thursday, February 29. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway improvements.
  • Monday, February 12 until Monday, February 19. Full closure of the entrance to McAllister Park at Buckhorn Rd. 

SH 16 – Bandera Road

  • Monday, February 5 until Friday, February 9. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at the intersection of Cedar Trail for pavement operations.
  • Monday, February 5 until Friday, February 9. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at the FM 1560/Leslie Rd. intersection for pavement operations.
  • Sunday, February 4 until Friday, February 9. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for pavement operations.
  • Monday, February 5 until Friday, February 9. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for curb and sidewalk construction. 

US 90 – West San Antonio

  • Sunday, February 4 until Thursday, February 8. 8:30 p.m. to 5 a.m. Single lane closures, in both directions, from Loop 410 to I-35 for guard rail repairs.