Pages

Friday, February 16

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector-distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Babcock Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Weeknights 9 p.m. until 5 a.m. Loop 1604 and La Cantera Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 19 until Monday, March 4. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, February 18 until Monday, March 4. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, February 18 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, February 18 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, February 18 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, February 18 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Monday, February 19 until Saturday, February 24. Nightly 9 p.m. until 5 a.m. Loop 1604 westbound entrance ramp closure from NW Military Highway (FM 1535) for bridge substructure work.
  • Thursday, February 22 at 9 p.m. until Friday, February 23 at 5 a.m. Nightly. Westbound mainlane full closure from the Lockhill Selma Road exit ramp to the IH-10 interchange to perform deck pour on the westbound direct connector.  
  • Thursday, February 22 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Vance Jackson Road northbound mainlane full closure on the bridge over Loop 1604 to perform deck pour on the westbound direct connector. 
  • Thursday, February 22 until Friday, February 23. Nightly 9 p.m. until 5 a.m. Vance Jackson Road southbound mainlane full closure on the bridge over Loop 1604 to perform deck pour on the westbound direct connector. 
  • Sunday, February 18 until Sunday, February 25. Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for wall construction under bridge.
  • Friday, February 23 at 9 p.m. until Saturday, February 24 at 12 p.m. Weekend Only. Loop 1604 eastbound mainlane full closure from the Bitters Road exit ramp to the Bitters Road entrance ramp for deck pour at Salado Creek. 

Loop 1604 – North East San Antonio/Bexar County

US 281 – North San Antonio/Bexar County

  • Current until Saturday, February 17. Southbound HOV lane closure from Cibolo Creek to Evans Rd. for illumination work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for drill shaft construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange to UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to the La Cantera Parkway entrance ramp for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 westbound cloverleaf exit ramp to Loop 1604 westbound full closure for placement of steel girders. Nightly closures.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound cloverleaf exit ramp to IH-10 eastbound full closure for placement of steel girders. Nightly closures.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound collector-distributor for placement of steel girders. Nightly closures.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. IH-10 westbound exit ramp to Loop 1604 westbound full closure for placement of steel girders. Nightly closures.
  • Sunday, February 18 until Friday, March 1. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound exit ramp to IH-10 westbound full closure for placement of steel girders. Nightly closures.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, February 19 until Friday, March 1. Weekdays 9 a.m. until 3 p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604 westbound frontage road for temporary pavement construction. Daily closures.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure. IH-10 westbound cloverleaf exit ramp to Loop 1604 westbound full closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  Loop 1604 westbound cloverleaf exit ramp to IH-10 eastbound full closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  Loop 1604 westbound frontage road full closure at the IH-10 interchange for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  IH-10 eastbound frontage road full closure between the Loop 1604 eastbound and westbound for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  Loop 1604 westbound collector-distributor for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  IH-10 westbound exit ramp to Loop 1604 westbound full closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Closure.  Loop 1604 westbound right lane closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 16 at 9 p.m. until Monday, February 19 at 5 a.m. Weekend Full Closure.  Loop 1604 westbound exit ramp to IH-10 westbound full closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, February 23 at 9 p.m. until Monday, February 26 at 5 a.m. Weekend Full Closure. Loop 1604 westbound exit ramp to IH-10 westbound full closure for placement of steel girders. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections. 

I-10 – Central San Antonio

  • Monday, February 19 until Friday, February 23. 8 a.m. to 5 p.m. Single lane closure on the eastbound frontage road from Fredericksburg Rd. to Cincinnati Ave. for maintenance.
  • Current until Friday, March 8. 9 p.m. to 5 a.m. Westbound exit ramp to Culebra Ave. closed for repairs.
  • Current until Friday, February 23. 9 p.m. to 5 a.m. Westbound turnaround closed at Fulton Ave. for maintenance. 

I-10 – East San Antonio

  • Current through April. The westbound I-10 entrance ramp from Ackerman will be closed from 9 a.m. January 18 through March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes may turn around at Ackerman, continue on the eastbound frontage road, and use the Foster turnaround to access the westbound I-10 entrance ramp at Foster. 

I-35 – Northeast San Antonio/New Braunfels/Comal County

  • Current until Thursday, February 29, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Friday, March 8, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for permanent widening and drainage work.
  • Current through Monday, March 25, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.
  • Current through Wednesday, April 24, long term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Current through Monday, May 20, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current through Thursday, July 4, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
  • Current through Saturday, August 3, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road for construction work.
  • Current until Sunday, September 8, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, February 18 until Wednesday, February 21. 9 p.m. to 5 a.m. Full closure on northbound mainlanes and entrance ramp closure of I-35 from Weidner Road to O’Connor Road for overhead sign removal. Traffic should use next entrance ramp.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive (FM 3009) for barrier work. Traffic should use next available ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for barrier, earthworks, and bridge work.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for construction work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for column cap work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound I-35 connector ramps to Loop 1604 and full closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for striping, barrier, temporary pavement, and demolition work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Alternating lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for bridge structure work.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Northbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes of Toepperwein Road at I-35 for column cap form work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple mainlane closures (3) on northbound I-35, entrance ramp closure, and alternating exit ramps closure from Judson Road to Shin Oak Drive for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and multiple lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for drainage and structures work. Traffic should use the next exit and entrance ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures on southbound frontage road, entrance ramp closure, and exit ramp closure of I-35 from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Left lane closure southbound frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of Randolph Boulevard and southbound frontage road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp and entrance ramp closure from Randolph Boulevard for column work. Traffic should follow detour signs.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, February 18 until Saturday, February 24. 9 p.m. to 5 a.m. Full closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway and full closure on Interchange Parkway from Fratt Road and Walzem Road for utility work. Traffic should follow signs.
  • Monday, February 19. 12 p.m. to 12 a.m. Right lane closure on southbound frontage road of I-35 from Evans Road to Retama Parkway for cap staging.
  • Monday, February 19. 9 p.m. to 5 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for cap setting.
  • Monday, February 19. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for cap setting. Traffic should follow detour signs.
  • Tuesday, February 20. 8 p.m. to 6 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for beam setting.
  • Tuesday, February 20. 8 p.m. to 6 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for beam setting. Traffic should follow detour signs.
  • Tuesday, February 20. 12 p.m. to 12 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Wednesday, February 21. 12 p.m. to 12 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Wednesday, February 21. 8 p.m. to 6 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for beam setting.
  • Wednesday, February 21. 8 p.m. to 6 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for beam setting. Traffic should follow detour signs.
  • Thursday, February 22. 12 p.m. to 12 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Thursday, February 22. 9 p.m. to 5 a.m. Multiple lane closures (2) on southbound mainlanes of I-35 from Old Austin Road to Forum Parkway for beam setting.
  • Thursday, February 22. 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for beam setting. Traffic should follow detour signs.
  • Friday, February 23. 12 p.m. to 12 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Friday, February 23. 9 p.m. to 5 p.m. Right lane closure on southbound mainlanes of I-35 from Loop 1604 to Pat Booker Road for beam setting.
  • Friday, February 23, 9 p.m. to 5 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for barrier work. Traffic should follow detour signs. 

I-410 – North East San Antonio

SH 16 – Bandera Road

  • Monday, February 19 until Friday, February 23. 8 a.m. to 5 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for curb and sidewalk construction. 

PA 1502 – Wurzbach Parkway

  • Current until Thursday, February 29. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway improvements.
  • Current until Monday, February 19. Full closure of the entrance to McAllister Park at Buckhorn Rd. 

SH 151 – West San Antonio

  • Saturday, February 17. 5 a.m. to 8 p.m. Full closure of the mainlanes, in both directions, at Wiseman Blvd. for bridge work. 

US 90 – West San Antonio

  • Sunday, February 18 until Thursday, February 22. 8:30 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Loop 410 to I-35 for guard rail repairs. 

SL 368 – Broadway

  • Sunday, February 18. 9 p.m. to 5 a.m. Right and center southbound lane closures from Burr Rd. to Hildebrand Ave. for bus pad construction.
  • Monday, February 19. 9 a.m. to 4 p.m. Right and center southbound lane closures from Burr Rd. to Hildebrand Ave. for barrier installation.
  • Monday, February 19 until Sunday, February 25. Single southbound lane closure from Burr Rd. to Hildebrand Ave. For bus pad construction.