Pages

Friday, November 16

UPCOMING CONSTRUCTION-RELATED CLOSURES

**ALL CLOSURES WEATHER PERMITTING**

I-10 – East San Antonio
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
  • Sunday, November 18 until Wednesday, November 21. 9 p.m. until 5 a.m. Alternating eastbound mainlane closure between FM 1516 and Loop 1604 for installation of portable concrete traffic barriers and striping work. 
  • Sunday, November 18 until Wednesday, November 21. 9 p.m. until 5 a.m. Alternating westbound mainlane closure from FM 1516 to Union Pacific railroad bridge for installation of portable concrete traffic barriers and striping work. 
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Eastbound right mainlane from Woodlake to FM 1516 for drainage work. 
  • Saturday, December 1. 7 a.m. until 5 p.m. Eastbound right mainlane from Woodlake to FM 1516 for drainage work. 
I-410 – West San Antonio
  • Sunday, November 18 until Tuesday, November 20. 8 p.m. until 5 a.m. Full northbound mainlane and frontage road closure from US 90 to Marbach to remove overhangs and direct connector work. 
  • Sunday, November 18 until Tuesday, November 20. 8 p.m. until 5 a.m. Full southbound mainlane and frontage road closure from US 90 to Valley Hi for overhang removal and direct connector work. 
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Northbound right turn lane at Marbach Road for electrical work. 
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Northbound left frontage road lane from Landing Avenue to Bronco Lane for curb work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Northbound alternating mainlane and frontage road closure from US 90 to Marbach to remove overhangs and direct connector work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Southbound alternating mainlane and frontage road closure from US 90 to Valley Hi for overhang removal and direct connector work. 
Loop 1604 – West San Antonio
  • Current until Saturday, December 1. 9 p.m. until 5 a.m. Alternating southbound mainlanes from Potranco Road to US 90 for paving, striping and barrier work. 
Loop 1604 – North San Antonio
  • Saturday, November 17 until Monday, November 19. 3 a.m. until 5 a.m. Full closure of eastbound mainlanes from US 281 northbound exit to northbound-eastbound direct connector entrance for direct connector work. DETOUR: Take US 281 northbound exit, go through US 281 and take Gold Canyon entrance. 
US 281 – North San Antonio
  • Friday, November 16 until Monday, November 19. 9 p.m until 5 a.m. Northbound alternating lanes from Sonterra Boulevard to Encino Rio for road widening work. 
  • Saturday, November 17 until Monday, November 19. 3 a.m. to 5 a.m. Southbound Sonterra Boulevard entrance ramp for retaining wall work. 
  • Saturday, November 17 until Monday, November 19. 3 a.m. to 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
US 90 – West San Antonio
  • Current until Tuesday, November 20. 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street to set bridge panels. DETOUR: Traffic will take the cloverleaves to I-410 northbound frontage road to the mainlanes; turnaround to southbound frontage road to mainlanes; exit at US 90 to access the westbound frontage road. 
  • Current until Tuesday November 20. 8 p.m. until 5 a.m. Full closure of eastbound mainlanes and frontage road from Ray Ellison Drive to I-410 for eastbound-northbound direct connector work. 
  • Current until Saturday, November 17. 10 p.m. until 5 a.m. Westbound left mainlane from I-410 to Tomar Drive for direct connector work. 
  • Sunday, November 18 until Tuesday, November 20. 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for bridge work. 
  • Monday, November 19. 9 a.m. until 3 p.m. Eastbound mainlane shoulder from I-410 to Military Drive for barrier work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for bridge work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Full closure of eastbound mainlanes and frontage road from Ray Ellison Drive to I-410 for eastbound-northbound direct connector work. 
I-37 – South Region
  • Current until November 30. 7 a.m. until 8 p.m. Northbound main lanes from Atascosa/Live Oak county line to approximately one mile north of US 281A for guard rail work. 
  • Monday, November 19 until Tuesday, November 20. 9:30 a.m. until 3:30 p.m. One southbound frontage road lane at Cesar Chavez Boulevard turnaround drilling work. DETOUR: Traffic takes left on Cesar Chavez Boulevard and another left to access I-37 northbound. 
I-35 – Central San Antonio
  • Monday, November 19. 9 a.m. until 3 p.m. One southbound mainlane at I-37 southbound exit ramp for barrier repair work. 
Loop 345 (Fredericksburg Road)
  • Monday, November 18 until Friday, November 23. 9 a.m. to 3 p.m. Right lane in both directions from Callaghan Road to Medical Drive for sidewalk and driveway work. 
FM 1346 (E. Houston St.) – Southeast San Antonio
  • Monday, November 19 until Tuesday, November 20. 9 a.m. until 4 p.m. Eastbound right lane from Whispering Creek to Estates Road for sidewalk and driveway work. 
US 87 – Rigsby Road
  • Monday, November 19 until Tuesday, November 20. 9 a.m. to 4 p.m. Eastbound right lane from Bonair Road to WW White for sidewalk and driveway work. 
Other roads – Bexar County
  • Current until Friday, December 21. 9 p.m. until 5 a.m. Both directions of Kilmarnoch Lane from Bonny Brae Lane to Loop 1604 for construction work. 
Other roads – Atascosa County
  • Current until November 30. 7 a.m. until 8 p.m. Two lanes of northbound I-37 between Atascosa/Live Oak county line to one mile north of US 281A for pouring concrete, paving and guardrail installation. DETOUR: Northbound traffic on I-37 will be diverted at Exit 98 (FM 541); westbound traffic on FM 1099 will be diverted to US 281A.