Pages

Wednesday, November 21

UPCOMING CONSTRUCTION-RELATED CLOSURES

**WEATHER PERMITTING**

I-10 – East San Antonio
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Eastbound right mainlane from Woodlake to FM 1516 for drainage work. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Alternating eastbound and westbound mainlanes in various locations between I-410 and Loop 1604 for installation of portable concrete traffic barriers and pavement striping. 
  • Saturday, December 1. 7 a.m. until 5 p.m. Eastbound right mainlane from Woodlake to FM 1516 for drainage work. 
  • Saturday, December 1. 5 a.m. until 9 p.m. Alternating eastbound and westbound mainlanes in various locations between I-410 and Loop 1604 for installation of portable concrete traffic barriers. 
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
I-10 – West San Antonio
  • Tuesday, November 27 until Thursday, November 29. 9 p.m. until 5 a.m. Right mainlane and shoulders in both directions from Balcones Creek to Fair Oaks Boulevard for road repair work. 
  • Wednesday, November 28 until Friday, November 30. 9 a.m. until 3 p.m. Full closure of westbound frontage road and Boerne Stage Road (exit ramp and road) for bridge work. DETOUR: Use Ralph Fair Road and Dominion Drive as alternative exits. 
  • Sunday, December 2 until Wednesday, December 5. 9 p.m. until 5 a.m. Right mainlane in both directions from Camp Bullis Road to La Cantera Parkway for concrete barrier removal work. 
  • Monday, December 3 until Friday, December 7. 9 p.m. until 5 a.m. Alternating eastbound mainlanes from Frederick Creek to US 87 for barrier installation work. 
  • Monday, December 3 until Friday, December 7. 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
  • Friday, December 7 until Monday, December 10. 9 p.m. until 5 a.m. Right westbound mainlane from Parkway Drive to US 87 for shoulder work. 
  • Monday, December 10 until Friday, December 14. 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
  • Monday, December 17 until Friday, December 21. 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
I-410 – West San Antonio
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Northbound right turn lane at Marbach Road for electrical work. 
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Northbound left frontage road lane from Landing Avenue to Bronco Lane for curb work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Northbound alternating mainlane and frontage road closure from US 90 to Marbach to remove overhangs and direct connector work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Southbound alternating mainlane and frontage road closure from US 90 to Valley Hi for overhang removal and direct connector work. 
Loop 1604 – West San Antonio
  • Current until Saturday, December 1. 9 p.m. until 5 a.m. Alternating southbound mainlanes from Potranco Road to US 90 for paving, striping and barrier work. 
  • Monday, November 26 until Friday, November 30. 9 a.m. until 3 p.m. Northbound right mainlane from Military Drive to Kilmarnoch Lane for curb reconstruction work. 
Loop 1604 – North San Antonio.
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Full closure of eastbound mainlanes from US 281 North exit ramp to northbound-eastbound direct connector entrance ramp for setting steel girders. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Westbound US 281 northbound exit ramp for direct connector work. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Full closure of westbound mainlanes from US 281 northbound exit ramp to US 281 entrance ramp for direct connector work. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Full closure of westbound frontage road from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
  • Saturday, December 1 until Monday, December 3. 3 a.m. until 5 a.m. Full closure of eastbound mainlanes from US 281 northbound exit ramp to northbound-eastbound direct connector entrance ramp for setting steel girders. 
  • Saturday, December 1 until Monday, December 3. 3 a.m. until 5 a.m. US 281 northbound exit ramp for direct connector work. 
  • Saturday, December 1 until Monday, December 3. 3 a.m. until 5 a.m. Full closure of westbound mainlanes from US 281 northbound exit ramp to US 281 entrance ramp for direct connector work. 
Loop 1604 – South San Antonio
  • Sunday, November 25 until Friday, November 30. 9 p.m. until 5 a.m. Westbound left mainlane from Golden Corral to Jim’s Restaurant for barrier removal work. 
  • Sunday, November 25 until Friday, November 30. 9 p.m. until 5 a.m. Eastbound left mainlane from Chili’s to HEB for barrier removal work. 
Loop 1604 – East San Antonio
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Southbound right mainlane and frontage road entrance ramp to mainlanes from Pat Booker Road to Kitty Hawk for barrier work.
US 281 – North San Antonio
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Alternating northbound mainlanes from TPC Parkway to Marshall Road to barrier and striping work. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Southbound Sonterra Boulevard entrance ramp for retaining wall demolition work. DETOUR: Continue southbound through Loop 1604 intersection and take Donella Drive entrance ramp. 
  • Monday, November 26 until Friday, November 30. 9 p.m. until 5 a.m. Southbound center frontage road lane from Sonterra Boulevard to Loop 1604 for striping work. 
  • Tuesday, November 27 until Thursday, November 29. 9 p.m. until 5 a.m. Northbound left mainlane from Donella Drive to Sonterra Boulevard for direct connector work. 
  • Tuesday, November 27 until Thursday, November 29. 9 p.m. until 5 a.m. Southbound left mainlane from Sonterra Boulevard to Loop 1604 for direct connector work. 
  • Saturday, December 1 until Monday, December 3. 3 a.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Saturday, December 1 until Monday, December 3. 3 a.m. until 5 a.m. Southbound Sonterra Boulevard entrance ramp for retaining wall demolition work. DETOUR: Continue southbound through Loop 1604 intersection and take Donella Drive entrance ramp. 
US 90 – West San Antonio
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for bridge work. 
  • Monday, November 26 until Friday, November 30. 8 p.m. until 5 a.m. Full closure of eastbound mainlanes and frontage road from Ray Ellison Drive to I-410 for eastbound-northbound direct connector work. 
I-37 – South Region
  • Current until November 30. 7 a.m. until 8 p.m. Northbound main lanes from Atascosa/Live Oak county line to approximately one mile north of US 281A for guard rail work. 
I-35 – Central San Antonio
  • Wednesday, November 28. 8 a.m. until 11 p.m. Right frontage road lane from southbound exit 182 to Marigold Way for beam work. 
  • Wednesday, November 28 until Sunday, November 30. 8:30 p.m. until 6 a.m. Full southbound mainlane closure from FM 1103 exit ramp to FM 1103 entrance ramp for bridge work. 
SH 16 – Bandera Road
  • Sunday, November 25 until Friday, November 30. 9 p.m. until 5 a.m. Two northbound lanes from Academy to 7-11 for barrier removal work. 
  • Sunday, November 25 until Friday, November 30. 9 p.m. until 5 a.m. Southbound left-turn lane from Cooter Brown to Chili’s for barrier removal work. 
Loop 345 – Fredericksburg Road
  • Current until Friday, November 23. 9 a.m. to 3 p.m. Right lane in both directions from Callaghan Road to Medical Drive for sidewalk and driveway work. 
Other roads – Bexar County
  • Current until Friday, December 21. 9 p.m. until 5 a.m. Both directions of Kilmarnoch Lane from Bonny Brae Lane to Loop 1604 for construction work. 
  • Current until Saturday, December 15. 9 a.m. until 5 p.m. Both directions of Reed Road between Copperfield Road to Loop 1604 northbound for road work. 
Other roads – Atascosa County
  • Current until November 30. 7 a.m. until 8 p.m. Two lanes of northbound I-37 between Atascosa/Live Oak county line to one mile north of US 281A for pouring concrete, paving and guardrail installation. DETOUR: Northbound traffic on I-37 will be diverted at Exit 98 (FM 541); westbound traffic on FM 1099 will be diverted to US 281A.