Pages

Friday, February 5

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Friday, February 5 until Monday, February 8. Weekend continuous closure 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for overhead signage work. DETOUR: Take the northbound US 281 exit ramp, turn left on the southbound US 281 frontage connector ramp road, and use the Donella Drive entrance ramp. 

Loop 1604 – Far East Bexar County

  • Sunday, February 7 until Tuesday, February 9. 7 p.m. to 5 a.m. Full closure of southbound mainlanes at I-10 interchange for drill shaft work. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, February 6. 7 a.m. to 5 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for riprap pouring.
  • Monday, February 8 – 9 p.m. to Friday, February 12 – 5 a.m. Full closure of Ramblewood, in both directions at US 281 for drainage work.
  • Friday, February 5 until Sunday, February 7. Weekend closure 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Stone Oak Parkway for a traffic switch.
  • Friday, February 5 until Tuesday, February 9. Weekend continuous closure 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Loop 1604 for concrete paving. DETOUR: Take southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road, and turn left on the northbound US 281 frontage road.
  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Continue north on US 281 mainlanes, use the Sonterra Boulevard exit ramp, and use the turnaround to access the southbound US 281 frontage road.
  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Friday, February 12 until Monday, February 15. Weekend closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Evans Road to Marshall Road for a traffic switch. DETOUR: Use the northbound US 281 Evans Road exit ramp.
  • Friday, February 12 until Monday, February 15. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Evans Road to Marshall Road for a traffic switch. DETOUR: Use the northbound US 281 Evans Road exit ramp.
  • Monday, February 8 until Friday, February 12. 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from FM 1863 to Cibolo Creek for barrier setting. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Current until Sunday, February 14. Full closure of eastbound frontage road from Scenic Loop Rd. to Balcones Creek for road improvements.
  • Current until Friday, February 12. Daily 9 a.m. to 3 p.m. Westbound HOV lane closed at various locations from Old Fredericksburg Rd. to La Cantera Parkway for barrier work.
  • Monday, February 8 until Friday, February 12. Daily 7:30 a.m. to 5 p.m. Alternating mainlane closures, in both directions, from Gillespie/Kerr County Line to Kimble/Kerr County Line for clean-up.
  • Saturday, February 6. 9 a.m. to 3 p.m. Various closures on HOV lanes, in both directions, from Old Fredericksburg Rd. to La Cantera Parkway for barrier work.
  • Wednesday, February 10 until Friday, February 12. Nightly 9 p.m. to 5 a.m. Full closure of eastbound mainlanes at Dominion Dr. for work on digital message sign boards. DETOUR: All traffic will be directed to frontage roads.  
  • Saturday, February 13. 9 a.m. to 3 p.m. Various closures on HOV lanes, in both directions, from Old Fredericksburg Rd. to La Cantera Parkway for barrier work. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Sunday, February 7 until Thursday, February 11. Nightly 9 p.m. to 5 a.m. Single eastbound mainlane closure from Graytown Rd. to FM 1518 to barrier installation.
  • Monday, February 8 from 9 a.m. to 4 p.m. Westbound right lane closure between Ackerman Road and IH-410 for median work.
  • Monday, February 8 until Friday, February 26. 8 a.m. to 6 p.m. Single mainlane closure, in both directions, from US 183 to SH 130 for sign placements.
  • Thursday, February 11 until Friday, February 12. 9 p.m. to 5 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier installation.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-10 – Central/East San Antonio  

  • Monday, February 8 until Tuesday, February 9. 8 p.m. to 5 a.m. Single westbound lane closure from S. Flores to I-35 northbound exit ramp for guardrail repairs.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Single eastbound mainlane closure from Nogalitos St. to southbound I-35 exit ramp for guardrail repairs.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Single westbound mainlane closure from S. Flores St. to I-35 northbound exit ramp for guardrail repairs.
  • Wednesday, February 10 until Thursday, February 11. 8 p.m. to 5 a.m. Single eastbound mainlane closure from Nogalitos St. to I-35 southbound exit ramp for guardrail repairs. 

I-37 – Central/South San Antonio

  • Monday, February 8 until Tuesday, February 9. 8 p.m. to 5 a.m. Southbound entrance ramp from Florida St/Carolina St. closed for guardrail repairs.
  • Monday, February 8 until Tuesday, February 9. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for guardrail repairs.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 for guardrail repair.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Southbound exit ramp to Florida St./Carolina St. closed for guardrail repairs. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, February 7 until Friday, February 12. Nightly 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for replacement of overhead signs.
  • Friday, February 5 until Saturday, February 6. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from Conrad’s bridge and FM 306 for barrier installation.
  • Current until Saturday, February 6. 9 a.m.to 5:30 p.m. Single northbound frontage road closure from Hubertus Rd. to Schwab Rd. for backfill work.
  • Current until Saturday, February 6. 9 a.m. to 5:30 p.m. Single northbound frontage road closure from Hubertus Rd. to Schwab Rd. for demolition work.
  • Current until Saturday, February 6. 9 a.m. to 5:30 p.m. Single southbound frontage road closure from Hubertus Rd. to FM 2252 for storm drain installation.
  • Current until Saturday, February 6. 9 a.m. to 5:30 p.m. Single southbound frontage road closure from Hubertus Rd. to FM 2252 for material excavation.
  • Monday, February 8 until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closures on northbound frontage road from Hubertus Rd. to Schwab Rd. for backfill work.
  • Monday, February 8 until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closures on northbound frontage road from Hubertus Rd. to Schwab Rd. for milling and overlay work.
  • Monday, February 8 until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for milling and overlay work.
  • Monday, February 8 until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for placement of barrier.
  • Monday, February 8 until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for guardrail repairs.
  • Tuesday, February 9 until Wednesday, February 10. 8 p.m. to 5 a.m. Northbound exit ramp to westbound I-10 closed for guardrail repairs.
  • Tuesday, February 9 until Thursday, February 11. Nightly 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for guardrail repairs.
  • Wednesday, February 10 until Thursday, February 11. 8 p.m. to 5 a.m. Northbound exit ramp to westbound I-10 closed for guardrail repairs.
  • Monday, February 15 until Tuesday, February 16. 11 p.m. to 5 a.m. Full closure of northbound mainlanes from AT&T Center Parkway to Loop 410 for sign replacements. DETOUR: Traffic will be directed to exit Binz-Engleman Rd. and continue on frontage roads. 

US 90 – Central/West San Antonio

  • Current until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Current until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.
  • Monday, February 8 until Saturday, February 20. Daily 7 a.m. to 7 p.m. Single lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Wednesday, February 10. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road at Hunt Lane for pole replacements. 

I-410 – West San Antonio

  • Current until Monday, February 8. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, February 8. 8 a.m. to 5 p.m. Alternating southbound lane closures, from N.W. Crossroads to Military Dr. for work on traffic rail.
  • Current until Monday, February 8. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 westbound frontage road to SH 151 eastbound frontage road intersection.
  • Current until Monday, February 8. 8 p.m. to 5 a.m. Full closure of southbound mainlanes from Military Dr. to SH 151 for bridge work.
  • Monday, February 8 until Monday, February 15. Nightly 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, February 8 until Saturday, February 13. Nightly 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection, in both directions, for bridge work.
  • Monday, February 15 until Wednesday, February 17. Nightly 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Rd. to SH 151 for restriping and barrier setting.
  • Monday, February 8 until Sunday, February 28. Northbound turnaround at W. Military Dr. closed for riprap work.
  • Monday, February 8 until Monday, February 15. Daily 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge and wall work.
  • Monday, February 8 until Monday, February 15. Daily 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to Military Dr. for rail improvements.
  • Current until Monday, February 8. Nightly 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 intersection for bridge work. 

SH 151 – West San Antonio

  • Current until Monday, February 8. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
  • Current until Monday, February 8. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Ingram Rd. for continued construction of flyover ramps.
  • onday, February 8 until Monday, February 15. Nightly 8 p.m. to 5 a.m. Full closure of eastbound mainlanes from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
  • Monday, February 8 until Monday, February 15. Daily 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage roads from Loop 410 to Ingram Rd. for continued construction of flyover ramps. 

FM 1535 – Northwest Military Highway

  • Current until Wednesday, February 3. Southbound right turn lane at Loop 1604 closed for sidewalk improvements. 

CR 8480 – Alamo Ranch Parkway

  • Monday, February 8. 9 a.m. to 3 p.m. Westbound left lane closed at Westwood Loop intersection, including the eastbound to westbound turnaround, for signal pole relocation. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 1560 – Hausman Road

  • Monday, February 8 until Friday, February 12. Daily 9 a.m. to 5 p.m. Eastbound center turn lane closed near Loop 1604 intersection for median installation.

RM 1376 – Kendall County

  • Current until Saturday, February 6. 8:30 a.m. to 8:30 p.m. Single lane closures at various culvert locations, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction. 

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.