Pages

Friday, February 12

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

*UPDATED 2/14/2021*

 The previously distributed construction closures below have been cancelled through Friday, February 19 in anticipation of the severe winter weather forecasted for the region. 


Loop 1604 – North Central San Antonio

  • Monday, February 15 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the eastbound direct connector ramp to US 281 for direct connector ramp opening. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road.
  • Monday, February 15 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the westbound direct connector ramp to US 281 for direct connector ramp opening. DETOUR: Take the northbound US 281 exit ramp, use the southbound US 281 frontage road and take the Donella Drive entrance ramp.

 US 281 – North Central San Antonio/Bexar County

  • Thursday, February 18. 9 p.m. to 5 a.m. Alternating southbound lane closures from Trinity Park to Overlook Parkway for traffic switch.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Continue north on US 281 mainlanes and use the exit ramp to Evans Road, and take the turnaround to access the southbound US 281 frontage road.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Continue north on US 281 mainlanes and use the exit ramp to Evans Road, and take the turnaround to access the southbound US 281 frontage road.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 14 until Friday, February 19. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, February 15 until Friday, February 19. Daily 5 a.m. until 5 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 15 until Friday, February 19. Daily 5 a.m. until 5 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Friday, February 19 until Sunday, February 21. Weekend continuous closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Evans Road to Marshall Road for a traffic switch. DETOUR: Take the northbound US 281 Evans Road exit ramp.
  • Friday, February 19 until Sunday, February 21. Weekend continuous closure 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Evans Road to Marshall Road for a traffic switch.

 I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Current until Sunday, February 14. Full closure of eastbound frontage road from Scenic Loop Rd. to Balcones Creek for road improvements.
  • Monday, February 15 until Friday, February 19. Daily 7:30 a.m. to 5 p.m. Alternating lane and shoulder closures, in both directions, from Gillespie/Kerr County Line to Kimble/Kerr County Line for road improvements. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Tuesday, February 16 until Wednesday, February 17. 8:30 p.m. to 5:30 a.m.  Eastbound right mainlane closed from FM 1518 to FM 2538 for installation of barrier.
  • Wednesday, February 17 until Thursday, February 18. 8:30 p.m. to 5:30 p.m. Eastbound right mainlane closure from FM 1518 to FM 2538 for barrier installation.
  • Thursday, February 18 until Friday, February 19. 8:30 p.m. to 5:30 p.m. Eastbound right mainlane closed from FM 1518 to FM 2538 for installation of barrier.
  • Wednesday, February 17 thru Friday, February 19 from 8 p.m. to 5 a.m. EACH NIGHT. Full eastbound mainlane closure from W.W. White to Loop 1604 for concrete barrier work.  DETOUR: All eastbound traffic diverted to frontage road from Foster Road to FM 1516.
  • Saturday, February 20. 6 a.m. to 9 p.m. Single eastbound mainlane closure from FM 1518 to FM 2538 for barrier installation.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closures on northbound frontage road from Hubertus Rd. to Schwab Rd. for backfill work.
  • Current until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closures on northbound frontage road from Hubertus Rd. to Schwab Rd. for milling and overlay work.
  • Current until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for milling and overlay work.
  • Current until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for placement of barrier.
  • Current until Saturday, February 13. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for demolition.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for profile removal.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for profile barrier placement.
  • Monday, February 15 until Saturday, February 20. 9 a.m. to 3 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for milling and overlay. 
  • Monday, February 15 until Tuesday, February 16. 9 p.m. to 5 a.m. Double northbound mainlane closure from exit 193 to Conrad’s bridge for material removal.
  • Thursday, February 18 until Friday, February 19. 9 p.m. to 5 a.m. Double northbound mainlane closure from Business 35 to FM 306 for barrier removal.
  • Sunday, February 21 until Friday, February 26. Nightly 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for replacement of overhead signs.
  • Monday, February 22 until Tuesday, February 23. 11 p.m. to 5 a.m. Full closure of northbound mainlanes from AT&T Center Parkway to Loop 410 for overhead sign replacement. 

US 90 – Central/West San Antonio

  • Current until Saturday, February 20. Daily 7 a.m. to 7 p.m. Single lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Monday, February 15 until Saturday, February 20. 7 a.m. to 7 p.m. Alternating lane closures on frontage roads in both directions from W. Military Dr. to S.W. 36th St. for milling and paving operations. 

I-410 – West San Antonio

  • Current until Monday, February 15. Nightly 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Saturday, February 13. Nightly 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection, in both directions, for bridge work.
  • Monday, February 15 until Wednesday, February 17. Nightly 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Rd. to SH 151 for restriping and barrier setting.
  • Current until Sunday, February 28. Northbound turnaround at W. Military Dr. closed for riprap work.
  • Current until Monday, February 15. Daily 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge and wall work.
  • Current until Monday, February 15. Daily 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to Military Dr. for rail improvements.
  • Thursday, February 18 until Friday, February 19. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze St. to SH 151 for barrier setting.
  • Saturday, February 20 until Sunday, February 21. 6 a.m. to 6 p.m. Full closure of southbound mainlanes from NW Crossroads to Military Dr. for sign removal.
  • Monday, February 15 until Monday, February 22. 9 a.m. to 3 p.m. Single mainlane closure, in both directions, from Marbach Rd. to Culebra Rd. for bridge and wall work.
  • Monday, February 15 until Monday, February 22. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from NW Crossroads to Military Dr. for rail pouring.
  • Monday, February 15 until Monday, February 22. 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 for bridge work.
  • Monday, February 15 until Monday, February 22. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Military Dr. to SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Monday, February 15 until Monday, February 22. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection at Loop 410 for bridge work. 

SH 151 – West San Antonio

  • Current until Monday, February 15. Nightly 8 p.m. to 5 a.m. Full closure of eastbound mainlanes from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
  • Current until Monday, February 15. Daily 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage roads from Loop 410 to Ingram Rd. for continued construction of flyover ramps.
  • Monday, February 15 until Monday, February 22. Nightly 8 p.m. to 5 a.m. Full closure on eastbound frontage road from Cable Ranch to Loop 410 for bridge work.
  • Monday, February 15 until Monday, February 22. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work. 

FM 1560 – Hausman Road

  • Monday, February 15 until Friday, February 19. Daily 9 a.m. to 5 p.m. Eastbound center turn lane closed at Loop 1604 for median installation. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and
  • Walzem Road for barrier setting work and road rehab work. 

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.