Friday, July 27

Next week's construction-related closures

I-35 – Northeast San Antonio
  • Monday, July 30. 9 a.m. until 3 p.m. The left mainlane in both directions between George Beach and Thousand Oaks will be closed for illumination work. 
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection. 
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination. 
  • Monday, July 30 until Friday, August 3. All northbound mainlanes between Valley Hi Drive and US 90 will be closed to set bridge panels. The Valley Hi Drive ramp will also be closed. DETOUR: Traffic will be detoured to the frontage road and re-enter after US 90. 
  • Monday, July 30 until Friday, August 3. All southbound mainlanes between US 90 exit ramp (past Marbach Road) to US 90 will be closed to set bridge panels. DETOUR: Traffic will be detoured to the frontage road and re-enter after US 90. 
SH 16 (Bandera Road) – West San Antonio
  • Current until Friday, August 3. 9 p.m. until 5 a.m. Alternating north and southbound lanes between Quincy Lee and Loop 1604 will be closed for striping and concrete traffic barrier work. 
  • Current until Friday, August 3. 9 p.m. until 5 a.m. Alternating eastbound Loop 1604 frontage road lanes between the Target/Lowes sign to the HEB Driveway will be closed for striping and concrete traffic barrier work. 
  • Sunday, July 29 until Friday, August 3. 9 p.m. until 5 a.m. Alternating westbound Loop 1604 frontage road lanes between the Home Depot driveway to the Bandera Road intersection will be closed for striping and concrete traffic barrier work. 
I-10 – West San Antonio
  • Monday, July 30 until Friday, August 3. 24 hour closure. The east to westbound turnaround at Wurzbach Road will be closed for reconstruction. 
US 90 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. Alternating mainlanes in both directions at Loop 1604 will be closed for installing brackets and concrete deck pour. The US 90 westbound frontage road turnaround to eastbound will also be closed. 
  • Current until Thursday, August 16. 24 hour closure. The eastbound left frontage road lane between the new entrance ramp to just west of Medio Creek bridge is closed for barrier work. 
  • Saturday, July 28 until Sunday, July 29. 6:30 p.m. until 11 a.m. All eastbound mainlanes between Hunt Lane and I-410 will be closed for concrete pavement pour. DETOUR: Traffic will exit to the frontage road and re-enter at the next entrance. 
  • Sunday, July 29 until Friday, August 3. All eastbound frontage road lanes between Loop 1604 to I-410 will be closed for storm sewer installation. DETOUR: Traffic will be detoured to Military and use the turnaround. 
Loop 1604 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. All mainlanes will be closed at US 90 for installing brackets and concrete deck pour. The US 90 eastbound entrance ramp from Loop 1604 will also be closed. DETOUR: Traffic will take US 90 westbound, exit Montgomery and take turnaround. 
  • Current until Sunday, July 29. 9 p.m. until 5 a.m. All east and westbound lanes on FM 1957 (Potranco Road) under Loop 1604 will be closed for precast deck panel work. Detours will be posted. 
  • Monday, July 30 until Friday, August 3. 8 a.m. until 4 p.m. The northbound left frontage road lane north of Marbach Road will be closed for OSB work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. The right turn lane in both directions at Wiseman Boulevard will be closed for traffic signal work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. The right turn lane in both directions at FM 1957 (Potranco Road) will be closed for traffic signal work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. The right turn lane in both directions at Military Drive will be closed for traffic signal work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. Alternating lanes in both directions at Wiseman Boulevard will be closed for signal cable work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. Alternating lanes in both directions at Military Drive will be closed for signal cable work. 
  • Monday, July 30 until Friday, August 3. 9 a.m. until 3 p.m. Alternating lanes in both directions at FM 1957 (Potranco Road) will be closed for signal cable and precast panel work. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. All southbound frontage road lanes between SH 151 and south of Valley Meadow Drive will be closed for striping work to prepare for an upcoming traffic switch. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. Two lanes in both directions at Military Drive will be closed for bridge work. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. Two lanes in both directions at FM 1957 (Potranco Road) will be closed for bridge work. 
  • Tuesday, July 31. 2 a.m. until 5 a.m. Northbound left turn between the US 90 east and westbound frontage road will be closed for deck pour. 
  • Saturday, August 4, 6 a.m. until 6 p.m. All lanes in both directions on Wiseman Boulevard between the south and northbound frontage roads and alternating southbound mainlanes between SH 151 and Critical Habitat Unit will be closed will be closed for a traffic switch on southbound Loop 1604. 
U.S. Hwy 281 – Far North San Antonio
  • Friday, July 27 until Monday, July 30. 8 p.m. until 5 a.m. All lanes in both directions of Redland Road at the intersection will be closed for intersection work. DETOUR: Traffic will used Ridgewood Parkway and Sonterra Boulevard. 
  • Sunday, July 29 until Monday, July 30. 9 p.m. until 5 a.m. The southbound right mainlane between Encino Rio Road and Sonterra Boulevard exit ramp will be closed for OSB removal. DETOUR: Traffic will use the Donella Drive exit; take the turnaround; turn left on the westbound frontage road and exit at Sonterra Boulevard. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. Alternating northbound mainlanes between Sonterra Boulevard entrance and exit ramp will be closed for restripe and temporary barrier work. DETOUR: Traffic will use the Donella Drive exit. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. The southbound left lane between Redland Road and Sonterra Boulevard will be closed for setting temporary barrier. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. The northbound left turn lane at Stone Oak Parkway will be closed for median work. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road will be closed for direct connector work. DETOUR: Traffic will take the Sonterra Boulevard entrance ramp; use the Donella Drive exit; take the Donella Drive turnaround; and turn left on to the westbound frontage road. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. The northbound right mainlane between Sonterra Boulevard exit and entrance ramp will be closed for direct connector work. DETOUR: Traffic will use the frontage road exit ramp. 
  • Monday, July 30 until Friday, August 3. 9 p.m. until 5 a.m. The east and westbound left turn lane at Stone Oak Parkway will be closed for median work. 
  • Tuesday, July 31 until Friday, August 3. 9 p.m. until 5 a.m. The left and center southbound mainlane between Sonterra Boulevard entrance ramp to Donella Drive exit ramp will be closed for direct connector work. 
  • Tuesday, July 31 until Friday, August 3. 9 p.m. until 5 a.m. The left and center northbound mainlane between Donella Drive entrance ramp to Sonterra Boulevard exit ramp will be closed for direct connector work. 
I-10 – East San Antonio
  • Friday, July 27 until Monday, July 30. 9 p.m. until 5 a.m. The eastbound mainlanes between Foster Road exit ramp and FM 1516 entrance ramp will be closed for structure culver crossing work. DETOUR: Eastbound mainlane traffic will exit Foster Road on to the eastbound frontage road and re-enter at FM 1516 entrance ramp. Foster Road entrance ramp on the eastbound will be detoured to FM 1516 entrance ramp. 
Other roads – San Antonio
  • Monday, July 30 until Friday, August 3. The right lane on both directions on FM 1957 (Potranco Road) between Leopard Claw and Rousseau Road will be closed for center median, curb and sidewalk work. 
Other roads – Boerne
  • Current until Tuesday, July 31. 9 a.m. until 4 p.m. Alternating mainlanes closed in both directions of SH 46 between I-10 to the Kendall/Bandera County Line for guardrail work. 
  • Monday, July 23 until Friday, August 10. 7 a.m. until 7 p.m. Alternating lanes in both directions of FM 474 between Guadalupe River to 7 miles south of the Guadalupe River for base repair work. 
Other roads – Converse
  • Current until Friday, August 3. 9 a.m. until 4 p.m. Complete closure of westbound FM 1516 from FM 78 and School Street for intersection work. DETOUR: Traffic will access westbound FM 1516 through the Converse Center Street. Eastbound FM 1516 will remain open. 
Other roads – Helotes
  • Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked. 
All closures are pending weather

Update on upcoming US 281 closures at Redland Road and Agora Palms Drive



Just a reminder that starting tonight the intersection of eastbound and westbound Redland Road at the approach of US 281 will be closed for construction. This closure will happen this weekend Friday, July 27, 2018, at 8 p.m. to Monday, July 30, 2018, at 5 a.m. and next weekend Friday, August 3, 2018, at 8 p.m. to August 6, 2018, at 5 a.m. Traffic will detour by using Ridgewood Parkway and Sonterra Boulevard.


Also, starting on Tuesday, July 31, 2018, thru Tuesday, August 7, 2018, eastbound Agora Palms Drive at the approach to US 281 will be closed. Traffic will detour by using Hardy Oaks Drive and E. Sonterra Boulevard.

Friday, July 20

Next week's construction-related closures

I-35 – Northeast San Antonio
  • Monday, July 23. 9 a.m. until 3 p.m. Alternating northbound mainlanes between Randolph Boulevard and I-35 northbound frontage road will be closed for illumination work. 
  • Tuesday, July 24. 9 a.m. until 3 p.m. The southbound ramp from Fratt Road will be closed for illumination work. 
I-410 – Northeast San Antonio
  • Monday, July 23. 9 a.m. until 3 p.m. Alternating northbound mainlanes between I-35 northbound and I-410 westbound ramp will be closed for illumination work. 
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection. 
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination. 
  • Sunday, July 22 until Friday, July 27. 8 p.m. until 5 a.m. All northbound mainlanes between Valley Hi Drive and US 90 will be closed to set bridge panels. DETOUR: Traffic will use the frontage road and re-enter after US 90. 
  • Sunday, July 22 until Friday, July 27. 8 p.m. until 5 a.m. All southbound mainlanes between the exit ramp past Marbach Road to US 90 will be closed to set bridge panels. DETOUR: Traffic will use the frontage road and re-enter after US 90.
US 90 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. Alternating mainlanes east and westbound at Loop 1604 closed for installing brackets and concrete deck pour. The US 90 westbound frontage road turnaround to eastbound will also be closed.
  • Current until Thursday, August 16. 24 hour closure. The eastbound left frontage road lane between the new entrance ramp to just west of Medio Creek bridge is closed for barrier work.
  • Saturday, July 21 until Sunday, July 22. 6:30 p.m. until 1 p.m. All eastbound mainlanes between Hunt Lane and I-410 will be closed for concrete pavement pour. DETOUR: Traffic will exit to the frontage road and re-enter at the next entrance.
  • Monday, July 23 until Thursday, July 26. 9 a.m. until 3 p.m. The eastbound right lane between Hunt Lane and I-410 will be closed for rail foundation pour. 
Loop 1604 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. All mainlanes will be closed at US 90 for installing brackets and concrete deck pour. The US 90 eastbound entrance ramp from Loop 1604 will also be closed. DETOUR: Traffic will take US 90 westbound, exit Montgomery and take turnaround.
  • Monday, July 23 until Friday, July 27. 9 a.m. until 3 p.m. The westbound FM 1957 (Potranco Road) to northbound Loop 1604 and northbound Loop 1604 to eastbound FM 1957 (Potranco Road) right turn lanes will be closed for traffic signal work.
  • Monday, July 23 until Friday, July 27. 9 a.m. until 3 p.m. The westbound Military Drive to northbound Loop 1604 and northbound Loop 1604 to eastbound Military Drive right turn lanes will be closed for traffic signal work.
  • Monday, July 23 until Friday, July 27. 9 a.m. until 3 p.m. The westbound Wiseman Boulevard to northbound Loop 1604 and northbound Loop 1604 to eastbound Wiseman Boulevard right turn lanes will be closed for traffic signal work.
  • Monday, July 23 until Friday, July 27. 9 a.m. until 3 p.m. Alternating east and westbound lanes on FM 1957 (Potranco Road) under Loop 1604 will be closed for traffic signal work.
  • Monday, July 23 until Friday, July 27. 9 a.m. until 3 p.m. Alternating east and westbound lanes on Military Drive under Loop 1604 will be closed for traffic signal work.
  • Tuesday, July 24 until Thursday, July 26. 9 p.m. until 5 a.m. All east and westbound lanes on Military Drive under Loop 1604 will be closed for precast deck panel work. Detours will be posted.
  • Friday, July 27 until Sunday, July 29. 9 p.m. until 5 a.m. All east and westbound lanes on FM 1957 (Potranco Road) under Loop 1604 will be closed for precast deck panel work. Detours will be posted.
SH 16 (Bandera Road) – West San Antonio
  • Sunday, July 22 until Friday, July 27. 9 p.m. until 5 a.m. Alternating north and southbound lanes between Quincy Lee and Loop 1604 will be closed for striping and concrete traffic barrier work.
  • Sunday, July 22 until Friday, July 27. 9 p.m. until 5 a.m. Alternating eastbound Loop 1604 frontage road lanes between the Target/Lowes sign to the HEB Driveway will be closed for striping and concrete traffic barrier work.
  • Sunday, July 22 until Friday, July 27. 9 p.m. until 5 a.m. Alternating westbound Loop 1604 frontage road lanes between the exit ramp of Loop 1604 to the Bandera Road intersection will be closed for striping and concrete traffic barrier work.
I-10 – West San Antonio
  • Tuesday, July 24. 9 a.m. until 4 p.m. Alternating westbound frontage road lanes between Ralph Fair Road and Fair Oaks Parkway will be closed for excavation/pipe installation/backfilling operations. DETOUR: Traffic at Ralph Fair Road will cross over the bridge and head north on the eastbound frontage road to Old Fredericksburg Road.
U.S. Hwy 281 – Far North San Antonio
  • Sunday, July 22 until Friday, July 27. 9 p.m. until 5 a.m. The northbound right frontage road lane between Sonterra Boulevard exit ramp and entrance ramp will be closed for direct connector work.
  • Sunday, July 22 until Friday, July 27. 9 p.m. to 5 p.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp to Loop 1604 westbound frontage road will be closed for direct connector work.
  • Sunday, July 22 until Friday, July 27. 9 p.m. to 5 p.m. Alternating eastbound lanes on Stone Oak Parkway approaching US 281 will be closed for intersection work.
  • Monday, July 23 until Friday, July 27. 9 p.m. until 5 a.m. Alternating northbound lanes will be closed between the Loop 1604 overpass and Sonterra Boulevard entrance ramp for striping work.
  • Monday, July 23 until Friday, July 27. 9 p.m. until 5 a.m. The northbound right lane will be closed between the Loop 1604 overpass and Sonterra Boulevard entrance ramp for setting temporary barrier.
  • Wednesday, July 25 until Thursday, July 26. 9 p.m. until 5 a.m. The north and southbound left and center lanes between Donella Drive entrance ramp and Sonterra Boulevard exit ramp will be closed for direct connector work.
  • Friday, July 27 until Monday, July 30. 8 p.m. until 5 a.m. All lanes on east and westbound Redland Road at the intersection will be closed for intersection work. DETOUR: Traffic will used Ridgewood Parkway and Sonterra Boulevard.
Loop 1604 – North San Antonio
  • Saturday, July 21. 2 a.m. until 7 p.m. All eastbound frontage road lanes between Gold Canyon Drive and US 281 for direct connector work. DETOUR: Traffic will take double left at Gold Canyon Drive; double left at Redland Road; use the Redland Road entrance ramp; take the Stone Oak Parkway exit ramp and the turnaround at US 281. 
Other roads – San Antonio
  • Monday, July 23 until Friday, July 27. The westbound right lane on FM 1957 (Potranco Road) between Leopard Claw and Rousseau Road will be closed for excavation for new pavement structure, asphalt paving operations, curb and sidewalk work.
Other roads – Boerne
  • Current until Tuesday, July 31. 9 a.m. until 4 p.m. Alternating mainlanes closed in both directions of SH 46 between I-10 to the Kendall/Bandera County Line for guardrail work. 
  • Monday, July 23 until Friday, August 10. 7 a.m. until 7 p.m. Alternating lanes in both directions of FM 474 between Guadalupe River to 7 miles south of the Guadalupe River for base repair work.
Other roads – Converse
  • Current until Friday, August 3. 9 a.m. until 4 p.m. Complete closure of westbound FM 1516 from FM 78 and School Street for intersection work. DETOUR: Traffic will access westbound FM 1516 through the Converse Center Street. Eastbound FM 1516 will remain open. 
Other roads – Helotes
  • Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked. 

All closures are pending weather

Thursday, July 19

Updates on setting beams at US 281 and Loop 1604 interchange; Redland Road/US 281 full closure

UPDATE: Sorry there was a change to the upcoming closures at US 281 and Loop 1604. We will have a closure this Saturday, July 21, 2018, at 2 a.m. until 7 p.m.

US 281/Loop 1604
Westbound to Northbound Direct Connector -
On the Loop 1604 westbound frontage road from Gold Canyon Drive to US 281 that includes the following detour: Taking a double left at Gold Canyon Drive, taking a double left a Redland Road, Using the Redland Road entrance ramp, using Stone Oak Parkway exit ramp, taking the turnaround at Stone Oak Parkway and taking the turnaround at US 281.

A look ahead to the weekends of July 27th and August 3rd...
Redland Road/US 281 intersection - Full Closure of eastbound and westbound Redland Road at the approach of US 281 – Public to detour by using Ridgewood Parkway and Sonterra Boulevard. 
      
  • Friday, July 27, 2018, at 8 p.m. to Monday, July 30, 2018, at 5 a.m. 
  • Friday, August 3, 2018, at 8 p.m. to August 6, 2018, at 5 a.m.

Please note that all work is weather permitting and that the sequence of work can change due to unforeseen issues.

You can receive information on lane closures straight to your e-mail inbox by registering here (link to http://eepurl.com/cXz2kr). Daily updates are sent out daily for the full closures.

Friday, July 13

Next week's construction-related closures

I-35 – Schertz
  • Saturday, July 14 until Sunday, July 15. 9 p.m. until 3 p.m. All mainlanes on both directions will be closed at FM 1103 for the complete removal of the FM 1103 bridge. DETOUR for I-35 northbound: Traffic will exit I-35 northbound mainlanes to the frontage road at FM 1103. Traffic to remain on frontage road through FM 1103. The entrance ramp from FM 1103 to I-35 northbound will be open to traffic. DETOUR for I-35 southbound: Traffic will exit I-35 southbound mainlanes to the frontage road at FM 1103 and enter I-35 southbound at the entrance ramp past FM 1103. 
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection. 
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination. 
  • Current until Friday, July 20. 9 p.m. until 5 a.m. All northbound mainlanes between SH 151 and Culebra Road will be closed for asphalt overlay work. Traffic will need to exit SH 151; travel through the intersection and enter highway at Culebra Road. 
  • Friday, July 13 until Sunday, July 15. 9 p.m. until 6 a.m. Northbound right and shoulder mainlanes between SH 151 and Ingram Road will be closed for asphalt overlay work. The Military Drive entrance will also be closed. 
  • Sunday, July 15 until Friday, August 3. 9 p.m. until 5 a.m. All southbound mainlanes between SH 151 and Ingram Road for asphalt overlay work. 
SH 151 – West San Antonio
  • Friday, July 13 until Sunday, July 15. 10 p.m. until 6 a.m. The eastbound/northbound connector ramp at I-410 northbound will be closed for overlay work on the I-410 northbound mainlanes to Ingram Road. DETOUR: Traffic will exit to the I-410 northbound frontage road and travel north to the Culebra Road entrance ramp. 
US 90 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. Alternating mainlanes east and westbound at Loop 1604 closed for installing brackets and concrete deck pour. The US 90 westbound frontage road turnaround to eastbound will also be closed. 
  • Monday, July 16 until Thursday, July 19. 9 a.m. until 3 p.m. Eastbound right mainlane between Hunt Lane and I-410 closed for pour rail foundation. 
  • Wednesday, July 18 until Friday, July 20. 9 p.m. until 5 a.m. Soutbound right and shoulder lane between Marbach Road bridge to US 90 bridge for barrier work. 
Loop 1604 – West San Antonio
  • Current until Monday, July 30. 9 p.m. until 5 a.m. All mainlanes will be closed at US 90 for installing brackets and concrete deck pour. The US 90 eastbound entrance ramp from Loop 1604 will also be closed. DETOUR: Traffic will take US 90 westbound, exit Montgomery and take turnaround. 
  • Wednesday, July 18 until Thursday, July 19. 9 p.m. until 5 a.m. All lanes on Military Drive under both directions of Loop 1604 and left turn lanes on Loop 1604 will be closed for bridge work. Detours will be posted. 
  • Thursday, July 19 until Friday, July 20. 9 p.m. until 5 a.m. All lanes on FM 1957 (Potranco Road) under both directions of Loop 1604 and left turn lanes on Loop 1604 will be closed for bridge work. Detours will be posted. 
SH 16 (Bandera Road) – West San Antonio
  • Sunday, July 15 until Friday, July 20. 9 p.m. until 5 a.m. Alternating southbound lanes at the approach of Loop 1604 will be closed for pavement work. 
I-10 – West San Antonio
  • Saturday, July 14 until Sunday, July 15. 3 a.m. until 5 a.m. All eastbound mainlanes closed between Dominion Drive and Camp Bullis Road for beam work at Dominion Drive. The underpass at Dominion Drive and entrance ramps will also be closed. DETOUR for I-10: Eastbound mainlane traffic will exit at Dominion Drive and enter highway at Camp Bullis Road. DETOUR for Dominion Drive: Westbound traffic will detour at Boerne Stage Road and eastbound traffic will detour at Camp Bullis Road. 
  • Monday, July 16 until Tuesday, July 17. 9 p.m. until 5 a.m. The eastbound left frontage road lane between USAA Boulevard and Wurzbach Road will be closed for removing existing striping and placing work zone striping. The Huebner Road entrance will also be closed. 
  • Tuesday, July 17 until Wednesday, July 18. 9 p.m. until 5 a.m. Alternating eastbound frontage road lanes at Wurzbach Road will be closed for removing existing striping and placing work zone striping. 
U.S. Hwy 281 – Far North San Antonio
  • Saturday, July 14 until Monday, July 16. 3 a.m. until 5 a.m. All lanes at the intersection at Redland Road for intersection reconstruction. DETOUR: Traffic will use Ridgewood Parkway and Sonterra Boulevard. 
  • Sunday, July 15 until Friday, July 20. 9 p.m. until 5 a.m. The southbound left lane will be closed between Redland Road and Sonterra Boulevard entrance ramp for setting temporary barrier. 
  • Sunday, July 15 until Friday, July 20. 9 p.m. until 5 a.m. The northbound left lane will be closed between the Loop 1604 overpass and Sonterra Boulevard entrance ramp for setting temporary barrier. 
  • Sunday, July 15 until Friday July 20. 9 p.m. to 5 p.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp to Loop 1604 westbound frontage road for direct connector work. 
  • Sunday, July 15 until Friday July 20. 9 p.m. to 5 p.m. Northbound right frontage road lane between Sonterra Boulevard exit ramp and entrance ramp for direct connector work. 
  • Monday, July 16 until Friday, July 20. 9 p.m. until 5 a.m. Alternating mainlanes on both directions closed at Stone Oak Parkway for utility work. Alternating lanes on westbound Stone Oak Parkway will also be closed. 
Loop 1604 – North San Antonio
  • Sunday, July 15 until Friday, July 20. 9 p.m. until 5 a.m. All westbound frontage road lanes closed between the Sonterra Boulevard exit and entrance ramp for direct connector work. DETOUR: Traffic will take double left at Gold Canyon Drive; double left at Redland Road; use the Redland Road entrance ramp; take the Stone Oak Parkway exit ramp and the turnaround. 
I-410 – Southwest San Antonio
  • Sunday, July 15 until Friday, July 20. 9 p.m. until 5 a.m. Alternating eastbound frontage road lanes between south of Pearsall Road and south of Valley Hi Drive and will be closed for mill and inlay work. 
  • Monday, July 16 until Friday, July 20. 9 p.m. until 5 a.m. Alternating frontage road lanes on both directions between south of Valley Hi Drive and south of Pearsall Road will be closed for boring work. Alternating ramps will also be closed. 
Other roads – Boerne
  • Current until Tuesday, July 31. 9 a.m. until 4 p.m. Alternating mainlanes closed in both directions of SH 46 between I-10 to the Kendall/Bandera County Line for guardrail work. 
Other roads – Converse
  • Current until Friday, August 3. 9 a.m. until 4 p.m. Complete closure of westbound FM 1516 from FM 78 and School Street for intersection work. DETOUR: Traffic will access westbound FM 1516 through the Converse Center Street. Eastbound FM 1516 will remain open. 
Other roads – Helotes
  • Current until Wednesday, July 18. 9 a.m. to 3 p.m. One lane in both directions will be closed at the intersection at Riggs Road for roadway improvements. 
  • Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked.

Wednesday, July 11

I-35 Mainlanes at FM 1103 to Close for Bridge Demolition

The Texas Department of Transportation will close the I-35 mainlanes to north and southbound traffic from 9 p.m. on Saturday, July 14, until 3 p.m. on Sunday, July 15 to demolish the bridge at FM 1103. I-35 northbound traffic will exit to the frontage road at FM 1103. Traffic will remain on the frontage road through FM 1103 and re-enter the highway. I-35 southbound traffic will exit to the frontage road at FM 1103 and re-enter the highway at the entrance ramp past FM 1103.

The new portion of the FM 1103 bridge will be open to westbound traffic only, once demolition of the old bridge is complete. Eastbound traffic will need to travel south to FM 2252, and U-turn to FM 1103. The eastbound portion of the bridge will be complete by spring 2019. 

Road signs have been placed to alert drivers of the upcoming closure. TxDOT asks the traveling public to adhere to construction signage and remain aware when traveling through the work zone. 

The $7.2 million project consists of expanding the FM 1103 bridge over I-35 to five lanes, plus U-turn bridges and will be complete in summer 2019.

Friday, July 6

Next week's construction-related closures

I-35 – Schertz
  • Monday, July 9 until Tuesday, July 10. 9 p.m. until 5 a.m. All northbound main lanes at FM 1103 will be closed to remove the bridge overhang brackets. They will also be performing pavement maintenance, replace missing reflective markers, and remove roadway debris along the barrier. DETOUR: Traffic will exit I-35 northbound main lane to the frontage road and enter I-35 northbound at the entrance just north of FM 1103. (Ramp is currently closed but will be open for closure to allow access to I-35 northbound). 
  • Tuesday, July 10 until Wednesday, July 11. 9 p.m. until 5 a.m. All southbound main lanes at FM 1103 will be closed to remove the bridge overhang brackets. They will also be performing pavement maintenance, replace missing reflective markers, and remove roadway debris along the barrier. DETOUR: Traffic will exit southbound at FM 1103 and enter I-35 southbound at entrance ramp past FM 1103. 
  • Saturday, July 14 until Sunday, July 15. 9 p.m. to 3 p.m.  All main lanes on both directions will be closed at FM 1103 for the complete removal of the FM 1103 bridge. DETOUR for I-35 northbound: Traffic will exit I-35 northbound main lane traffic to the frontage road at FM 1103. Traffic to remain on frontage road through FM 1103. The entrance ramp from FM 1103 to I-35 northbound will be open to traffic. DETOUR for I-35 southbound: Traffic will exit I-35 southbound main lanes to the frontage road at FM 1103 and enter I-35 southbound at the entrance ramp past FM 1103. 
I-10 – Boerne
  • Current until Tuesday, July 10. 9 p.m. until 5 a.m. The right westbound main lane between ½ mile west of Bus 87 to Scenic Loop will be closed for concrete traffic barrier work. 
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection. 
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination. 
  • Current until Friday, July 20. 9 p.m. until 5 a.m. All northbound main lanes between SH 151 and Culebra Road will be closed for asphalt overlay work. Traffic will need to exit SH 151; travel through the intersection and enter highway at Culebra Road. 
US 90 – West San Antonio
  • Monday, July 11 until Monday, July 30. 9 p.m. until 5 a.m. Alternating lanes east and westbound at Loop 1604 closed for installing brackets and concrete deck pour. The US 90 westbound frontage road turnaround to eastbound will also be closed. 
Loop 1604 – West San Antonio
  • Monday, July 11 until Monday, July 30. 9 p.m. until 5 a.m. All lanes will be closed at US 90 for installing brackets and concrete deck pour. The US 90 eastbound entrance ramp from Loop 1604 will also be closed. DETOUR: Traffic will take US 90 westbound, exit Montgomery and take turnaround. 
SH 16 (Bandera Road) - West San Antonio
  • Sunday, July 8 until Friday, July 13. 9 p.m. until 5 a.m. Alternating southbound lanes between FM 1604 and Legend Trails will be closed for pavement work. 
I-10 – West San Antonio
  • Saturday, July 14 until Sunday, July 15. 3 a.m. until 5 a.m. All eastbound main lane lanes closed between Dominion Drive and Camp Bullis Road for beam work at Dominion Drive. The underpass at Dominion Drive and entrance ramps will also be closed. DETOUR for I-10: Eastbound main lane traffic will exit at Dominion Drive and enter highway at Camp Bullis Road. DETOUR for Dominion Drive: Westbound traffic will detour at Boerne Stage Road and eastbound traffic will detour at Camp Bullis Road. 
U.S. Hwy 281 – Far North San Antonio
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. Alternating northbound main lanes will be closed between Donella Drive entrance ramp and Sonterra Boulevard exit ramp for restriping work. The Sonterra Boulevard exit ramp will be closed. Traffic will need to use the Donella Drive exit ramp. 
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road will be closed for southbound/westbound direct connector bent work. DETOUR: Traffic will take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp; take turnaround and turn left on the westbound frontage road. 
  • Monday, July 9 until Thursday, July 12. 9 p.m. until 5 a.m. Alternating southbound main lanes will be closed between Sonterra Boulevard exit ramp and Loop 1604 for restriping work. The Sonterra Boulevard exit ramp will be closed. DETOUR: Traffic will use Donella Drive exit ramp and take the turnaround. 
  • Monday, July 9 until Friday, July 13. 9 p.m. until 5 a.m. The northbound right and center lanes will be closed between Sonterra Boulevard exit ramp and Sonterra Boulevard entrance ramp for northbound/westbound direct connector bent work. The Sonterra Boulevard exit ramp will be closed. 
  • Monday, July 9 until Friday, July 13. 9 p.m. until 5 a.m. The northbound right and center lanes will be closed between Donella Drive entrance ramp and Sonterra Boulevard exit ramp for northbound/eastbound direct connector bent work. The Donella Drive entrance ramp will be closed. DETOUR: Traffic will need to use the Loop 1604 entrance ramp. 
  • Tuesday, July 10 until Wednesday, July 11. 8 p.m. until 5 a.m. All northbound frontage road lanes between Loop 1604 and Sonterra Boulevard exit ramp for bridge beam work on the westbound/northbound direct connector. DETOUR: Traffic will use the US 281 southbound frontage road; use Donella Drive turnaround; and take the Donella Drive entrance ramp. 
  • Wednesday, July 11 until Friday, July 13. 8 p.m. until 5 a.m. All southbound frontage road lanes between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road will be closed for bridge beam work on the southbound/westbound direct connector. DETOUR: Traffic will take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp, take turnaround and turn left on the westbound frontage road. 
  • Thursday, July 12 until Friday, July 13. 8 p.m. until 5 a.m. All southbound main lanes will be closed between Sonterra Boulevard entrance ramp and Loop 1604 westbound frontage road for southbound/westbound direct connector bent work. DETOUR: Traffic will need to take the Sonterra Boulevard entrance ramp; use the Donella Drive exit ramp, take turnaround and turn left on the westbound frontage road. 
  • Saturday, July 14 until Monday, July 16. 3 a.m. until 5 a.m. All lanes at the intersection at Redland Road for intersection reconstruction. DETOUR: Traffic will use Ridgewood Parkway and Sonterra Boulevard. 
Loop 1604 – North San Antonio
  • Monday, July 9 until Wednesday, July 11. 8 p.m. until 5 a.m. All westbound frontage road lanes between Gold Canyon Drive and US 281 will be closed for bridge beam work on the westbound/northbound direct connector. The US 281 northbound exit will also be closed. DETOUR: Traffic will take double left at Gold Canyon Drive; take double left turn at Redland Road; use the Redland Road entrance ramp; take Stone Oak Parkway exit ramp and use the turnaround at Stone Oak Parkway. 
I-410 – Southwest San Antonio
  • Sunday, July 8 until Friday, July 13. 9 p.m. until 5 a.m. Alternating frontage road lanes on both directions between south of Valley Hi Drive and south of Pearsall Road will be closed for mill and inlay work. 
  • Wednesday, July 11 until Friday, July 13. 9 a.m. to 4 p.m. Two lanes frontage road lanes on both directions will be closed for boring work. 
Other roads – Boerne
  • Monday, July 2 until Tuesday, July 31. 9 a.m. until 4 p.m. Alternating main lanes closed in both directions of SH 46 between I-10 to the Kendall/Bandera County Line for guardrail work. 
Other roads – Converse
  • Monday, July 9 until Friday, August 3. 9 a.m. until 4 p.m. Complete closure of westbound FM 1516 from FM 78 and School Street for intersection work. DETOUR: Traffic will access westbound FM 1516 through the Converse Center Street. Eastbound FM 1516 will remain open. 
Other roads – Helotes
  • Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked. 
All closures are pending weather

A look ahead to next weekend

We do not have any major construction closures this coming weekend due to the 4th of July. However, we do have a few major FULL main lane closures next weekend that can impact travelers:

I-35 at FM 1103 in Schertz
Starting at 9 p.m. on Saturday, July 14, I-35 both north and southbound will be closed to demolish the existing FM 1103 bridge structure. Demolition of the bridge is expected to be complete by late Sunday morning with cleanup and restoration to original main lane configuration by 3 p.m. Sunday afternoon.
Detours:
I-35 Northbound
Traffic will exit I-35 northbound main lane traffic to the frontage road at FM 1103. Traffic to remain on frontage road thru FM 1103. The entrance ramp from FM 1103 to I-35 northbound will be open to traffic.
I-35 Southbound 
Traffic will exit I-35 southbound main lanes to the frontage road at FM 1103 and enter I-35 southbound at the entrance ramp past FM 1103. 
The new FM 1103 portion of the bridge will be open to traffic for westbound traffic only once demolition of the old bridge is complete.

Redland Road at US 281
This full closure will be necessary to construct the Redland Road intersection. Work includes installation of drainage structures, removal of some existing utility, new base and asphalt pavement. Also, temporary pavement will be constructed to tie-in to existing travel lanes.
Work is scheduled to take place in two weekends:
  • From Saturday, July 14, 2018, at 3 a.m. to Monday, July 16, 2018, at 5 a.m. 
  • From Saturday, July 21, 2018, at 3 a.m. to Monday, July 23, 2018, at 5 a.m. 
During the execution of this work, full closures will be required as follows:
Full Closure of eastbound and westbound Redland Road at the approach of US 281 – Public to detour by using Ridgewood Parkway and Sonterra Boulevard.
During this closure, traffic will be detoured to allow workers full access to the roadway to allow them to work quickly and uninterrupted. Complete closure of the roadway can result in increased productivity, reduced construction time, reduced impact to traffic, increased safety for both traveling public & workers, and in some cases a cost saving. Off-duty police will be used to assist with traffic control. Work is weather permitting.
You can receive information on lane closures straight to your e-mail inbox by registering here http://eepurl.com/cXz2kr.

I-10 at Dominion Drive
Crews will close the eastbound main lanes of I-10 between Boerne Stage Road and Camp Bullis Road Saturday, July 14 at 3 a.m. until 5 a.m. Sunday, July 15 to continue work that was previously done this past weekend. The underpass at Dominion Drive and entrance ramps will also be closed. DETOUR for I-10: Eastbound main lane traffic will exit at Dominion Drive and enter highway at Camp Bullis Road. DETOUR for Dominion Drive: Westbound traffic will detour at Boerne Stage Road and eastbound traffic will detour at Camp Bullis Road.