Friday, May 20

UPCOMING SCHEDULED CONSTRUCTION CLOSURES


Loop 1604 – North West San Antonio/Bexar County

  • Sunday, June 12. 2 a.m. Full closure of the mainlanes, in both directions, from I-10 to Vance Jackson Rd. for utility work. Intermittent closures will take place in 15-minute interval throughout the day.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Sunday, May 22 until Friday, June 3. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Monday, May 23 until Monday, June 6. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Monday, May 23 until Monday, June 6. Weeknights 10 p.m. until 12 p.m. Eastbound mainlane full closure from Kyle Seale Parkway to Babcock Road for bridge construction.
  • Monday, May 23 until Monday, June 6. Weeknights 9 p.m. until 5 a.m. Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 23 until Monday, June 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Saturday, May 21 at 10 p.m. until Sunday, May 22 at 12 p.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: deck pour. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, May 22 until Friday, May 27. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, May 22 until Friday, May 27. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, May 22 until Friday, May 27. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to NW Military Highway for barrier setting and MBGF removal.
  • Sunday, May 22 until Friday, May 27. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from NW Military Highway to IH-10 for barrier setting and MBGF removal.
  • Monday, May 23 until Friday, May 27. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work.
  • Monday, May 23 until Friday, May 27. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work.
  • Monday, May 23 until Friday, May 27. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Hwy for concrete removal and traffic signal work.
  • Monday, May 23 until Friday, May 27. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Hwy for concrete removal and traffic signal work.
  • Sunday, May 22 until Thursday, May 26. Nightly 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Sunday, May 22 until Friday, May 27. Continuous 9 p.m. until 3 p.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Single westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Single westbound lane closure between southbound I-35 and Gateway Boulevard for geotechnical and drilling work.
  • Monday, May 23 to Thursday, May 26. 9 a.m. to 5 p.m. Left shoulder closure on westbound frontage road from Old Austin Road to Gateway Place for geotechnical and drilling work.
  • Tuesday, May 24 to Wednesday, May 25. 9 a.m. to 5 p.m. Various east and westbound mainlane and frontage road closures from Kitty Hawk to Pat Booker. 

US 281 – North San Antonio/Bexar County

  • Sunday, May 22 until Friday, May 27. Continuous 9 p.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Sunday, May 22 until Friday, May 27. Continuous 9 p.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work.
  • Monday, May 23 until Friday, May 27. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604.
  • Wednesday, June 1 until Friday, June 3. 9 p.m. to 6 a.m. Full closure of the Marshall Rd. intersection for bridge work.
  • Friday, June 10 until Saturday, June 11. 9 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work. 

I-10 – Central San Antonio/Bexar County

  • Sunday, June 5 until Tuesday, June 7. 9 p.m. to 5 a.m. Multiple westbound mainlane closures at Frio St. for bridge repairs. 

I-10 – East San Antonio/Bexar County

  • Sunday, May 22. 8:30 p.m. to 5:30 a.m. Alternating mainlane closures, in both directions, from FM 1518 to Cibolo Creek for barrier work.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 6 a.m. Single eastbound mainlane closure from Zuehl Rd. to FM 465 for barrier installation.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 6 a.m. Single westbound mainlane closure from FM 465 to Zuehl Rd. for barrier installation.
  • Monday, May 23 until Friday, May 27. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from Cibolo Creek to FM 2538 for barrier work.
  • Saturday, May 21 from 4 a.m. to 9 p.m. Full eastbound and westbound mainlane closure of I-10 between Graytown Road and Loop 1604 for bridge work. Detour:
  • Westbound I-10 traffic will take Graytown/Pfeil exit, use frontage road, take 1604 entrance ramp.
  • Eastbound I-10 traffic will take the Graytown/Pfeil exit, use frontage road, and take temporary Pfeil entrance ramp. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, June 5. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals.
  • Sunday, June 12. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals.
  • Sunday, June 26. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals.
  • Sunday, May 22 until Monday, May 23. 9 p.m. to 5 a.m. Double northbound mainlane closure and entrance and exit ramps from Guadalupe River to SH 46 for overhead sign work.
  • Sunday, May 22 until Monday, May 23. 9 p.m. to 5 a.m. Double northbound mainlane closure and entrance ramp from FM 306 to Kohlenberg for overhead sign work.
  • Sunday, May 22 until Tuesday, May 24. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to FM 2252 for pavement work.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Loop 1604 exit ramp (172). Follow the detour signs.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Northbound Selma Schertz exit ramp (exit 174A) closure and left frontage road lane from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detours.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Northbound connector ramp closure to Loop 1604 westbound from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic on I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. 
  • Sunday, May 22 until Friday, May 27. 8 p.m. to 5 a.m. Southbound connector ramp closure from I-35 southbound to Loop 1604 eastbound from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. All traffic will continue on I-35 southbound frontage road will make a U-turn at I-35 Access Road to northbound frontage road to eastbound Loop 1604.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Southbound frontage road entrance ramp closure from eastbound I-410 to Fratt Road for geotechnical and drilling work. Traffic should continue on southbound frontage road of I-35 to entrance ramp at Walzem Road. 
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Single northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Single southbound mainlane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Northbound entrance ramp closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Thousand Oaks Drive exit ramp closure on southbound I-35 for geotechnical and drilling work.
  • Monday, May 23 until Tuesday, May 24. 9 p.m. to 5 a.m. Single southbound mainlane closure from FM 306 to Parkway bridge for metal beam and guardrail work.
  • Monday, May 23 until Tuesday, May 24. 9 p.m. to 5 a.m. Single southbound mainlane closure from Post Road exit ramp and entrance ramp for mow strip work.
  • Monday, May 23 to Thursday, May 26 9 a.m. to 5 p.m. Right shoulder closure on the northbound frontage road from Shin Oak Drive to Live Oak Crossing for geotechnical and drilling work.
  • Monday, May 23 to Thursday, May 23. 9 a.m. to 5 p.m. Single lane closure on the northbound frontage road from O’Connor Road to Judson Road for utility pothole.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on the northbound frontage road from Forum Parkway to Forum Access for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road of I-35 between Evans Road and Retama Parkway for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, May 23 until Friday, May 27. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Tuesday, May 24 until Wednesday, May 25. 9 p.m. to 5 a.m. Single northbound mainlane closure from FM 306 to Parkway bridge for ramp and guardrail work.
  • Tuesday, May 24 until Wednesday, May 25. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to FM 2252 for pavement work.
  • Tuesday, May 24 to Thursday, May 26. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road of I-35 from Arcadia Drive to Olympia Parkway for utility pothole.
  • Tuesday, May 24 to Thursday, May 26. 9 a.m. to 5 p.m. Left lane closure on northbound frontage road of I-35 from Crestway Road to Starlight Terrace for utility pothole.
  • Wednesday, May 25 until Friday, May 27. 9 p.m. to 5 a.m. Single southbound mainlane closure from FM 306 to Parkway bridge for attenuator work.
  • Wednesday, May 25 until Friday, May 27. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 for pavement work.
  • Thursday, May 26 until Friday, May 27. 9 p.m. to 5 a.m. Single northbound frontage road lane closure from Business 35 to FM 306 for delineator installation work.
  • Tuesday, May 31 until Wednesday, June 1. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 for pavement work. 

I-410 – North East San Antonio

I-410 – East San Antonio

  • Continuing through Monday, May 30. DAYTIME alternating southbound I-410 frontage road lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, May 30. NIGHTTIME northbound I-410 exit to eastbound I-10 closed from 8 p.m. to 5 a.m. each night for overpass work. Click here for detour map.
  • Continuing through Monday, June 6. NIGHTTIME alternating southbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work.
  • Continuing through Monday, June 6. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work.  

I-410 – West San Antonio

  • Current until Monday, May 23. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Current until Monday, May 23. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for pavement operations.
  • Current until Monday, May 23. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at the Culebra Rd. intersection for concrete work.
  • Current until Sunday, May 22. 8 p.m. to 5 a.m. Alternating full closures, in both directions, at the Culebra Rd. intersection for column work.
  • Current until Monday, May 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, May 23. 7 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for mill and overlay operations.
  • Sunday, May 22 until Monday, June 6. 8 p.m. to 5 a.m. Full closure of the Culebra Rd. intersection for column work.
  • Monday, May 23 until Monday, June 6. 7 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to Ingram Rd. for mill and overlay work.
  • Monday, May 23 until Monday, June 6. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Monday, May 23 until Monday, June 6. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at Culebra Rd. for concrete work.
  • Monday, May 23 until Monday, June 6. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Monday, May 23 until Monday, June 6. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations. 

I-410 – Southwest San Antonio

  • Current until Monday, May 23. Northbound exit ramp to Valley Hi Rd. closed for pavement repairs. 

SH 151 – West San Antonio

  • Current until Monday, May 23. 8 p.m. to 5 a.m. Full alternating mainlane closures at Loop 410 for painting operations.
  • Current until Monday, May 23. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier work.
  • Monday, May 23 until Monday, June 6. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from W. Military Dr. to Ingram Rd. for barrier work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, May 27. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for rail work.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single westbound lane closure at the Lockhill Selma Rd. intersection for island work.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single eastbound lane closure at Lockhill Selma for island work.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single westbound lane closure at N.W. Military Highway intersection for paving operations.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single eastbound lane closure at N.W. Military Highway for concrete operations. 

Lockhill Selma Rd. – Bexar County

  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for island work.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for island work. 

FM 1535 – N.W. Military Highway

  • Monday, May 23 until Friday, May 27. 7 a.m. to 6 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for traffic switch.
  • Monday, May 23 until Tuesday, May 24. 7 a.m. to 6 p.m. Closure of the Pond Hill intersection for utility work.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paving operations.
  • Monday, May 23 until Friday, June 3. 9 a.m. to 4 p.m. Single northbound lane closure at Wurzbach Parkway for concrete work. 

US 90 – Far West Bexar County

  • Tuesday, May 31 until Friday, June 3. 7 p.m. to 6 a.m. Alternating full closures of the frontage roads and exit ramps, in both directions, at Montgomery Rd. for mill and overlay work. 

SH 181 – Bexar County

  • Current until May 2022. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

Other – Bexar County

  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Northbound to southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Various lane closures on Austin Highway between eastbound and westbound frontage road of I-410 for geotechnical and drilling work.
  • Sunday, May 22 to Friday, May 27. 8 p.m. to 5 a.m. Single lane closures on westbound Fratt Road between Interchange Parkway and Austin Highway for geotechnical and drilling work. Follow detour signs. 

Loop 337 – Comal County

  • Monday, May 23 until Tuesday, May 24. 7 a.m. to 5 p.m. Single northbound mainlane closures at River Rd. for metal beam guard fence installations. 

FM 306 – Comal County

  • Monday, May 23 until Tuesday, May 24. 9 p.m. to 5 a.m. Single lane closure in each direction from I-35 to Town Center Drive for pavement marking and center median work.
  • Tuesday, May 24 until Wednesday, May 25. 9 p.m. to 5 a.m. Northbound turnaround closure at FM 306 for delineator installation work.
  • Wednesday, May 25 until Thursday, May 26. 9 p.m. to 5 a.m. Northbound turnaround closure at FM 306 for delineator installation work.

Sunday, May 15

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Wednesday, May 11 until Monday, May 23. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Wednesday, May 11 until Monday, May 23. Weeknights 10 p.m. until 12 p.m. Eastbound mainlane full closure from Kyle Seale Parkway to Babcock Road for bridge construction: bridge deck pour.
  • Wednesday, May 11 until Monday, May 23 Weeknights 9 p.m. until 5 a.m. Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, May 15 until Thursday, May 19. Nightly 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Sunday, May 15 until Friday, May 20. Continuous 9 p.m. until 3 p.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Sunday, May 15 until Friday, May 20. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, May 15 until Friday, May 20. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Monday, May 16 until Friday, May 20. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to NW Military Highway for barrier setting and MBGF removal.
  • Monday, May 16 until Friday, May 20. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from NW Military Highway to IH-10 for barrier setting and MBGF removal.
  • Monday, May 16 until Friday, May 20. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work.
  • Monday, May 16 until Friday, May 20. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work.
  • Monday, May 16 until Friday, May 20. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Hwy for concrete removal and traffic signal work.
  • Monday, May 16 until Friday, May 20. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Hwy for concrete removal and traffic signal work. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Single westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, May 15 to Friday, May 20. 8 p.m. to 5 a.m. Single westbound lane closure between southbound I-35 and Gateway Boulevard for geotechnical and drilling work. 

US 281 – North San Antonio/Bexar County

  • Sunday, May 15 until Thursday, May 19. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604.
  • Sunday, May 15 until Friday, May 20. Continuous 9 p.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Sunday, May 15 until Friday, May 20. Continuous 9 p.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work. 

I-10 – East San Antonio/Bexar County

  • Sunday, May 15 until Friday, May 20. 8 p.m. to 6 a.m. Single eastbound mainlane closure from FM 2538 to FM 465 for barrier work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Loop 1604 exit ramp (172). Follow the detour signs.
  • Sunday, May 15 until Friday, May 20.  8 p.m. to 5 a.m. Northbound Selma Schertz exit ramp (exit 174A) closure and left frontage road lane from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detours.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Single northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Northbound connector ramp closure to Loop 1604 westbound from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic on I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. 
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Southbound connector ramp closure from I-35 southbound to Loop 1604 eastbound from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. All traffic will continue on I-35 southbound frontage road will make a U-turn at I-35 Access Road to northbound frontage road to eastbound Loop 1604.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Single southbound mainlane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, May 15 to Friday, May 20. 8 p.m. to 5 a.m. Northbound entrance ramp closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Thousand Oaks Drive exit ramp closure on southbound I-35 for geotechnical and drilling work.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Southbound frontage road entrance ramp closure from eastbound I-410 to Fratt Road for geotechnical and drilling work. Traffic should continue on southbound frontage road of I-35 to entrance ramp at Walzem Road.
  • Sunday, May 15 until Friday, May 20. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and I-410 for geotechnical and drilling work. To access northbound I-35, traffic must use Austin Highway to I-35 for entrance ramp. Follow the detour signs
  • Monday, May 16 until Wednesday, May 18. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Toepperwein Road to Sandpiper Drive for utility pothole.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road of I-35 between Evans Road and Retama Parkway for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Double lane closure on the northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on the northbound frontage road from Forum Parkway to Forum Access for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, May 16 until Friday, May 20. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Tuesday, May 17 until Wednesday, May 18. 8 p.m. to 5 a.m. Southbound shoulder and entrance ramp between FM 306 to Business I-35 for mow strip work.
  • Tuesday, May 17 until Thursday, May 19. 9 a.m. to 5 p.m. Single lane closure on the northbound frontage road from Starlight Terrace to North Weidner Road for utility pothole.
  • Tuesday, May 17 until Thursday, May 19. 9 a.m. to 5 p.m. Single shoulder closure on the northbound frontage road from Shin Oak Drive to Pat Booker for soil sample work.
  • Tuesday, May 17 until Thursday, May 19. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road turnaround at FM 1518.
  • Wednesday, May 18 until Friday, May 20. 8 a.m. to 5 p.m. Southbound shoulder and entrance ramp between FM 306 to Business I-35 for mow strip work.
  • Sunday, June 5. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals.
  • Sunday, June 12. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals.
  • Sunday, June 26. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at St. Mary’s St. for utility work. Intermittent closures will take place throughout the day in 15-minute intervals. 

I-410 – North East San Antonio

I-410 – East San Antonio

  • Continuing through Monday, May 16. NIGHTTIME Northbound I-410 exit to eastbound I-10 closed from 8 p.m. to 5 a.m. each night for overpass work. Click here for detour map.
  • Continuing through Monday, May 23. NIGHTTIME alternating southbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work.
  • Continuing through Monday, June 6. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work.  

I-410 – West San Antonio

  • Current until Monday, May 23. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Current until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic and barrier switch.
  • Current until Monday, May 23. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for pavement operations.
  • Current until Monday, May 23. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at the Culebra Rd. intersection for concrete work.
  • Current until Sunday, May 22. 8 p.m. to 5 a.m. Alternating full closures, in both directions, at the Culebra Rd. intersection for column work.
  • Current until Monday, May 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, May 23. 7 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for mill and overlay operations. 

I-410 – Southwest San Antonio

  • Current until Monday, May 23. Northbound exit ramp to Valley Hi Rd. closed for pavement repairs. 

SH 151 – West San Antonio

  • Current until Monday, May 23. 8 p.m. to 5 a.m. Full alternating mainlane closures at Loop 410 for painting operations.
  • Current until Monday, May 23. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier work.
  • Current until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at Loop 410 for signal work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, May 27. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for rail work 

SH 181 – Bexar County

  • Current until May 2022. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

Other – Bexar County

  • Sunday, May 15 to Friday, May 20. 8 p.m. to 5 a.m. Various lane closures on Austin Highway between eastbound and westbound frontage road of I-410 for geotechnical and drilling work.
  • Sunday, May 15 to Friday, May 20. 8 p.m. to 5 a.m. Single lane closures on westbound Fratt Road between Interchange Parkway and Austin Highway for geotechnical and drilling work. Follow detour signs.
  • Sunday, May 15 to Friday, May 20. 8 p.m. to 5 a.m. Northbound to southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, May 16 to Wednesday, May 18. 9 a.m. to 5 p.m. Single lane closure on eastbound Fratt Road from eastbound frontage road of Loop 410 to Interchange Parkway for utility pothole. 

Monday, May 9

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Wednesday, May 11 until Monday, May 23. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Wednesday, May 11 until Monday, May 23. Weeknights 10 p.m. until 12 p.m. Eastbound mainlane full closure from Kyle Seale Parkway to Babcock Road for bridge construction: bridge deck pour.
  • Wednesday, May 11 until Monday, May 23 Weeknights 9 p.m. until 5 a.m.  Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, May 6 at 9 p.m. until Monday, May 9 at 5 a.m. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection, including turnarounds, for storm drain work.
  • Friday, May 13 at 9 p.m. until Monday, May 16 at 5 a.m. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection, including turnarounds, for storm drain work. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Lockhill Selma Road exit ramp to IH-10 for overhead sign bridge removal.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from IH-10 to Vance Jackson Road for overhead sign bridge removal.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Short-term full closure of NW Military Highway at the Loop 1604 intersection, including turnarounds, for temporary illumination installation. Anticipated 2-hour closures.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Eastbound frontage road left lane closure from the Lockhill Selma Road entrance ramp to the NW Military Highway exit ramp for temporary illumination installation.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Westbound frontage road left lane closure from the NW Military Highway entrance ramp to the Lockhill Selma Road exit ramp for temporary illumination installation.
  • Monday, May 9 until Friday, May 13. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work. 

Loop 1604 – North East San Antonio/Bexar County

  • Monday, May 9 until Friday, May 13. 8 p.m. to 5 a.m. Single westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single westbound mainlane between northbound I-35 and Gateway Boulevard for geotechnical and drilling work.
  • Tuesday, May 10 until Thursday, May 12. 9 a.m. to 5 p.m. Single lane closure on westbound to eastbound turnaround on 1604 Access Road for utility pothole work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single shoulder closure on westbound frontage road from Old Austin Road to Gateway Place for utility pothole work.  

US 281 – North San Antonio/Bexar County

  • Friday, May 13. 10 p.m. to 12 p.m. Full closure of Wilderness Oak intersection for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Anderson Loop exit ramp (172). Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Single northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Northbound clover ramp closure to Loop 1604 westbound for geotechnical and drilling work. Traffic on the I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Southbound clover ramp closure to Loop 1604 eastbound for geotechnical and drilling work. Traffic on the I-35 southbound frontage road will make a U-turn at I-35 access road to northbound frontage road to eastbound Loop 1604. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Southbound frontage road entrance ramp closure from eastbound I-410 to Fratt Road for geotechnical and drilling work. Traffic should continue on the southbound frontage road to the entrance ramp at Walzem Road.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single southbound lane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Monday, May 9 to Tuesday, May 10. 9 a.m. to 5 p.m. Various lane closures on southbound frontage road from Judson Road to Crownpoint Drive for soil sample work.
  • Monday, May 9 to Tuesday, May 10. 9 a.m. to 10:30 a.m. Singe lane closure on southbound frontage road and various lane closures on northbound frontage road from Wayland Way to Bladau Bishop for soil sample work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from North Evans Road to Olympia Parkway for utility pothole work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Evans Road and Retama Parkway for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from Forum Parkway to Old Austin Road for utility pothole work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Double lane closure on northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Singe lane closure on the northbound frontage road from Toepperwein to Sandpiper Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Forum Parkway to Forum Access for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9:00 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Tuesday, May 10 to Thursday, May 12. 9 a.m. to 5 p.m. Various lane closures on southbound and northbound frontage roads at Weidner Road intersection for soil sample work.
  • Wednesday, May 11. 9 a.m. to 12 p.m. Southbound to northbound turnaround closure and various lane closures on northbound frontage road from Starlight Terrace to Weidner Road for soil sample work.
  • Wednesday, May 11. 1 p.m. to 5 p.m. Various lane closures on northbound and southbound frontage road and northbound to southbound turnaround closure at Starlight Terrace for soil sample work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single shoulder closure on northbound frontage road from Shin Oak Drive to Live Oak Crossing for utility pothole work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from O’Connor Drive to Bladau Bishop drive for utility pothole work.
  • Thursday, May 12. 9 a.m. to 5 p.m. Various lane closures on northbound frontage road from Starlight Terrance to Crestway Drive for utility pothole work. 

I-410 – North East San Antonio

  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and I-35 for geotechnical and drilling work. Traffic should use Austin Highway to I-35 for entrance ramp. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. 5 a.m. Single lane closure on the westbound frontage road from Perrin Creek Road and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single northbound mainlane closure between Austin Highway to Crestway Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9:00 a.m. to 5 p.m. Single lane closure on the westbound frontage road from Perrin Creek Road and Perrin Beitel Road for geotechnical and drilling work.
  • Thursday, May 12. 12 p.m. to 5 p.m. Single lane closure on westbound frontage road from Perrin Creek Pump to Perrin Beitel Road for soil sample work.
  • Friday, May 13 to Friday May 13. 9 a.m. to 1 p.m. Single lane closure on eastbound frontage road at Starcrest Drive for soil sample work.
  • Friday, May 13 to Friday, May 13. 2 p.m. to 3:30 p.m. Single lane closure on westbound frontage road from Brookhaven Drive to Chisolm Trail for soil sample work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Various lane closures on Austin Highway between eastbound and westbound frontage road of I-410 for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single lane closures on westbound Fratt Road between Interchange Parkway and Austin Highway for geotechnical and drilling work. Follow detour signs. 

I-410 – East San Antonio

  • Tuesday, May 10 from 9 p.m. to 5 a.m. NIGHTTIME southbound I-410 right lane closure between FM 78 and Houston Street for coring operations.
  •  Continuing through Monday, May 9. NIGHTTIME northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work. (No weekend work).
  • Ackerman Road from 9 a.m. to 5 p.m. each day for detour work. 
  • Continuing through Monday, May 23. NIGHTTIME alternating southbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work.
  • Continuing through Monday, May 16. NIGHTTIME Northbound I-410 exit to eastbound I-10 closed from 8 p.m. to 5 a.m. each night for overpass work. Click here for detour map.
  • Continuing through Monday, June 6. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and 

I-410 – West San Antonio

  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Monday, May 9 until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic and barrier switch.
  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for pavement operations.
  • Monday, May 9 until Monday, May 23. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at the Culebra Rd. intersection for concrete work.
  • Sunday, May 15 until Sunday, May 22. 8 p.m. to 5 a.m. Alternating full closures, in both directions, at the Culebra Rd. intersection for column work.
  • Monday, May 9 until Monday, May 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Bandera Rd. for signal work. 

I-410 – Southwest San Antonio

  • Current until Monday, May 23. Northbound exit ramp to Valley Hi Rd. closed for pavement repairs. 

SH 151 – West San Antonio

  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Full alternating mainlane closures at Loop 410 for painting operations.
  • Monday, May 9 until Monday, May 23. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier work.
  • Friday, May 13 until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at Loop 410 for signal work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, May 27. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for rail work 

SH 181 – Bexar County

  • Current until Saturday, April 30. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

I-37 – Atascosa County

  • Monday, May 9 until Tuesday, May 10. 9 a.m. to 5 p.m. Single northbound mainlane closure at Coughran Rd. for bridge repairs.