Friday, April 30

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 p.m. until 9 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for asphalt paving. 

Loop 1604 – Far East San Antonio/Bexar County

  • Monday, May 3. 9 a.m. to 1 p.m. Full closure of southbound mainlanes at I-10 intersection for bridge work.

Loop 1604 – North East San Antonio/Bexar County

  • Tuesday, May 4 until Wednesday, May 5. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Palisades Dr. to Pat Booker Rd. for barrier setting and traffic switch.
  • Thursday, May 5 until Friday, May 7. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Palisades Dr. to Pat Booker Rd. for traffic switch. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, May 1. 7 a.m. to 5 p.m. Single southbound lane closure at Overlook Parkway for sidewalk improvements.
  • Saturday, May 8. 7 a.m. to 5 p.m. Single southbound lane closure at Overlook Parkway for sidewalk improvements.
  • Tuesday, May 4 until Friday, May 7. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to Basse Rd. for overhead sign replacements.
  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving and sign installation.
  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, May 3 until Friday, May 7. Continuous 7 a.m. until 9 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for drainage work. DETOUR: Turn left at Evans Road and left again onto the southbound US 281 frontage road.
  • Monday, May 3 until Friday, May 7. Continuous 7 a.m. until 9 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for drainage work. DETOUR: Use eastbound Evans Road to access the southbound US 281 frontage road.
  • Monday, May 3 until Friday, May 7. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for sign installation.
  • Monday, May 3 until Friday, May 7. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for sign installation.
  • Monday, May 3 until Friday, May 7. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, May 3 until Friday, May 7. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Friday, May 14 until Friday, May 21. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. at US 281 intersection for drainage installation.

Stone Oak Parkway – North Central San Antonio

  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating eastbound crossing closure at the US 281 intersection for a traffic switch.
  • Friday, April 30 until Monday, May 3. Weekend continuous 9 p.m. until 5 a.m. Alternating westbound crossing closure at the US 281 intersection for a traffic switch.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating eastbound crossing closure at the US 281 intersection for a traffic switch.
  • Saturday, May 8 until Monday, May 10. Weekend continuous 3 a.m. until 5 a.m. Alternating westbound crossing closure at the US 281 intersection for a traffic switch. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Sunday, May 2. 7 a.m. to 12 p.m. Full closure of mainlanes and frontage roads, in both directions, from Medical Dr. to Callaghan Rd. utility work by Verizon.
  • Monday, May 3 until Thursday, May 6. 7 p.m. to 5 a.m. Double mainlane closures, in both directions, from Loop 1604 to Saltrillo Creek for material backfill.
  • Monday, May 3 until Friday, May 7. 7:30 a.m. to 5:30 p.m. Single mainlane closures, in both directions, from mile marker 510 to mile marker 517 for mow strip and guardrail improvements.
  • Monday, May 3 until Friday, May 7. 7:30 a.m. to 5:30 p.m. Single mainlane closures, in both directions, from one mile east of John’s Rd. to one mile west of Cibolo Creek for guardrail improvements.
  • Monday, May 3 until Wednesday, May 5. 7:30 a.m. to 5:30 p.m. Single mainlane closures, in both directions, from one mile east of Frederick’s Creek to one mile west of Frederick’s Creek for concrete pouring.
  • Thursday, May 7 until Friday, May 7. 9 p.m. to 1 a.m. Double mainlane closures, in both directions, from the Ralph Fair Rd. exit ramp to the Ralph Fair Rd. bridge for sign installations. 
  • Friday, May 14 - 9 p.m. to Monday, May 17 - 5 a.m. Full closure of mainlanes, in both directions, from SH 46 to Scenic Loop Rd. for demolition of US 87 bridge. Lanes under Scenic Loop Rd. bridge will also be closed. DETOUR: Traffic will be directed to frontage roads. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, May 1. 7 a.m. to 5 p.m. Single westbound mainlane closure from FM 1516 to Martinez Creek for pipe installation. Exit ramp to Woodlake Parkway also closed. Detour: Westbound traffic to Woodlake Parkway can exit at FM 1516 and continue on westbound frontage road.
  • Monday, May 3 until Wednesday, May 5. 7 p.m. to 5 a.m. Full closure of westbound mainlanes at Graytown Rd. for panel placements. DETOUR: Westbound traffic will be directed to Graytown Rd. exit ramp and re-enter at Graytown entrance ramp.
  • Monday, May 3 until Thursday, May 6. 7 p.m. to 5 a.m. Single mainlane closures, in both directions, from Loop 1604 to Saltrillo Creek to haul backfill.
  • Tuesday, May 4. 7 a.m. to 5 p.m. Single lane closure on westbound frontage road from Foster Rd. to Ackerman Rd. for riprap placement.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to FM 2252 for haul off materials.
  • Current until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul off.
  • Current until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul off.
  • Current until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, May 3 until Saturday, May 8. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for material haul-off.
  • Monday, May 3 until Saturday, May 8. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Sunday, May 2 until Friday, May 7. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to FM 1103 for milling and overlay work.
  • Sunday, May 2 until Tuesday, May 4. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from US 90 to Olympia Parkway for overhead sign replacements. 

I-410 – West San Antonio

  • Monday, May 3 until Monday, May 10. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
  • Monday, May 3 until Monday, May 10. 8 p.m. to 5 a.m. Full closure of mainlane, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, May 3 until Monday, May 10. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for underground work.
  • Friday, April 30 until Saturday, May 1. 8 p.m. to 12 p.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for beam removal.
  • Monday, May 3 until Monday, May 10. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Loop 410 to Ingram Rd. for wall improvements.
  • Monday, May 3 until Monday, May 10. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, May 3 until Monday, May 10. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, May 3 until Monday, May 10. 8 p.m. to 5 a.m. Double lane closure on southbound frontage roads from SH 151 to Lakeside Parkway for bridge work.
  • Monday, May 3 until Monday, May 10. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 

SH 151 – West San Antonio

  • Monday, May 3 until Monday, May 10. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

Alamo Ranch Parkway – West Bexar County

  • Monday, May 3 until Friday, May 7. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from Loop 1604 to Lone Star Parkway for bridge construction. 

PA 1502 – Wurzbach Parkway

  • Sunday, May 2 until Friday, May 7. 9 p.m. to 5 a.m. Various and alternating lane closures between the intersections of Lockhill Selma Rd. and N. W. Military Hwy for a traffic switch. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

Other Roads – Bexar County

  • Hildebrand Ave. Monday, May 3 until Friday, May 7. 9 a.m.to 4 p.m. Left lane closures, in both directions, from Brackenridge Rd. to US 281 for roadway improvements.

Monday, April 26

POSTPONED: FULL CLOSURE OF I-10 IN BOERNE STARTING FRIDAY, APRIL 30

THIS CLOSURE HAS BEEN POSTPONED DUE TO WEATHER. 
THE WORK WILL BE RESCHEDULED FOR THE WEEKEND OF MAY 14 - 16. 


As part of the ongoing IH-10 frontage road construction, work is progressing into the next stage of construction which will require the demolition of the existing US-87 (Main Street) bridge. 

In order to safely remove the bridge, crews will need approximately 56 hours of continuous full mainlane closure of the IH-10 eastbound and westbound travel lanes between SH-46 (Bandera Rd) and Scenic Loop. The removal of this bridge will allow crews to start working on the new US-87 bridge.  

The work is scheduled to start on Friday April 30, 2021 at 9:00 pm and is expected to be completed by 5:00 am on Monday May 3, 2021, weather permitting.

The westbound mainlanes will be removed at Exit 542 Business US-87 and will be directed along the Westbound Frontage Road to the next available entrance ramp prior to SH-46, and

The eastbound mainlanes will be removed near SH-46 and will be detoured along the Eastbound Frontage Road and will be allowed to enter back onto the mainlanes east of Scenic Loop.  

During this closure, there will be no through traffic at Scenic Loop under IH-10. All traffic will be required to turn right onto the frontage roads.

  • Northbound Scenic Loop traffic will be detoured to Balcones Creek intersection and
  • Southbound Scenic Loop traffic will be detoured to the SH-46 intersection.
As a reminder, all construction work is subject to change. 

Need Additional Information?

Construction Update “Go Ahead!” Bloghttp://txdotsanantonio.blogspot.com/

Twitter: @TxDOTSanAntonio

Friday, April 23

UPCOMING SCHEUDLED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the southbound US 281 direct connector ramp for sign installation. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road.
  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the southbound US 281 direct connector ramp for sign installation. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road.
  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 p.m. until 9 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.

Loop 1604 – South San Antonio

  • Monday, April 26 until Thursday, April 29. 8 a.m. to 5 p.m. Single mainlane closures, in both directions, from FM 2790 to Benton City Rd. for roadway improvements.

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, April 25 until Monday, April 26. 9 p.m. to 5 a.m. Single northbound mainlane closure from Granada Dr. to Pat Booker Rd. for traffic switch.
  • Monday, April 26 until Tuesday, April 27. 9 p.m. to 5 a.m. Single northbound mainlane closure, including the exit ramp to I-35, from Pat Booker Rd. to I-35 for pavement pouring.

US 281 – North Central San Antonio/Bexar County

  • Saturday, April 24. 7 a.m. to 5 p.m. Southbound right lane closed at Overlook Parkway for sidewalk improvements.
  • Tuesday, April 27 until Friday, April 30. Nightly 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to Basse Rd. for overhead sign replacements.
  • Saturday, April 24 until Sunday, April 25. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, April 24 until Sunday, April 25. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, April 24 until Sunday, April 25. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, April 24 until Sunday, April 25. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, April 26 until Friday, April 30. Daily 7 a.m. until 9 p.m. Southbound frontage road closure of the south- to eastbound left turn lane at Evans Road for drainage work.
  • Monday, April 26 until Friday, April 30. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for painting operations.
  • Monday, April 26 until Friday, April 30. Daily 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for painting operations.
  • Monday, April 26 until Friday, April 30. Continuous 9 a.m. until 4 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for drainage work. DETOUR: Use westbound Evans Road to access the southbound US 281 frontage road.
  • Monday, April 26 until Friday, April 30. Continuous 9 a.m. until 4 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for drainage work. DETOUR: Use eastbound Evans Road to access the southbound US 281 frontage road.
  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for sign installation.
  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for sign installation.
  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, April 26 until Friday, April 30. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 1 until Sunday, May 2. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

Encino Rio – North Central San Antonio

  • Saturday, April 24. Weekend continuous 4 a.m. until 9 p.m. Alternating eastbound crossing closure at the US 281 intersection for conduit installation.
  • Saturday, April 24. Weekend continuous 4 a.m. until 9 p.m. Alternating westbound crossing closure at the US 281 intersection for conduit installation. 

Stone Oak Parkway – North Central San Antonio

  • Saturday, April 24. Weekend continuous 4 a.m. until 9 p.m. Alternating eastbound crossing closure at the US 281 intersection for conduit installation.
  • Saturday, April 24. Weekend continuous 4 a.m. until 9 p.m. Alternating westbound crossing closure at the US 281 intersection for conduit installation. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Friday, April 30 9 p.m. to Monday, May 3 5 a.m. Full mainlane closures, in both directions, from SH 46 to Scenic Loop Road for bridge demolition. DETOUR: Traffic will be directed to frontage roads.
  • Monday, April 26 until Friday, April 30. 7:30 a.m. to 5:30 p.m. Alternating mainlane closures, in both directions, from mile marker 510 to mile marker 517 for guardrail improvements.
  • Wednesday, April 28 until Friday, April 30. 7:30 a.m. to 5:30 p.m. Single mainlane closures, in both directions, from one mile east of Frederick’s Creek to one mile west of Frederick’s Creek for bridge pouring. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, April 24. 6 a.m. to 8 a.m. Full mainlane closures, in both directions, from FM 1516 to Weichold Rd. for bridge work.
  • Saturday, April 24 6 a.m. until Sunday, April 25 9 p.m. Full westbound mainlane closure and single eastbound mainlane closure from FM 1516 to Weichold Rd. for bridge work.
  • Sunday, April 25 until Saturday, May 1. Single mainlane closure, in both directions, from Loop 1604 to Saltrillo Creek for hauling in material.
  • Current until Friday, April 30. Eastbound entrance ramp from FM 2538 closed.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, April 24. 9 a.m. to 5:30 p.m. Single northbound mainlane closure from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, April 24. 9 a.m. to 5:30 p.m. Single left lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, April 24. 9 a.m. to 5:30 p.m. Single left lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Current until Saturday, April 24. 9 a.m. to 5:30 p.m. Single right lane closure on southbound frontage road from FM 1103 to FM 2252 for storm drain installation.
  • Sunday, April 25 until Tuesday, April 27. Nightly 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from US 90 to Olympia Parkway for overhead sign replacement.
  • Monday, April 26 until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to FM 2252 for haul off materials.
  • Monday, April 26 until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul off.
  • Monday, April 26 until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul off.
  • Monday, April 26 until Saturday, May 1. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, April 26 until Thursday, April 29. 9 p.m. to 5 a.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Sunday, April 25 until Thursday, April 29. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to FM 1103 for road improvements. 

US 90 – Central/West San Antonio

  • Current until Friday, April 30. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Marian St. to Nogalitos St. for excavation work. 

I-410 – West San Antonio

  • Current until Monday, April 26. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Monday, April 26. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, April 26. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads until W. Military Dr. for underground work.
  • Current until Monday, April 26. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: traffic will be directed to frontage roads.
  • Current until Monday, April 26. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
  • Current until Monday, April 26. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Current until Monday, April 26. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Loop 410 to Ingram Rd. for underground box installation.
  • Monday, April 26 until Tuesday, April 27. 9 a.m. to 4 p.m. Single southbound mainlane closure from Marbach Rd. to US 90 for installation of metal beam guard fence. 
  • Monday, April 26 until Monday, May 3. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 
  • Monday, April 26 until Monday, May 3. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work. 
  • Monday, April 26 until Monday, May 3. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Ingram Rd. to Culebra Rd. for bridge work. 
  • Monday, April 26 until Monday, May 3. 8 a.m. to 5 p.m. Single southbound mainlane closure from N.W. Crossroads to W. Military Dr. for underground work. 
  • Monday, April 26 until Monday, May 3. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to SH 151 for bridge work. 
  • Monday, April 26 until Monday, May 3. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work. 
  • Monday, April 26 until Monday, May 3. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work. 
  • Monday, April 26 until Monday, May 3. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Ingram Rd. to Culebra Rd. for traffic signal work. 

SH 151 – West San Antonio

  • Current until Monday, April 26. 9 a.m. to 3 p.m. Eastbound to westbound turnaround at Loop 410 closed for bridge work.
  • Current until Monday, April 26. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 
  • Monday, April 26 until Monday, May 3. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work. 
  • Monday, April 26 until Monday, May 3. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

Alamo Ranch Parkway – West Bexar County

  • Monday, April 26 until Friday, April 30. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from Loop 1604 to Lone Star Parkway for bridge construction.
  • Monday, May 3 until Friday, May 7. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from Loop 1604 to Lone Star Parkway for bridge construction.  

FM 1535 – N.W. Military Highway

  • Current until Friday, April 30. Single northbound right lane closure from just south of Wagon Trail to Pond Hill Rd. for utility work.  

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.  

Loop 13 – Military Drive

  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements.
  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from S. New Braunfels Ave. to Alsbrook Dr. for sidewalk improvements. 

Culebra Road – San Antonio

  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from Rogers Rd. to Easterline for sidewalk improvements.  

FM 1957 – Potranco Road

  • Bexar County Improvement Project. Monday, April 19 until Saturday, April 24. 9 a.m. to 4 p.m. Eastbound lane closure at the intersection of SH 211 for barrier setting. 

Other Roads – Bexar County

  • Hildebrand Ave. Current until Friday, April 30. 9 a.m. to 4 p.m. Single lane closures, in both directions, from Brackenridge Rd. to Devine Rd. for construction of left turn lane.

Friday, April 16

UPCOMING SCHEUDLED CONSTRUCTION LANE CLOSURES



Loop 1604 – North Central San Antonio

  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the southbound US 281 direct connector ramp for sign installation. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the southbound US 281 direct connector ramp for sign installation. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road. 

Loop 1604 – South San Antonio

  • Monday, April 19 until Thursday, April 22. 8 a.m. to 5 p.m. Single mainlane closure, in both directions, from just south of FM 2790 to Benton City Rd. for maintainer work. 

Loop 1604 – North East San Antonio/Bexar County

  • Tuesday, April 20 until Wednesday, April 21. 9 a.m. to 4 p.m. Northbound to southbound turnaround at Pat Booker Rd. closed for rubble removal.
  • Thursday, April 22 until Friday, April 23. 9 p.m. to 5 a.m. Single northbound mainlane closure, including exit ramp to I-35, from Pat Booker Rd. to I-35 for paving operations. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, April 17 until Sunday, April 18. 6 a.m. to 10 a.m. Full closure of Ramblewood St. at US 281 intersection for grading work.
  • Saturday, April 17. 7 a.m. to 5 p.m. Southbound right lane closed at Overlook Parkway for sidewalk improvements.
  • Monday, April 19. 9 a.m. to 4 p.m. Eastbound lanes of Borgfeld Rd. closed at US 281 intersection for sidewalk improvements.
  • Saturday, April 24. 7 a.m. to 5 p.m. Southbound right lane closed at Overlook Parkway for sidewalk improvements.
  • Friday, April 16 until Sunday, April 18. Weekend continuous 9 p.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Friday, April 16 until Sunday, April 18. Weekend continuous 9 p.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, April 19 until Friday, April 23. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for painting operations.
  • Monday, April 19 until Friday, April 23. Daily 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for painting operations.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Right lane northbound frontage road closure from Encino Rio to Evans Road for concrete paving.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for sign installation.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for sign installation.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, April 19 until Friday, April 23. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Friday, April 23 until Saturday, April 24. Weekend overnight 9 p.m. until 5 a.m. Full southbound frontage road closure from Stone Oak Parkway to Evans Road for asphalt paving. DETOUR: Use the southbound US 281 mainlanes and take the US 281 Evans Road exit ramp.
  • Saturday, April 24 until Monday, April 26. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, April 24 until Monday, April 26. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

Encino Rio – North Central San Antonio

  • Saturday, April 24 until Monday, April 26. Weekend continuous 3 a.m. until 5 a.m. Alternating eastbound crossing closure at the US 281 intersection for conduit installation.
  • Saturday, April 24 until Monday, April 26. Weekend continuous 3 a.m. until 5 a.m. Alternating westbound crossing closure at the US 281 intersection for conduit installation. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Monday, April 19 until Wednesday, April 21. 7:30 a.m. to 5:30 p.m. Left mainlane closures, in both directions, at Frederick’s Creek for bridge pouring.
  • Monday, April 19 until Friday, April 23. 7:30 a.m. to 5:30 p.m. Alternating mainlane closures, in both directions, from mile marker 518 to mile marker 521 for guardrail replacement.
  • Monday, April 19 until Friday, April 23. 7:30 a.m. to 5:30 p.m. Alternating mainlane closures, in both directions, from mile marker 508 to mile marker 514 for guardrail improvements. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, April 17 until Sunday, April 18. 3 a.m. to 9 p.m. Full closure of mainlanes, in both directions, from Graytown Rd. to Loop 1604 for girder setting on the Saltillo Bridge. DETOUR: Traffic will be detoured to frontage roads.
  • Current until Friday, April 30. Eastbound entrance ramp from FM 2538 closed.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.  

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, April 17. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Current until Saturday, April 17. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for material haul-off.  
  • Monday, April 19 until Saturday, April 24. 9 a.m. to 5:30 p.m. Single northbound mainlane closure from FM 2252 to FM 1103 for material haul-off.
  • Monday, April 19 until Saturday, April 24. 9 a.m. to 5:30 p.m. Single left lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, April 19 until Saturday, April 24. 9 a.m. to 5:30 p.m. Single left lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, April 19 until Saturday, April 24. 9 a.m. to 5:30 p.m. Single right lane closure on southbound frontage road from FM 1103 to FM 2252 for storm drain installation.  

I-35 – South San Antonio/Bexar County

  • Current until Friday, April 23. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from Loop 1604 to Somerset Rd. for road repairs.
  • Current until Friday, April 23. 9 p.m. to 5 a.m. Single southbound mainlane closure from Loop 410 to Loop 1604 in south Bexar County for road repairs.
  • Current until Friday, April 23. 7 p.m. to 7 a.m. Single lane closure on southbound frontage road from Fischer Rd. to Benton City Rd. for road repairs.
  • Current until Friday, April 23. 7 p.m. to 7 a.m. Single lane closure on northbound frontage road from Quarter Horse Rd. to Rife Ln. for road repairs.   

US 90 – Central/West San Antonio

  • Current until Friday, April 30. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Marian St. to Nogalitos St. for excavation work.  

I-410 – West San Antonio

  • Saturday, April 17. 8 a.m. to 3 p.m. Northbound entrance ramp from W. Military Dr. closed, including the southbound to northbound turnaround, for conduit work.
  • Current until Monday, April 19. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road at Ingram Rd for installation of underground boxes.
  • Current until Monday, April 19. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Monday, April 19. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, April 19. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail work.
  • Current until Monday, April 19. Nightly 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Current until Monday, April 19. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
  • Current until Monday, April 19. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, April 19 until Monday, April 26. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, April 19 until Monday, April 26. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, April 19 until Monday, April 26. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads until W. Military Dr. for underground work.
  • Monday, April 19 until Monday, April 26. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: traffic will be directed to frontage roads.
  • Monday, April 19 until Monday, April 26. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
  • Monday, April 19 until Monday, April 26. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, April 19 until Monday, April 26. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Loop 410 to Ingram Rd. for underground box installation.
  • Monday, April 26 until Tuesday, April 27. 9 a.m. to 4 p.m. Single southbound mainlane closure from Marbach Rd. to US 90 for installation of metal beam guard fence. 

SH 151 – West San Antonio

  • Saturday, April 17. 4 a.m. to 8 p.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, April 19. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Current until Monday, April 19. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Thursday, April 22. 9 p.m. to 5 a.m. Full eastbound mainlane closure from Wiseman Blvd. to Hunt Ln. for inlay work.
  • Current until Thursday, April 22. 9 p.m. to 5 a.m. Full westbound mainlane closure from Hunt Ln. to Wiseman Blvd. for inlay work.
  • Monday, April 19 until Monday, April 26. 9 a.m. to 3 p.m. Eastbound to westbound turnaround at Loop 410 closed for bridge work.
  • Monday, April 19 until Monday, April 26. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

Alamo Ranch Parkway – West Bexar County

  • Monday, April 19 until Friday, April 23. 9 a.m. to 3 p.m. Single westbound mainlane closure from Loop 1604 to Lonestar Parkway for construction work.  

FM 1535 – N.W. Military Highway

  • Current until Friday, April 30. Single northbound right lane closure from just south of Wagon Trail to Pond Hill Rd. for utility work.   

PA 1502 – Wurzbach Parkway

  • Friday, April 16 until Monday, April 19. 9 p.m. to 5 a.m. Full weekend closure of Wurzbach Parkway from N.W. Military Highway to Blanco Rd. for bridge work. DETOUR: Traffic will be directed to West Ave. and Lockhill Selma Rd.
  • Monday, April 19 until Friday, April 23. Nightly 8 p.m. to 6 a.m. Full closure of Wurzbach Parkway from N.W. Military Highway to Blanco Rd. for bridge work.   

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and
  • Walzem Road for barrier setting work and road rehab work. 

Loop 13 – Military Drive

  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements.
  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from S. New Braunfels Ave. to Alsbrook Dr. for sidewalk improvements.  

Culebra Road – San Antonio

  • Current until Friday, April 30. 8:30 a.m. to 3:30 p.m. Single eastbound mainlane closure from Rogers Rd. to Easterline for sidewalk improvements.  

SH 211 – Bexar County

  • Bexar County Improvement Project. Monday, April 19 until Saturday, April 24. 9 a.m. to 4 p.m. Northbound right lane closure from just south of FM 1957 to the intersection of FM 1957 for barrier setting.  

FM 1957 – Potranco Road

  • Bexar County Improvement Project. Monday, April 19 until Saturday, April 24. 9 a.m. to 4 p.m. Eastbound lane closure at the intersection of SH 211 for barrier setting.  

Other Roads – Bexar County

  • Hildebrand Ave. Current until Friday, April 30. 9 a.m. to 4 p.m. Single lane closures, in both directions, from Brackenridge Rd. to Devine Rd. for construction of left turn lane.  

FM 306 – Comal County

  • Sunday, April 18 until Monday, April 19. 8:30 p.m. to 5 a.m. Double mainlane closures, in both directions, from Town Center Dr. to H-E-B driveway for barrier movement.